33 C.F.R. § 149.610   What must the District Commander be notified of and when?


Title 33 - Navigation and Navigable Waters


Title 33: Navigation and Navigable Waters
PART 149—DEEPWATER PORTS: DESIGN, CONSTRUCTION, AND EQUIPMENT
Subpart F—Design and Equipment
General

Browse Previous |  Browse Next

§ 149.610   What must the District Commander be notified of and when?

The District Commander must be notified of the following:

------------------------------------------------------------------------                                             The District Commander must                   When_                            be notified_------------------------------------------------------------------------(a) Construction of a pipeline, platform,   At least 30 days before or SPM is planned.                          construction begins.(b) Construction of a pipeline, platform,   Within 24 hours, from the or SPM begins.                              date construction begins,                                             that the lights and sound                                             signals are in use at the                                             construction site.(c) A light or sound signal is changed      Within 24 hours of the during construction.                        change.(d) Lights or sound signals used during     Within 24 hours of the construction of a platform, buoy, or SPM    replacement. are replaced by permanent fixtures to meet the requirements of this part.(e) The first cargo transfer operation      At least 60 days before the begins.                                     operation.------------------------------------------------------------------------

Browse Previous |  Browse Next


chanrobles.com