[CGD 91–034, 58 FR 7424, Feb. 5, 1993, as amended by CGD 90–068, 58 FR 67995, Dec. 22, 1993; CGD 96–026, 61 FR 33666, June 28, 1996; CGD 95–028, 62 FR 51194, Sept. 30, 1997; USCG–1998–4443, 63 FR 71763, Dec. 30, 1998; USCG–1999–5151, 64 FR 67176, Dec. 1, 1999; 69 FR 18803, Apr. 9, 2004]
Subpart B—Vessel Equipment
top
Source: CGD 75–124a, 48 FR 45715, Oct. 6, 1983, unless otherwise noted.
§ 155.200 Definitions.
top
As used in this subpart:
Inland oil barge means a tank barge carrying oil in bulk as cargo certificated by the Coast Guard under 46 CFR chapter I, subchapter D for river or canal service or lakes, bays, and sounds service.
On-deck spill means a discharge of oil on the deck of a vessel during loading, unloading, transfer, or other shipboard operations. An on-deck spill could result from a leaking fitting, an overfill, a bad connection, or similar operational mishap. The term on-deck spill is used to differentiate these operational discharges from those caused by collision or grounding where the hull is punctured and a tank is ruptured, resulting in an uncontrolled discharge of oil into the marine environment.
Offshore oil barge means a tank barge carrying oil in bulk as cargo, including dual-mode integrated tug-barges, certificated by the Coast Guard under 46 CFR chapter I, subchapter D, for navigation in waters outside the Boundary Lines, as defined in 46 CFR part 7, in any ocean or the Gulf of Mexico; any tank barge in Great Lakes service; or any foreign flag tank barge.
Oil tanker means a self-propelled vessel carrying oil in bulk as cargo, including integrated tug-barges designed for push-mode operation.
Sea state 5, the equivalent of Beaufort number or force 6, is a sea condition with winds speeds of 22 to 27 knots and classified as “strong breeze”, and with waves measuring 2.5 to 4 meters in height and classified as “rough”.
Vessel carrying oil as secondary cargo means a vessel carrying oil pursuant to a permit issued under 46 CFR 30.01–5, 46 CFR 70.05–30, or 46 CFR 90.05–35 or pursuant to an International Oil Pollution Prevention (IOPP) or Noxious Liquid Substance (NLS) certificate required by §§151.33 or 151.35 of this chapter; or any uninspected vessel that carries oil in bulk as cargo.
[CGD 90–068, 58 FR 67996, Dec. 22, 1993, as amended by USCG–2001–9046, 67 FR 58524, Sept. 17, 2002]
Effective Date Note: By USCG–2001–9046, 70 FR 41617, July 20, 2005, the definition for “Sea state 5” was suspended from Aug. 19, 2005 until July 21, 2008.
§ 155.205 Discharge removal equipment for vessels 400 feet or greater in length.
top
(a) Oil tankers and offshore oil barges with an overall length of 400 feet or more must carry appropriate equipment and supplies for the containment and removal of on-deck oil cargo spills of at least 12 barrels.
(b) The equipment and supplies must include—
(1) Sorbents;
(2) Non-sparking hand scoops, shovels, and buckets;
(3) Containers suitable for holding recovered waste;
(4) Emulsifiers for deck cleaning;
(5) Protective clothing;
(6) A minimum of one non-sparking portable pump with hoses; and
(7) Scupper plugs.
(c) During cargo transfer operations, the equipment and supplies must remain ready for immediate use.
[CGD 90–068, 58 FR 67996, Dec. 22, 1993, as amended by USCG–1998–3799, 63 FR 35531, June 30, 1998]
§ 155.210 Discharge removal equipment for vessels less than 400 feet in length.
top
(a) Oil tankers and offshore oil barges with an overall length of less than 400 feet must carry appropriate equipment and supplies for the containment and removal of on-deck oil spills of at least 7 barrels.
(b) The equipment and supplies must include—
(1) Sorbents;
(2) Non-sparking hand scoops, shovels, and buckets;
(3) Containers suitable for holding recovered waste;
(4) Emulsifiers for deck cleaning;
(5) Protective clothing;
(6) A minimum of one non-sparking portable pump with hoses; and
(7) Scupper plugs.
(c) During cargo transfer operations, the equipment and supplies must remain ready for immediate use.
[CGD 90–068, 58 FR 67996, Dec. 22, 1993, as amended by USCG–1998–3799, 63 FR 35531, June 30, 1998]
§ 155.215 Discharge removal equipment for inland oil barges.
top
(a) During cargo transfer operations, inland oil barges must have appropriate equipment and supplies ready for immediate use to control and remove on-deck oil cargo spills of at least one barrel.
(b) The equipment and supplies must include—
(1) Sorbents;
(2) Non-sparking hand scoops, shovels, and buckets;
(3) Containers suitable for holding recovered waste;
(4) Emulsifiers for deck cleaning; and
(5) Protective clothing.
(c) The oil barge owner or operator may rely on equipment available at the transfer facility receiving from or discharging to the barge, provided the barge owner or operator has prearranged for the use of the equipment by contract or other means approved by the Coast Guard.
[CGD 90–068, 58 FR 67996, Dec. 22, 1993, as amended by USCG–1998–3799, 63 FR 35531, June 30, 1998]
§ 155.220 Discharge removal equipment for vessels carrying oil as secondary cargo.
top
(a) Vessels carrying oil as secondary cargo must carry appropriate equipment and supplies for the containment and removal of on-deck oil cargo spills of at least one-half barrel.
(b) The equipment and supplies must include—
(1) Sorbents;
(2) Non-sparking hand scoops, shovels, and buckets;
(3) Containers suitable for holding recovered waste;
(4) Emulsifiers for deck cleaning; and
(5) Protective clothing
(c) The equipment and supplies must be ready for immediate use during cargo transfer operations.
[CGD 90–068, 58 FR 67996, Dec. 22, 1993, as amended by USCG–1998–3799, 63 FR 35531, June 30, 1998]
§ 155.225 Internal cargo transfer capability.
top
Oil tankers and offshore oil barges must carry suitable hoses and reducers for internal transfer of cargo to tanks or other spaces within the cargo block, unless the vessel's installed cargo piping system is capable of performing this function.
[CGD 90–068, 58 FR 67996, Dec. 22, 1993, as amended by USCG–1998–3799, 63 FR 35531, June 30, 1998]
§ 155.230 Emergency control systems for tank barges.
top
(a) Application. This section does not apply to foreign vessels engaged in innocent passage (that is, neither entering nor leaving a U.S. port); it applies to tank barges and vessels towing them on the following waters:
(1) On the territorial sea of the U.S. [as defined in Presidential Proclamation 5928 of December 27, 1988, it is the belt of waters 12 nautical miles wide with its shoreward boundary the baseline of the territorial sea], unless—
(i) The barge is being pushed ahead of, or towed alongside, the towing vessel; and
(ii) The barge's coastwise route is restricted, on its certificate of inspection (COI), so the barge may operate “in fair weather only, within 20 miles of shore,” or with words to that effect. The Officer in Charge, Marine Inspection, may define “fair weather” on the COI.
(2) In Great Lakes service unless—
(i) The barge is being pushed ahead of, or towed alongside, the towing vessel; and
(ii) The barge's route is restricted, on its certificate of inspection (COI), so the barge may operate “in fair weather only, within 5 miles of a harbor,” or with words to that effect. The Officer in Charge, Marine Inspection, may define “fair weather” on the COI.
(3) On Long Island Sound. For the purposes of this section, Long Island Sound comprises the waters between the baseline of the territorial sea on the eastern end (from Watch Hill Point, Rhode Island, to Montauk Point, Long Island) and a line drawn north and south from Premium Point, New York (about 40°54.5' N, 73°45.5' W), to Hewlett Point, Long Island (about 40°50.5' N, 73°45.3' W), on the western end.
(4) In the Strait of Juan de Fuca.
(5) On the waters of Admiralty Inlet north of Marrowstone Point (approximately 48°06' N, 122°41' W).
(b) Safety program. If you are the owner or operator of a single-hull tank barge or of a vessel towing it, you must adequately man and equip either the barge or the vessel towing it so the crew can arrest the barge by employing Measure 1, described in paragraph (b)(1) of this section. Moreover, the crew must be able to arrest or retrieve the barge by employing either Measure 2 or Measure 3, described in paragraphs (b)(2) and (3) of this section, respectively. If you are the owner or operator of a double-hull tank barge, you must adequately equip it and train its crew or, if it is unmanned, train the crew of the vessel towing it, so the crew can retrieve the barge by employing Measure 2 described in paragraph (b)(2) of this section.
(1) Measure 1. Each single-hull tank barge, whether manned or unmanned, must be equipped with an operable anchoring system that conforms to 46 CFR 32.15–15; except that, for barges operating only on the West Coast of the U.S., a system comprising heavy surge gear and bridle legs may serve instead of the anchoring system. Because these systems will also serve as emergency control systems, the owner or operator must ensure that they meet the following criteria:
(i) Operation and performance. When the barge is underway—
(A) The system is ready for immediate use;
(B) No more than two crewmembers are needed to operate the system and anchor the barge or arrest its movement;
(C) While preparing to anchor the barge or arrest its movement, the operator of the system should confer with the master or mate of the towing vessel regarding appropriate length of cable or chain to use; and
(D) Each operator of the system should wear a safety belt or harness secured by a lanyard to a lifeline, drop line, or fixed structure such as a welded padeye, if the sea or the weather warrants this precaution. Each safety belt, harness, lanyard, lifeline, and drop line must meet the specifications of ANSI A10.14.
