10 C.F.R. Subpart A—Early Site Permits


Title 10 - Energy


Title 10: Energy
PART 52—EARLY SITE PERMITS; STANDARD DESIGN CERTIFICATIONS; AND COMBINED LICENSES FOR NUCLEAR POWER PLANTS

Browse Next

Subpart A—Early Site Permits

§ 52.11   Scope of subpart.

This subpart sets out the requirements and procedures applicable to Commission issuance of early site permits for approval of a site or sites for one or more nuclear power facilities separate from the filing of an application for a construction permit or combined license for such a facility.

§ 52.13   Relationship to subpart F of 10 CFR part 2 and appendix Q of this part.

The procedures of this subpart do not replace those set out in subpart F of 10 CFR part 2 or appendix Q of this part. Subpart F applies only when early review of site suitability issues is sought in connection with an appliction for a permit to construct certain power facilities. Appendix Q applies only when NRC staff review of one or more site suitability issues is sought separately from and prior to the submittal of a construction permit. A Staff Site Report issued under appendix Q in no way affects the authority of the Commission or the presiding officer in any proceeding under subpart F or G of 10 CFR part 2. Subpart A applies when any person who may apply for a construction permit under 10 CFR part 50 or for a combined license under 10 CFR part 52 seeks an early site permit from the Commission separately from an application for a construction permit or a combined license for a facility.

§ 52.15   Filing of applications.

(a) Any person who may apply for a construction permit under 10 CFR part 50, or for a combined license under 10 CFR part 52, may file with the Director of Nuclear Reactor Regulation an application for an early site permit. An application for an early site permit may be filed notwithstanding the fact that an application for a construction permit or a combined license has not been filed in connection with the site or sites for which a permit is sought.

(b) The application must comply with the filing requirements of 10 CFR 50.30 (a), (b), and (f) as they would apply to an application for a construction permit. The following portions of §50.4, which is referenced by §50.30(a)(1), are applicable: paragraphs (a), (b) (1)–(3), (c), (d), and (e).

§ 52.17   Contents of applications.

(a)(1) The application must contain the information required by §50.33 (a) through (d), the information required by §50.34 (a)(12) and (b)(10), and to the extent approval of emergency plans is sought under paragraph (b)(2)(ii) of this section, the information required by §50.33 (g) and (j), and §50.34 (b)(6)(v) of this chapter. The application must also contain a description and safety assessment of the site on which the facility is to be located. The assessment must contain an analysis and evaluation of the major structures, systems, and components of the facility that bear significantly on the acceptability of the site under the radiological consequence evaluation factors identified in §50.34(a)(1) of this chapter. Site characteristics must comply with part 100 of this chapter. In addition, the application should describe the following:

(i) The number, type, and thermal power level of the facilities for which the site may be used;

(ii) The boundaries of the site;

(iii) The proposed general location of each facility on the site;

(iv) The anticipated maximum levels of radiological and thermal effluents each facility will produce;

(v) The type of cooling systems, intakes, and outflows that may be associated with each facility;

(vi) The seismic, meteorological, hydrologic, and geologic characteristics of the proposed site;

(vii) The location and description of any nearby industrial, military, or transportation facilities and routes; and

(viii) The existing and projected future population profile of the area surrounding the site.

(2) A complete environmental report as required by 10 CFR 51.45 and 51.50 must be included in the application, provided, however, that such environmental report must focus on the environmental effects of construction and operation of a reactor, or reactors, which have characteristics that fall within the postulated site parameters, and provided further that the report need not include an assessment of the benefits (for example, need for power) of the proposed action, but must include an evaluation of alternative sites to determine whether there is any obviously superior alternative to the site proposed.

(b)(1) The application must identify physical characteristics unique to the proposed site, such as egress limitations from the area surrounding the site, that could pose a significant impediment to the development of emergency plans.

(2) The application may also either:

(i) Propose major features of the emergency plans, such as the exact sizes of the emergency planning zones, that can be reviewed and approved by NRC in consultation with FEMA in the absence of complete and integrated emergency plans; or

(ii) Propose complete and integrated emergency plans for review and approval by the NRC, in consultation with the Federal Emergency Management Agency, in accord with the applicable provisions of 10 CFR 50.47.

