24 C.F.R. Subpart A—General


Title 24 - Housing and Urban Development


Title 24: Housing and Urban Development
PART 968—PUBLIC HOUSING MODERNIZATION

Browse Next

Subpart A—General

§ 968.101   Purpose and applicability.

(a) Purpose. The purpose of this part is to set forth the policies and procedures for the Modernization program authorizing HUD to provide financial assistance to Public Housing Agencies (PHAs).

(b) Applicability. (1) Subpart A of this part applies to all modernization under this part. Subpart B of this part sets forth the requirements and procedures for the Comprehensive Improvement Assistance Program (CIAP) for PHAs that own or operate fewer than 250 public housing units. Subpart C of this part sets forth the requirements and procedures for the Comprehensive Grant Program (CGP) for PHAs that own or operate 250 or more units. A PHA that qualifies for participation in the CGP is not eligible to participate in the CIAP. A PHA that has already qualified to participate in the CGP may elect to continue to participate in the CGP so long as it owns or operates at least 200 units.

(2) This part applies to PHA-owned low-income public housing developments (including developments managed by a resident management corporation pursuant to a contract with the PHA); conveyed Lanham Act and Public Works Administration (PWA) developments; and to Section 23 Leased Housing Bond-Financed developments. Rental developments which are planned for conversion to homeownership under sections 5(h), 21, or 301 of the Act, but which have not yet been sold by a PHA, continue to qualify for assistance under this part. This part does not apply to developments under the Section 23 Leased Housing Non-Bond Financed program, the Section 10(c) Leased program, or the Section 23 or Section 8 Housing Assistance Payments programs.

(3) A section 23 Leased Housing Bond-Financed development is eligible for modernization only if HUD determines that the development has met the following conditions:

(i) The development was financed by the issuance of bonds;

(ii) Clear title to the development will be conveyed to or vested in the PHA at the end of the section 23 lease term;

(iii) There are no legal obstacles affecting the PHA's use of the property as public housing during the 20-year period of the modernization;

(iv) After completion of the modernization, the development will have a remaining useful life of at least 20 years and it is in the financial interest of the Federal Government to improve the development; and

(v) The development is covered by a cooperation agreement between the PHA and local governing body during the 20-year period of the modernization.

(4) A section 23 Leased Housing Bond-Financed development which has been conveyed to the PHA after the bonds have been retired is similarly eligible for modernization if the conditions specified under paragraph (b)(3) of this section have been satisfied.

(5) A development/building/unit which is assisted under section 5(j)(2) of the Act (Major Reconstruction of Obsolete Projects) (MROP) is eligible for section 14 funding (CIAP or CGP) where it received MROP funding after FFY 1988 and has reached Date of Full Availability (DOFA) or where it received MROP funding during FFYs 1986–1988 and all MROP funds have been expended.

(c) Transition. Any amount that HUD has approved for a PHA must be used for the purposes for which the funding was provided, or:

(1) For a CGP PHA, for purposes consistent with an approved Annual Statement or Five-Year Action Plan submitted by the PHA, as the PHA determines to be appropriate; or

(2) For a CIAP PHA, in accordance with a revised CIAP budget.

(d) Approved information collections. The following sections of this subpart have been approved by the Office of Management and Budget in accordance with the Paperwork Reduction Act of 1995 and assigned OMB approval number 2577–0044: §§968.135, 968.145, 968.210, 968.215, 968.225, and 968.230. The following sections of this subpart have been similarly approved and assigned approval number 2577.0157: §§968.310, 968.315, 968.325, and 968.330.

[57 FR 5570, Feb. 14, 1992, as amended at 58 FR 13930, Mar. 15, 1993; 61 FR 8737, Mar. 5, 1996]

§ 968.102   Special requirements for Turnkey III developments.

(a) Modernization Costs. Modernization work on a Turnkey III unit shall not increase the purchase price or amortization period of the home.

(b) Eligibility of paid-off and conveyed units for assistance.—(1) Paid-off units. A Turnkey III unit that is paid off but has not been conveyed at the time the CIAP application or CGP Annual Submission is submitted, is eligible for any physical improvement under §968.112(d).

(2) Conveyed units. Where modernization work has been approved before conveyance, the PHA may complete the work even if title to the unit is subsequently conveyed before the work is completed. However, once conveyed, the unit is not eligible for additional or future assistance. A PHA shall not use funds provided under this part for the purpose of modernizing units if the modernization work was not approved before conveyance of title.

(c) Other. The homebuyer family must be in compliance with its financial obligations under its homebuyer agreement in order to be eligible for non-emergency physical improvements, with the exception of work necessary to meet statutory and regulatory requirements, (e.g., accessibility for persons with disabilities and lead-based paint activities) and the correction of development deficiencies. Notwithstanding the above requirement, a PHA may, with prior HUD approval, complete non-emergency physical improvements on any homeownership unit where the PHA demonstrates that, due to economies of scale or geographic constraints, substantial cost savings may be realized by completing all necessary work in a development at one time.

[59 FR 44837, Aug. 30, 1994, as amended at 61 FR 8737, Mar. 5, 1996; 62 FR 27126, May 16, 1997; 64 FR 50229, Sept. 15, 1999]

§ 968.103   Allocation of funds under section 14.

(a) General. This section describes the process for allocating modernization funds to the aggregate of PHAs and IHAs participating in the CIAP and to individual PHAs and IHAs participating in the CGP.

(b) Set-aside for emergencies and disasters. For each FFY, HUD shall reserve from amounts approved in the appropriation act for grants under this part and part 950 of this title, an amount not to exceed $75 million (which shall include unused reserve amounts carried over from previous FFYs), which shall be made available to PHAs and IHAs for modernization needs resulting from natural and other disasters, and from emergencies. HUD shall replenish this reserve at the beginning of each FFY. Any unused funds from previous years may remain in the reserve until allocated. The requirements governing the reserve for disasters and emergencies and the procedures by which a PHA may request such funds, are set forth in §968.104.

(c) Set-aside for credits for mod troubled PHAs under subpart C of this part. After deducting an amount for the reserve for natural and other disasters and for emergencies under paragraph (b) of this section, HUD shall set aside from the funds remaining no more than five percent for the purpose of providing credits to PHAs that were formerly designated as mod troubled agencies under the Public Housing Management Assessment Program (PHMAP) (see 24 CFR part 901). The purpose of this set-aside is to compensate these PHAs for amounts previously withheld by HUD because of a PHA's prior designation as a mod troubled agency. Since part 901 of this chapter does not apply to IHAs, they are not classified as “mod troubled” and they do not participate in the set-aside credits established under paragraph (c) of this section.

(d) Formula allocation based on relative needs. After determining the amounts to be reserved under paragraphs (b) and (c) of this section, HUD shall allocate the amount remaining pursuant to the formula set forth in paragraphs (e) and (f) of this section, which is designed to measure the relative backlog and accrual needs of PHAs and IHAs.1

1 In construing all terms used in the statutory indicators for estimating backlog and accrual need, HUD shall use the meanings cited in Appendix B of the HUD Report to the Congress on Alternative Methods for Funding Public Housing Modernization (April 1990). Copies of the HUD Report to Congress may be obtained by contacting the HUD User at 1–800–245–2691.

