33 C.F.R. § 117.307 Miami River, North Fork.
Title 33 - Navigation and Navigable Waters
The draw of the FDOT Railroad Bridge, mile 5.3 at Miami, shall open on signal if at least 48-hour notice is given to CSX System Operating Headquarters (800) 232–0144. [CGD07–03–088, 69 FR 9549, Mar. 1, 2004]
Title 33: Navigation and Navigable Waters
PART 117—DRAWBRIDGE OPERATION REGULATIONS
Subpart B—Specific Requirements
Florida
§ 117.307 Miami River, North Fork.

