18 C.F.R. Subpart C—Other Filing Requirements


Title 18 - Conservation of Power and Water Resources


Title 18: Conservation of Power and Water Resources
PART 35—FILING OF RATE SCHEDULES AND TARIFFS

Browse Previous |  Browse Next

Subpart C—Other Filing Requirements

§ 35.14   Fuel cost and purchased economic power adjustment clauses.

(a) Fuel adjustment clauses which are not in conformity with the principles set out below are not in the public interest. These regulations contemplate that the filing of proposed rate schedules which embody fuel clauses failing to conform to the following principles may result in suspension of those parts of such rate schedules:

(1) The fuel clause shall be of the form that provides for periodic adjustments per kWh of sales equal to the difference between the fuel and purchased economic power costs per kWh of sales in the base period and in the current period:

Adjustment Factor =Fm/Sm-Fb/Sb

Where: F is the expense of fossil and nuclear fuel and purchased economic power in the base (b) and current (m) periods; and S is the kWh sales in the base and current periods, all as defined below.

(2) Fuel and purchased economic power costs (F) shall be the cost of:

(i) Fossil and nuclear fuel consumed in the utility's own plants, and the utility's share of fossil and nuclear fuel consumed in jointly owned or leased plants.

(ii) The actual identifiable fossil and nuclear fuel costs associated with energy purchased for reasons other than identified in paragraph (a)(2)(iii) of this section.

(iii) The total cost of the purchase of economic power, as defined in paragraph (a)(11) of this section, if the reserve capacity of the buyer is adequate independent of all other purchases where non-fuel charges are included in either Fb or Fm;

(iv) Energy charges for any purchase if the total amount of energy charges incurred for the purchase is less than the buyer's total avoided variable cost;

(v) And less the cost of fossil and nuclear fuel recovered through all inter-system sales.

(3) Sales (S) must be all kWh's sold, excluding inter-system sales. Where for any reason, billed system sales cannot be coordinated with fuel costs for the billing period, sales may be equated to the sum of: (i) Generation, (ii) purchases, (iii) exchange received, less (iv) energy associated with pumped storage operations, less (v) inter-system sales referred to in paragraph (a)(2)(iv) of this section, less (vi) total system losses.

(4) The adjustment factor developed according to this procedure shall be modified to properly allow for losses (estimated if necessary) associated only with wholesale sales for resale.

(5) The adjustment factor developed according to this procedure may be further modified to allow the recovery of gross receipts and other similar revenue based tax charges occasioned by the fuel adjustment revenues.

(6) The cost of fossil fuel shall include no items other than those listed in Account 151 of the Commission's Uniform System of Accounts for Public Utilities and Licensees. The cost of nuclear fuel shall be that as shown in Account 518, except that if Account 518 also contains any expense for fossil fuel which has already been included in the cost of fossil fuel, it shall be deducted from this account. (Paragraph C of Account 518 includes the cost of other fuels used for ancillary steam facilities.)

(7) Where the cost of fuel includes fuel from company-owned or controlled1 sources, that fact shall be noted and described as part of any filing. Where the utility purchases fuel from a company-owned or controlled source, the price of which is subject to the jurisdiction of a regulatory body, and where the price of such fuel has been approved by that regulatory body, such costs shall be presumed, subject to rebuttal, to be reasonable and includable in the adjustment clause. If the current price, however, is in litigation and is being collected subject to refund, the utility shall so advise the Commission and shall keep a separate account of such amounts paid which are subject to refund, and shall advise the Commission of the final disposition of such matter by the regulatory body having jurisdiction. With respect to the price of fuel purchases from company-owned or controlled sources pursuant to contracts which are not subject to regulatory authority, the utility company shall file such contracts and amendments thereto with the Commission for its acceptance at the time it files its fuel clause or modification thereof. Any subsequent amendment to such contracts shall likewise be filed with the Commission as a rate schedule change and may be subject to suspension under section 205 of the Federal Power Act. Fuel charges by affiliated companies which do not appear to be reasonable may result in the suspension of the fuel adjustment clause or cause an investigation thereof to be made by the Commission on its own motion under section 206 of the Federal Power Act.

1 As defined in the Commission's Uniform System of Accounts 18 CFR part 101, Definitions 5B.

(8) All rate filings which contain a proposed new fuel clause or a change in an existing fuel clause shall conform such clauses with the regulations. Within one year of the effectiveness of this rulemaking, all public utilities with rate schedules that contain a fuel clause should conform such clauses with the regulations. Recognizing that individual public utilities may have special operating characteristics that may warrant granting temporary delays in the implementation of the regulations, the Commission may, upon showing of good cause, waive the requirements of this section of the regulations for an additional one-year period so as to permit the public utilities sufficient time to adjust to the requirements.

(9) All rate filings containing a proposed new fuel clause or change in an existing fuel clause shall include:

(i) A description of the fuel clause with detailed cost support for the base cost of fuel and purchased economic power or energy.

(ii) Full cost of service data unless the utility has had the rate approved by the Commission within a year, provided that such cost of service may not be required when an existing fuel cost adjustment clause is being modified to conform to the Commission's regulations.

(10) Whenever particular circumstances prevent the use of the standards provided for herein, or the use thereof would result in an undue burden, the Commission may, upon application under §385.207 of this chapter and for good cause shown, permit deviation from these regulations.

(11) For the purpose of paragraph (a)(2)(iii) of this section, the following definitions apply:

(i) Economic power is power or energy purchased over a period of twelve months or less where the total cost of the purchase is less than the buyer's total avoided variable cost.

(ii) Total cost of the purchase is all charges incurred in buying economic power and having such power delivered to the buyer's system. The total cost includes, but is not limited to, capacity or reservation charges, energy charges, adders, and any transmission or wheeling charges associated with the purchase.

(iii) Total avoided variable cost is all identified and documented variable costs that would have been incurred by the buyer had a particular purchase not been made. Such costs include, but are not limited to, those associated with fuel, start-up, shut-down or any purchases that would have been made in lieu of the purchase made.

(12) For the purpose of paragraph (a)(2)(iii) of this section, the following procedures and instructions apply:

(i) A utility proposing to include purchase charges other than those for fuel or energy in fuel and purchased economic power costs (F) under paragraph (a)(2)(iii) of this section shall amend its fuel cost adjustment clause so that it is consistent with paragraphs (a)(1) and (a)(2)(iii) of this section. Such amendment shall state the system reserve capacity criteria by which the system operator decides whether a reliability purchase is required. Where the utility filing the statement is required by a State or local regulatory body (including a plant site licensing board) to file a capacity criteria statement with that body, the system reserve capacity criteria in the statement filed with the Commission shall be identical to those contained in the statement filed with the State or local regulatory body. Any utility that changes its reserve capacity criteria shall, within 45 days of such change, file an amended fuel cost and purchased economic power adjustment clause to incorporate the new criteria.