(e) Allocation for backlog needs. HUD shall allocate half of the formula amount under paragraph (d) of this section based on the relative backlog needs of PHAs and IHAs, as follows:

(1) Determination of backlog need:

(i) Statistically reliable data are available. Where HUD determines that the data concerning the categories of backlog need identified under paragraph (e)(4) of this section are statistically reliable for individual IHAs and PHAs with 250 or more units, or for the aggregate of IHAs and PHAs with fewer than 250 units, which are not participating in the formula funding portion of the modernization program, it will base its allocation on direct estimates of the statutory categories of backlog need, based on the most recently available, statistically reliable data;

(ii) Statistically reliable data are unavailable. Where HUD determines that statistically reliable data concerning the categories of backlog need identified under paragraph (e)(4) of this section are not available for individual PHAs and IHAs with 250 or more units, it will base its allocation of funds under this section on estimates of the categories of backlog need using:

(A) The most recently available data on the categories of backlog need under paragraph (e)(4) of this section;

(B) Objectively measurable data concerning the following PHA or IHA, community and development characteristics:

(1) The average number of bedrooms in the units in a development. (Weighted at 2858.7);

(2) The proportion of units in a development available for occupancy by very large families. (Weighted at 7295.7);

(3) The extent to which units for families are in high-rise elevator developments. (Weighted at 5555.8);

(4) The age of the developments, as determined by the DOFA date (date of full availability). In the case of acquired developments, HUD will use the DOFA date unless the PHA provides HUD with the actual date of construction, in which case HUD will use the actual date of construction (or, for scattered sites, the average dates of construction of all the buildings), subject to a 50 year cap. (Weighted at 206.5);

(5) In the case of a large agency, the number of units with 2 or more bedrooms. (Weighted at .433);

(6) The cost of rehabilitating property in the area. (Weighted at 27544.3);

(7) For family developments, the extent of population decline in the unit of general local government determined on the basis of the 1970 and 1980 censuses. (Weighted at 759.5);

(C) An equation constant of 1412.9.

(2) Calibration of backlog need for developments constructed prior to 1985. The estimated backlog need, as determined under either paragraph (e)(1)(i) or (e)(1)(ii) of this section, shall be adjusted upward for developments constructed prior to 1985 by a constant ratio of 1.5 to more accurately reflect the costs of modernizing the categories of backlog need under paragraph (e)(4) of this section for the public housing stock as of 1991.

(3) Replacement factor to reflect backlog need for developments with demolition, disposition, or conversion occurring on or after October 1, 1996. (i) PHAs that have a reduction in units attributable to demolition, disposition, or conversion of units during the period (reflected in data maintained by HUD) that lowers the formula unit count for the Comprehensive Grant formula calculations qualify for application of a replacement housing factor, subject to satisfaction of criteria stated in paragraph (e)(3)(ii) of this section. The factor will be added, where applicable, for the first 5 years after such reduction, and consists of 50 percent of the published Total Development Cost for a two-bedroom unit in a walkup type structure for the period April 3, 1996 through April 30, 1997, multiplied times the number of units to be demolished, disposed of, or converted. The total relative backlog need of the PHA resulting from application of this replacement factor cannot exceed the share it would have had if the demolition, disposition, or conversion had not taken place.

(ii) A PHA is eligible for application of this factor only if the PHA satisfies the following criteria:

(A) The PHA requests the application of the replacement factor;

(B) The restored funding that results from the use of the replacement factor is used to provide replacement housing (in any year in which replacement housing is an eligible activity) or accelerated renovation of vacant but viable units, in accordance with the PHA's five-year action plan, approved by HUD (see §968.315);

(C) The PHA does not receive funding under the public housing development; Major Reconstruction of Obsolete Public Housing, or HOPE VI programs for the units developed or modernized with funds received under this replacement housing factor;

(D) A PHA that has been determined by HUD to be troubled or mod-troubled that is not already under the direction of HUD or a court-appointed receiver, in accordance with part 901 of this chapter, must use an Alternative Management Entity as defined in §901.5 of this chapter for development of replacement housing and must comply with any applicable provisions of its Memorandum of Agreement executed with HUD under that part; and

(E) Any development of replacement housing by any PHA must be done in accordance with part 941 of this chapter.

(iii) If the PHA does not use the restored funding that results from the use of the replacement factor to provide replacement housing or renovate vacant units in a timely fashion, in accordance with §968.125 and §941.501 of this chapter, and make reasonable progress on such use of the funding, in accordance with §968.335(a)(3) and §941.501, HUD may require appropriate corrective action under §968.335 and §941.501; may recapture and reallocate the funds; or may use other remedies available to HUD.

(4) Deduction for prior modernization: HUD shall deduct from the estimated backlog need, as determined under either paragraph (e)(1)(i) or (e)(1)(ii) of this section, amounts previously provided to a PHA or IHA for modernization, using one of the following methods:

(i) Standard deduction for prior CIAP and MROP. HUD shall deduct 60 percent of the CIAP funds made available on a PHA-wide or IHA-wide basis from FFY 1984 to 1991, and 40 percent of the funds made available on a development-specific basis for the Major Reconstruction of Obsolete Projects (MROP) (not to exceed the estimated formula need for the development), subject to a maximum fifty percent deduction of a PHA's or IHA's total need for backlog funding;

(ii) Newly constructed units. Units with a DOFA date of October 1, 1991 or thereafter will be considered to have a zero backlog; or

(iii) Acquired developments. Developments acquired by a PHA with a DOFA date of October 1, 1991 or thereafter will be considered by HUD to have a zero backlog.

(5) Categories of backlog need. The most recently available data used under either paragraph (e)(1)(i) or (e)(1)(ii) of this section must pertain to the following categories of backlog need:

(i) Backlog of needed repairs and replacements of existing physical systems in public housing developments;

(ii) Items that must be added to developments to meet HUD's modernization standards under §968.115, and State and local codes; and

(iii) Items that are necessary or highly desirable for the long-term viability of a development, in accordance with HUD's modernization standards.

(f) Allocation for accrual needs. HUD shall allocate the other half remaining under the formula allocation under paragraph (d) of this section based upon the relative accrual needs of PHAs and IHAs, determined as follows:

(1) Statistically reliable data are available. Where HUD determines that statistically reliable data are available concerning the categories of need identified under paragraph (f)(3) of this section for individual PHAs and IHAs with 250 or more units, and for the aggregate of PHAs and IHAs with fewer than 250 units, it shall base its allocation of assistance under this section on the needs that are estimated to have accrued since the date of the last objective measurement of backlog needs under paragraph (e)(1)(i) of this section;

(2) Statistically reliable data are unavailable. Where HUD determines that statistically reliable data concerning the categories of need identified under paragraph (f)(3) of this section are not available for individual PHAs and IHAs with 250 or more units, it shall base its allocation of assistance under this section on estimates of accrued need using:

(i) The most recently available data on the categories of accrual need under paragraph (f)(3) of this section;

(ii) Objectively measurable data concerning the following PHA or IHA, community, and development characteristics:

(A) The average number of bedrooms in the units in a development. (Weighted at 100.1);

(B) The proportion of units in a development available for occupancy by very large families. (Weighted at 356.7);

(C) The age of the developments. (Weighted 10.4);

(D) The extent to which the buildings in developments of an agency average fewer than 5 units. (Weighted at 87.1);

(E) The cost of rehabilitating property in the area. (Weighted at 679.1);

(F) The total number of units of each PHA or IHA that owns or operates 250 or more units. (weighted at .0144);

(iii) An equation constant of 602.1.

