30 C.F.R. § 282.28   Environmental protection measures.


Title 30 - Mineral Resources


Title 30: Mineral Resources
PART 282—OPERATIONS IN THE OUTER CONTINENTAL SHELF FOR MINERALS OTHER THAN OIL, GAS, AND SULPHUR
Subpart C—Obligations and Responsibilities of Lessees

Browse Previous |  Browse Next

§ 282.28   Environmental protection measures.

(a) Exploration, testing, development, production, and processing activities proposed to be conducted under a lease will only be approved by the Director upon the determination that the adverse impacts of the proposed activities can be avoided, minimized, or otherwise mitigated. The Director shall take into account the information contained in the sale-specific environmental evaluation prepared in association with the lease offering as well as the site- and operational-specific environmental evaluations prepared in association with the review and evaluation of the approved Delineation, Testing, or Mining Plan. The Director's review of the air quality consequences of proposed OCS activities will follow the practices and procedures specified in §§250.194, 250.218, 250.249, and 250.303 of this title.

(b) If the baseline data available are judged by the Director to be inadequate to support an environmental evaluation of a proposed Delineation, Testing, or Mining Plan, the Director may require the lessee to collect additional environmental baseline data prior to the approval of the activities proposed.

(c)(1) The lessee shall monitor activities in a manner that develops the data and information necessary to enable the Director to assess the impacts of exploration, testing, mining, and processing activities on the environment on and off the lease; develop and evaluate methods for mitigating adverse environmental effects; validate assessments made in previous environmental evaluations; and ensure compliance with lease and other requirements for the protection of the environment.

(2) Monitoring of environmental effects shall include determination of the spatial and temporal environmental changes induced by the exploration, testing, development, production, and processing activities on the flora and fauna of the sea surface, the water column, and/or the seafloor.

(3) The Director may place observers onboard exploration, testing, mining, and processing vessels; installations; or structures to ensure that the provisions of the lease, the approved plan, and these regulations are followed and to evaluate the effectiveness of the approved monitoring and mitigation practices and procedures in protecting the environment.

(4) The Director may order or the lessee may request a modification of the approved monitoring program prior to the startup of testing activities or commercial-scale recovery, and at other appropriate times as necessary, to reflect accurately the proposed operations or to incorporate the results of recent research or improved monitoring techniques.

(5) When prototype test mining is proposed, the lessee shall include a monitoring strategy for assessing the impacts of the testing activities and for developing a strategy for monitoring commercial-scale recovery and mitigating the impacts of commercial-scale recovery more effectively. At a minimum, the proposed monitoring activities shall address specific concerns expressed in the lease-sale environmental analysis.

(6) When required, the monitoring plan shall specify:

(i) The sampling techniques and procedures to be used to acquire the needed data and information;

(ii) The format to be used in analysis and presentation of the data and information;

(iii) The equipment, techniques, and procedures to be used in carrying out the monitoring program; and

(iv) The name and qualifications of person(s) designated to be responsible for carrying out the environmental monitoring.

(d) Lessees shall develop and conduct their operations in a manner designed to avoid, minimize, or otherwise mitigate environmental impacts and to demonstrate the effectiveness of efforts to that end. Based upon results of the monitoring program, the Director may specify particular procedures for mitigating environmental impacts.

(e) In the event that equipment or procedural failure might result in significant additional damage to the environment, the lessee shall submit a Contingency Plan which specifies the procedures to be followed to institute corrective actions in response to such a failure and to minimize adverse impacts on the environment. Such procedures shall be designed for the site and mining activities described in the approved Delineation, Testing, or Mining Plan.

[54 FR 2067, Jan. 18, 1989; 64 FR 9066, Feb. 24, 1999, as amended at 64 FR 72795, Dec. 28, 1999; 70 FR 51519, Aug. 30, 2005]

Browse Previous |  Browse Next






















chanrobles.com


ChanRobles Legal Resources:

ChanRobles On-Line Bar Review

ChanRobles Internet Bar Review : www.chanroblesbar.com

ChanRobles MCLE On-line

ChanRobles Lawnet Inc. - ChanRobles MCLE On-line : www.chanroblesmcleonline.com