(ii) Reserve capacity shall be deemed adequate if, at the time a purchase was initiated, the buyer's system reserve capacity criteria were projected to be satisfied for the duration of the purchase without the purchase at issue.

(iii) The total cost of the purchase must be projected to be less than total avoided variable cost, at the time a purchase was initiated, before any non-fuel purchase charge may be included in Fm.

(iv) The purchasing utility shall make a credit to Fm after a purchase terminates if the total cost of the purchase exceeds the total avoided variable cost. The amount of the credit shall be the difference between the total cost of the purchase and the total avoided variable cost. This credit shall be made in the first adjustment period after the end of the purchase. If a utility fails to make the credit in the first adjustment period after the end of the purchase, it shall, when making the credit, also include in Fm interest on the amount of the credit. Interest shall be calculated at the rate required by §35.19a(a)(2)(iii) of this chapter, and shall accrue from the date the credit should have been made under this paragraph until the date the credit is made.

(v) If a purchase is made of more capacity than is needed to satisfy the buyer's system reserve capacity criteria because the total costs of the extra capacity and associated energy are less than the buyer's total avoided variable costs for the duration of the purchase, the charges associated with the non-reliability portion of the purchase may be included in F.

(Approved by the Office of Management and Budget under control number 1902–0096)

(Federal Power Act, 16 U.S.C. 824d, 824e and 825h (1976 & Supp. IV 1980); Department of Energy Organization Act, 42 U.S.C. 7171, 7172 and 7173(c) (Supp. IV 1980); E.O. 12009, 3 CFR part 142 (1978); 5 U.S.C. 553 (1976))

[Order 271, 28 FR 10573, Oct. 2, 1963, as amended by Order 421, 36 FR 3047, Feb. 17, 1971; 39 FR 40583, Nov. 19, 1974; Order 225, 47 FR 19056, May 3, 1982; Order 352, 48 FR 55436, Dec. 13, 1983; 49 FR 5073, Feb. 10, 1984; Order 529, 55 FR 47321, Nov. 13, 1990; Order 600, 63 FR 53809, Oct. 7, 1998]

§ 35.15   Notices of cancellation or termination.

(a) General rule. When a rate schedule or part thereof required to be on file with the Commission is proposed to be cancelled or is to terminate by its own terms and no new rate schedule or part thereof is to be filed in its place, each party required to file the schedule shall notify the Commission of the proposed cancellation or termination on the form indicated in §131.53 of this chapter at least sixty days but not more than one hundred-twenty days prior to the date such cancellation or termination is proposed to take effect. A copy of such notice to the Commission shall be duly posted. With such notice each filing party shall submit a statement giving the reasons for the proposed cancellation or termination, and a list of the affected purchasers to whom the notice has been mailed. For good cause shown, the Commission may by order provide that the notice of cancellation or termination shall be effective as of a date prior to the date of filing or prior to the date the filing would become effective in accordance with these rules.

(b) Applicability. (1) The provisions of paragraph (a) of this section shall apply to all contracts for unbundled transmission service and all power sale contracts:

(i) Executed prior to July 9, 1996; or

(ii) If unexecuted, filed with the Commission prior to July 9, 1996.

(2) Any power sales contract executed on or after July 9, 1996 that is to terminate by its own terms shall not be subject to the provisions of paragraph (a) of this section.

(c) Notice. Any public utility providing jurisdictional services under a power sales contract that is not subject to the provisions of paragraph (a) of this section shall notify the Commission of the date of the termination of such contract within 30 days after such termination takes place.

[Order 888, 61 FR 21692, May 10, 1996]

§ 35.16   Notice of succession.

Whenever the name of a public utility is changed, or its operating control is transferred to another public utility in whole or in part, or a receiver or trustee is appointed to operate any public utility, the exact name of the public utility, receiver, or trustee which will operate the property thereafter shall be filed within 30 days thereafter with the Commission on the form indicated in §131.51 of this chapter.

§ 35.17   Changes relating to suspended rate schedules or parts thereof.4

4 See General Policy and Interpretations, §2.4, of this chapter.

(a) Withdrawal of suspended rate schedules or parts thereof. Where a rate schedule or part thereof has been suspended by the Commission, it may be withdrawn during the period of suspension only by special permission of the Commission granted upon application therefor and for good cause shown. If permitted to be withdrawn, any such rate schedule may be refiled with the Commission within a one-year period thereafter only with special permission of the Commission for good cause shown.

(b) Changes in suspended rate schedules or parts thereof. A public utility may not, within the period of suspension, file any change in a rate schedule or part thereof which has been suspended by order of the Commission except by special permission of the Commission granted upon application therefor and for good cause shown.

(c) Changes in rate schedules or parts thereof continued in effect and which were proposed to be changed by the suspended filing. A public utility may not, within the period of suspension, file any change in a rate schedule or part thereof continued in effect by operation of an order of suspension and which was proposed to be changed by the suspended filing, except by special permission of the Commission granted upon application therefor and for good cause shown.

§ 35.18   Asset retirement obligations.

(a) A public utility that files a rate schedule under §35.12 or §35.13 and has recorded an asset retirement obligation on its books must provide a schedule, as part of the supporting work papers, identifying all cost components related to the asset retirement obligations that are included in the book balances of all accounts reflected in the cost of service computation supporting the proposed rates. However, all cost components related to asset retirement obligations that would impact the calculation of rate base, such as electric plant and related accumulated depreciation and accumulated deferred income taxes, may not be reflected in rates and must be removed from the rate base calculation through a single adjustment.

(b) A public utility seeking to recover nonrate base costs related to asset retirement costs in rates must provide, with its filing under §35.12 or §35.13, a detailed study supporting the amounts proposed to be collected in rates.

(c) A public utility that has recorded asset retirement obligations on its books, but is not seeking recovery of the asset retirement costs in rates, must remove all asset-retirement-obligations-related cost components from the cost of service supporting its proposed rates.

[Order 631, 68 FR 19619, Apr. 21, 2003]

§ 35.19   Submission of information by reference.

If all or any portion of the information called for in this part has already been submitted to the Commission, substantially in the form prescribed above, specific reference thereto may be made in lieu of re-submission in response to the requirements of this part.

§ 35.19a   Refund requirements under suspension orders.

(a) Refunds. (1) The public utility whose proposed increased rates or charges were suspended shall refund at such time in such amounts and in such manner as required by final order of the Commission the portion of any increased rates or charges found by the Commission in that suspension proceeding not to be justified, together with interest as required in paragraph (a)(2) of this section.

(2) Interest shall be computed from the date of collection until the date refunds are made as follows:

(i) At a rate of seven percent simple interest per annum on all excessive rates or charges held prior to October 10, 1974;

(ii) At a rate of nine percent simple interest per annum on all excessive rates or charges held between October 10, 1974, and September 30, 1979; and

(iii)(A) At an average prime rate for each calendar quarter on all excessive rates or charges held (including all interest applicable to such rates or charges) on or after October 1, 1979. The applicable average prime rate for each calendar quarter shall be the arithmetic mean, to the nearest one-hundredth of one percent, of the prime rate values published in the Federal Reserve Bulletin, or in the Federal Reserve's “Selected Interest Rates” (Statistical Release G. 13), for the fourth, third, and second months preceeding the first month of the calendar quarter.

