33 C.F.R. § 117.511 West Pearl River.
Title 33 - Navigation and Navigable Waters
(a) The draw of the Norfolk Southern railroad bridge, mile 22.1 at Pearl River Station, shall open on signal if at least six hours notice is given. (b) The draw of the US 90 bridge, mile 7.9 near Pearlington, shall open on signal if at least four hours notice is given. [CGD 82–025, 49 FR 17452, Apr. 24, 1984, as amended by CGD 08–84–03, 49 FR 47231, Dec. 3, 1984]
Title 33: Navigation and Navigable Waters
PART 117—DRAWBRIDGE OPERATION REGULATIONS
Subpart B—Specific Requirements
Louisiana
§ 117.511 West Pearl River.

