23 C.F.R. § 636.201 What selection procedures and award criteria may be used?
Title 23 - Highways
You should consider using two-phase selection procedures for all design-build projects. However, if you do not believe two-phase selection procedures are appropriate for your project (based on the criteria in §636.202), you may use a single phase selection procedure or the modified-design-build contracting method. The following procedures are available:
Title 23: Highways
PART 636—DESIGN-BUILD CONTRACTING
Subpart B—Selection Procedures, Award Criteria
§ 636.201 What selection procedures and award criteria may be used?
------------------------------------------------------------------------ Criteria for using Selection procedure a selection Award criteria procedure options------------------------------------------------------------------------(a) Two-Phase Selection § 636.202.... Lowest price, Procedures (RFQ followed by Adjusted low-bid RFP). (price per quality point), meets criteria/ low bid, weighted criteria process, fixed price/best design, best value.(b) Single Phase (RFP).......... Project not All of the award meeting the criteria in item criteria in (a) of this § 636.202. table.(c) Modified Design-Build (may Any project....... Lowest price be one or two phases). technically acceptable.------------------------------------------------------------------------
Browse Next