(B) The interest required to be paid under clause (iii)(A) shall be compounded quarterly.

(3) Any public utility required to make refunds pursuant to this section shall bear all costs of such refunding.

(b) Reports. Any public utility whose proposed increased rates or charges were suspended and have gone into effect pending final order of the Commission pursuant to section 205(e) of the Federal Power Act shall keep accurate account of all amounts received under the increased rates or charges which became effective after the suspension period, for each billing period, specifiying by whom and in whose behalf such amounts are paid.

[44 FR 53503, Sept. 14, 1979, as amended at 45 FR 3889, Jan. 21, 1980; Order 545, 57 FR 53990, Nov. 16, 1992]

§ 35.21   Applicability to licensees and others subject to section 19 or 20 of the Federal Power Act.

Upon further order of this Commission issued upon its own motion or upon complaint or request by any person or State within the meaning of sections 19 or 20 of the Federal Power Act, the provisions of §§35.1 through 35.19 shall be operative as to any licensee or others who are subject to this Commission's jurisdiction in respect to services and the rates and charges of payment therefor by reason of the requirements of sections 19 or 20 of the Federal Power Act. The requirement of this section for compliance with the provisions of §§35.1 through 35.19 shall be in addition to and independent of any obligation for compliance with those regulations by reason of the provisions of sections 205 and 206 of the Federal Power Act. For purposes of applying this section Electric Service as otherwise defined in §35.2(a) shall mean: Services to customers or consumers of power within the meaning of sections 19 or 20 of the Federal Power Act which may be comprised of various classes of capacity and energy and/or transmission services subject to the jurisdiction of this Commission. Electric Service shall include the utilization of facilities owned or operated by any licensee or others to effect any of the foregoing sales or services whether by leasing or other arrangements. As defined herein Electric Service is without regard to the form of payment or compensation for the sales or services rendered, whether by purchase and sale, interchange, exchange, wheeling charge, facilities charge, rental or otherwise. For purposes of applying this section, Rate Schedule as otherwise defined in §35.2(b) shall mean: A statement of

(1) Electric service as defined in this §35.21,

(2) Rates and charges for or in connection with that service, and

(3) All classifications, practices, rules, regulations, or contracts which in any manner affect or relate to the aforementioned service, rates and charges. This statement shall be in writing and may take the physical form of a contractual document, purchase or sale agreement, lease of facilities, tariff5 or other writing. Any oral agreement or understanding forming a part of such statement shall be reduced to writing and made a part thereof.

5 See footnote 1 to §35.2.

§ 35.22   Limits for percentage adders in rates for transmission services; revision of rate schedules.

(a) Applicability. This section applies to all electric rate schedules required to be filed under this part that are used for transactions in which the utility or system performs a transmission or purchase and resale function.

(b) Definition. For purposes of this section, purchased power price means the amount paid by a utility or system that performs a transmission or purchase and resale function for electric power generated by another utility or system.

(c) General rule. (1) If a utility or system uses a rate component that recovers revenues computed wholly or in part as a percentage of the purchased power price, the utility or system shall establish a limit on the revenues recovered by such rate component in any transaction, in accordance with paragraph (d) of this section.

(2) The limit established under this paragraph shall be stated in mills per kilowatt-hour.

(d) Cost support information. (1) A utility or system shall submit cost support information to justify any revenue limit established under paragraph (c) of this section, except as provided in paragraph (e) of this section.

(2) The information submitted under this section shall consist of those costs, other than the purchased power price, incurred by a utility or system as a result of a transmission or purchase and resale transaction, which costs are not recovered under any other rate component.

(e) Exception. A utility or system need not submit the cost support information required under paragraph (d) of this section if the limit established under paragraph (c) of this section is not more than one mill per kilowatt-hour.

(f) Revision of rate schedules. Every utility or system shall:

(1) Amend any rate schedule or tariff to indicate any limit established pursuant to this section, not later than 60 days after the effective date of this rule; and

(2) Hereafter conform any rate or rate change filed under this part to the requirements of this section.

(Federal Power Act, as amended, 16 U.S.C. 792–828c; Department of Energy Organization Act, 42 U.S.C. 7101–7352; E.O. 12009, 3 CFR 142 (1978))

[Order 84, 45 FR 31300, May 13, 1980. Redesignated by Order 545, 57 FR 53990, Nov. 16, 1992]

§ 35.23   General provisions.

(a) Applicability. This subpart applies to any wholesale sale of electric energy in a coordination transaction by a public utility if that sale requires the use of an emissions allowance.

(b) Implementation Procedures. (1) If a public utility has a coordination rate schedule on file that expressly provides for the recovery of all incremental or out-of-pocket costs, such utility may make an abbreviated rate filing detailing how it will recover emissions allowance costs. Such filing must include the following: the index or combination of indices to be used; the method by which the emission allowance amounts will be calculated; timing procedures; how inconsistencies, if any, with dispatch criteria will be reconciled; and how any other rate impacts will be addressed. In addition, a utility making an abbreviated filing must:

(i) Clearly identify the filing as being limited to an amendment to a coordination rate to reflect the cost of emissions allowances, in the first paragraph of the letter of transmittal accompanying the filing;

(ii) Submit revised pages that can be inserted into each rate schedule; and

(iii) Identify each rate schedule to which the amendment applies.

(2) The abbreviated filing must apply consistent treatment to all coordination rate schedules. If the filing does not apply consistent rate treatment, the public utility must explain why it does not do so.

(3) If a public utility wants to charge incremental costs for emissions allowances, but its rate schedule on file with the Commission does not provide for the recovery of all incremental costs, the selling public utility may submit an abbreviated filing if all customers agree to the rate change. If customers do not agree, the selling public utility must tender its emissions allowance proposal in a separate section 205 rate filing, fully justifying its proposal.

[59 FR 65938, Dec. 22, 1994]

§ 35.24   Tax normalization for public utilities.

(a) Applicability. (1) Except as provided in subparagraph (2) of this paragraph, this section applies, with respect to rate schedules filed under §§35.12 and 35.13 of this part, to the ratemaking treatment of the tax effects of all transactions for which there are timing differences.

(2) This section does not apply to the following timing differences:

(i) Differences that result from the use of accelerated depreciation;

(ii) Differences that result from the use of Class Life Asset Depreciation Range (ADR) provisions of the Internal Revenue Code;

(iii) Differences that result from the use of accelerated amortization provisions on certified defense and pollution control facilities;

(iv) Differences that arise from recognition of extraordinary property losses as a current expense for tax purposes but as a deferred and amortized expense for book purposes;

(v) Differences that arise from recognition of research, development, and demonstration expenditures as a current expense for tax purposes but as a deferred and amortized expense for book purposes;

(vi) Differences that result from different tax and book reporting of deferred gains or losses from disposition of utility plant;

(vii) Differences that result from the use of the Asset Guideline Class “Repair Allowance” provision of the Internal Revenue Code;

(viii) Differences that result from recognition of purchased gas costs as a current expense for tax purposes but as a deferred expense for book purposes.

