10 C.F.R. § 830.206 Preliminary documented safety analysis.
Title 10 - Energy
If construction begins after December 11, 2000, the contractor responsible for a hazard category 1, 2, or 3 new DOE nuclear facility or a major modification to a hazard category 1, 2, or 3 DOE nuclear facility must: (a) Prepare a preliminary documented safety analysis for the facility, and (b) Obtain DOE approval of: (1) The nuclear safety design criteria to be used in preparing the preliminary documented safety analysis unless the contractor uses the design criteria in DOE Order 420.1, Facility Safety; and (2) The preliminary documented safety analysis before the contractor can procure materials or components or begin construction; provided that DOE may authorize the contractor to perform limited procurement and construction activities without approval of a preliminary documented safety analysis if DOE determines that the activities are not detrimental to public health and safety and are in the best interests of DOE.
Title 10: Energy
PART 830—NUCLEAR SAFETY MANAGEMENT
Subpart B—Safety Basis Requirements
§ 830.206 Preliminary documented safety analysis.