30 C.F.R. PART 7--TESTING BY APPLICANT OR THIRD PARTY
TITLE 30--Mineral Resources
CHAPTER I--MINE SAFETY AND HEALTH ADMINISTRATION, DEPARTMENT OF LABOR
SUBCHAPTER B--TESTING, EVALUATION, AND APPROVAL OF MINING PRODUCTS
PART 7--TESTING BY APPLICANT OR THIRD PARTY
Subpart A--GENERAL
|
Application procedures and requirements.
|
|
|
Approval marking and distribution record.
|
|
|
Post-approval product audit.
|
|
|
MSHA acceptance of equivalent non-MSHA product safety standards.
|
|
Subpart B--BRATTICE CLOTH AND VENTILATION TUBING
|
Purpose and effective date.
|
|
|
Application requirements.
|
|
|
Critical characteristics.
|
|
|
Test for flame resistance of brattice cloth.
|
|
|
Test for flame resistance of rigid ventilation tubing.
|
|
|
Post-approval product audit.
|
|
Subpart C--BATTERY ASSEMBLIES
|
Purpose and effective date.
|
|
|
Application requirements.
|
|
|
Deflection temperature test.
|
|
|
Post-approval product audit.
|
|
Subpart D--MULTIPLE-SHOT BLASTING UNITS
|
Purpose and effective date.
|
|
|
Application requirements.
|
|
|
Critical characteristics.
|
|
|
Firing line terminals test.
|
|
|
Post-approval product audit.
|
|
Subpart E--DIESEL ENGINES INTENDED FOR USE IN UNDERGROUND COAL MINES
|
Purpose and effective date.
|
|
|
Application requirements.
|
|
|
Critical characteristics.
|
|
|
Test equipment and specifications.
|
|
|
Test to determine the maximum fuel-air ratio.
|
|
|
Test to determine the gaseous ventilation rate.
|
|
|
Test to determine the particulate index.
|
|
|
Post-approval product audit.
|
|
Subpart F--DIESEL POWER PACKAGES INTENDED FOR USE IN AREAS OF UNDERGROUND COAL MINES WHERE PERMISSIBLE ELECTRIC EQUIPMENT IS REQUIRED
|
Purpose and effective date.
|
|
|
Application requirements.
|
|
|
Critical characteristics.
|
|
|
Surface temperature tests.
|
|
|
Exhaust gas cooling efficiency test.
|
|
|
Safety system control test.
|
|
|
Internal static pressure test.
|
|
|
Post-approval product audit.
|
|
Subpart J--ELECTRIC MOTOR ASSEMBLIES
|
Purpose and effective date.
|
|
|
Application requirements.
|
|
|
Critical characteristics.
|
|
|
Lockwasher equivalency test.
|
|
|
Post-approval product audit.
|
|
Subpart K--ELECTRIC CABLES, SIGNALING CABLES, AND CABLE SPLICE KITS
|
Purpose and effective date.
|
|
|
Application requirements.
|
|
|
Critical characteristics.
|
|
|
Test for flame resistance of electric cables and cable splices.
|
|
|
Test for flame resistance of signaling cables.
|
|
|
Post-approval product audit.
|
|