(3) Categories of need. The data to be provided under either paragraph (f)(1) or (2) of this section must pertain to the following categories of need:

(i) Backlog of needed repairs and replacements of existing physical systems in public housing developments; and

(ii) Items that must be added to developments to meet HUD's modernization standards under §968.115, and State and local codes.

(4) Replacement factor to reflect accrual need for developments with demolition, disposition, or conversion occurring on or after October 1, 1996. (i) PHAs that have a reduction in units attributable to demolition, disposition, or conversion of units during the period (reflected in data maintained by HUD) that lowers the formula unit count for the Comprehensive Grant formula calculations qualify for application of a replacement housing factor, subject to satisfaction of criteria stated in paragraph (f)(4)(ii) of this section. The factor will be added, where applicable, for the first five years after such reduction, and consists of two percent of the published Total Development Cost for a two-bedroom unit in a walkup type structure for the period April 3, 1996 through April 30, 1997, multiplied times the number of units to be demolished, disposed of, or converted. The total relative accrual need of the PHA resulting from application of this replacement factor cannot exceed the share it would have had if the demolition, disposition, or conversion had not taken place.

(ii) A PHA is eligible for application of this factor only if the PHA satisfies the following criteria:

(A) The PHA requests the application of the replacement factor;

(B) The restored funding that results from the use of the replacement factor is used to provide replacement housing (in any year in which replacement housing is an eligible activity) or accelerated renovation of vacant but viable units, in accordance with the PHA's five-year action plan, approved by HUD (see §968.315);

(C) The PHA does not receive funding under the public housing development, Major Reconstruction of Obsolete Public Housing, or HOPE VI programs for the units developed or modernized with funding received under this replacement housing factor;

(D) A PHA that has been determined by HUD to be troubled or mod-troubled, in accordance with part 901 of this chapter that is not already under the direction of HUD or a court-appointed receiver, must use an Alternative Management Entity as defined in §901.5 of this chapter for development of replacement housing and must comply with any applicable provisions of its Memorandum of Agreement executed with HUD under that part; and

(E) Any development of replacement housing by any PHA must be done in accordance with part 941 of this chapter.

(iii) If the PHA does not use the restored funding that results from the use of the replacement factor to provide replacement housing or renovate vacant units in a timely fashion, in accordance with §968.125 and §941.501 of this chapter, and make reasonable progress on such use of the funding, in accordance with §968.335(a)(3) and §941.501, HUD may require appropriate corrective action under §968.335 and §941.501; may recapture and reallocate the funds; or may use other remedies available to HUD.

(g) Allocation of CIAP. The formula amount determined under paragraphs (e) and (f) of this section for PHAs and IHAs with fewer than 250 units shall be allocated to PHAs in accordance with the requirements of subpart B of this part (the CIAP), and to IHAs in accordance with the requirements of 24 CFR part 950, subpart I.

(h) Allocation for CGP. The formula amount determined under paragraphs (e) and (f) of this section for PHAs with 250 or more units shall be allocated in accordance with the requirements of subpart C of this part (the CGP), and for IHAs in accordance with the requirements of 24 CFR part 950, subpart I. A PHA that is eligible to receive a grant under the CGP may appeal the amount of its formula allocation in accordance with the requirements set forth in §968.310(b). A PHA that is eligible to receive modernization funds under the CGP because it owns or operates 250 or more units is disqualified from receiving assistance under the CIAP under this part.

(i) Use of formula allocation. Any amounts allocated to a PHA under paragraphs (e) and (f) of this section may be used for any eligible activity under this part, notwithstanding that the allocation amount is determined by allocating half based on the relative backlog needs and half based on the relative accrual needs of PHAs and IHAs.

(j) Calculation of number of units. For purposes of determining under this section the number of units owned or operated by a PHA or IHA, and the relative modernization needs of PHAs and IHAs, HUD shall count as one unit each existing rental and section 23 bond-financed unit under the ACC, except that it shall count as one-fourth of a unit each existing unit under the Turnkey III program. In addition, HUD shall count as one unit each existing unit under the Mutual Help program. New development units that are added to an PHA's or IHA's inventory will be added to the overall unit count so long as they are under ACC amendment and have reached DOFA by the first day in the FFY in which the formula is being run. Any increase in units (reaching DOFA and under ACC amendment) as of the beginning of the FFY shall result in an adjustment upwards in the number of units under the formula. New units reaching DOFA after this date will be counted for formula purposes as of the following FFY.

(k) Demolition, disposition and conversion of units—(1) General. Where an existing unit under an ACC is demolished, disposed of, or converted into a larger or smaller unit, including the substantial rehabilitation of a Mutual Help or Turnkey III unit, HUD shall not adjust the amount the PHA or IHA receives under the formula, unless more than one percent of the units are affected on a cumulative basis. Where more than one percent of the existing units are demolished, disposed of, or converted, HUD shall reduce the formula amount for the PHA or IHA over a 3-year period to reflect removal of the units from the ACC;

(2) Determination of one percent cap. In determining whether more than one percent of the units are affected on a cumulative basis, HUD will compare the units eligible for funding in the initial year under formula funding with the number of units eligible for funding for formula funding purposes for the current year, and shall base its calculations on the following:

(i) Increases in the number of units resulting from the conversion of existing units will be added to the overall unit count so long as they are under ACC amendment by the first day in the FFY in which the formula is being run;

(ii) Units which are lost as a result of demolition, disposition or conversion shall not be offset against units subsequently added to a PHA's or IHA's inventory;

(iii) For purposes of calculating the number of converted units, HUD shall regard the converted size of the unit as the appropriate unit count (e.g., a unit that originally was counted as one unit under paragraph (j) of this section, but which later was converted into two units, shall be counted as two units under the ACC).

(3) Phased-in reduction of units. (i) Reduction less than one percent. If HUD determines that the reduction in units under paragraph (k)(2) of this section is less than one percent, the PHA or IHA will be funded as though no change had occurred;

(ii) Reduction greater than one percent. If HUD determines that the reduction in units under paragraph (k)(2) of this section is greater than one percent, the number of units on which formula funding is based will be the number of units reported as eligible for funding for the current program, plus two thirds of the difference between the initial year and the current year in the first year, plus one third of the difference in the second year, and at the level of the current year in the third year;

(iii) Exception. A unit which is conveyed under the Mutual Help or Turnkey III programs will result in an automatic (rather than a phased-in) reduction in the unit count. Paid-off Mutual Help or Turnkey III units continue to be counted until they are conveyed.

(4) Subsequent reductions in unit count. (i) Once a PHA's or IHA's unit count has been fully reduced under paragraph (k)(3)(ii) of this section to reflect the new number of units under the ACC, this new number of units will serve as the base for purposes of calculating whether there has been a one percent reduction in units on a cumulative basis;

(ii) A reduction in formula funding, based upon additional reductions to the number of a PHA's or IHA's units, will also be phased in over a three-year period, as described in paragraph (k)(2) of this section.

