33 C.F.R. § 117.939 Wando River.
Title 33 - Navigation and Navigable Waters
The draw of the S41 bridge, mile 10.0 near Cainhoy, shall open on signal if at least 12 hours notice is given.
Title 33: Navigation and Navigable Waters
PART 117—DRAWBRIDGE OPERATION REGULATIONS
Subpart B—Specific Requirements
South Carolina
§ 117.939 Wando River.