(3) Under paragraphs (b) (1) and (2)(i) of this section, the application must include a description of contacts and arrangements made with local, state, and federal governmental agencies with emergency planning responsibilities. Under the option set forth in paragraph (b)(2)(ii) of this section, the applicant shall make good faith efforts to obtain from the same governmental agencies certifications that: (i) The proposed emergency plans are practicable; (ii) These agencies are committed to participating in any further development of the plans, including any required field demonstrations, and (iii) that these agencies are committed to executing their responsibilities under the plans in the event of an emergency. The application must contain any certifications that have been obtained. If these certifications cannot be obtained, the application must contain information, including a utility plan, sufficient to show that the proposed plans nonetheless provide reasonable assurance that adequate protective measures can and will be taken, in the event of a radiological emergency at the site.

(c) If the applicant wishes to be able to perform, after grant of the early site permit, the activities at the site allowed by 10 CFR 50.10(e)(1) without first obtaining the separate authorization required by that section, the applicant shall propose, in the early site permit, a plan for redress of the site in the event that the activities are performed and the site permit expires before it is referenced in an application for a construction permit or a combined license issued under subpart C of this part. The application must demonstrate that there is reasonable assurance that redress carried out under the plan will achieve an environmentally stable and aesthetically acceptable site suitable for whatever non-nuclear use may conform with local zoning laws.

[54 FR 15386, Sept. 18, 1989, as amended at 61 FR 65175, Dec. 11, 1996]

§ 52.18   Standards for review of applications.

Applications filed under this subpart will be reviewed according to the applicable standards set out in 10 CFR part 50 and its appendices and part 100 as they apply to applications for construction permits for nuclear power plants. In particular, the Commission shall prepare an environmental impact statement during review of the application, in accordance with the applicable provisions of 10 CFR part 51, provided, however, that the draft and final environmental impact statements prepared by the Commission focus on the environmental effects of construction and operation of a reactor, or reactors, which have characteristics that fall within the postulated site parameters, and provided further that the statements need not include an assessment of the benefits (for example, need for power) of the proposed action, but must include an evaluation of alternative sites to determine whether there is any obviously superior alternative to the site proposed. The Commission shall determine, after consultation with the Federal Emergency Management Agency, whether the information required of the applicant by §52.17(b)(1) shows that there is no significant impediment to the development of emergency plans, whether any major features of emergency plans submitted by the applicant under §52.17(b)(2)(i) are acceptable, and whether any emergency plans submitted by the applicant under §52.17(b)(2)(ii) provide reasonable assurance that adequate protective measures can and will be taken in the event of a radiological emergency.

§ 52.19   Permit and renewal fees.

The fees charged for the review of an application for the initial issuance or renewal of an early site permit are set forth in 10 CFR 170.21 and shall be paid in accordance with 10 CFR 170.12.

[56 FR 31499, July 10, 1991]

§ 52.21   Hearings.

An early site permit is a partial construction permit and is therefore subject to all procedural requirements in 10 CFR part 2 which are applicable to construction permits, including the requirements for docketing in §2.101(a)(1)-(4), and the requirements for issuance of a notice of hearing in §§2.104(a), (b)(1)(iv) and (v), (b)(2) to the extent it runs parallel to (b)(1)(iv) and (v), and (b)(3), provided that the designated sections may not be construed to require that the environmental report or draft or final environmental impact statement include an assessment of the benefits of the proposed action. In the hearing, the presiding officer shall also determine whether, taking into consideration the site criteria contained in 10 CFR part 100, a reactor, or reactors, having characteristics that fall within the parameters for the site can be constructed and operated without undue risk to the health and safety of the public. All hearings conducted on applications for early site permits filed under this part are governed by the procedures contained in subparts C, G and L of part 2 of this chapter.

[69 FR 2277, Jan. 14, 2004]

§ 52.23   Referral to the ACRS.

The Commission shall refer a copy of the application to the Advisory Committee on Reactor Safeguards (ACRS). The ACRS shall report on those portions of the application which concern safety.