(ii) Maintenance and inspections. The owner or operator of the system shall inspect it annually. The inspection must verify that the system is ready for immediate use, and must include a visual inspection of the equipment that comprises the system in accordance with the manufacturer's recommendations. The inspection must also verify that the system is being maintained in accordance with the manufacturer's recommendations. The inspection need not include actual demonstration of the operation of the equipment or system.
(iii) Training. On each manned barge, every crewmember must be thoroughly familiar with the operation of the system. On each vessel towing an unmanned barge, every deck crewmember must be thoroughly familiar with the operation of the system installed on the barge. If during the last 12 months the system was not used to anchor or arrest the movement of the barge, then a drill on the use of the system must be conducted within the next month. The drill need not involve actual deployment of the system. However, it must allow every participant to demonstrate the competencies (that is, the knowledge, skills, and abilities) needed to ensure that everyone assigned a duty in anchoring or arresting the movement of the barge is ready to do his or her duty.
(2) Measure 2. If you are the owner or operator of a tank barge or a vessel towing it and this section applies to you by virtue of paragraph (a) of this section, you must have installed an emergency retrieval system or some other measure acceptable to the Coast Guard, as provided in paragraph (b)(3) of this section. Any such system must meet the following criteria:
(i) Design. The system must use an emergency towline with at least the same pulling strength as required of the primary towline. The emergency towline must be readily available on either the barge or the vessel towing it. The towing vessel must have on board equipment to regain control of the barge and continue towing (using the emergency towline), without having to place personnel on board the barge.
(ii) Operation and performance. The system must use a stowage arrangement that ensures the readiness of the emergency towline and the availability of all retrieval equipment for immediate use in an emergency whenever the barge is being towed astern.
(iii) Maintenance and inspection. The owner or operator of the system shall inspect it annually. The inspection must verify that the emergency retrieval system is ready for immediate use, and must include a visual inspection of the equipment that comprises the system in accordance with the manufacturer's recommendations. The inspection must also verify that the system is being maintained in accordance with the manufacturer's recommendations. The inspection need not include actual demonstration of the operation of the equipment or system. Details concerning maintenance of towlines appear in 33 CFR 164.74(a)(3) and Navigation and Vessel Inspection Circular (NVIC) No. 5–92. Our NVICs are available online at http://www.uscg.mil/hq/g-m/nvic/index.htm.
(iv) Training. Barge-retrieval drills must take place annually, and not more than one month after a master or mate responsible for supervising barge retrieval begins employment on a vessel that tows tank barges.
(A) Each drill must allow every participant to demonstrate the competencies (that is, the knowledge, skills, and abilities) needed to ensure that everyone assigned a duty in barge retrieval is ready to do his or her part to regain control of a drifting barge.
(B) If the drill includes actual operation of a retrieval system, it must be conducted under the supervision of the master or mate responsible for retrieval, and preferably in open waters free from navigational hazards so as to minimize risk to personnel and the environment.
(3) Measure 3. If you are the owner or operator of a tank barge or a vessel towing it and this section applies to you by virtue of paragraph (a) of this section, you may use an alternative measure or system fit for retrieving a barge or arresting its movement as a substitute for Measure 2, described in paragraph (b)(2) of this section. Before you use such a measure or system, however, it must receive the approval of the Commandant (G-MSE). It will receive this approval if it provides protection against grounding of the tank vessel comparable to that provided by one of the other two measures described in this section.
[USCG–1998–4443, 65 FR 31811, May 19, 2000]
§ 155.235 Emergency towing capability for oil tankers.
top
An emergency towing arrangement shall be fitted at both ends on board all oil tankers of not less than 20,000 deadweight tons (dwt), constructed on or after September 30, 1997. For oil tankers constructed before September 30, 1997, such an arrangement shall be fitted at the first scheduled dry-docking, but not later than January 1, 1999. The design and construction of the towing arrangement shall be in accordance with IMO resolution MSC.35(63).
[CGD 95–028, 62 FR 51194, Sept. 30, 1997]
§ 155.240 Damage stability information for oil tankers and offshore oil barges.
top
(a) Owners or operators of oil tankers and offshore oil barges shall ensure that their vessels have prearranged, prompt access to computerized, shore-based damage stability and residual structural strength calculation programs.
(b) Vessel baseline strength and stability characteristics must be pre-entered into such programs and be consistent with the vessel's existing configuration.
(c) Access to the shore-based calculation program must be available 24 hours a day.
(d) At a minimum, the program must facilitate calculation of the following:
(1) Residual hull girder strength based on the reported extent of damage.
(2) Residual stability when the vessel's compartments are breached.
(3) The most favorable off-loading, ballasting, or cargo transfer sequences to improve residual stability, reduce hull girder stresses, and reduce ground-force reaction.
(4) The bending and shear stresses caused by pinnacle loads from grounding or stranding.
[CGD 90–068, 58 FR 67996, Dec. 22, 1993, as amended by USCG–1998–3799, 63 FR 35531, June 30, 1998]
§ 155.245 Damage stability information for inland oil barges.
top
(a) Owners or operators of inland oil barges shall ensure that the vessel plans necessary to perform salvage, stability, and residual hull strength assessments are maintained at a shore-based location.
(b) Access to the plans must be available 24 hours a day.
[CGD 90–068, 58 FR 67997, Dec. 22, 1993, as amended by USCG–1998–3799, 63 FR 35531, June 30, 1998]
§ 155.310 Containment of oil and hazardous material cargo discharges.
top
(a) A tank vessel with a capacity of 250 or more barrels that is carrying oil or hazardous material as cargo must have—
(1) Under or around each loading manifold and each transfer connection point, a fixed container or enclosed deck area that, in all conditions of ship list or trim encountered during the loading operation, has a capacity of at least:
(i) One half barrel if it serves one or more hoses with an inside diameter of 2 inches or less, or one or more loading arms with a nominal pipe size diameter of 2 inches or less;
(ii) One barrel if it serves one or more hoses with an inside diameter of more than 2 inches but less than 4 inches, or one or more loading arms with a nominal pipe size diameter of more than 2 inches but less than 4 inches;
(iii) Two barrels if it serves one or more hoses with an inside diameter of 4 inches or more, but less than 6 inches, or one or more loading arms with a nominal pipe size diameter of 4 inches or more, but less than 6 inches;
(iv) Three barrels if it serves one or more hoses with an inside diameter of 6 inches or more, but less than 12 inches, or one or more loading arms with a nominal pipe size diameter of 6 inches or more, but less than 12 inches; or
(v) Four barrels if it serves one or more hoses with an inside diameter of 12 inches or more, or one or more loading arms with a nominal pipe size diameter of 12 inches or more;
(2) A means of draining or removing discharged oil or hazardous material from each container or enclosed deck area without discharging the oil or hazardous material into the water; and
(3) A mechanical means of closing each drain and scupper in the container or enclosed deck area required by this section.
(b) An offshore tank barge with a cargo capacity of 250 or more barrels that is carrying hazardous material as cargo and an inland tank barge with the capacity of 250 or more barrels that is carrying oil or a hazardous material as cargo must meet paragraph (a) of this section or be equipped with—
(1) A coaming, at least 4 inches high but not more than 8 inches high, enclosing the immediate area of the cargo hatches, loading manifolds, and transfer connections, that has a capacity, in all conditions of vessel list and trim to be encountered during the loading operation, of at least one-half barrel per hatch, manifold, and connection within the enclosed area;
(2) A fixed or portable container under each loading manifold and each transfer connection within the coaming, that holds at least one-half barrel;
(3) A mechanical means of closing each drain and scupper within the coaming; and
(4) A means of draining or removing discharged oil or hazardous material from the fixed or portable container and from within the coamings without discharging the oil or hazardous material into the water.
(c) All oil tankers and offshore oil barges with a cargo capacity of 250 or more barrels must have peripheral coamings, including port and starboard coamings and forward and aft athwartships coamings, completely enclosing the cargo deck area, cargo hatches, manifolds, transfer connections, and any other openings where cargo may overflow or leak.
(1) Coamings must be at least 4 inches high except in the aft corners.
(2) In the aft corners (port and starboard) of a vessel, the coamings must be at least 8 inches high and extend—
(i) Forward at least 14 feet from each corner; and
(ii) Inboard at least 8 feet from each corner.
(3) Each area enclosed by the coaming required under this paragraph must have—
(i) A means of draining or removing oil from the enclosed deck area without discharging oil into the water; and
(ii) A mechanical means of closing each drain and scupper in the enclosed deck-area.
(4) For a tankship, as defined in 46 CFR 30.10–67, the coaming or other barrier required in 46 CFR 32.56–15 may serve as the aft athwartships coaming if the tankship is otherwise in compliance with the requirements of this section.
(d) In addition to the requirements of paragraphs (a) and (b) of this section, an offshore oil barge with a cargo capacity of 250 or more barrels must have—
(1) A fixed or portable container that holds at least one-half barrel under each oil loading manifold and each oil transfer connection within the coaming;
(2) A mechanical means of closing each drain and scupper within the coaming; and
(3) A means of draining or removing discharged oil from the fixed or portable container and from within the coaming without discharging the oil into the water.
