29 C.F.R. § 1919.31   Proof tests—loose gear.


Title 29 - Labor


Title 29: Labor
PART 1919—GEAR CERTIFICATION
Subpart E—Certification of Vessels: Tests and Proof Loads; Heat Treatment; Competent Persons

Browse Previous |  Browse Next

§ 1919.31   Proof tests—loose gear.

(a) Chains, rings, shackles and other loose gear (whether accessory to a machine or not) shall be tested with a proof load against the article equal to that shown in the following table:

 ------------------------------------------------------------------------              Article of gear                        Proof load------------------------------------------------------------------------Chain, ring, hook, shackle or swivel......  100 percent in excess of the                                             safe working load.Blocks:  Single sheave block.....................  300 percent in excess of the                                             safe working load.\1\  Multiple sheave block with safe working   100 percent in excess of the   load up to and including 20 tons.         safe working load.  Multiple sheave block with safe working   20 tons in excess of the   load over 20 tons up to and including     safe working load.   40 tons.  Multiple sheave block with safe working   50 percent in excess of the   load over 40 tons.                        safe working load.  Pitched chains used with hand-operated    50 percent in excess of the   blocks and rings, hooks, shackles or      safe working load.   swivels permanently attached thereto.  Hand-operated blocks used with pitched    50 percent in excess of the   chains and rings, hooks, shackles or      safe working load.   swivels permanently attached thereto.------------------------------------------------------------------------\1\ The proof load applied to the block is equivalent to twice the  maximum resultant load on the eye of pin of the block when lifting the  nominal safe working load defined in (i) below. The proof load is,  therefore, equal to four times the safe working load as defined in (i)  below or twice the safe working load as defined in (ii) below.(i) The nominal safe working load of a single-sheave block should be the  maximum load which can be safely lifted by the block when the load is  attached to a rope which passes around the sheave of the block.(ii) In the case of a single-sheave block where the load is attached  directly to the block instead of to a rope passing around the sheave,  it is permissible to lift a load equal to twice the nominal safe  working load of the block as defined in (i) above.(iii) In the case of a lead block so situated that an acute angle cannot  be formed by the two parts of the rope passing over it (i.e., the  angle is always 90° or more), the block need not have a greater  nominal safe working load than one-half the maximum resultant load  which can be placed upon it.

(b) In cases where persons accredited to carry out loose gear tests may be retained to conduct tests of special stevedoring gear as described in §1918.61(b) of this chapter, which does not form part of a vessel's equipment, such tests shall adhere to the requirements set forth in §1918.61(b) (1), (2), and (3) of this chapter.

(c) After being tested as required by paragraph (a) of this section, and before being taken into use, all chains, rings, hooks, shackles, blocks or other loose gear, except as noted in §1919.32, shall be thoroughly examined, the sheaves and pins of the blocks being removed for this purpose, to determine whether any part has been injured or permanently deformed by the test. Shell bolt nuts shall be securely locked upon reassembly. Defective loose gear components shall be replaced before the certificate is issued.

(d) Any certificate relating to shackles, swivels or strength members of single-sheave blocks which have been restored to original dimensions by welding shall state this fact.

Browse Previous |  Browse Next