33 C.F.R. § 117.675 Back Bay of Biloxi.
Title 33 - Navigation and Navigable Waters
(a) The draw of the I–110 bridge, mile 3.0 at Biloxi, shall open on signal if at least six hours notice is given. (b) The draw of the Popps Ferry Road bridge, mile 8.0, at Biloxi, shall open on signal; except that, from 7:30 a.m. to 9 a.m. and from 4:30 p.m. to 6 p.m. Monday through Friday, except Federal holidays, the draw need not be opened for passage of vessels. The draw shall open at any time for a vessel in distress. [CGD8–85–05, 50 FR 27583, July 5, 1985, as amended by CGD08–96–049, 64 FR 6221, Feb. 9, 1999; CGD08–06–015, 71 FR 26416, May 5, 2006]
Title 33: Navigation and Navigable Waters
PART 117—DRAWBRIDGE OPERATION REGULATIONS
Subpart B—Specific Requirements
Mississippi
§ 117.675 Back Bay of Biloxi.