[CGD 75–124a, 48 FR 45715, Oct. 6, 1983, as amended by CGD 86–034, 55 FR 36254, Sept. 4, 1990; CGD 90–068, 58 FR 67997, Dec. 22, 1993; USCG–1998–3799, 63 FR 35531, June 30, 1998]
§ 155.320 Fuel oil and bulk lubricating oil discharge containment.
top
(a) A ship of 300 gross tons or more constructed after June 30, 1974 must have a fixed container or enclosed deck area under or around each fuel oil or bulk lubricating oil tank vent, overflow, and fill pipe, that:
(1) For a ship of 300 or more but less than 1600 gross tons has a capacity of at least one-half barrel; and
(2) For a ship of 1600 or more gross tons has a capacity of one barrel.
(b) A ship of 100 gross tons or more constructed before July 1, 1974, and a ship of 100 or more but less than 300 gross tons constructed after June 30, 1974 must:
(1) Meet paragraph (a)(1) of this section; or
(2) Equip each fuel oil or bulk lubricating oil tank vent, overflow, and fill pipe during oil transfer operations with a portable container of at least a 5 U.S. gallon capacity; or
(3) If the ship has a fill fitting for which containment is impractical, use an automatic back pressure shut-off nozzle.
(c) This section does not apply to a fixed or floating drilling rig or other platform.
§ 155.330 Oily mixture (bilge slops)/fuel oil tank ballast water discharges on U.S. non-oceangoing ships.
top
(a) No person may operate a U.S. non-oceangoing ship in the navigable waters of the United States, unless it has the capacity to retain on board all oily mixtures and is equipped to discharge these oily mixtures to a reception facility.
(b) A U.S. non-oceangoing ship may retain all oily mixtures on board in the ship's bilges. An oil residue (sludge) tank is not required.
(c) This section does not apply to a fixed or floating drilling rig or other platform.
[CGD 75–124a, 48 FR 45715, Oct. 6, 1983, as amended by USCG–2000–7641, 66 FR 55571, Nov. 2, 2001]
§ 155.350 Oily mixture (Bilge slops)/fuel oil tank ballast water discharges on oceangoing ships of less than 400 gross tons.
top
(a) No person may operate an oceangoing ship of less than 400 gross tons, unless it either:
(1) Has the capacity to retain on board all oily mixtures and is equipped to discharge these oily mixtures to a reception facility; or
(2) Has approved oily-water separating equipment for processing oily mixtures from bilges or fuel oil tank ballast and discharges into the sea according to §151.10 of this chapter.
(b) An oceangoing ship of less than 400 gross tons may retain all oily mixtures on board in the ship's bilges. An oil residue (sludge) tank is not required.
(c) This section does not apply to a barge that is not equipped with an installed bilge pumping system for discharge into the sea.
(d) This section does not apply to a fixed or floating drilling rig or other platform.
[CGD 75–124a, 48 FR 45715, Oct. 6, 1983, as amended by CGD 88–002, 54 FR 18407, Apr. 28, 1989; CGD 97–023, 62 FR 33364, June 19, 1997; USCG–1998–3799, 63 FR 35531, June 30, 1998; USCG–2000–7641, 66 FR 55571, Nov. 2, 2001]
§ 155.360 Oily Mixture (Bilge slops) discharges on oceangoing ships of 400 gross tons and above but less than 10,000 gross tons, excluding ships that carry ballast water in their fuel oil tanks.
top
(a) No person may operate an oceangoing ship of 400 gross tons and above but less than 10,000 gross tons, excluding a ship that carries ballast water in its fuel oil tanks, unless it is fitted with approved 15 parts per million (ppm) oily-water separating equipment for the processing of oily mixtures from bilges or fuel oil tank ballast.
(b) No person may operate a ship under this section unless it is fitted with a tank or tanks of adequate capacity to receive the oil residue that cannot be dealt with otherwise.
(1) In new ships such tanks shall be designed and constructed to facilitate cleaning and the discharge of the oily residues to reception facilities. Existing ships shall comply with this requirement as far as reasonable and practicable.
(2) Tanks used for oily mixtures on ships certificated under 46 CFR Chapter I shall meet the requirements of 46 CFR 56.50–50(h) for isolation between oil and bilge systems.
(c) No person may operate a ship unless it is equipped with a pipeline to discharge oily mixtures to a reception facility.
(d) This section does not apply to a barge that is not equipped with an installed bilge pumping system for discharge into the sea.
(e) This section does not apply to a fixed or floating drilling rig or other platform, except as specified in §155.400(a)(2).
[CGD 75–124a, 48 FR 45715, Oct. 6, 1983, as amended by USCG–1998–3799, 63 FR 35531, June 30, 1998; USCG–2000–7641, 66 FR 55571, Nov. 2, 2001]
§ 155.370 Oily mixture (bilge slops)/fuel oil tank ballast water discharges on oceangoing ships of 10,000 gross tons and above and oceangoing ships of 400 gross tons and above that carry ballast water in their fuel oil tanks.
top
(a) No person may operate an oceangoing ship of 10,000 gross tons and above, or any oceangoing ship of 400 gross tons and above, that carries ballast water in its fuel oil tanks, unless it has—
(1) Approved 15 ppm oily-water separating equipment for the processing of oily mixtures from bilges or fuel oil tank ballast;
(2) A bilge alarm; and
(3) A means for automatically stopping any discharge of oily mixture when the oil content in the effluent exceeds 15 ppm.
(b) No person may operate a ship under this section unless it is fitted with a tank or tanks of adequate capacity to receive the oil residue that cannot be dealt with otherwise.
(1) In new ships such tanks shall be designed and constructed to facilitate cleaning and the discharge of the oil residue to reception facilities. Existing ships shall comply with this requirement as far as reasonable and practicable.
(2) Tanks used for oily mixtures on ships certificated under 46 CFR Chapter I shall meet the requirements of 46 CFR 56.50–50(h) for isolation between oil and bilge systems.
(c) No person may operate a ship under this section unless it is equipped with a pipeline to discharge oily mixtures to a reception facility.
(d) This section does not apply to a barge that is not equipped with an installed bilge pumping system for discharge into the sea.
(e) This section does not apply to a fixed or floating drilling rig or other platform, except as specified in §155.400(a)(2). (Approved by the Office of Management and Budget under control number 1625–0009)
[CGD 75–124a, 48 FR 45715, Oct. 6, 1983, as amended by USCG–1998–3799, 63 FR 35531, June 30, 1998; USCG–2000–7641, 66 FR 55571, Nov. 2, 2001; USCG–2006–25150, 71 FR 39210, July 12, 2006]
§ 155.380 Oily-water separating equipment, bilge alarm, and bilge monitor approval standards.
top
(a) On U.S. inspected ships, oily-water separating equipment, bilge alarms, and bilge monitors must be approved under 46 CFR 162.050.
(b) On U.S. uninspected ships and foreign ships, oily-water separating equipment, bilge alarms, and bilge monitors must be approved under 46 CFR 162.050 or be listed in the current International Maritime Organization (IMO) Marine Environment Protection Committee (MEPC) Circular summary of MARPOL 73/78 approved equipment.
(c) A ship that is required to have a bilge alarm may have a bilge monitor installed in its place.
[CGD 75–124a, 48 FR 45715, Oct. 6, 1983, as amended by USCG–2000–7641, 66 FR 55572, Nov. 2, 2001]
§ 155.400 Platform machinery space drainage on oceangoing fixed and floating drilling rigs and other platforms.
top
(a) No person may operate an oceangoing fixed or floating drilling rig or other platform unless it either—
(1) Complies with the oily-water separating equipment requirements of a valid National Pollutant Discharge Elimination System (NPDES) permit issued in accordance with section 402 of the Clean Water Act and 40 CFR Chapter I;
(2) Complies with the oily-water separating equipment requirements for oceangoing ships of 400 gross tons and above as set forth in either §155.360 or §155.370; or
(3) Is not equipped with an installed bilge pumping system for discharge of oily mixtures from platform machinery spaces into the sea and has the capacity to retain on board all of these oily mixtures and is equipped to discharge these mixtures for transport to a reception facility.
(b) When an oceangoing fixed or floating drilling rig or other platform is in a special area, is not proceeding en route, or is within 12 nautical miles of the nearest land; it must either—
(1) Have the capacity to retain on board all machinery space oily mixtures from platform machinery space drainage and be equipped to discharge these mixtures for transport to a reception facility; or
(2) Discharge in accordance with §151.10 (b)(3), (b)(4), and (b)(5) of this chapter, provided the drilling rig or platform is not within a special area.
(c) Paragraph (b) of this section does not apply to a fixed or floating drilling rig or other platform that is operating under an NPDES permit.
