33 C.F.R. § 149.610 What must the District Commander be notified of and when?
Title 33 - Navigation and Navigable Waters
The District Commander must be notified of the following:
Title 33: Navigation and Navigable Waters
PART 149—DEEPWATER PORTS: DESIGN, CONSTRUCTION, AND EQUIPMENT
Subpart F—Design and Equipment
General
§ 149.610 What must the District Commander be notified of and when?
------------------------------------------------------------------------ The District Commander must When_ be notified_------------------------------------------------------------------------(a) Construction of a pipeline, platform, At least 30 days before or SPM is planned. construction begins.(b) Construction of a pipeline, platform, Within 24 hours, from the or SPM begins. date construction begins, that the lights and sound signals are in use at the construction site.(c) A light or sound signal is changed Within 24 hours of the during construction. change.(d) Lights or sound signals used during Within 24 hours of the construction of a platform, buoy, or SPM replacement. are replaced by permanent fixtures to meet the requirements of this part.(e) The first cargo transfer operation At least 60 days before the begins. operation.------------------------------------------------------------------------
Browse Previous |
Browse Next