[57 FR 5571, Feb. 14, 1992, as amended at 59 FR 30477, June 13, 1994; 59 FR 44837, Aug. 30, 1994; 61 FR 8737, Mar. 5, 1996; 63 FR 46107, Aug. 28, 1998]

§ 968.104   Reserve for emergencies and disasters.

(a) Emergencies—(1) Eligibility for assistance. A PHA (including a PHA that has been designated as mod troubled under PHMAP) may obtain funds at any time, for any eligible emergency work item as defined in §968.305 (for CGP PHAs) or for any eligible emergency work item (described as emergency modernization in §968.205) (for CIAP PHAs), from the reserve established under §968.103(b). However, emergency reserve funds may not be provided to a CGP PHA that has the necessary funds available from any other source, including its annual formula allocation under §968.103 (e) and (f), other unobligated modernization funds, and its replacement reserves. A PHA is not required to have an approved comprehensive plan under §968.315 before it can request emergency assistance from this reserve. Emergency reserve funds may not be provided to a CIAP PHA unless it does not have the necessary funds available from any other source, including unobligated CIAP, and no CIAP modernization funding is available from HUD for the remainder of the fiscal year.

(2) Procedure. To obtain emergency funds, a PHA must submit a request, in a form to be prescribed by HUD, which demonstrates that without the requested funds from the set-aside, the PHA does not have adequate funds available to correct the conditions which present an immediate threat to the health or safety of the residents. HUD will immediately process a request for such assistance and, if it determines that the PHA's request meets the requirements under paragraph (a)(1) of this section, it shall approve the request, subject to the availability of funds in the reserve;

(3) Repayment. A CGP PHA that receives assistance for its emergency needs from the reserve under §968.103(b) must repay such assistance from its future allocations of assistance, where available. For CGP PHAs, HUD shall deduct up to 50 percent of a PHA's succeeding year's formula allocation under §968.103 (e) and (f) to repay emergency funds previously provided by HUD to the PHA. The remaining balance, if any, shall be deducted from a PHA's succeeding years' formula allocations. A CIAP PHA is not required to repay assistance for its emergency needs from the reserve.

(b) Natural and other disasters—(1) Eligibility for assistance. A PHA (including a PHA that has been designated as mod troubled under PHMAP) may request assistance at any time from the reserve established under §968.103(b) for the purpose of permitting the PHA to address a natural or other disaster. To qualify for assistance, the disaster must pertain to an extraordinary event affecting only one or a few PHAs, such as an earthquake or hurricane. Any disaster declared by the President (or which HUD determines would qualify for a Presidential declaration if it were on a larger scale) qualifies for assistance under this paragraph. A PHA may receive funds from the reserve regardless of the availability of other modernization funds or reserves, but only to the extent that its needs are in excess of its insurance coverage or other Federal assistance. A CGP PHA is not required to have an approved comprehensive plan under §968.315 before it can request assistance from the reserve under §968.103(b);

(2) Procedure. To obtain funding for natural or other disasters under §968.103(b), a PHA must submit a request, in a form to be prescribed by HUD, which demonstrates that the PHA meets the requirements of paragraph (b)(1) of this section. HUD will immediately process a request for such assistance and, if it determines that the request meets the requirements under paragraph (b)(1) of this section, it shall approve the request, subject to the availability of funds in the reserve;

(3) Repayment. Funds provided to a PHA under §968.103(b) for natural and other disasters are not required to be repaid.

[57 FR 5575, Feb. 14, 1992, as amended at 59 FR 44838, Aug. 30, 1994. Redesignated and amended at 61 FR 8738, Mar. 5, 1996]

§ 968.105   Definitions.

The terms HUD and Public Housing Agency (PHA) are defined in 24 CFR part 5.

Act. The United States Housing Act of 1937, as amended, (42 U.S.C. 1437 et seq.).

Annual contributions contract (ACC). A contract under the Act between HUD and the PHA containing the terms and conditions under which the Department assists the PHA in providing decent, safe, and sanitary housing for low-income families. The ACC must be in a form prescribed by HUD under which HUD agrees to provide assistance in the development, modernization, and/or operation of a low-income housing project under the Act, and the PHA agrees to develop, modernize, and operate the project in compliance with all provisions of the ACC and the Act, and all HUD regulations and implementing requirements and procedures.

CGP. The Comprehensive Grant Program, which provides modernization funds on a formula basis to PHAs with 250 or more public housing units.

CIAP. The Comprehensive Improvement Assistance Program, which provides modernization funds on a competitive basis to PHAs with fewer than 250 public housing units.

Development. The term development has the same meaning as that provided for low-income housing project, as that term is defined in section 3(b)(1) of the Act.

FFY. Federal fiscal year.

Force account labor. Labor employed directly by the PHA on either a permanent or a temporary basis. See §968.120.

Hard costs. The physical improvement costs in development accounts 1450 through 1475 of the Low-Rent Housing Accounting Handbook 7510.1, as revised, which include: Account 1450 Site Improvements; Account 1460 Dwelling Structures; Account 1465.1 Dwelling Equipment—Nonexpendable; Account 1470 Nondwelling Structures; and Account 1475 Nondwelling Equipment.

Homebuyer agreement. A Turnkey III Homebuyer Ownership Opportunity Agreement.

Modernization funds. Funds derived from an allocation of budget authority for the purpose of funding physical and management improvements.

Modernization program. A PHA's program for carrying out modernization, as set forth in the approved CIAP budget or CGP Annual Statement.

Modernization project. The improvement of one or more existing public housing developments under a unique number designated for that modernization program. For each modernization project, HUD and the PHA shall enter into an ACC amendment, requiring low-income use of the housing for not less than 20 years from the date of the ACC amendment (subject to sale of homeownership units in accordance with the terms of the ACC). The terms “modernization project number” and “comprehensive grant number” are used interchangeably.

Non-routine maintenance. Work items that ordinarily would be performed on a regular basis in the course of upkeep of property, but have become substantial in scope because they have been put off, and involve expenditures that would otherwise materially distort the level trend of maintenance expenses. Replacement of equipment and materials rendered unsatisfactory because of normal wear and tear by items of substantially the same kind does qualify, but reconstruction, substantial improvement in the quality or kind of original equipment and materials, or remodeling that alters the nature or type of housing units does not qualify.

Partnership process. A specific and ongoing process that is designed to ensure that residents, resident groups, and the PHA work in a cooperative and collaborative manner to develop, implement and monitor the CIAP or CGP. At a minimum, a PHA shall ensure that the partnership process incorporates full resident participation in each of the required program components.

PHMAP. The Public Housing Management Assessment Program (PHMAP) is a process designed to allow HUD and the PHA to identify PHA management capabilities and deficiencies, and to lead to overall better management of the public housing program, in accordance with 24 CFR part 901.

Reasonable cost. Total unfunded hard cost needs for a development that do not exceed 90 percent of the computed Total Development Cost (TDC) for a new development with the same structure type and number and size of units in the market area.

Soft costs. The non-physical improvement costs which exclude any costs in development accounts 1450 through 1475.