[CGD 75–124a, 48 FR 45715, Oct. 6, 1983, as amended by CGD 88–002, 54 FR 18407, Apr. 28, 1989; CGD 94–056, 60 FR 43378, Aug. 21, 1995; USCG–1998–3799, 63 FR 35531, June 30, 1998]
§ 155.410 Pumping, piping and discharge requirements for non-oceangoing ships of 100 gross tons and above.
top
(a) No person may operate a non-oceangoing ship of 100 gross tons and above that is fitted with main or auxiliary machinery spaces in the navigable waters of the United States unless:
(1) The ship has at least one pump installed to discharge oily mixtures through a fixed piping system to a reception facility;
(2) The piping system required by this section has at least one outlet that is accessible from the weather deck;
(3) Each outlet required by this section has a shore connection that is compatible with reception facilities in the ship's area of operation; and
(4) The ship has a stop valve for each outlet required by this section.
(b) Paragraph (a) of this section does not apply to a ship that has approved oily-water separating equipment for the processing of oily mixtures from bilges or fuel oil tank ballast.
(c) This section does not apply to a fixed or floating drilling rig or other platform.
[CGD 75–124a, 48 FR 45715, Oct. 6, 1983, as amended by USCG–2000–7641, 66 FR 55572, Nov. 2, 2001]
§ 155.420 Pumping, piping and discharge requirements for oceangoing ships of 100 gross tons and above but less than 400 gross tons.
top
(a) No person may operate an oceangoing ship of 100 gross tons and above but less than 400 gross tons that is fitted with main or auxiliary machinery spaces unless:
(1) The ship has at least one pump installed to discharge oily mixtures through a fixed piping system to a reception facility;
(2) The piping system required by this section has at least one outlet accessible from the weather deck;
(3) For a ship on an international voyage, the outlet required by this section has a shore connection that meets the specifications in §155.430, or the ship has at least one adapter that meets the specifications in §155.430 and fits the required outlets;
(4) For a ship not on an international voyage, the outlet required by this section has a shore connection that is compatible with reception facilities in the ship's area of operation;
(5) The ship has a means on the weather deck near the discharge outlet to stop each pump that is used to discharge oily mixtures; and
(6) The ship has a stop valve installed for each outlet required by this section.
(b) Paragraph (a) of this section does not apply to a ship that has approved oily-water separating equipment for the processing of oily mixtures from bilges or fuel oil tank ballast.
(c) This section does not apply to a fixed or floating drilling rig or other platform.
[CGD 75–124a, 48 FR 45715, Oct. 6, 1983, as amended by USCG–2000–7641, 66 FR 55572, Nov. 2, 2001]
§ 155.430 Standard discharge connections for oceangoing ships of 400 gross tons and above.
top
(a) All oceangoing ships of 400 gross tons and above must have a standard shore connection for reception facilities to discharge oily mixtures from machinery space bilges or ballast water containing an oily mixture from fuel oil tanks. The discharge connection must have the following dimensions:
(1) Outside diameter=215 millimeters (mm).
(2) Inner diameter=according to pipe outside diameter.
(3) Bolt circle diameter=183 mm.
(4) Slots in flange=6 holes 22 mm in diameter equidistantly placed on a bolt circle of the above diameter, slotted to the flange periphery. The slot width to be 22 mm.
(5) Flange thickness=20 mm.
(6) Bolts and nuts, quantity and number=6 each of 20 mm in diameter and of suitable length.
(b) A portable adapter that meets the specifications of paragraph (a) of this section and that fits the discharge shore connection, for the discharge of oily wastes from machinery space bilges may be substituted for the standard discharge connection requirement of paragraph (a) of this section.
(c) The flange must be designed to accept pipes up to a maximum internal diameter of 125 mm and shall be of steel or other equivalent material having a flat face. This flange, together with a gasket of oilproof material, must be suitable for a service pressure of 6 kilograms/square centimeters (kg/cm2 ).
[CGD 75–124a, 48 FR 45715, Oct. 6, 1983, as amended by USCG–2000–7641, 66 FR 55572, Nov. 2, 2001]
§ 155.440 Segregation of fuel oil and ballast water on new oceangoing ships of 4,000 gross tons and above, other than oil tankers, and on new oceangoing oil tankers of 150 gross tons and above.
top
(a) Except as provided for in paragraph (b) of this section, in new oceangoing ships of 4,000 gross tons and above other than oil tankers, and in new oceangoing oil tankers of 150 gross tons and above, ballast water must not be carried in any fuel oil tank.
(b) Where abnormal conditions or the need to carry large quantities of fuel oil render it necessary to carry ballast water that is not a clean ballast in any fuel oil tank, that ballast water must be discharged to reception facilities or into the sea in compliance with Part 151 of this chapter using the equipment specified in §155.370, and an entry shall be made in the Oil Record Book to this effect. (Approved by the Office of Management and Budget under control number 1625–0009)
[CGD 75–124a, 48 FR 45715, Oct. 6, 1983, as amended by USCG–2006–25150, 71 FR 39210, July 12, 2006]
§ 155.450 Placard.
top
(a) A ship, except a ship of less than 26 feet in length, must have a placard of at least 5 by 8 inches, made of durable material fixed in a conspicuous place in each machinery space, or at the bilge and ballast pump control station, stating the following:
Discharge of Oil Prohibited
The Federal Water Pollution Control Act prohibits the discharge of oil or oily waste into or upon the navigable waters of the United States, or the waters of the contiguous zone, or which may affect natural resources belonging to, appertaining to, or under the exclusive management authority of the United States, if such discharge causes a film or discoloration of the surface of the water or causes a sludge or emulsion beneath the surface of the water. Violators are subject to substantial civil penalties and/or criminal sanctions including fines and imprisonment.
(b) Existing stocks of placards may be used for the life of the placard.
(c) The placard required by paragraph (a) or (b) of this section must be printed in the language or languages understood by the crew.
[CGD 75–124a, 48 FR 45715, Oct. 6, 1983, as amended by CGD 93–054, 58 FR 62262, Nov. 26, 1993]
§ 155.470 Prohibited spaces.
top
(a) In a ship of 400 gross tons and above, for which the building contract is placed after January 1, 1982 or, in the absence of a building contract, the keel of which is laid or which is at a similar stage of construction after July 1, 1982, oil or hazardous material must not be carried in a forepeak tank or a tank forward of the collision bulkhead.
(b) A self-propelled ship of 300 gross tons and above, to which paragraph (a) of this section does not apply, may not carry bulk oil or hazardous material in any space forward of a collision bulkhead except:
(1) For a ship constructed after June 30, 1974, fuel oil for use on the ship may be carried in tanks forward of a collision bulkhead, if such tanks are at least 24 inches inboard of the hull structure; or
(2) For a ship constructed before July 1, 1974, fuel oil for use on the ship may be carried in tanks forward of a collision bulkhead, if such tanks were designated, installed, or constructed for fuel oil carriage before July 1, 1974.
[CGD 75–124a, 48 FR 45715, Oct. 6, 1983, as amended by CGD 86–034, 55 FR 36254, Sept. 4, 1990]
§ 155.480 Overfill devices.
top
(a) For the purposes of this section, “oil” has the same definition as provided in §151.05 of this chapter.
(b) Each tank vessel with a cargo capacity of 1,000 or more cubic meters (approximately 6,290 barrels), loading oil or oil residue as cargo, must have one overfill device that is permanently installed on each cargo tank and meets the requirements of this section.
(1) On a tankship, each cargo tank must be equipped with an overfill device (including an independent audible alarm or visible indicator for that tank) that meets the requirements for tank overfill alarms under 46 CFR 39.20–7(b)(2) and (3), and (d)(1) through (d)(4).
(2) On a tank barge, each cargo tank must be equipped with an overfill device that—
(i) Meets the requirements of 46 CFR 39.20–7(b)(2) and (b)(3) and (d)(1) through (d)(4), and 46 CFR 39.20–9(a)(1) through (a)(3);
(ii) Is an installed automatic shutdown system that meets the requirements of 46 CFR 39.20–9(b); or
(iii) Is an installed high level indicating device that meets the requirements of 46 CFR 39.20–3(b)(1), (b)(2), and (b)(3).
(c) Each cargo tank of a U.S. flag tank vessel must have installed on it an overfill device meeting the requirements of this section at the next scheduled cargo tank internal examination performed on the vessel under 46 CFR 31.10–21.
(d) Each cargo tank of a foreign flag tank vessel must have installed on it an overfill device—
(1) At the first survey that includes dry docking, as required by the vessel's flag administration, to meet the International Convention for the Safety of Life at Sea (SOLAS), 1974, as amended, or the International Load Line Convention of 1966; or
(2) At the first cargo tank internal examination performed on the tank vessel under 46 CFR 31.10–21.
(e) This section does not apply to a tank vessel that does not meet the double hull requirements of §157.10d of this chapter and, under 46 U.S.C. 3703a(c), may not operate in the navigable waters or Exclusive Economic Zone of the United States after January 1, 2000.
(f) This section does not apply to tank vessels that carry asphalt, animal fat, or vegetable oil as their only cargo.
[CGD 90–071a, 59 FR 53290, Oct. 21, 1994, as amended by CGD 90–071a, 62 FR 48773, Sept. 17, 1997]
§ 155.490 Tank level or pressure monitoring devices.
top
(a) Applicability. The tank level or pressure monitoring (TLPM) device requirements of this section apply to—
(1) U.S.-flag single-hull tank vessels carrying oil or oil residue as cargo; and
(2) Foreign-flag single-hull tank vessels carrying oil or oil residue as cargo when operating in the navigable waters of the United States and the exclusive economic zone (EEZ) when bound to or from a port or place in the United States.
