33 C.F.R. § 117.1081 Black River.
Title 33 - Navigation and Navigable Waters
The draw of the CP Rail railroad bridge, mile 1.0 at La Crosse, shall open on signal if at least two hours notice is given. [CGD 82–025, 49 FR 17452, Apr. 24, 1984, as amended by USCG–1998–3799, 63 FR 35527, June 30, 1998]
Title 33: Navigation and Navigable Waters
PART 117—DRAWBRIDGE OPERATION REGULATIONS
Subpart B—Specific Requirements
Wisconsin
§ 117.1081 Black River.