[54 FR 52689, Dec. 21, 1989, as amended at 56 FR 922, Jan. 9, 1991; 57 FR 5573, Feb. 14, 1992; 58 FR 13931, Mar. 15, 1993; 61 FR 5216, Feb. 9, 1996; 61 FR 8738, Mar. 5, 1996]

§ 968.108   Displacement, relocation, and real property acquisition.

(a) Minimizing displacement. Consistent with the other goals and objectives of this part, PHAs must assure that they have taken all reasonable steps to minimize the displacement of persons (families, individuals, businesses, nonprofit organizations, and farms) as a result of a project assisted under this part.

(b) Temporary relocation. Residents who will not be required to move permanently, but who must relocate temporarily (e.g., to permit rehabilitation), shall be provided:

(1) Reimbursement for all reasonable out-of-pocket expenses incurred in connection with the temporary relocation, including the cost of moving to and from the temporary housing and any increase in monthly rent/utility costs; and

(2) Appropriate advisory services, including reasonable advance written notice of:

(i) The date and approximate duration of the temporary relocation;

(ii) The location of the suitable, decent, safe, and sanitary housing to be made available for the temporary period;

(iii) The terms and conditions under which the resident may lease and occupy a suitable, decent, safe, and sanitary dwelling in the building/complex following completion of the project; and

(iv) The provisions of paragraph (b)(1) of this section.

(c) Relocation assistance for displaced persons. A “displaced person” (defined in paragraph (g) of this section) must be provided relocation assistance at the levels described in, and in accordance with the requirements of, the Uniform Relocation Assistance and Real Property Acquisition Policies Act of 1970, as amended (URA) (42 U.S.C. 4601–4655) and implementing regulations at 49 CFR part 24. A “displaced person” shall be advised of his/her rights under the Fair Housing Act (42 U.S.C. 3601–19), and, if the representative comparable replacement dwelling used to establish the amount of the replacement housing payment to be provided to a minority person is located in an area of minority concentration, such person also shall be given, if possible, referrals to comparable and suitable, decent, safe, and sanitary replacement dwellings not located in such areas.

(d) Real property acquisition requirements. The acquisition of real property for a development is subject to the URA and the requirements described in 49 CFR part 24, subpart B.

(e) Appeals. A person who disagrees with the PHA's determination concerning whether the person qualifies as a “displaced person,” or the amount of the relocation assistance for which the person is eligible, may file a written appeal of that determination with the PHA. A lower-income person who is dissatisfied with the PHA's determination on his or her appeal may submit a written request for review of that determination to the HUD Field Office.

(f) Responsibility of PHA. (1) The PHA shall certify that it will comply (i.e., provide assurance of compliance, as required by 49 CFR part 24) with the URA, the regulations at 49 CFR part 24, and the requirements of this section and shall ensure such compliance, notwithstanding any third party's contractual obligation to the PHA to comply with these provisions.

(2) The PHA shall maintain records in sufficient detail to demonstrate compliance with these provisions. The PHA shall maintain data on the race, ethnic, gender, and handicap status of displaced persons.

(g) Definition of displaced person. (1) For purposes of this section, the term displaced person means a person (family, individual, business, nonprofit organization, or farm) that moves from real property, or moves personal property from real property, permanently, as a direct result of acquisition, rehabilitation, or demolition for a project assisted under this part. This includes any permanent, involuntary move for an assisted project, including any permanent move from the building/complex that is made:

(i) On or after the date of the “initiation of negotiations” (defined in §968.108(h)), if the person is the resident of a dwelling and any one of the following three situations occurs:

(A) The resident has not been provided, before the move, a written notice offering the resident the opportunity to lease and occupy a suitable, decent, safe, and sanitary dwelling in the same building/complex upon completion of the project under reasonable terms and conditions. Such reasonable terms and conditions include a monthly rent and estimated average monthly utility costs that do not exceed the total tenant payment, as determined under 24 CFR 913.107; or

(B) The resident is required to relocate temporarily, does not return to the building/complex, and either:

(1) The resident is not offered payment for all reasonable out-of-pocket expenses incurred in connection with the temporary relocation, or

(2) Other conditions of the temporary relocation are not reasonable; or

(C) The resident is required to move to another dwelling unit in the same building/complex but is not offered reimbursement for all reasonable out-of-pocket expenses incurred in connection with the move, or other conditions of the move are not reasonable; or

(ii) Before the “initiation of negotiations,” if the PHA or HUD determines that the displacement resulted directly from acquisition, rehabilitation, or demolition for the assisted project;

(2) Notwithstanding the provisions of paragraph (g)(1) of this section, a person does not qualify as a “displaced person” (and is not eligible for relocation assistance under the URA or this section), if:

(i) The person has been evicted for serious or repeated violation of the terms and conditions of the lease or occupancy agreement, violation of applicable Federal, State or local law, or other good cause, and the PHA determines that the eviction was not undertaken for the purpose of evading the obligation to provide relocation assistance;

(ii) The person moved into the property after the submission of the Annual Statement (CGP) or application (CIAP) and, before signing a lease and commencing occupancy, was provided written notice of the project, its possible impact on the person (e.g., that the person may be displaced or temporarily relocated) and the fact that he or she would not qualify as a “displaced person” (or for assistance under this section) as a result of the project;

(iii) The person is ineligible under 49 CFR 24.2(g)(2); or

(iv) HUD determines that the person was not displaced as a direct result of acquisition, rehabilitation, or demolition for the project.

(3) The PHA may ask HUD, at any time, to determine whether a displacement is or would be covered by this section.

(h) Definition of initiation of negotiations. For purposes of determining the formula for computing the replacement housing assistance to be provided to a resident who is displaced by rehabilitation or demolition, the term initiation of negotiations means 45 calendar days before (1) the issuance of the invitation for bids for the project or (2) the start of force account work, whichever is applicable.

(Approved by the Office of Management and Budget under OMB Control Number 2506–0121)

[58 FR 13931, Mar. 15, 1993, as amended at 61 FR 8738, Mar. 5, 1996]

§ 968.110   Other program requirements.

In addition to the Federal requirements set forth in 24 CFR part 5, the PHA shall comply with the following program requirements:

(a) Nondiscrimination and equal opportunity. The PHA shall comply with Title II of the Americans with Disabilities Act and 28 CFR part 35; section 504 of the Rehabilitation Act of 1973 and 41 CFR part 60–471; and the Architectural Barriers Act of 1968 (42 U.S.C. 4151–4157) and 24 CFR part 40.

(b) [Reserved]

(c) Environmental clearance. Before approving a proposed project, HUD will comply with the requirements of 24 CFR part 50, implementing the National Environmental Policy Act of 1969 (42 U.S.C. 4332 et seq.) and related requirements of 24 CFR 50.4.

(d) Flood insurance. HUD will not approve for acquisition, construction, or improvement, a building located in an area that has been identified by the Federal Emergency Management Agency as having special flood hazards, unless the following conditions are met:

(1) Flood insurance on the building is obtained in compliance with section 102(a) of the Flood Disaster Protection Act of 1973 (42 U.S.C. 4001 et seq.); and

(2) The community in which the area is situated is participating in the National Flood Insurance Program in accord with 44 CFR parts 59–79, or less than one year has passed since FEMA notification regarding flood hazards.