(b) By October 17, 2007, each vessel required under paragraph (a) of this section to meet the requirements of this section, must have a tank level or pressure monitoring device that is permanently installed on each cargo tank and meets the requirements of this section.
(c) Each device must meet the following requirements:
(1) Be intrinsically safe as per 46 CFR 111.105;
(2) Indicate any loss of power or failure of the tank level or pressure monitoring device and monitor the condition of the alarm circuitry and sensor by an electronic self-testing feature;
(3) Alarm at or before the cargo in the cargo tank either increases or decreases by a level of one percent from the cargo quantity in the tank after securing cargo transfer operations;
(4) Operate in conditions up to sea state 5, moisture, and varying weather conditions; and
(5) Have audible and visual alarm indicators which are distinctly identifiable as cargo tank level or pressure monitoring alarms that can be seen and heard on the navigation bridge of the tank ship or towing vessel and on the cargo deck area.
(d) Double-hull tank vessels are exempt from the requirements of this section.
(e) This section does not apply to tank vessels that carry asphalt as their only cargo.
[USCG–2001–9046, 67 FR 58524, Sept. 17, 2002]
Effective Date Note: By USCG–2001–9046, 70 FR 41617, July 20, 2005, §155.490 was suspended from Aug. 19, 2005 until July 21, 2008.
Subpart C—Transfer Personnel, Procedures, Equipment, and Records
top
§ 155.700 Designation of person in charge.
top
Each operator or agent of a vessel with a capacity of 250 or more barrels of fuel oil, cargo oil, hazardous material, or liquefied gas as regulated in Table 4 of 46 CFR part 154, or each person who arranges for and hires a person to be in charge of a transfer of fuel oil, of a transfer of liquid cargo in bulk, or of cargo-tank cleaning, shall designate, either by name or by position in the crew, the person in charge (PIC) of each transfer to or from the vessel and of each tank-cleaning.
[CGD 79–116, 62 FR 25126, May 8, 1997]
§ 155.710 Qualifications of person in charge.
top
(a) On each tankship required to be documented under the laws of the United States, the operator or agent of the vessel, or the person who arranges and hires a person to be in charge either of a transfer of liquid cargo in bulk or of cargo-tank cleaning, shall verify to his or her satisfaction that each person designated as a PIC—
(1) Has sufficient training and experience with the relevant characteristics of the vessel on which he or she is engaged—including the cargo for transfer, the cargo-containment system, the cargo system (including transfer procedures, and shipboard-emergency equipment and procedures), the control and monitoring systems, the procedures for reporting pollution incidents, and, if installed, the Crude-Oil Washing (COW), inert-gas, and vapor-control systems—to safely conduct a transfer of fuel oil, a transfer of liquid cargo in bulk, or cargo-tank cleaning;
(2) Except as provided in paragraph (g) of this section, holds a license issued under 46 CFR part 10 authorizing service aboard a vessel certified for voyages beyond any Boundary Line described in 46 CFR part 7, except on tankships or self-propelled tank vessels not certified for voyages beyond the Boundary Line; and
(3) Except as provided in paragraph (g) of this section and 46 CFR 13.113 (a) or (c), holds a Tankerman-PIC endorsement issued under 46 CFR part 13 that authorizes the holder to supervise the transfer of fuel oil, the transfer of liquid cargo in bulk, or cargo-tank cleaning, as appropriate to the product.
(b) On each tank barge required to be inspected under 46 U.S.C. 3703, the operator or agent of the vessel, or the person who arranges and hires a person to be in charge of a transfer of fuel oil, of a transfer of liquid cargo in bulk, or of cargo-tank cleaning, shall verify to his or her satisfaction that each PIC—
(1) Has sufficient training and experience with the relevant characteristics of the vessel on which he or she is engaged—including the cargo for transfer, the cargo-containment system, the cargo system (including transfer procedures, and shipboard-emergency equipment and procedures), the control and monitoring systems, the procedures for reporting pollution incidents, and, if installed, the COW, inert-gas, and vapor-control systems—to safely conduct either a transfer of liquid cargo in bulk or cargo-tank cleaning; and
(2) Except as provided in paragraph (g) of this section and 46 CFR part 13.113 (a) or (c), holds a Tankerman-PIC or Tankerman-PIC (Barge) endorsement issued under 46 CFR part 13 that authorizes the holder to supervise the transfer of fuel oil, the transfer of liquid cargo in bulk, or cargo-tank cleaning, as appropriate to the product and vessel.
(c) On each foreign tankship, the operator or agent of the vessel shall verify to his or her satisfaction that each PIC either of a transfer of liquid cargo in bulk or of cargo-tank cleaning—
(1) Has sufficient training and experience with the relevant characteristics of the vessel on which he or she is engaged, including the cargo for transfer, the cargo-containment system, the cargo system (including transfer procedures, and shipboard-emergency equipment and procedures), the control and monitoring systems, the procedures for reporting pollution incidents, and, if installed, the systems for crude-oil washing, inert gas, and vapor control, to safely conduct either a transfer of liquid cargo in bulk or cargo-tank cleaning;
(2) Except as provided in paragraph (g) of this section, holds a license or other document issued by the flag state or its authorized agent authorizing service as master, mate, pilot, engineer, or operator on that vessel;
(3) Except as provided in paragraph (g) of this section, holds a Dangerous-Cargo Endorsement or Certificate issued by a flag state party to the International Convention on Standards of Training, Certification and Watchkeeping for Seafarers, 1978 (STCW), or other form of evidence acceptable to the Coast Guard, attesting the PIC's meeting the requirements of Chapter V of STCW as a PIC of the transfer of fuel oil, of the transfer of liquid cargo in bulk, or of cargo-tank cleaning;
(4) Is capable of reading, speaking, and understanding in English, or a language mutually-agreed-upon with the shoreside PIC of the transfer, all instructions needed to commence, conduct, and complete a transfer of fuel oil, a transfer of liquid cargo in bulk, or cargo-tank cleaning, except that the use of an interpreter meets this requirement if the interpreter—
(i) Fluently speaks the language spoken by each PIC;
(ii) Is immediately available to the PIC on the tankship at all times during the transfer or cargo-tank cleaning; and
(iii) Is knowledgeable about, and conversant with terminology of, ships, transfers, and cargo-tank cleaning; and
(5) Is capable of effectively communicating with all crewmembers involved in the transfer or cargo-tank cleaning, with or without an interpreter.
(d) On each foreign tank barge, the operator or agent of the vessel shall verify to his or her satisfaction that each PIC either of the transfer of liquid cargo in bulk or of cargo-tank cleaning—
(1) Has sufficient training and experience with the relevant characteristics of the vessel on which he or she is engaged—including the cargo for transfer, the cargo-containment system, the cargo system (including transfer procedures, and shipboard-emergency equipment and procedures), the control and monitoring systems, the procedures for reporting pollution incidents, and, if installed, the COW, inert-gas, and vapor-control systems—to safely conduct a transfer of fuel oil, a transfer of liquid cargo in bulk, or cargo-tank cleaning;
(2) Except as provided in paragraph (g) of this section, holds a Dangerous-Cargo Endorsement or Certificate issued by a flag state party to STCW, or other form of evidence acceptable to the Coast Guard, attesting the PIC's meeting the requirements of Chapter V of STCW as a PIC of the transfer of fuel oil, of the transfer of liquid cargo in bulk, or of cargo-tank cleaning;
(3) Is capable of reading, speaking, and understanding in English, or a language mutually-agreed-upon with the shoreside PIC of the transfer, all instructions needed to commence, conduct, and complete a transfer of fuel oil, a transfer of liquid cargo in bulk, or cargo-tank cleaning, except that the use of an interpreter meets this requirement if the interpreter—
(i) Fluently speaks the language spoken by each PIC;
(ii) Is immediately available to the PIC on the tankship at all times during the transfer or cargo-tank cleaning; and
(iii) Is knowledgeable about, and conversant with terminology of, ships, transfers, and cargo-tank cleaning; and
(4) Is capable of effectively communicating with all crewmembers involved in the transfer or cargo-tank cleaning, with or without an interpreter.
(e) The operator or agent of each vessel to which this section applies shall verify to his or her satisfaction that the PIC of any transfer of fuel oil requiring a Declaration of Inspection—
(1) On each inspected vessel required by 46 CFR chapter I to have a licensed person aboard, holds a valid license issued under 46 CFR part 10 authorizing service as a master, mate, pilot, engineer, or operator aboard that vessel, or holds a valid merchant mariner's document endorsed as Tankerman-PIC;
(2) On each uninspected vessel, either complies with the requirements of paragraph (e)(1) of this section or carries a letter satisfying the requirements of §155.715 and designating him or her as a PIC, unless equivalent evidence is immediately available aboard the vessel or at his or her place of employment.
(3) On each tank barge, for its own engine-driven pumps, either complies with paragraph (e)(1) or (2) of this section or has been instructed by the operator or agent of the vessel both in his or her duties and in the Federal statutes and regulations on water pollution that apply to the vessel; or
(4) On each foreign vessel, holds a license or certificate issued by a flag state party to STCW, or other form of evidence acceptable to the Coast Guard, attesting the qualifications of the PIC to act as master, mate, pilot, operator, engineer, or tankerman aboard that vessel.
