10 C.F.R. § 205.301 Time of filing.
Title 10 - Energy
Each application should be made at least six months in advance of the initiation of the proposed electricity export, except when otherwise permitted by the ERA to resolve an emergency situation.
Title 10: Energy
PART 205—ADMINISTRATIVE PROCEDURES AND SANCTIONS
Subpart W—Electric Power System Permits and Reports; Applications; Administrative Procedures and Sanctions
Application for Authorization to Transmit Electric Energy to a Foreign Country
§ 205.301 Time of filing.