33 C.F.R. § 117.637 Manistee River.
Title 33 - Navigation and Navigable Waters
(a) The draws of the Maple Street bridge, mile 1.1, and US–31 highway bridge, mile 1.4, both at Manistee, shall operate as follows: (1) From May 1 through October 31, between 7 a.m. to 11 p.m., the bridges shall open on signal. From 11 p.m. to 7 a.m., the bridges need not open unless notice is given at least two hours in advance of a vessel's time of intended passage through the draws. (2) From November 1 through April 30, the bridges need not open unless notice is given at least 24 hours in advance of a vessel's time of intended passage through the draws. (b) The CSX Transportation railroad bridge, mile 1.5, at Manistee, shall open on signal from May 1 to October 31. From November 1 to April 30, the bridge need not open unless notice is given at least 24 hours in advance of a vessel's time of intended passage through the draw. [CGD 09–93–006, 58 FR 52442, Oct. 8, 1993, as amended by CGD09–97–014, 62 FR 43931, Aug. 18, 1997]
Title 33: Navigation and Navigable Waters
PART 117—DRAWBRIDGE OPERATION REGULATIONS
Subpart B—Specific Requirements
Michigan
§ 117.637 Manistee River.

