33 C.F.R. § 117.703 Bass River.
Title 33 - Navigation and Navigable Waters
The draw of the U.S. 9 bridge, mile 2.6, at New Gretna, shall operate as follows: (a) The draw shall open on signal if at least six hours notice is given, except that public vessels of the United States, State and local vessels used for public safety, and vessels in distress shall be passed as soon as possible. (b) The owners of this bridge shall provide and keep in good legible condition clearance gauges for the draw span with figures not less than 12 inches high designed, installed and maintained in accordance with the provisions of §118.160 of this chapter. [CGD5–91–031, 57 FR 22175, May 27, 1992]
Title 33: Navigation and Navigable Waters
PART 117—DRAWBRIDGE OPERATION REGULATIONS
Subpart B—Specific Requirements
New Jersey
§ 117.703 Bass River.

