30 C.F.R. § 780.13 Operation plan: Blasting.
Title 30 - Mineral Resources
(a) Blasting plan. Each application shall contain a blasting plan for the proposed permit area, explaining how the applicant will comply with the requirements of §§816.61 through 816.68 of this chapter. This plan shall include, at a minimum, information setting forth the limitations the operator will meet with regard to ground vibration and airblast, the bases for those limitations, and the methods to be applied in controlling the adverse effects of blasting operations. (b) Monitoring system. Each application shall contain a description of any system to be used to monitor compliance with the standards of §816.67 including the type, capability, and sensitivity of any blast-monitoring equipment and proposed procedures and locations of monitoring. (c) Blasting near underground mines. Blasting operations within 500 feet of active underground mines require approval of the State and Federal regulatory authorities concerned with the health and safety of underground miners. [48 FR 9806, Mar. 8, 1983]
Title 30: Mineral Resources
PART 780—SURFACE MINING PERMIT APPLICATIONS—MINIMUM REQUIREMENT FOR RECLAMATION AND OPERATION PLAN
§ 780.13 Operation plan: Blasting.