(f) Except as provided in paragraph (g) of this section, the operator or agent of each self-propelled tank vessel carrying oil or hazardous material in bulk shall verify to his or her satisfaction that the PIC of the transfer of oil or hazardous material in bulk to or from a vessel, or of cargo-tank cleaning, holds a Tankerman-PIC endorsement on his or her MMD and either a license or a Certificate issued by a flag state party to STCW authorizing service as a master, mate, pilot, engineer, or operator aboard that vessel.
(g) The PIC of a cargo-tank cleaning on a vessel at a tank-cleaning facility or shipyard need not hold any of the licenses, documents, certificates, or endorsements required in paragraphs (a) through (f) of this section, if he or she is a National Fire Protection Association Certificated Marine Chemist.
[CGD 79–116, 60 FR 17141, Apr. 4, 1995, as amended by CGD 79–116, 61 FR 25126, May 8, 1997; CGD 79–116, 63 FR 35826, July 1, 1998]
§ 155.715 Contents of letter of designation as a person-in-charge of the transfer of fuel oil.
top
The letter of instruction required in §155.710(e)(2) must designate the holder as a person-in-charge of the transfer of fuel oil and state that the holder has received sufficient formal instruction from the operator or agent of the vessel to ensure his or her ability to safely and adequately carry out the duties and responsibilities of the PIC described in 33 CFR 156.120 and 156.150.
[CGD 79–116, 63 FR 35826, July 1, 1998]
§ 155.720 Transfer procedures.
top
The operator of a vessel with a capacity of 250 or more barrels of oil, hazardous material, or liquefied gas as regulated in Table 4 of 46 CFR part 154 shall provide transfer procedures that meet the requirements of this part and part 156 of this chapter for transferring—
(a) To or from the vessel; and
(b) From tank to tank within the vessel.
[CGD 86–034, 55 FR 36254, Sept. 4, 1990, as amended by CGD 79–116, 62 FR 25127, May 8, 1997]
§ 155.730 Compliance with transfer procedures.
top
The vessel operator of each vessel required by §155.720 to have transfer procedures shall maintain them current and shall require vessel personnel to use the transfer procedures for each transfer operation.
[CGD 75–124, 45 FR 7175, Jan. 31, 1980, as amended by CGD 86–034, 55 FR 36254, Sept. 4, 1990]
§ 155.740 Availability of transfer procedures.
top
The transfer procedures required by §155.720 must be:
(a) Available for inspection by the COTP or OCMI whenever the vessel is in operation;
(b) Legibly printed in a language or languages understood by personnel engaged in transfer operations; and
(c) Permanently posted or available at a place where the procedures can be easily seen and used by members of the crew when engaged in transfer operations.
[CGD 75–124, 45 FR 7175, Jan. 31, 1980, as amended by CGD 86–034, 55 FR 36254, Sept. 4, 1990]
§ 155.750 Contents of transfer procedures.
top
(a) The transfer procedures required by §155.720 must contain, either in the order listed or by use of a cross-reference index page:
(1) A list of each product transferred to or from the vessel, including the following information:
(i) Generic or chemical name;
(ii) Cargo information as described in §154.310(a)(5)(ii) of this chapter; and
(iii) Applicability of transfer procedures;
(2) A description of each transfer system on the vessel including:
(i) A line diagram of the vessel's transfer piping, including the location of each valve, pump, control device, vent, and overflow;
(ii) The location of the shutoff valve or other isolation device that separates any bilge or ballast system from the transfer system; and
(iii) A description of and procedures for emptying the discharge containment system required by §§155.310 and 155.320;
(3) The number of persons required to be on duty during transfer operations;
(4) The duties by title of each officer, person in charge, tankerman, deckhand, and any other person required for each transfer operation;
(5) Procedures and duty assignments for tending the vessel's moorings during the transfer of oil or hazardous material;
(6) Procedures for operating the emergency shutdown and communications means required by §§155.780 and 155.785, respectively;
(7) Procedures for topping off tanks;
(8) Procedures for ensuring that all valves used during the transfer operations are closed upon completion of transfer;
(9) Procedures for reporting discharges of oil or hazardous material into the water; and
(10) Procedures for closing and opening the vessel openings in §155.815.
(11) Statements explaining that each hazardous materials transfer hose is marked with either the name of each product which may be transferred through the hose or with letters, numbers or other symbols representing all such products and the location in the transfer procedures where a chart or list of the symbols used and a list of the compatible products which may be transferred through the hose can be found for consultation before each transfer.
(b) Exemptions or alternatives granted must be placed in the front of the transfer procedures.
(c) The vessel operator shall incorporate each amendment to the transfer procedures under §155.760 in the procedures with the related existing requirement, or at the end of the procedures if not related to an existing requirement.
(d) If a vessel is fitted with a vapor control system, the transfer procedures must contain a description of the vapor collection system on the vessel which includes:
(1) A line diagram of the vessel's vapor collection system piping, including the location of each valve, control device, pressure-vacuum relief valve, pressure indicator, flame arresters, and detonation arresters, if fitted;
(2) The location of spill valves and rupture disks, if fitted;
(3) The maximum allowable transfer rate determined in accordance with 46 CFR 39.30–1(d) (1) through (d)(3);
(4) The initial transfer rate for each tank that complies with 46 CFR 39.30–1(h);
(5) A table or graph of transfer rates and corresponding vapor collection system pressure drops calculated in accordance with 46 CFR 39.30–1(b);
(6) The relief settings of each spill valve, rupture disk, and pressure-vacuum relief valve; and
(7) A description of and procedures for operating the vapor collection system, including the:
(i) Pre-transfer equipment inspection requirements;
(ii) Vapor line connection;
(iii) Closed gauging system;
(iv) High level alarm system, if fitted; and
(v) Independent automatic shutdown system, if fitted.
(e) If a cargo tank of a tank vessel is fitted with an overfill device, the transfer procedures must contain a description of the overfill device, including:
(1) The tank overfill device system and specific procedures for the person in charge to—
(i) Monitor the level of cargo in the tank; and
(ii) Shut down transfer operations in time to ensure that the cargo level in each tank does not exceed the maximum amount permitted by §155.775(b).
(2) Pre-transfer overfill device equipment inspection and test requirements. (Approved by the Office of Management and Budget under control number 1625–0030)
[CGD 75–124, 45 FR 7175, Jan. 31, 1980, as amended by CGD 88–102, 55 FR 25445, June 21, 1990; CGD 86–034, 55 FR 36254, Sept. 4, 1990; CGD 92–027, 58 FR 39662, July 26, 1993; CGD 90–071a, 59 FR 53291, Oct. 21, 1994; USCG–2006–25150, 71 FR 39210, July 12, 2006]
§ 155.760 Amendment of transfer procedures.
top
(a) The COTP or OCMI may require the vessel operator of any vessel that is required to have transfer procedures under §155.720 to amend those procedures if the COTP or OCMI finds that the transfer procedures do not meet the requirements of this part.
(b) The COTP or OCMI shall notify the vessel operator in writing of any inadequacies in the oil transfer procedures. The vessel operator may submit written information, views, and arguments on and proposals for amending the procedures within 14 days from the date of the COTP or OCMI notice. After considering all relevant material presented, the COTP or OCMI shall notify the vessel operator of any amendment required or adopted, or the COTP or OCMI may rescind the notice. The amendment becomes effective 30 days after the vessel operator receives the notice, unless the vessel operator petitions the Commandant to review the COTP or OCMI notice, in which case its effective date is delayed pending a decision by the Commandant. Petitions to the Commandant must be submitted in writing via the COTP or OCMI who issued the requirement to amend.
(c) If the COTP or OCMI finds that there is a condition requiring immediate action to prevent the discharge or risk of discharge that makes the procedure in paragraph (b) of this section impractical or contrary to the public interest, he or she may issue an amendment effective on the date the vessel operator receives notice of it. In such a case, the COTP or OCMI includes a brief statement of the reasons for the findings in the notice, and the vessel operator may petition the Commandant, in any manner, to review the amendment. The petition does not postpone the amendment.
[CGD 75–124, 45 FR 7175, Jan. 31, 1980, as amended by CGD 86–034, 55 FR 36255, Sept. 4, 1990]
§ 155.770 Draining into bilges.
top
No person may intentionally drain oil or hazardous material from any source into the bilge of a vessel.
[CGD 86–034, 55 FR 36255, Sept. 4, 1990]
§ 155.775 Maximum cargo level of oil.
top
(a) For the purposes of this section, “oil” has the same meaning as provided in §151.05 of this chapter.
(b) A cargo tank on a tank vessel may not be filled with oil higher than—
(1) 98.5 percent of the cargo tank volume; or
(2) The level at which the overfill alarm required by §155.480 is set.
[CGD 90–071a, 59 FR 53291, Oct. 21, 1994]
§ 155.780 Emergency shutdown.
top
(a) A tank vessel with a capacity of 250 or more barrels that is carrying oil or hazardous material as cargo must have on board an emergency means to enable the person in charge of a transfer operation to a facility, to another vessel, or within the vessel to stop the flow of oil or hazardous material.
(b) The means to stop the flow may be a pump control, a quick-acting, power actuated valve, or an operating procedure. If an emergency pump control is used, it must stop the flow of oil or hazardous material if the oil or hazardous material could siphon through the stopped pump.