(See Order 13, issued October 18, 1978; Order 203, issued May 29, 1958; Order 204, issued May 29, 1958; Order 404, issued May 15, 1970; Order 408, issued August 26, 1970; Order 432, issued April 23, 1971; Order 504, issued February 11, 1974; Order 505, issued February 11, 1974; Order 566, issued June 3, 1977; Opinion 578, issued June 3, 1970; and Opinion 801, issued May 31, 1977.)

(b) General rules—1) Tax normalization required. (i) A public utility must compute the income tax component of its cost of service by using tax normalization for all transactions to which this section applies.

(ii) Except as provided in paragraph (c) of this section, application of tax normalization by a public utility under this section to compute the income tax component will not be subject to case-by-case adjudication.

(2) Reduction of, and addition to, rate base. (i) The rate base of a public utility using tax normalization under this section must be reduced by the balances that are properly recordable in Account 281, “Accumulated deferred income taxes-accelerated amortization property;” Account 282, “Accumulated deferred income taxes—other property;” and Account 283, “Accumulated deferred income taxes—other.” Balances that are properly recordable in Account 190, “Accumulated deferred income taxes,” must be treated as an addition to rate base.

(ii) Such rate base reductions or additions must be limited to deferred taxes related to rate base, construction or other jurisdictional activities.

(iii) If a public utility uses an approved purchased gas adjustment clause or a research, development and demonstration tracking clause, the rate base reductions or additions required under this subparagraph must apply only to the extent that the balances in Account 190 and Accounts 281 through 283 are not used, for purposes of calculating carrying charges, as an offset to balances properly recordable in Account 188, “Research development and demonstration expenditures,” or Account 191, “Unrecovered purchased gas costs.”

(c) Special rules. (1) This paragraph applies:

(i) If the public utility has not provided deferred taxes in the same amount that would have accrued had tax normalization been applied for the tax effects of timing difference transactions originating at any time prior to the test period; or

(ii) If, as a result of changes in tax rates, the accumulated provision for deferred taxes becomes deficient in or in excess of amounts necessary to meet future tax liabilities as determined by application of the current tax rate to all timing difference transactions originating in the test period and prior to the test period.

(2) The public utility must compute the income tax component in its cost of service by making provision for any excess or deficiency in deferred taxes described in subparagraphs (1)(i) or (1)(ii) of this paragraph.

(3) The public utility must apply a Commission-approved ratemaking method made specifically applicable to the public utility for determining the cost of service provision described in subparagraph (2) of this paragraph. If no Commission-approved ratemaking method has been made specifically applicable to the public utility, then the public utility must use some ratemaking method for making such provision, and the appropriateness of this method will be subject to case-by-case determination.

(d) Definitions. For purposes of this section, the term:

(1) Tax normalization means computing the income tax component as if the amounts of timing difference transactions recognized in each period for ratemaking purposes were also recognized in the same amount in each such period for income tax purposes.

(2) Timing differences means differences between amounts of expenses or revenues recognized for income tax purposes and amounts of expenses or revenues recognized for ratemaking purposes, which differences arise in one time period and reverse in one or more other time periods so that the total amounts of expenses or revenues recognized for income tax purposes and for ratemaking purposes are equal.

(3) Commission-approved ratemaking method means a ratemaking method approved by the Commission in a final decision including approval of a settlement agreement containing a ratemaking method only if such settlement agreement applies that method beyond the effective term of the settlement agreement.

(4) Income tax purposes means for the purpose of computing income tax under the provisions of the Internal Revenue Code or the income tax provisions of the laws of a State or political subdivision of a State (including franchise taxes).

(5) Income tax component means that part of the cost of service that covers income tax expenses allowable by the Commission.

(6) Ratemaking purposes means for the purpose of fixing, modifying, approving, disapproving or rejecting rates under the Federal Power Act or the Natural Gas Act.

(7) Tax effect means the tax reduction or addition associated with a specific expense or revenue transaction.

(8) Transaction means an activity or event that gives rise to an accounting entry that is used in determining revenues or expenses.

[46 FR 26636, May 14, 1981. Redesignated and amended by Order 144–A, 47 FR 8342, Feb. 26, 1982; Redesignated by Order 545, 57 FR 53990, Nov. 16, 1992]

§ 35.25   Construction work in progress.

(a) Applicability. This section applies to any rate schedule filed under this part by any public utility as defined in subsection 201(e) of the Federal Power Act.

(b) Definitions. For purposes of this section:

(1) Constuction work in progress or CWIP means any expenditure for public utility plant in process of construction that is properly included in Accounts 107 (construction work in progress) and 120.1 (nuclear fuel in process of refinement, conversion, enrichment, and fabrication) of part 101 of this chapter, the Uniform System of Accounts Prescribed for Public Utilities and Licensees Subject to the Provisions of the Federal Power Act (Major and Nonmajor), that would otherwise be eligible for allowance for funds used during construction (AFUDC) treatment.

(2) Double whammy means a situation which may arise when a wholesale electric rate customer embarks upon its own or participates in a construction program to supply itself with all or a portion of its future power needs, thereby reducing its future dependence on the CWIP of the rate applicant, but is simultaneously forced to pay to the CWIP public utility rate applicant the CWIP portion of the wholesale rates that reflects existing levels of service or a different anticipated service level.

(3) Fuel conversion facility means any addition to public utility plant that enables a natural gas-burning plant to convert to the use of other fuels, or that enables an oil-burning plant to convert to the use of other fuels, other than natural gas. Such facilities include those that alter internal plant workings, such as oil or coal burners, soot blowers, bottom ash removal systems and concomitant air pollution control facilities, and any facility needed for receiving and storing the fuel to which the plant is being converted, which facility would not be necessary if the plant continued to burn gas or oil.

(4) Pollution control facility means an identifiable structure or portions of a structure that is designed to reduce the amount of pollution produced by the power plant, but does not include any facility that reduces pollution by substituting a different method of generation or that generates the additional power necessitated by the operation of a pollution control facility.

(c) General rule. For purposes of any initial rate schedule or any rate schedule change filed under §35.12 or §35.13 of this part, a public utility may include in its rate base any costs of construction work in progress (CWIP), including allowance for funds used during construction (AFUDC), as provided in this section.

(1) Pollution control facilities—(i) General rule. Any CWIP for pollution control facilities allocable to electric power sales for resale may be included in the rate base of the public utility.

