33 C.F.R. § 117.587 Apponagansett River.
Title 33 - Navigation and Navigable Waters
(a) The draw of the Padanaram Bridge mile 1.0 shall open on signal 1 May through 31 October from 5 a.m. to 9 p.m. daily as follows: (1) The bridge shall open on signal, twice an hour, on the hour and the half hour between 5 a.m. and 9 a.m. and between 8 p.m. and 9 p.m. (2) The bridge shall open on signal, once an hour, on the hour between 9 a.m. and 8 p.m. (b) At all other times the bridge shall open if at least four (4) hours advance notice is given. (c) The owners of this bridge shall provide and maintain mooring facilities for vessels to make fast while waiting for the bridge to open. (d) The owners of this bridge shall provide and keep in good legible condition, clearance gauges for each draw with figures not less than twelve (12) inches high designed, installed and maintained according to the provisions of section 118.160 of this chapter. [CGD01–95–008, 60 FR 29761, June 6, 1995]
Title 33: Navigation and Navigable Waters
PART 117—DRAWBRIDGE OPERATION REGULATIONS
Subpart B—Specific Requirements
Massachusetts
§ 117.587 Apponagansett River.