(c) The means to stop the flow must be operable from the cargo deck, cargo control room, or the usual operating station of the person in charge of the transfer operation.
[CGD 86–034, 55 FR 36255, Sept. 4, 1990]
§ 155.785 Communications.
top
(a) During vessel to vessel transfers, each tank vessel with a capacity of 250 or more barrels of cargo that is carrying oil or hazardous material must have a means that enables continuous two-way voice communication between the persons in charge of the transfer operations on both vessels.
(b) Each vessel must have a means, which may be the communication system itself, that enables a person on board each vessel to effectively indicate his desire to use the means of communication required by paragraph (a) of this section.
(c) The means required by paragraph (a) of this section must be usable and effective in all phases of the transfer operation and all conditions of weather.
(d) Portable radio devices used to comply with paragraph (a) of this section during the transfer of flammable or combustible liquids must be intrinsically safe, as defined in 46 CFR 110.15–100(i), and meet Class I, Division I, Group D requirements as defined in 46 CFR 111.80.
[CGD 75–124, 45 FR 7175, Jan. 31, 1980; 45 FR 43705, June 30, 1980, as amended by CGD 86–034, 55 FR 36255, Sept. 4, 1990]
§ 155.790 Deck lighting.
top
(a) A self-propelled vessel with a capacity of 250 or more barrels of oil or hazardous material that is conducting transfer operations between sunset and sunrise must have deck lighting that adequately illuminates—
(1) Each transfer operations work area and each transfer connection point in use on the vessel; and
(2) Each transfer operations work area and each transfer connection point in use on each barge, if any, moored to the vessel to or from which oil or hazardous material is being transferred;
(b) Where the illumination is apparently inadequate the OCMI or COTP may require verification by instrument of the levels of illumination. On a horizontal plane 3 feet above the deck the illumination must measure at least:
(1) 5.0 foot candles at transfer connection points; and
(2) 1.0 foot candle in transfer operations work areas.
(c) Lighting must be located or shielded so as not to mislead or otherwise interfere with navigation on the adjacent waterways.
[CGD 75–124, 45 FR 7175, Jan. 31, 1980, as amended by CGD 86–034, 55 FR 36255, Sept. 4, 1990]
§ 155.800 Transfer hose.
top
Hose used to transfer oil or hazardous material must meet the requirements of §154.500 of this chapter.
[CGD 75–124, 45 FR 7175, Jan. 31, 1980, as amended by CGD 86–034, 55 FR 36255, Sept. 4, 1990]
§ 155.805 Closure devices.
top
(a) Each end of each transfer hose on board which is not connected for the transfer of oil or hazardous material must be blanked off with butterfly valves, wafer-type resilient seated valves, blank flanges, or other means acceptable to the COTP or OCMI.
(b) New, unused hose is exempt from the requirement in paragraph (a) of this section.
[CGD 75–124, 45 FR 7175, Jan. 31, 1980, as amended by CGD 86–034, 55 FR 36255, Sept. 4, 1990]
§ 155.810 Tank vessel security.
top
Operators of tank vessels carrying more oil cargo residue than normal in any cargo tank must assign a surveillance person or persons responsible for maintaining standard vessel security.
[ USCG–2000–7641, 66 FR 55572, Nov. 2, 2001]
§ 155.815 Tank vessel integrity.
top
(a) Except as provided in paragraph (b) of this section, a tank vessel underway or at anchor must have all closure mechanisms on the following openings properly closed:
(1) Expansion trunk hatches;
(2) Ullage openings;
(3) Sounding ports;
(4) Tank cleaning openings; and
(5) Any other tank vessel openings that maintain the seaworthy condition of the tank vessel and prevent the inadvertent release of oil or hazardous material in the event of a tank vessel accident.
(b) No person may open any of the closure mechanisms in paragraph (a) of this section while the tank vessel is underway or at anchor except when authorized and supervised by a licensed officer or the tankerman required by 46 CFR 31.15–5(a).
[CGD 75–124, 45 FR 7175, Jan. 31, 1980, as amended by CGD 86–034, 55 FR 36255, Sept. 4, 1990]
§ 155.820 Records.
top
The vessel operator shall keep a written record available for inspection by the COTP or OCMI of:
(a) The name of each person currently designated as a person in charge of transfer operations.
(b) The date and result of the most recent test and inspection of each item tested or inspected as required by §156.170 of this chapter;
(c) The hose information required by §154.500(e) and (g) of this chapter unless that information is marked on the hose; and
(d) The Declaration of Inspection as required by §156.150(f) of this chapter.
[CGD 75–124, 45 FR 7175, Jan. 31, 1980, as amended by CGD 86–034, 55 FR 36255, Sept. 4, 1990]
Subpart D—Tank Vessel Response Plans for Oil
top
Source: CGD 91–034, 61 FR 1081, Jan. 12, 1996, unless otherwise noted.
§ 155.1010 Purpose.
top
The purpose of this subpart is to establish requirements for oil spill response plans for certain vessels. The planning criteria in this subpart are intended for use in response plan development and the identification of resources necessary to respond to the oil spill scenarios prescribed during the planning process. The development of a response plan prepares the vessel owner or operator and the vessel's crew to respond to an oil spill. The specific criteria for response resources and their arrival times are not performance standards. They are planning criteria based on a set of assumptions that may not exist during an actual oil spill incident.
§ 155.1015 Applicability.
top
(a) Except as provided in paragraph (c) of this section, this subpart applies to each vessel that is constructed or adapted to carry, or that carries, oil in bulk as cargo or oil cargo residue, and that—
(1) Is a vessel of the United States;
(2) Operates on the navigable waters of the United States; or
(3) Transfers oil in a port or place subject to the jurisdiction of the United States.
(b) This subpart also applies to vessels which engage in oil lightering operations in the marine environment beyond the baseline from which the territorial sea is measured, when the cargo lightered is destined for a port or place subject to the jurisdiction of the United States.
(c) This subpart does not apply to the following types of vessels:
(1) Public vessels and vessels deemed public vessels under 14 U.S.C. 827.
(2) Vessels that, although constructed or adapted to carry oil in bulk as cargo or oil cargo residue, are not storing or carrying oil in bulk as cargo or oil cargo residue.
(3) Dedicated response vessels when conducting response operations.
(4) Vessels of opportunity when conducting response operations in a response area.
(5) Offshore supply vessels as defined in 46 U.S.C. 2101.
(6) Fishing or fishing tender vessels as defined in 46 U.S.C. 2101 of not more than 750 gross tons when engaged only in the fishing industry.
(7) Foreign flag vessels engaged in innocent passage.
(d) Vessels covered by this subpart that are not operating within the navigable waters or the exclusive economic zone of the United States must meet all requirements of this subpart except for—
(1) Identifying and ensuring, through contract or other approved means, the availability of response resources including the shore-based spill management team;
(2) Providing the geographic-specific appendices required in §155.1035, 155.1040, or 155.1045, as appropriate; and
(3) Identifying and designating a qualified individual and alternate qualified individual required in §155.1026.
[CGD 91–034, 61 FR 1081, Jan. 12, 1996, as amended by USCG–2000–7641, 66 FR 55572, Nov. 2, 2001]
§ 155.1020 Definitions.
top
Except as otherwise defined in this section, the definitions in §155.110 apply to this subpart and subparts F and G of this part. For the purposes of this subpart only, the term:
Adverse weather means the weather conditions that will be considered when identifying response systems and equipment in a response plan for the applicable operating environment. Factors to consider include, but are not limited to, significant wave height, ice, temperature, weather-related visibility, and currents within the Captain of the Port (COTP) zone in which the systems or equipment are intended to function.
Animal fat means a non-petroleum oil, fat, or grease derived from animals and not specifically identified elsewhere in this part.
Average most probable discharge means a discharge of the lesser of 50 barrels of oil or 1 percent of the cargo from the vessel during cargo oil transfer operations to or from the vessel.
Bulk means any volume of oil carried in an integral tank of the vessel and oil transferred to or from a marine portable tank or independent tank while on board a vessel.
Captain of the Port (COTP) Zone means a zone specified in 33 CFR part 3 and, for coastal ports, the seaward extension of that zone to the outer boundary of the exclusive economic zone (EEZ).
Cargo means oil that is transported to and off-loaded at a destination by a vessel. It does not include—
(1) Oil carried in integral tanks, marine portable tanks, or independent tanks for use by machinery, helicopters, and boats carried aboard the vessel, or for use by helicopters that are directly supporting the vessel's primary operations; or
(2) Oil transferred from a towing vessel to a vessel in its tow to operate installed machinery other than the propulsion plant.