(ii) Qualification as a pollution control facility. In determining whether a facility is a pollution control facility for purposes of this section, the Commission will consider:

(A) Whether such facility is the type facility described in the Internal Revenue Service laws, 26 U.S.C. 169(d)(1), as follows:

“A new identifiable treatment facility which is used  *  *  * to abate or control water or atmospheric pollution or contamination by removing, altering, disposing, storing, or preventing the creation or emission of pollutants, contaminants, wastes or heat”;

(B) Whether such facility has been certified by a local, state, or federal agency as being in conformity with, or required by, a program of pollution control;

(C) Other evidence showing that such facilities are for pollution control.

(2) Fuel conversion facilities. Any CWIP for fuel conversion facilities allocable to electric power sales for resale may be included in the rate base of the public utility.

(3) Non-pollution control of fuel conversion (non-PC/FC) CWIP. No more than 50 percent of any CWIP allocable to electric power sales for resale not otherwise included in rate base under paragraphs (c) (1) and (2) of this section, may be included in the rate base of the public utility.

(4) Forward looking allocation ratios. Every test period CWIP project requested for wholesale rate base treatment pursuant to §35.26(c)(1), (2), and (3) of this part will be allocated to the customer classes on the basis of forward looking allocation ratios reflecting the anticipated average annual use the wholesale customers will make of the system over the estimated service life of the project. Supporting documentation, as required by §§35.12 and 35.13 of this part, must be in sufficient detail to permit examination and verification of the forward looking allocation ratio's recognition of each wholesale customer's plans, if any, for future alternative or supplementary power supplies. For the purpose of preventing anticompetitive effects, including CWIP-induced price squeeze and double whammy, sufficient recognition of such plans may require the public utility applicant to provide for separate customer groups or provide for a rate design incorporating selected CWIP project credits.

(d) Effective date. If a public utility proposes in its filed rates to include CWIP in rate base under this section, that portion of the rate related to CWIP is collectable at the time the general rates become effective pursuant to Commission order, whether or not subject to refund, except as provided in paragraph (g) of this section.

(e) Discontinuance of AFUDC. On the date that any proposed rate that includes CWIP in rate base becomes effective, a public utility that has included CWIP in rate base must discontinue the capitalization of any AFUDC related to those amounts of CWIP is rate base.

(f) Accounting procedures. When a public utility files to include CWIP in its rate base pursuant to this section, it must propose accounting procedures in that rate schedule filing that:

(1) Ensure that wholesale customers will not be charged for both capitalized AFUDC and corresponding amounts of CWIP proposed to be included in rate base; and

(2) Ensure that wholesale customers will not be charged for any corresponding AFUDC capitalized as a result of different accounting or ratemaking treatments accorded CWIP by state or local regulatory authorities.

(g) Anticompetitive procedures—(1) Filing requirements. In order to facilitate Commission review of the anticompetitive effects of applications for CWIP pursuant to §35.26(c)(3), a public utility applying for rates based upon inclusion of such CWIP in rate base must include the following information in its filing:

(i) The percentage of the proposed increase in the jurisdictional rate level attributable to non-pollution control/fuel conversion CWIP and the percentage of non-pollution control/fuel conversion CWIP supporting the proposed rate level;

(ii) The percentage of non-pollution control/fuel conversion CWIP permitted by the state or local commission supporting the current retail rates of the public utility against which the relevant wholesale customers compete; and

(iii) Individual earned rate of return analyses of each of the competing retail rates developed on a basis fully consistent with the wholesale cost of service for the same test period if the requested percentage of wholesale non-pollution control/fuel conversion CWIP exceeds that permitted by the relevant state or local authority to support the currently competing retail rates.

(2) Preliminary relief. (i) If an intervenor in its initial pleading alleges that a price squeeze will occur as a direct result of the public utility's request for CWIP pursuant to §35.26(c)(3), makes a showing that it is likely to incur harm if such CWIP is allowed subject to refund, and makes a showing of how the harm to the intervenor would be mitigated or eliminated by the types of preliminary relief requested, the Commission will consider preliminary relief at the suspension stage of the case pursuant to paragraph (g)(4) of this section. In determining whether to grant preliminary relief, the Commission will balance the following public interest considerations:

(A) The harm to the intervenor if it is not granted preliminary relief from the requested CWIP;

(B) The harm to the public utility if, during the interim period of preliminary relief, the public utility is required to recover its financing charges later through AFUDC rather than immediately through CWIP; and

(C) Mitigating bias against investment in new plants, ensuring accurate price signals, and fostering rate stability.

(ii) Whether or not preliminary relief is granted at the suspension stage will not preclude consideration of further interim or final remedies later in the preceedings, if warranted.

(3) If the Commission makes a final determinaion that a price squeeze due solely to allowance of a lower percentage of non-pollution control/fuel conversion CWIP in the public utility's retail rate base than allowed by this Commission, the Commission will consider an adjustment to non-pollution control/fuel conversion CWIP in order to eliminate or mitigate the price squeeze.

(4) If an intervenor meets the requirements of paragraph (g)(2) of this section, the Commission, depending on the type of showing made including the likelihood, immediacy, and severity of any anticompetitive harm, may:

(i) Suspend the entire rate increase or all or a portion of the non-pollution control/fuel conversion CWIP component for up to five months;

(ii) Allow all or a portion of the non-pollution control/fuel conversion CWIP only prospectively from the issuance of the Commission's final order on rehearing on the matter; or

(iii) Take such other action as is proper under the circumstances.

[Order 474, 52 FR 23965, June 26, 1987, as amended by Order 474–A, 52 FR 35702, Sept. 23, 1987; Order 474–B, 54 FR 32804, Aug. 10, 1989. Redesignated by Order 545, 57 FR 53990, Nov. 16, 1992, as amended by Order 626, 67 FR 36096, May 23, 2002]

§ 35.26   Recovery of stranded costs by public utilities and transmitting utilities.

(a) Purpose. This section establishes the standards that a public utility or transmitting utility must satisfy in order to recover stranded costs.

(b) Definitions—1) Wholesale stranded cost means any legitimate, prudent and verifiable cost incurred by a public utility or a transmitting utility to provide service to:

(i) A wholesale requirements customer that subsequently becomes, in whole or in part, an unbundled wholesale transmission services customer of such public utility or transmitting utility; or

(ii) A retail customer that subsequently becomes, either directly or through another wholesale transmission purchaser, an unbundled wholesale transmission services customer of such public utility or transmitting utility.

(2) Wholesale requirements customer means a customer for whom a public utility or transmitting utility provides by contract any portion of its bundled wholesale power requirements.

(3) Wholesale transmission services means the transmission of electric energy sold, or to be sold, at wholesale in interstate commerce or ordered pursuant to section 211 of the Federal Power Act (FPA).

(4) Wholesale requirements contract means a contract under which a public utility or transmitting utility provides any portion of a customer's bundled wholesale power requirements.

(5) Retail stranded cost means any legitimate, prudent and verifiable cost incurred by a public utility to provide service to a retail customer that subsequently becomes, in whole or in part, an unbundled retail transmission services customer of that public utility.