(e) Wage rates—(1) Davis-Bacon. With respect to modernization work or contracts over $2,000 (except for nonroutine maintenance work), all laborers and mechanics (other than volunteers under the conditions set out in 24 CFR part 70) who are employed by the PHA or its contractors shall be paid not less than the wages prevailing in the locality, as predetermined by the Secretary of Labor pursuant to the Davis-Bacon Act (40 U.S.C. 276a–276a–5).

(2) HUD-determined. With respect to all nonroutine maintenance work or contracts, all laborers and mechanics (other than volunteers under the conditions set out in 24 CFR part 70) who are employed by the PHA or its contractors shall be paid not less than the wages prevailing in the locality, as determined or adopted by HUD pursuant to section 12 of the United States Housing Act of 1937.

(3) State. Prevailing wage rates determined under State law are inapplicable under the circumstances set forth in §965.101 of this chapter.

(f) Technical wage rates. All architects, technical engineers, draftsmen and technicians (other than volunteers under the conditions set out in 24 CFR part 70) who are employed in the development of a project shall be paid not less than the wages prevailing in the locality, as determined or adopted (subsequent to a determination under applicable State or local law) by HUD.

(g)–(j) [Reserved]

(k) Lead-based paint poisoning prevention. The PHA shall comply with the relevant requirements of the Lead-Based Paint Poisoning Prevention Act (42 U.S.C. 4821–4846), the Residential Lead-Based Paint Hazard Reduction Act of 1992 (42 U.S.C. 4851–4856), and implementing regulations at part 35, subparts A, B, L, and R of this title.

(l) [Reserved]

(m) Coastal barriers. In accordance with the Coastal Barriers Resources Act, 16 U.S.C. 3501, no financial assistance under this part may be made available within the Coastal Barrier Resources System.

[54 FR 52689, Dec. 21, 1989, as amended at 56 FR 922, Jan. 9, 1991; 56 FR 15175, Apr. 15, 1991; 57 FR 5573, Feb. 14, 1992; 57 FR 14761, Apr. 22, 1992; 58 FR 13932, Mar. 15, 1993; 61 FR 5216, Feb. 9, 1996; 61 FR 8738, Mar. 5, 1996; 64 FR 33637, June 23, 1999; 64 FR 50229, Sept. 15, 1999]

§ 968.112   Eligible costs.

(a) General. A PHA may use financial assistance received under this part for the following eligible costs:

(1) For a CGP PHA, the eligible costs are:

(i) Undertaking activities described in its approved Annual Statement under §968.325 and approved Five-Year Action Plan under §968.315(e)(5);

(ii) Carrying out emergency work, whether or not the need is indicated in the PHA's approved Comprehensive Plan, including Five-Year Action Plan, or Annual Statement;

(iii) Funding a replacement reserve to carry out eligible activities in future years, subject to the restrictions set forth in paragraph (f) of this section;

(iv) Preparing the Comprehensive Plan and Five-Year Action Plan under §968.315 and the Annual Submission under §968.325, including reasonable costs necessary to assist residents to participate in a meaningful way in the planning, implementation and monitoring process; and

(v) Carrying out an audit, in accordance with 24 CFR part 44.

(2) For a CIAP PHA, the eligible costs are activities approved by HUD and included in an approved CIAP budget.

(b) Demonstration of viability. Except in the case of emergency work, a PHA shall only expend funds on a development for which the PHA has determined, and HUD agrees, that the completion of the improvements and replacements (for CGP PHAs, as identified in the Comprehensive Plan) will reasonably ensure the long-term physical and social viability of the development at a reasonable cost (as defined in §968.105), or for essential non-routine maintenance needed to keep the property habitable until the demolition or disposition application is approved and residents are relocated.

(c) Physical improvements. Eligible costs include alterations, betterments, additions, replacements, and non-routine maintenance that are necessary to meet the modernization and energy conservation standards prescribed in §968.115. These mandatory standards may be exceeded when a PHA (and HUD in the case of CIAP PHAs) determines that it is necessary or highly desirable for the long-term physical and social viability of the individual development. Development specific work includes work items that are modest in design and cost, but still blend in with the design and architecture of the surrounding community by including amenities, quality materials and design and landscaping features that are customary for the locality and culture. The Field Office has the authority to approve nondwelling space where such space is needed to administer, and is of direct benefit to, the public housing program. If demolition or disposition is proposed, a PHA shall comply with 24 CFR part 970. Additional dwelling space may be added to existing units.

(d) Turnkey III developments—(1) General. Eligible physical improvement costs for existing Turnkey III developments are limited to work items that are not the responsibility of the homebuyer families and that are related to health and safety, correction of development deficiencies, physical accessibility, energy audits and cost-effective energy conservation measures, or LBP testing, interim containment, professional risk assessment and abatement. In addition, management improvements are eligible costs.

(2) Ineligible costs. Routine maintenance or replacements, and items that are the responsibility of the homebuyer families are ineligible costs.

(3) Exception for vacant or non-homebuyer-occupied Turnkey III units. (i) Notwithstanding the requirements of paragraph (d)(1) of this section, a PHA may substantially rehabilitate a Turnkey III unit whenever the unit becomes vacant or is occupied by a non-homebuyer family in order to return the unit to the inventory or make the unit suitable for homeownership purposes. A PHA that intends to use funds under this paragraph must identify in its CIAP application or CGP annual submission the estimated number of units proposed for substantial rehabilitation and subsequent sale. In addition, a PHA must demonstrate, for each of the Turnkey III units proposed to be substantially rehabilitated, that it has homebuyers who both are eligible for homeownership, in accordance with the requirements of 24 CFR part 904, and have demonstrated their intent to be placed into the unit.

(ii) Before a PHA may be approved for substantial rehabilitation of a unit under this paragraph, it must first deplete any Earned Home Payments Account (EHPA) or Non-Routine Maintenance Reserve (NRMR) pertaining to the unit, and request the maximum amount of operating subsidy. Any increase in the value of a unit caused by its substantial rehabilitation under this paragraph shall be reflected solely by its subsequent appraised value, and not by an automatic increase in its selling price.

(e) Demolition and conversion costs. Eligible costs include:

(1) Demolition of dwelling units or non-dwelling facilities, where the demolition is approved by HUD under 24 CFR part 970, and related costs, such as clearing and grading the site after demolition and subsequent site improvement to benefit the remaining portion of the existing development; and

(2) Conversion of existing dwelling units to different bedroom sizes or to non-dwelling use.

(f) Replacement reserve costs (for CGP only). (1) Funding a replacement reserve to carry out eligible activities in future years is an eligible cost, subject to the following restrictions:

(i) Annual CGP funds are not needed for existing needs, as identified by the PHA in its needs assessments; or

(ii) A physical improvement requires more funds than the PHA would receive under its annual formula allocation; or

(iii) A management improvement requires more funds than the PHA may use under its 20% limit for management improvements (except as provided in paragraph (n)(2)(i) of this section), and the PHA needs to save a portion of its annual grant, in order to combine it with a portion of subsequent year(s) grants to fund the work item.

(2) The PHA shall invest replacement reserve funds so as to generate a return equal to or greater than the average 91-day Treasury bill rate.

