33 C.F.R. § 117.913 Ashepoo River.
Title 33 - Navigation and Navigable Waters
The draw of the Seaboard System Railroad bridge, mile 32.0 at Ashepoo, need not be opened for the passage of vessels. However, the draw shall be returned to operable condition within six months after notification by the District Commander to do so.
Title 33: Navigation and Navigable Waters
PART 117—DRAWBRIDGE OPERATION REGULATIONS
Subpart B—Specific Requirements
South Carolina
§ 117.913 Ashepoo River.