(6) Retail transmission services means the transmission of electric energy sold, or to be sold, in interstate commerce directly to a retail customer.

(7) New wholesale requirements contract means any wholesale requirements contract executed after July 11, 1994, or extended or renegotiated to be effective after July 11, 1994.

(8) Existing wholesale requirements contract means any wholesale requirements contract executed on or before July 11, 1994.

(c) Recovery of wholesale stranded costs—1) General requirement. A public utility or transmitting utility will be allowed to seek recovery of wholesale stranded costs only as follows:

(i) No public utility or transmitting utility may seek recovery of wholesale stranded costs if such recovery is explicitly prohibited by a contract or settlement agreement, or by any power sales or transmission rate schedule or tariff.

(ii) No public utility or transmitting utility may seek recovery of stranded costs associated with a new wholesale requirements contract if such contract does not contain an exit fee or other explicit stranded cost provision.

(iii) If wholesale stranded costs are associated with a new wholesale requirements contract containing an exit fee or other explicit stranded cost provision, and the seller under the contract is a public utility, the public utility may seek recovery of such costs, in accordance with the contract, through rates for electric energy under sections 205–206 of the FPA. The public utility may not seek recovery of such costs through any transmission rate for FPA section 205 or 211 transmission services.

(iv) If wholesale stranded costs are associated with a new wholesale requirements contract, and the seller under the contract is a transmitting utility but not also a public utility, the transmitting utility may not seek an order from the Commission allowing recovery of such costs.

(v) If wholesale stranded costs are associated with an existing wholesale requirements contract, if the seller under such contract is a public utility, and if the contract does not contain an exit fee or other explicit stranded cost provision, the public utility may seek recovery of stranded costs only as follows:

(A) If either party to the contract seeks a stranded cost amendment pursuant to a section 205 or section 206 filing under the FPA made prior to the expiration of the contract, and the Commission accepts or approves an amendment permitting recovery of stranded costs, the public utility may seek recovery of such costs through FPA section 205–206 rates for electric energy.

(B) If the contract is not amended to permit recovery of stranded costs as described in paragraph (c)(1)(v)(A) of this section, the public utility may file a proposal, prior to the expiration of the contract, to recover stranded costs through FPA section 205–206 or section 211–212 rates for wholesale transmission services to the customer.

(vi) If wholesale stranded costs are associated with an existing wholesale requirements contract, if the seller under such contract is a transmitting utility but not also a public utility, and if the contract does not contain an exit fee or other explicit stranded cost provision, the transmitting utility may seek recovery of stranded costs through FPA section 211–212 transmission rates.

(vii) If a retail customer becomes a legitimate wholesale transmission customer of a public utility or transmitting utility, e.g., through municipalization, and costs are stranded as a result of the retail-turned-wholesale customer's access to wholesale transmission, the utility may seek recovery of such costs through FPA section 205–206 or section 211–212 rates for wholesale transmission services to that customer.

(2) Evidentiary demonstration for wholesale stranded cost recovery. A public utility or transmitting utility seeking to recover wholesale stranded costs in accordance with paragraphs (c)(1) (v) through (vii) of this section must demonstrate that:

(i) It incurred costs to provide service to a wholesale requirements customer or retail customer based on a reasonable expectation that the utility would continue to serve the customer;

(ii) The stranded costs are not more than the customer would have contributed to the utility had the customer remained a wholesale requirements customer of the utility, or, in the case of a retail-turned-wholesale customer, had the customer remained a retail customer of the utility; and

(iii) The stranded costs are derived using the following formula: Stranded Cost Obligation = (Revenue Stream Estimate—Competitive Market Value Estimate) × Length of Obligation (reasonable expectation period).

(3) Rebuttable presumption. If a public utility or transmitting utility seeks recovery of wholesale stranded costs associated with an existing wholesale requirements contract, as permitted in paragraph (c)(1) of this section, and the existing wholesale requirements contract contains a notice provision, there will be a rebuttable presumption that the utility had no reasonable expectation of continuing to serve the customer beyond the term of the notice provision.

(4) Procedure for customer to obtain stranded cost estimate. A customer under an existing wholesale requirements contract with a public utility seller may obtain from the seller an estimate of the customer's stranded cost obligation if it were to leave the public utility's generation supply system by filing with the public utility a request for an estimate at any time prior to the termination date specified in its contract.

(i) The public utility must provide a response within 30 days of receiving the request. The response must include:

(A) An estimate of the customer's stranded cost obligation based on the formula in paragraph (c)(2)(iii) of this section;

(B) Supporting detail indicating how each element in the formula was derived;

(C) A detailed rationale justifying the basis for the utility's reasonable expectation of continuing to serve the customer beyond the termination date in the contract;

(D) An estimate of the amount of released capacity and associated energy that would result from the customer's departure; and

(E) The utility's proposal for any contract amendment needed to implement the customer's payment of stranded costs.

(ii) If the customer disagrees with the utility's response, it must respond to the utility within 30 days explaining why it disagrees. If the parties cannot work out a mutually agreeable resolution, they may exercise their rights to Commission resolution under the FPA.

(5) A customer must be given the option to market or broker a portion or all of the capacity and energy associated with any stranded costs claimed by the public utility.

(i) To exercise the option, the customer must so notify the utility in writing no later than 30 days after the public utility files its estimate of stranded costs for the customer with the Commission.

(A) Before marketing or brokering can begin, the utility and customer must execute an agreement identifying, at a minimum, the amount and the price of capacity and associated energy the customer is entitled to schedule, and the duration of the customer's marketing or brokering of such capacity and energy.

(ii) If agreement over marketing or brokering cannot be reached, and the parties seek Commission resolution of disputed issues, upon issuance of a Commission order resolving the disputed issues, the customer may reevaluate its decision in paragraph (c)(5)(i) of this section to exercise the marketing or brokering option. The customer must notify the utility in writing within 30 days of issuance of the Commission's order resolving the disputed issues whether the customer will market or broker a portion or all of the capacity and energy associated with stranded costs allowed by the Commission.

(iii) If a customer undertakes the brokering option, and the customer's brokering efforts fail to produce a buyer within 60 days of the date of the brokering agreement entered into between the customer and the utility, the customer shall relinquish all rights to broker the released capacity and associated energy and will pay stranded costs as determined by the formula in paragraph (c)(2)(iii) of this section.

(d) Recovery of retail stranded costs—1) General requirement. A public utility may seek to recover retail stranded costs through rates for retail transmission services only if the state regulatory authority does not have authority under state law to address stranded costs at the time the retail wheeling is required.

(2) Evidentiary demonstration necessary for retail stranded cost recovery. A public utility seeking to recover retail stranded costs in accordance with paragraph (d)(1) of this section must demonstrate that:

(i) It incurred costs to provide service to a retail customer that obtains retail wheeling based on a reasonable expectation that the utility would continue to serve the customer; and

(ii) The stranded costs are not more than the customer would have contributed to the utility had the customer remained a retail customer of the utility.