§ 52.24   Issuance of early site permit.

After conducting a hearing under §52.21 of this subpart and receiving the report to be submitted by the Advisory Committee on Reactor Safeguards under §52.23 of this subpart, and upon determining that an application for an early site permit meets the applicable standards and requirements of the Atomic Energy Act and the Commission's regulations, and that notifications, if any, to other agencies or bodies have been duly made, the Commission shall issue an early site permit, in the form and containing the conditions and limitations, as the Commission deems appropriate and necessary.

§ 52.25   Extent of activities permitted.

(a) If an early site permit contains a site redress plan, the holder of the permit, or the applicant for a construction permit or combined license who references the permit, may perform the activities at the site allowed by 10 CFR 50.10(e)(1) without first obtaining the separate authorization required by that section, provided that the final environmental impact statement prepared for the permit has concluded that the activities will not result in any significant adverse environmental impact which cannot be redressed.

(b) If the activities permitted by paragraph (a) of this section are performed at any site for which an early site permit has been granted, and the site is not referenced in an application for a construction permit or a combined license issued under subpart C of this part while the permit remains valid, then the early site permit must remain in effect solely for the purpose of site redress, and the holder of the permit shall redress the site in accordance with the terms of the site redress plan required by §52.17(c). If, before redress is complete, a use not envisaged in the redress plan is found for the site or parts thereof, the holder of the permit shall carry out the redress plan to the greatest extent possible consistent with the alternate use.

§ 52.27   Duration of permit.

(a) Except as provided in paragraph (b) of this section, an early site permit issued under this subpart may be valid for not less than ten nor more than twenty years from the date of issuance.

(b)(1) An early site permit continues to be valid beyond the date of expiration in any proceeding on a construction permit application or a combined license application which references the early site permit and is docketed either before the date of expiration of the early site permit, or, if a timely application for renewal of the permit has been filed, before the Commission has determined whether to renew the permit.

(2) An early site permit also continues to be valid beyond the date of expiration in any proceeding on an operating license application which is based on a construction permit which references the early site permit, and in any hearing held under §52.103 of this part before operation begins under a combined license which references the early site permit.

(c) An applicant for a construction permit or combined license may, at its own risk, reference in its application a site for which an early site permit application has been docketed but not granted.

§ 52.29   Application for renewal.

(a) Not less than twelve nor more than thirty-six months prior to the end of the initial twenty-year period, or any later renewal period, the permit holder may apply for a renewal of the permit. An application for renewal must contain all information necessary to bring up to date the information and data contained in the previous application.

(b) Any person whose interests may be affected by renewal of the permit may request a hearing on the application for renewal. The request for a hearing must comply with 10 CFR 2.309. If a hearing is granted, notice of the hearing will be published in accordance with 10 CFR 2.309.

(c) An early site permit, either original or renewed, for which a timely application for renewal has been filed, remains in effect until the Commission has determined whether to renew the permit. If the permit is not renewed, it continues to be valid in certain proceedings in accordance with the provisions of §52.27(b).

(d) The Commission shall refer a copy of the application for renewal to the Advisory Committee on Reactor Safeguards (ACRS). The ACRS shall report on those portions of the application which concern safety and shall apply the criteria set forth in §52.31.

[54 FR 15386, Apr. 18, 1989, as amended at 69 FR 2277, Jan. 14, 2004]

§ 52.31   Criteria for renewal.

(a) The Commission shall grant the renewal if the Commission determines that the site complies with the Atomic Energy Act and the Commission's regulations and orders applicable and in effect at the time the site permit was originally issued, and any new requirements the Commission may wish to impose after a determination that there is a substantial increase in overall protection of the public health and safety or the common defense and security to be derived from the new requirements and that the direct and indirect costs of implementation of those requirements are justified in view of this increased protection.

(b) A denial of renewal on this basis does not bar the permit holder or another applicant from filing a new application for the site which proposes changes to the site or the way in which it is used which correct the deficiencies cited in the denial of the renewal.

§ 52.33   Duration of renewal.

