30 C.F.R. PART 816--PERMANENT PROGRAM PERFORMANCE STANDARDS--SURFACE MINING ACTIVITIES
TITLE 30--Mineral Resources
CHAPTER VII--OFFICE OF SURFACE MINING RECLAMATION AND ENFORCEMENT, DEPARTMENT OF THE INTERIOR
SUBCHAPTER K--PERMANENT PROGRAM PERFORMANCE STANDARDS
PART 816--PERMANENT PROGRAM PERFORMANCE STANDARDS--SURFACE MINING ACTIVITIES
|
|
| Casing and sealing of drilled holes: General requirements.
|
|
|
|
| Casing and sealing of drilled holes: Temporary.
|
|
|
|
| Casing and sealing of drilled holes: Permanent.
|
|
|
|
| Hydrologic-balance protection.
|
|
|
|
| Hydrologic balance: Water quality standards and effluent limitations.
|
|
|
|
| Hydrologic balance: Sediment control measures.
|
|
|
|
| Hydrologic balance: Siltation structures.
|
|
|
|
| Hydrologic balance: Discharge structures.
|
|
|
|
| Postmining rehabilitation of sedimentation ponds, diversions, impoundments, and treatment facilities.
|
|
|
|
| Hydrologic balance: Stream buffer zones.
|
|
|
|
| Use of explosives: General requirements.
|
|
|
|
| Use of explosives: Preblasting survey.
|
|
|
|
| Use of explosives: Blasting schedule.
|
|
|
|
| Use of explosives: Blasting signs, warnings, and access control.
|
|
|
|
| Use of explosives: Control of adverse effects.
|
|
|
|
| Use of explosives: Records of blasting operations.
|
|
|
|
| Disposal of excess spoil: General requirements.
|
|
|
|
| Disposal of excess spoil: Valley fills/head-of-hollow fills.
|
|
|
|
| Disposal of excess spoil: Durable rock fills.
|
|
|
|
| Disposal of excess spoil: Preexisting benches.
|
|
|
|
| Protection of underground mining.
|
|
|
|
| Coal mine waste: General requirements.
|
|
|
|
| Coal mine waste: Refuse piles.
|
|
|
|
| Coal mine waste: Impounding structures.
|
|
|
|
| Coal mine waste: Burning and burned waste utilization.
|
|
|
|
| Disposal of noncoal mine wastes.
|
|
|
|
| Stabilization of surface areas.
|
|
|
|
| Protection of fish, wildlife, and related environmental values.
|
|
|
|
| Contemporaneous reclamation.
|
|
|
|
| Backfilling and grading: Time and distance requirements.
|
|
|
|
| Backfilling and grading: General requirements.
|
|
|
|
| Backfilling and grading: Thin overburden.
|
|
|
|
| Backfilling and grading: Thick overburden.
|
|
|
|
| Backfilling and grading: Previously mined areas.
|
|
|
|
| Backfilling and grading: Steep slopes.
|
|
|
|
| Revegetation: General requirements.
|
|
|
|
| Revegetation: Mulching and other soil stabilizing practices.
|
|
|
|
| Revegetation: Standards for success.
|
|
|
|
| Cessation of operations: Temporary.
|
|
|
|
| Cessation of operations: Permanent.
|
|
|
|
| Interpretative rules related to general performance standards.
|
|