[Order 888–A, 62 FR 12460, Mar. 14, 1997]

§ 35.27   Power sales at market-based rates.

(a) Notwithstanding any other requirements, any public utility seeking authorization to engage in sales for resale of electric energy at market-based rates shall not be required to demonstrate any lack of market power in generation with respect to sales from capacity for which construction has commenced on or after July 9, 1996.

(b) Nothing in this part—

(1) Shall be construed as preempting or affecting any jurisdiction a state commission or other state authority may have under applicable state and federal law, or

(2) Limits the authority of a state commission in accordance with state and federal law to establish

(i) Competitive procedures for the acquisition of electric energy, including demand-side management, purchased at wholesale, or

(ii) Non-discriminatory fees for the distribution of such electric energy to retail consumers for purposes established in accordance with state law.

(c) Reporting requirement. Any public utility with the authority to engage in sales for resale of electric energy in interstate commerce at market-based rates shall be subject to the following:

(1) As a condition of obtaining and retaining market-based rate authority, a public utility with market-based rate authority must timely report to the Commission any change in status that would reflect a departure from the characteristics the Commission relied upon in granting market-based rate authority. A change in status includes, but is not limited to, each of the following:

(i) Ownership or control of generation or transmission facilities or inputs to electric power production other than fuel supplies, or

(ii) Affiliation with any entity not disclosed in the application for market-based rate authority that owns or controls generation or transmission facilities or inputs to electric power production, or affiliation with any entity that has a franchised service area.

(2) Any change in status subject to paragraph (c)(1) of this section must be filed no later than 30 days after the change in status occurs.

[Order 888, 61 FR 21693, May 10, 1996, as amended by Order 652, 70 FR 8269, Feb. 18, 2005]

§ 35.28   Non-discriminatory open access transmission tariff.

(a) Applicability. This section applies to any public utility that owns, controls or operates facilities used for the transmission of electric energy in interstate commerce and to any non-public utility that seeks voluntary compliance with jurisdictional transmission tariff reciprocity conditions.

(b) Definitions—(1) Requirements service agreement means a contract or rate schedule under which a public utility provides any portion of a customer's bundled wholesale power requirements.

(2) Economy energy coordination agreement means a contract, or service schedule thereunder, that provides for trading of electric energy on an “if, as and when available” basis, but does not require either the seller or the buyer to engage in a particular transaction.

(3) Non-economy energy coordination agreement means any non-requirements service agreement, except an economy energy coordination agreement as defined in paragraph (b)(2) of this section.

(c) Non-discriminatory open access transmission tariffs—(1) Every public utility that owns, controls or operates facilities used for the transmission of electric energy in interstate commerce must have on file with the Commission a tariff of general applicability for transmission services, including ancillary services, over such facilities. Such tariff must be the open access pro forma tariff contained in Order No. 888, FERC Stats. & Regs. ¶31,036 (Final Rule on Open Access and Stranded Costs) or such other open access tariff as may be approved by the Commission consistent with Order No. 888, FERC Stats. & Regs. ¶31,036.

(i) Subject to the exceptions in paragraphs (c)(1)(ii), (c)(1)(iii), and (c)(1)(iv) of this section, the pro forma tariff contained in Order No. 888, FERC Stats. & Regs. ¶31,036, and accompanying rates, must be filed no later than 60 days prior to the date on which a public utility would engage in a sale of electric energy at wholesale in interstate commerce or in the transmission of electric energy in interstate commerce.

(ii) If a public utility owns, controls or operates facilities used for the transmission of electric energy in interstate commerce as of July 9, 1996, it must file the pro forma tariff contained in Order No. 888, FERC Stats. & Regs. ¶31,036, pursuant to section 206 of the FPA and accompanying rates pursuant to section 205 of the FPA, no later than July 9, 1996. However, if a public utility has already filed, or has on file, an open access tariff and accompanying rates as of April 24, 1996, it may, but is not required to, file new rates with its section 206 pro forma tariff filing.

(iii) If a public utility owns, controls or operates transmission facilities used for the transmission of electric energy in interstate commerce as of July 9, 1996, such facilities are jointly owned with a non-public utility, and the joint ownership contract prohibits transmission service over the facilities to third parties, the public utility with respect to access over the public utility's share of the jointly owned facilities must file no later than December 31, 1996 the pro forma tariff contained in Order No. 888, FERC Stats. & Regs. ¶31,036, pursuant to section 206 of the FPA and accompanying rates pursuant to section 205 of the FPA.

(iv) If a public utility obtains a waiver of the tariff requirement pursuant to paragraph (d) of this section, it does not need to file the pro forma tariff required by this section.

(v) Any public utility that seeks a deviation from the pro forma tariff contained in Order No. 888, FERC Stats. & Regs. ¶31,036, must demonstrate that the deviation is consistent with the principles of Order No. 888, FERC Stats. & Regs. ¶31,036.

(vi) Each public utility's open access transmission tariff must include the standards incorporated by reference in part 38 of this chapter.

(2) Every public utility that owns, controls or operates facilities used for the transmission of electric energy in interstate commerce, and that uses those facilities to engage in wholesale sales and/or purchases of electric energy, or unbundled retail sales of electric energy, must take transmission service for such sales and/or purchases under the open access tariff filed pursuant to this section.

(i) Subject to the exceptions in paragraphs (c)(2)(ii) and (c)(3)(iv) of this section, this requirement is effective on the date that such public utility engages in a wholesale sale or purchase of electric energy or any unbundled retail sale of electric energy, but no earlier than July 9, 1996.

(ii) For sales of electric energy pursuant to a requirements service agreement executed on or before July 9, 1996, this requirement will not apply unless separately ordered by the Commission. For sales of electric energy pursuant to a bilateral economy energy coordination agreement executed on or before July 9, 1996, this requirement is effective on December 31, 1996. For sales of electric energy pursuant to a bilateral non-economy energy coordination agreement executed on or before July 9, 1996, this requirement will not apply unless separately ordered by the Commission.

(3) Every public utility that owns, controls or operates facilities used for the transmission of electric energy in interstate commerce, and that is a member of a power pool, public utility holding company, or other multi-lateral trading arrangement or agreement that contains transmission rates, terms or conditions, must file a joint pool-wide or system-wide open access transmission pro forma tariff.

(i) For any power pool, public utility holding company or other multi-lateral arrangement or agreement that contains transmission rates, terms or conditions and that is executed after July 9, 1996, this requirement is effective on the date that transactions begin under the arrangement or agreement.

(ii) For any public utility holding company arrangement or agreement that contains transmission rates, terms or conditions and that is executed on or before July 9, 1996, this requirement is effective July 9, 1996, except for the Central and South West System, which must comply no later than December 31, 1996.

(iii) For any power pool or multi-lateral arrangement or agreement other than a public utility holding company arrangement or agreement, that contains transmission rates, terms or conditions and that is executed prior to July 9, 1996, this requirement is effective on December 31, 1996.