(3) Interest earned on funds in the replacement reserve will not be added to the PHA's income in the determination of a PHA's operating subsidy eligibility, but must be used for eligible modernization costs.

(4) To the extent that its annual formula allocation and any unobligated balances of modernization funds are not adequate to meet emergency needs, a PHA must first use its replacement reserve, where funded, to meet emergency needs, before requesting funds from the reserve under §968.104. Use of the replacement reserve is not required for emergencies if the amount that otherwise would be used from that reserve is an accumulation from application of the replacement housing factor (§968.103(e) (3) and (f)(4)) that is necessary so that replacement housing can be provided efficiently and effectively.

(5) A PHA is not required to use its replacement reserve for costs related to natural and other disasters.

(g) Management improvement costs—(1) General. Management improvements that are development-specific or PHA-wide in nature are eligible costs where needed to upgrade the operation of the PHA's developments, sustain physical improvements at those developments or correct management deficiencies. A PHA's ongoing operating expenses are ineligible management improvement costs. For CIAP PHAs, management improvements may be funded as a single work item.

(2) Eligible costs. Eligible costs include:

(i) General management improvement costs. Eligible costs include general management improvement costs, such as: management, financial, and accounting control systems of the PHA; adequacy and qualifications of PHA personnel, including training; resident programs and services through the coordination of the provision of social services from tribal or local government or other public and private entities; resident and development security; resident selection and eviction; occupancy; rent collection; maintenance; and equal opportunity.

(ii) Economic development costs. Eligible costs include job training for residents and resident business development activities, for the purpose of carrying out activities related to the modernization-funded management and physical improvements. HUD encourages PHAs, to the greatest extent feasible, to hire residents as trainees, apprentices, or employees to carry out the modernization program under this part, and to contract with resident-owned businesses for modernization work.

(iii) Resident management costs. Eligible costs include technical assistance to a resident council or resident management corporation (RMC), as defined in part 964, in order to: determine the feasibility of resident management to carry out management functions for a specific development or developments; train residents in skills directly related to the operations and management of the development(s) for potential employment by the RMC; train RMC board members in community organization, board development, and leadership; and assist in the formation of an RMC.

(iv) Resident homeownership costs. Eligible costs are limited to the study of the feasibility of converting rental to homeownership units and the preparation of an application for conversion to homeownership or sale of units.

(v) Preventive maintenance system. Eligible costs include the establishment of a preventive maintenance system or improvement of an existing system. A preventive maintenance system must provide for regular inspections of building structures, systems and units and distinguish between work eligible for operating funds (routine maintenance) and work eligible for modernization funding (non-routine maintenance).

(h) Drug elimination costs. Eligible costs include drug elimination activities involving management or physical improvements, as specified by HUD.

(i) Lead-based paint costs. Eligible costs include lead-based paint activities, such as insurance coverage and cleanup and disposal, in accordance with part 35 of this title.

(j) Administrative costs. Administrative costs necessary for the planning, design, implementation and monitoring of the physical and management improvements are eligible costs and include the following:

(1) Salaries. The salaries of non-technical and technical PHA personnel assigned full-time or part-time to modernization are eligible costs only where the scope and volume of the work are beyond that which could be reasonably expected to be accomplished by such personnel in the performance of their non-modernization duties. A PHA shall properly apportion to the appropriate program budget any direct charges for the salaries of assigned full- or part-time staff (e.g., to the CIAP, CGP or operating budget);

(2) Employee benefit contributions. PHA contributions to employee benefit plans on behalf of non-technical and technical PHA personnel are eligible costs in direct proportion to the amount of salary charged to the CIAP or CGP, as appropriate;

(3) Preparation of CIAP or CGP required documents;

(4) Resident participation. Eligible costs include those associated with ensuring the meaningful participation of residents in the development of the CIAP Application or the CGP Annual Submission and Comprehensive Plan and the implementation and monitoring of the approved modernization program; and

(5) Other administrative costs, such as telephone and facsimile, as specified by HUD.

(k) Audit costs (CGP only). Eligible costs are limited to the portion of the audit costs that are attributable to the modernization program.

(l) Architectural/engineering and consultant fees. Eligible costs include fees for planning, identification of needs, detailed design work, preparation of construction and bid documents and other required documents, LBP professional risk assessments and testing, and inspection of work in progress.

(m) Relocation costs. Eligible costs include relocation and other assistance for permanent and temporary relocation, as a direct result of rehabilitation, demolition or acquisition for a modernization-funded activity, where this assistance is required by 49 CFR part 24 or §968.108.

(n) Cost limitations—(1) CIAP costs. (i) Management improvement costs. Management improvement costs shall not exceed a percentage of the CIAP funds available to a Field Office in a particular FFY, as specified by HUD.

(ii) Planning costs. Planning costs are costs incurred before HUD approval of the CIAP application and which are related to developing the CIAP application or carrying out eligible modernization planning, such as detailed design work, preparation of solicitations, and LBP professional risk assessment and testing. Planning costs may be funded as a single work item. If a PHA incurs planning costs without prior HUD approval, a PHA does so with the full understanding that the costs may not be reimbursed upon approval of the CIAP application. Planning costs shall not exceed 5 percent of the CIAP funds available to a Field Office in a particular FFY.

(2) CGP costs. (i) Management improvement costs. Notwithstanding the full fungibility of work items, a PHA shall not use more than a total of 20 percent of its annual grant for management improvement costs in account 1408, unless specifically approved by HUD or the PHA has been designated as both an over-all high performer and mod-high performer under the PHMAP.

(ii) Administrative costs. Notwithstanding the full fungibility of work items, a PHA shall not use more than a total of 10 percent of its annual grant on administrative costs in account 1410, excluding any costs related to lead-based paint or asbestos testing (whether conducted by force account employees or by a contractor), in-house architectural/engineering (A/E) work, or other special administrative costs required by State or local law, unless specifically approved by HUD.

(3) Program benefit. Where the physical or management improvement, including administrative cost, will benefit programs other than Public Housing, such as Section 8 or local revitalization programs, eligible costs are limited to the amount directly attributable to the public housing program.

(4) No duplication. Any eligible cost for an activity funded by CIAP or CGP shall not also be funded by any other HUD program.

(o) Ineligible costs. Ineligible costs include:

(1) Luxury improvements;

(2) Indirect administrative costs (overhead), as defined in OMB Circular A–87;

(3) Public housing operating assistance;

(4) Direct provision of social services, through either force account or contract labor, from FFY 1996 and future FFYs funds, unless otherwise provided by law; and

(5) Other ineligible activities, as specified by HUD.

(p) Expanded eligibility for FFY 1995 and prior year modernization funds. The FFY 1995 Rescissions Act expanded the eligible activities that may be funded with CIAP or CGP assistance provided from FFY 1995 and prior FFY funds. Such activities include, but are not limited to:

(1) New construction or acquisition of additional public housing units, including replacement units;

(2) Modernization activities related to the public housing portion of housing developments held in partnership, or cooperation with non-public housing entities; and

(3) Other activities related to public housing, including activities eligible under the Urban Revitalization Demonstration (HOPE VI).

