33 C.F.R. § 117.551 Chester River.
Title 33 - Navigation and Navigable Waters
The draw of the S213 bridge, mile 26.8 at Chestertown, shall open on signal from April 1 though September 30 from 6 a.m. to 6 p.m. At all other times, the draw shall open on signal if at least six hours notice is given.
Title 33: Navigation and Navigable Waters
PART 117—DRAWBRIDGE OPERATION REGULATIONS
Subpart B—Specific Requirements
Maryland
§ 117.551 Chester River.

