33 C.F.R. § 117.925 Cooper River.
Title 33 - Navigation and Navigable Waters
The draw of the Seaboard System Railroad bridge, mile 42.8 near Cordesville, shall open on signal if at least six hours advance notice is given. [CGD 7–85–24, 50 FR 37175, Sept. 12, 1985]
Title 33: Navigation and Navigable Waters
PART 117—DRAWBRIDGE OPERATION REGULATIONS
Subpart B—Specific Requirements
South Carolina
§ 117.925 Cooper River.

