18 C.F.R. § 1304.403 Marina sewage pump-out stations and holding tanks.
Title 18 - Conservation of Power and Water Resources
All pump-out facilities constructed after September 8, 2003 shall meet the following minimum design and operating requirements: (a) Spill-proof connection with shipboard holding tanks; (b) Suction controls or vacuum breaker capable of limiting suction to such levels as will avoid collapse of rigid holding tanks; (c) Available fresh water facilities for tank flushing; (d) Check valve and positive cut-off or other device to preclude spillage when breaking connection with vessel being severed; (e) Adequate interim storage where storage is necessary before transfer to approved treatment facilities; (f) No overflow outlet capable of discharging effluent into the reservoir; (g) Alarm system adequate to notify the operator when the holding tank is full; (h) Convenient access to holding tanks and piping system for purposes of inspection; (i) Spill-proof features adequate for transfer of sewage from all movable floating pump-out facilities to shore-based treatment plants or intermediate transfer facilities; (j) A reliable disposal method consisting of: (1) An approved upland septic system that meets TVA, State, and local requirements; or (2) Proof of a contract with a sewage disposal contractor; and (k) A written statement to TVA certifying that the system shall be operated and maintained in such a way as to prevent any discharge or seepage of wastewater or sewage into the reservoir.
Title 18: Conservation of Power and Water Resources
PART 1304—APPROVAL OF CONSTRUCTION IN THE TENNESSEE RIVER SYSTEM AND REGULATION OF STRUCTURES AND OTHER ALTERATIONS
Subpart E—Miscellaneous
§ 1304.403 Marina sewage pump-out stations and holding tanks.

