10 C.F.R. § 963.15 Postclosure suitability determination.
Title 10 - Energy
DOE will apply the method and criteria described in §§963.16 and 963.17 to evaluate the suitability of the Yucca Mountain site for the postclosure period. If DOE finds that the results of the total system performance assessments conducted under §963.16 show that the Yucca Mountain site is likely to meet the applicable radiation protection standard, DOE may determine the site suitable for the postclosure period.
Title 10: Energy
PART 963—YUCCA MOUNTAIN SITE SUITABILITY GUIDELINES
Subpart B—Site Suitability Determination, Methods, and Criteria
§ 963.15 Postclosure suitability determination.