33 C.F.R. § 117.984 San Bernard River.
Title 33 - Navigation and Navigable Waters
The draw of the Union Pacific railroad bridge, mile 20.7 near Brazoria, shall open on signal; except that, from 10 a.m. to 2 p.m. and 10 p.m. to 2 a.m., the draw shall open on signal if at least three hours notice is given. [CGD 08–84–14, 50 FR 15743, Apr. 22, 1985]
Title 33: Navigation and Navigable Waters
PART 117—DRAWBRIDGE OPERATION REGULATIONS
Subpart B—Specific Requirements
Texas
§ 117.984 San Bernard River.