[61 FR 8738, Mar. 5, 1996, as amended at 62 FR 27126, May 16, 1997; 63 FR 46108, Aug. 28, 1998; 64 FR 50229, Sept. 15, 1999]

§ 968.115   Modernization and energy conservation standards.

All improvements funded under this part shall:

(a) Meet the modernization standards as prescribed by HUD;

(b) Incorporate cost-effective energy conservation measures, identified in the PHA's most recently updated energy audit, conducted pursuant to part 965, subpart C;

(c) Where changing or installing a new utility system, conduct a life-cycle cost analysis, reflecting installation and operating costs; and

(d) Provide decent, safe, and sanitary living conditions in PHA-owned and PHA-operated public housing.

[61 FR 8740, Mar. 5, 1996]

§ 968.120   Force account.

(a) For both CIAP and CGP, a PHA may undertake the activities using force account labor, only where specifically approved by HUD in the CIAP budget or CGP Annual Statement, except no prior HUD approval is required where the PHA is designated as both an overall high performer and Modernization high performer under the PHMAP.

(b) If the entirety of modernization activity (including the planning and architectural design of the rehabilitation) is administered by the RMC, the PHA shall not retain for any administrative or other reason, any portion of the modernization funds provided, unless the PHA and the RMC provide otherwise by contract.

[61 FR 8740, Mar. 5, 1996]

§ 968.125   Initiation of modernization activities.

After HUD has approved the modernization program and entered into an ACC amendment with the PHA, a PHA shall undertake the modernization activities and expenditures set forth in its approved CIAP budget or CGP Annual Statement/Five-Year Action Plan in a timely, efficient and economical manner. All approved funding must be obligated within two years of approval and expended within three years of approval unless HUD approves a longer time period in the PHA's implementation schedule, as set forth in the CIAP budget or CGP Annual Statement. HUD may approve a longer time period for such reasons as the large size of the grant or the complexity of the work.

[61 FR 8741, Mar. 5, 1996]

§ 968.130   Fund requisitions.

To draw down modernization funds against the approved CIAP budget or CGP Annual Statement, a PHA shall comply with requirements prescribed by HUD.

[61 FR 8741, Mar. 5, 1996]

§ 968.135   Contracting requirements.

In addition to the requirements specified in 24 CFR parts 5, 85, and 965, subpart A, and §968.110(e), the following provisions apply:

(a) Architect/engineer and other professional services contracts. For CIAP only and notwithstanding 24 CFR 85.36(g), a PHA shall comply with the following HUD requirements:

(1) Where the proposed contract amount exceeds the HUD-established threshold, submit the contract for prior HUD approval before execution or issuance; or

(2) Where the proposed contract amount does not exceed the HUD-established threshold, certify that the scope of work is consistent with the originally approved modernization program, and that the amount is appropriate and does not result in the total HUD-approved CIAP budget being exceeded.

(b) Assurance of completion. For both CIAP and CGP and notwithstanding 24 CFR 85.36(h), for each construction contract over $100,000, the contractor shall furnish a bid guarantee from each bidder equivalent to 5% of the bid price; and one of the following:

(1) A performance and payment bond for 100 percent of the contract price; or

(2) Separate performance and payment bonds, each for 50% or more of the contract price; or

(3) A 20% cash escrow; or

(4) a 25% irrevocable letter of credit.

(c) Construction solicitations. For CIAP only and notwithstanding 24 CFR 85.36(g), a PHA shall comply with HUD requirements to either:

(1) Where the estimated contract amount exceeds the HUD-established threshold, submit a complete construction solicitation for prior HUD approval before issuance; or

(2) Where the estimated contract amount does not exceed the HUD-established threshold, certify receipt of the required architect's/engineer's certification that the construction documents accurately reflect HUD-approved work and meet the modernization and energy conservation standards and that the construction solicitation is complete and includes all mandatory items.

(d) Contract awards. (1) For CIAP only, a PHA shall obtain HUD approval of the proposed award of a contract if the contract work is inconsistent with the originally approved modernization program or the procurement meets the criteria set forth in 24 CFR 85.36(g)(2)(i) through (iv). In all other instances, a PHA shall make the award without HUD approval after the PHA has certified that:

(i) The solicitation and award procedures were conducted in compliance with State or local laws and Federal requirements;

(ii) The award does not meet the criteria in 24 CFR 85.36(g)(2)(i) through (iv) for prior HUD approval; and

(iii) The contractor is not on the Lists of Parties Excluded from Federal Procurement or Nonprocurement Programs;

(2) For CGP only, a PHA shall obtain HUD approval of the proposed award of a contract if the procurement meets the criteria set forth in 24 CFR 85.36(g)(2)(i) through (iv).

(e) Contract modifications. For CIAP only and notwithstanding 24 CFR 85.36(g), except in an emergency endangering life or property, a PHA shall comply with HUD requirements to either:

(1) Where the proposed contract modification exceeds the HUD-established threshold, submit the proposed modification for prior HUD approval before issuance; or

(2) Where the proposed contract modification does not exceed the HUD-established threshold, certify that the proposed modification is within the scope of the contract and that any additional costs are within the total HUD-approved CIAP budget amount.

(f) Construction requirements. Where indicated by poor performance, a PHA may be required to submit to HUD periodic progress reports and, for prior HUD approval, construction completion documents above a HUD-specified amount. For CGP only, a PHA is notified of additional construction requirements by a notice of deficiency or a corrective action order.

(g) Reward for high performers. For CIAP only, if a PHA is both an overall high performer and a modernization high performer under the Public Housing Management Assessment Program (PHMAP), HUD will not establish thresholds, and the PHA is not required to obtain prior HUD approval, under paragraphs (a), (c), and (e) of this section.

[61 FR 8741, Mar. 5, 1996]

§ 968.140   On-site inspections.

It is the responsibility of the PHA, not HUD, to provide, by contract or otherwise, adequate and competent supervisory and inspection personnel during modernization, whether work is performed by contract or force account labor and with or without the services of an architect/engineer, to ensure work quality and progress.

[58 FR 13938, Mar. 15, 1993. Redesignated at 61 FR 8741, Mar. 5, 1996]

§ 968.145   Fiscal closeout.

(a) Actual modernization cost certificate (AMCC). Upon expenditure by the PHA of all funds, or termination by HUD of the activities funded in a modernization program, a PHA shall submit the AMCC, in a form prescribed by HUD, to HUD for review and approval for audit. After audit verification, HUD shall approve the AMCC.

(b) Audit. The audit shall follow the guidelines prescribed in 24 CFR part 44, Non-Federal Government Audit Requirements. If the pre-audit or post-audit AMCC indicates that there are excess funds, a PHA shall immediately remit the excess funds as directed by HUD. If the pre-audit or post-audit AMCC discloses unauthorized or ineligible expenditures, a PHA shall immediately take such corrective actions as HUD may direct.

[61 FR 8741, Mar. 5, 1996]

Browse Next






















chanrobles.com


ChanRobles Legal Resources:

ChanRobles On-Line Bar Review

ChanRobles Internet Bar Review : www.chanroblesbar.com

ChanRobles MCLE On-line

ChanRobles Lawnet Inc. - ChanRobles MCLE On-line : www.chanroblesmcleonline.com