Each renewal of an early site permit may be for not less than ten nor more than twenty years.

§ 52.35   Use of site for other purposes.

A site for which an early site permit has been issued under this subpart may be used for purposes other than those described in the permit, including the location of other types of energy facilities. The permit holder shall inform the Director of Nuclear Reactor Regulation of any significant uses for the site which have not been approved in the early site permit. The information about the activities must be given to the Director in advance of any actual construction or site modification for the activities. The information provided could be the basis for imposing new requirements on the permit, in accordance with the provisions of §52.39. If the permit holder informs the Director that the holder no longer intends to use the site for a nuclear power plant, the Director shall terminate the permit.

§ 52.37   Reporting of defects and noncompliance; revocation, suspension, modification of permits for cause.

For purposes of part 21 and 10 CFR 50.100, an early site permit is a construction permit.

§ 52.39   Finality of early site permit determinations.

(a)(1) Notwithstanding any provision in 10 CFR 50.109, while an early site permit is in effect under §§52.27 or 52.33 the Commission may not impose new requirements, including new emergency planning requirements, on the early site permit or the site for which it was issued, unless the Commission determines that a modification is necessary either to bring the permit or the site into compliance with the Commission's regulations and orders applicable and in effect at the time the permit was issued, or to assure adequate protection of the public health and safety or the common defense and security.

(2) In making the findings required for issuance of a construction permit, operating license, or combined license, or the findings required by §52.103 of this part, if the application for the construction permit, operating license, or combined license references an early site permit, the Commission shall treat as resolved those matters resolved in the proceeding on the application for issuance or renewal of the early site permit, unless a contention is admitted that a reactor does not fit within one or more of the site parameters included in the site permit, or a petition is filed which alleges either that the site is not in compliance with the terms of the early site permit, or that the terms and conditions of the early site permit should be modified.

(i) A contention that a reactor does not fit within one or more of the site parameters included in the site permit may be litigated in the same manner as other issues material to the proceeding.

(ii) A petition alleging that the site is not in compliance with the terms of the early site permit must include, or clearly reference, official NRC documents, documents prepared by or for the permit holder, or evidence admissible in a proceeding under subpart C of 10 CFR part 2, which show, prima facie, that the acceptance criteria have not been met. The permit holder and NRC staff may file answers to the petition within the time specified in 10 CFR 2.323 for answers to motions by parties and staff. If the Commission, in its judgment, decides, on the basis of the petitions and any answers thereto, that the petition meets the requirements of this paragraph, that the issues are not exempt from adjudication under 5 U.S.C. 554(a)(3), that genuine issues of material fact are raised, and that settlement or other informal resolution of the issues is not possible, then the genuine issues of material fact raised by the petition must be resolved in accordance with the provisions in 5 U.S.C. 554, 556, and 557 which are applicable to determining applications for initial licenses.

(iii) A petition which alleges that the terms and conditions of the early site permit should be modified will be processed in accord with 10 CFR 2.206. Before construction commences, the Commission shall consider the petition and determine whether any immediate action is required. If the petition is granted, then an appropriate order will be issued. Construction under the construction permit or combined license will not be affected by the granting of the petition unless the order is made immediately effective.

(iv) Prior to construction, the Commission shall find that the terms of the early site permit have been met.

(b) An applicant for a construction permit, operating license, or combined license who has filed an application referencing an early site permit issued under this subpart may include in the application a request for a variance from one or more elements of the permit. In determining whether to grant the variance, the Commission shall apply the same technically relevant criteria as were applicable to the application for the original or renewed site permit. Issuance of the variance must be subject to litigation during the construction permit, operating license, or combined license proceeding in the same manner as other issues material to those proceedings.

[54 FR 15386, Apr. 18, 1989, as amended at 69 FR 2277, Jan. 14, 2004]

Browse Next









































































chanrobles.com





ChanRobles Legal Resources:

ChanRobles On-Line Bar Review

ChanRobles Internet Bar Review : www.chanroblesbar.com

ChanRobles MCLE On-line

ChanRobles Lawnet Inc. - ChanRobles MCLE On-line : www.chanroblesmcleonline.com