(iv) A public utility member of a power pool, public utility holding company or other multi-lateral arrangement or agreement that contains transmission rates, terms or conditions and that is executed on or before July 9, 1996 must begin to take service under a joint pool-wide or system-wide pro forma tariff for wholesale trades among the pool or system members no later than December 31, 1996.

(d) Waivers. A public utility subject to the requirements of this section and Order No. 889, FERC Stats. & Regs. ¶31,037 (Final Rule on Open Access Same-Time Information System and Standards of Conduct) may file a request for waiver of all or part of the requirements of this section, or Part 37 (Open Access Same-Time Information System and Standards of Conduct for Public Utilities), for good cause shown. Except as provided in paragraph (f) of this section, an application for waiver must be filed either:

(i) No later than July 9, 1996 or

(ii) No later than 60 days prior to the time the public utility would otherwise have to comply with the requirement.

(e) Non-public utility procedures for tariff reciprocity compliance. (1) A non-public utility may submit a transmission tariff and a request for declaratory order that its voluntary transmission tariff meets the requirements of Order No. 888 (Final Rule on Open Access and Stranded Costs).

(i) Any submittal and request for declaratory order submitted by a non-public utility will be provided an NJ (non-jurisdictional) docket designation.

(ii) If the submittal is found to be an acceptable transmission tariff, an applicant in a Federal Power Act (FPA) section 211 case against the non-public utility shall have the burden of proof to show why service under the open access tariff is not sufficient and why a section 211 order should be granted.

(2) A non-public utility may file a request for waiver of all or part of the reciprocity conditions contained in a public utility open access tariff, for good cause shown. An application for waiver may be filed at any time.

(f) Standard generator interconnection procedures and agreements. (1) Every public utility that is required to have on file a non-discriminatory open access transmission tariff under this section must amend such tariff by adding the standard interconnection procedures and agreement contained in Order No. 2003, FERC Stats. & Regs. & 31,146 (Final Rule on Generator Interconnection), as amended by the Commission in Order No. 661, FERC Stats. & Regs. ¶31,186 (Final Rule on Interconnection for Wind Energy), and the standard small generator interconnection procedures and agreement contained in Order No. 2006, FERC Stats. & Regs. ¶31,180 (Final Rule on Small Generator Interconnection), or such other interconnection procedures and agreements as may be approved by the Commission consistent with Order No. 2003, FERC Stats. & Regs. & 31,146 (Final Rule on Generator Interconnection) and Order No. 2006, FERC Stats. & Regs. ¶31,180 (Final Rule on Small Generator Interconnection).

(i) The amendment to implement the Final Rule on Generator Interconnection required by the preceding subsection must be filed no later than January 20, 2004.

(ii) The amendment to implement the Final Rule on Small Generator Interconnection required by the preceding subsection must be filed no later than August 12, 2005.

(iii) The amendment to implement the Final Rule on Interconnection for Wind Energy required by the preceding subsection must be filed no later than December 30, 2005.

(iv) Any public utility that seeks a deviation from the standard interconnection procedures and agreement contained in Order No. 2003, FERC Stats. & Regs. & 31,146 (Final Rule on Generator Interconnection), as amended by the Commission in Order No. 661, FERC Stats. & Regs. ¶31,186 (Final Rule on Interconnection for Wind Energy), or the standard small generator interconnection procedures and agreement contained in Order No. 2006, FERC Stats. & Regs. ¶31,180 (Final Rule on Small Generator Interconnection), must demonstrate that the deviation is consistent with the principles of either Order No. 2003, FERC Stats. & Regs. & 31,146 (Final Rule on Generator Interconnection) or Order No. 2006, FERC Stats. & Regs. ¶31,180 (Final Rule on Small Generator Interconnection).

(2) The non-public utility procedures for tariff reciprocity compliance described in paragraph (e) of this section are applicable to the standard interconnection procedures and agreements.

(3) A public utility subject to the requirements of this paragraph pertaining to the Final Rule on Generator Interconnection may file a request for waiver of all or part of the requirements of this paragraph, for good cause shown. An application for waiver must be filed either:

(i) No later than January 20, 2004, or

(ii) No later than 60 days prior to the time the public utility would otherwise have to comply with the requirements of this paragraph.

(4) A public utility subject to the requirements of this paragraph pertaining to the Final Rule on Small Generator Interconnection may file a request for waiver of all or part of the requirements of this paragraph, for good cause shown. An application for waiver must be filed either:

(i) No later than August 12, 2005, or

(ii) No later than 60 days prior to the time the public utility would otherwise have to comply with the requirements of this paragraph.

[Order 888, 61 FR 21693, May 10, 1996, as amended by Order 2003, 68 FR 49929, Aug. 19, 2003; Order 2006, 70 FR 34240, June 13, 2005; Order 661, 70 FR 75014, Dec. 19, 2005; Order 676, 71 FR 26212, May 4, 2006]

§ 35.29   Treatment of special assessments levied under the Atomic Energy Act of 1954, as amended by Title XI of the Energy Policy Act of 1992.

The costs that public utilities incur relating to special assessments under the Atomic Energy Act of 1954, as amended by the Energy Policy Act of 1992, are costs that may be reflected in jurisdictional rates. Public utilities seeking to recover the costs incurred relating to special assessments shall comply with the following procedures.

(a) Fuel adjustment clauses. In computing the Account 518 cost of nuclear fuel pursuant to §35.14(a)(6), utilities seeking to recover the costs of special assessments through their fuel adjustment clauses shall:

(1) Deduct any expenses associated with special assessments included in Account 518;

(2) Add to Account 518 one-twelfth of any payments made for special assessments within the 12-month period ending with the current month; and

(3) Deduct from Account 518 one-twelfth of any refunds of payments made for special assessments received within the 12-month period ending with the current month that is received from the Federal government because the public utility has contested a special assessment or overpaid a special assessment.

(b) Cost of service data requirements. Public utilities filing rate applications under §§35.12 or 35.13 (regardless of whether the utility elects the abbreviated, unadjusted Period I, adjusted Period I, or Period II cost support requirements) must submit cost data that is computed in accordance with the requirements specified in paragraphs (a) (1), (2) and (3) of this section.

(c) Formula rates. Public utilities with formula rates on file that provide for the automatic recovery of nuclear fuel costs must reflect the costs of special assessments in accordance with the requirements specified in paragraphs (a) (1), (2) and (3) of this section.

[Order 557, 58 FR 51221, Oct. 1, 1993. Redesignated by Order 888, 61 FR 21692, May 10, 1996]

Browse Previous |  Browse Next






















chanrobles.com


ChanRobles Legal Resources:

ChanRobles On-Line Bar Review

ChanRobles Internet Bar Review : www.chanroblesbar.com

ChanRobles MCLE On-line

ChanRobles Lawnet Inc. - ChanRobles MCLE On-line : www.chanroblesmcleonline.com