Contract or other approved means includes—
(1) A written contractual agreement between a vessel owner or operator and an oil spill removal organization. The agreement must identify and ensure the availability of specified personnel and equipment required under this subpart within stipulated response times in the specified geographic areas;
(2) Certification by the vessel owner or operator that specified personnel and equipment required under this subpart are owned, operated, or under the direct control of the vessel owner or operator, and are available within stipulated response times in the specified geographic areas;
(3) Active membership in a local or regional oil spill removal organization that has identified specified personnel and equipment required under this subpart that are available to respond to a discharge within stipulated response times in the specified geographic areas;
(4) A document which—
(i) Identifies the personnel, equipment, and services capable of being provided by the oil spill removal organization within stipulated response times in the specified geographic areas;
(ii) Sets out the parties' acknowledgment that the oil spill removal organization intends to commit the resources in the event of a response;
(iii) Permits the Coast Guard to verify the availability of the identified response resources through tests, inspections, and exercises; and
(iv) Is referenced in the response plan; or
(5) With the written consent of the oil spill removal organization, the identification of an oil spill removal organization with specified equipment and personnel which are available within stipulated response times in the specified geographic areas. This paragraph is an other approved means for only—
(i) A vessel carrying oil as secondary cargo to meet the requirements under §155.1045(i)(3);
(ii) A barge operating on rivers and canals to meet the requirements for lightering capability under §§155.1050(l), 155.1052(g), 155.1230(g), and 155.2230(g);
(iii) A vessel to meet the salvage and firefighting requirements in §§155.1050(k), 155.1052(f), 155.1230(f), and 155.2230(f); and
(iv) A vessel to meet the resource requirements in §155.1052(c), 155.1230(c), and 155.2230(c).
Dedicated response vessel means a vessel of which the service is limited exclusively to oil and hazardous substance spill response-related activities, including spill recovery and transport, tanker escorting, deployment of spill response equipment, supplies, and personnel, and spill response-related training, testing, exercises, and research.
Exclusive economic zone means the zone contiguous to the territorial sea of United States extending to a distance up to 200 nautical miles from the baseline from which the breadth of the territorial sea is measured.
Great Lakes means Lakes Superior, Michigan, Huron, Erie, and Ontario, their connecting and tributary waters, the Saint Lawrence River as far as Saint Regis, and adjacent port areas.
Higher volume port area means the following areas, including any water area within 50 nautical miles seaward of the entrance(s) to the specified port:
(1) Boston, MA.
(2) New York, NY.
(3) Delaware Bay and River to Philadelphia, PA.
(4) St. Croix, VI.
(5) Pascagoula, MS.
(6) Mississippi River from Southwest Pass, LA to Baton Rouge, LA. Note: Vessels destined for, departing from, or offloading at the Louisiana Offshore Oil Port are not considered to be operating in this higher volume port area.
(7) Lake Charles, LA.
(8) Sabine-Neches River, TX.
(9) Galveston Bay and Houston Ship Channel, TX.
(10) Corpus Christi, TX.
(11) Los Angeles/Long Beach Harbor, CA.
(12) San Francisco Bay, San Pablo Bay, Carquinez Strait, and Suisun Bay to Antioch, CA.
(13) Strait of Juan De Fuca at Port Angeles, WA to and including Puget Sound, WA.
(14) Prince William Sound, AK.
Inland area means the area shoreward of the boundary lines defined in 46 CFR part 7, except that in the Gulf of Mexico, it means the area shoreward of the lines of demarcation (COLREG lines) as defined in §§80.740 through 80.850 of this chapter. The inland area does not include the Great Lakes.
Maximum extent practicable means the planned capability to respond to a worst case discharge in adverse weather, as contained in a response plan that meets the criteria in this subpart or in a specific plan approved by the Coast Guard.
Maximum most probable discharge means a discharge of—
(1) 2,500 barrels of oil for vessels with an oil cargo capacity equal to or greater than 25,000 barrels; or
(2) 10% of the vessel's oil cargo capacity for vessels with a capacity of less than 25,000 barrels.
Nearshore area means the area extending seaward 12 miles from the boundary lines defined in 46 CFR part 7, except in the Gulf of Mexico. In the Gulf of Mexico, a nearshore area is one extending seaward 12 miles from the line of demarcation (COLREG lines) as defined in §§80.740 through 80.850 of this chapter.
Non-persistent or Group I oil means a petroleum-based oil that, at the time of shipment, consists of hydrocarbon fractions—
(1) At least 50% of which by volume, distill at a temperature of 340 degrees C (645 degrees F); and
(2) At least 95% of which by volume, distill at a temperature of 370 degrees C (700 degrees F).
Non-petroleum oil means oil of any kind that is not petroleum-based. It includes, but is not limited to, animal fats and vegetable oils.
Ocean means the open ocean, offshore area, and nearshore area as defined in this subpart.
Offshore area means the area up to 38 nautical miles seaward of the outer boundary of the nearshore area.
Oil field waste means non-pumpable drilling fluids with possible trace amounts of metal and oil.
Oil spill removal organization means an entity that provides response resources.
On-scene coordinator or OSC means the Federal official predesignated by the Coast Guard or Environmental Protection Agency to coordinate and direct Federal removal efforts at the scene of an oil or hazardous substance discharge as prescribed in the National Oil and Hazardous Substances Pollution Contingency Plan (National Contingency Plan) as published in 40 CFR part 300.
Open ocean means the area from 38 nautical miles seaward of the outer boundary of the nearshore area, to the seaward boundary of the exclusive economic zone.
Operating in compliance with the plan means operating in compliance with the provisions of this subpart, including ensuring the availability of the response resources by contract or other approved means and conducting the necessary training and exercises.
Operator means person who is an owner, a demise charterer, or other contractor, who conducts the operation of, or who is responsible for the operation of a vessel. For the purposes of this subpart only, the operator of a towing vessel is not, per se, considered the operator of a vessel being towed.
Other non-petroleum oil means an oil of any kind that is not a petroleum oil, an animal fat, or a vegetable oil.
Owner or vessel owner means any person holding legal or equitable title to a vessel; provided, however, that a person holding legal or equitable title to a vessel solely as security is not the owner. In a case where a Certificate of Documentation has been issued, the owner is the person or persons whose name or names appear on the vessel's Certificate of Documentation provided, however, that where a Certificate of Documentation has been issued in the name of a president or secretary of an incorporated company, such incorporated company is the owner.
Persistent oil means a petroleum-based oil that does not meet the distillation criteria for a non-persistent oil. For the purposes of this subpart, persistent oils are further classified based on specific gravity as follows:
(1) Group II—specific gravity of less than .85.
(2) Group III—specific gravity equal to or greater than .85 and less than .95.
(3) Group IV—specific gravity equal to or greater than .95 and less than or equal to 1.0.
(4) Group V—specific gravity greater than 1.0.
Petroleum oil means petroleum in any form, including but not limited to, crude oil, fuel oil, sludge, oil residue, and refined products.
Qualified individual and alternate qualified individual means a shore-based representative of a vessel owner or operator who meets the requirements of 33 CFR 155.1026.
Response activity means the containment and removal of oil from the water and shorelines, the temporary storage and disposal of recovered oil, or the taking of other actions as necessary to minimize or mitigate damage to public health or welfare or the environment.
Response resources means the personnel, equipment, supplies, and other capability necessary to perform the response activities identified in a response plan.
Rivers and canals mean bodies of water confined within the inland area, including the Intracoastal Waterways and other waterways artificially created for navigation, that have a project depth of 12 feet or less.
Secondary Cargo (see Vessels Carrying Oil as a Secondary Cargo)
Specific gravity means the ratio of the mass of a given volume of liquid at 15 degrees C (60 degrees F) to the mass of an equal volume of pure water at the same temperature.
Spill management team means the personnel identified to staff the organizational structure identified in a response plan to manage response plan implementation.
Substantial threat of such a discharge means any incident involving a vessel that may create a significant risk of discharge of cargo oil. Such incidents include, but are not limited to, groundings, strandings, collisions, hull damage, fire, explosion, loss of propulsion, flooding, on-deck spills, or other similar occurrences.
Tanker means a self-propelled tank vessel constructed or adapted primarily to carry oil or hazardous material in bulk in the cargo spaces.
Tier means the combination of required response resources and the times within which the resources must arrive on scene. Appendix B of this part, especially Tables 5 and 6, provide specific guidance on calculating the response resources required by each tier. Sections 155.1050(g), 155.1135, 155.1230(d), and 155.2230(d) set forth the required times within which the response resources must arrive on scene. Tiers are applied in three categories:
(1) Higher volume port areas;
(2) The Great Lakes; and
(3) All other operating environments, including rivers and canals, inland, nearshore, and offshore areas.
Vegetable oil means a non-petroleum oil or fat not specifically identified elsewhere in this part that is derived from plant seeds, nuts, kernels or fruits.
Vessel of opportunity means a vessel engaged in spill response activities that is normally and substantially involved in activities other than spill response and not a vessel carrying oil as a primary cargo.
Vessels carrying oil as a primary cargo means all vessels except dedicated response vessels carrying oil in bulk as cargo or cargo residue that have a Certificate of Inspection issued under 46 CFR Chapter I, subchapter D.
Vessels carrying oil as a secondary cargo means vessels, other than vessels carrying oil as a primary cargo, carrying oil in bulk as cargo or cargo residue pursuant to a permit issued under 46 CFR 30.01–5, 70.05–30, or 90.05–35, an International Oil Pollution Prevention (IOPP) or Noxious Liquid Substance (NLS) certificate required by 33 CFR §§151.33 or 151.35; or any uninspected vessel that carries oil in bulk as cargo or cargo residue.
Worst case discharge means a discharge in adverse weather conditions of a vessel's entire oil cargo.
[CGD 91–034, 61 FR 1081, Jan. 12, 1996, as amended by USCG–2000–7641, 66 FR 55572, Nov. 2, 2001]
§ 155.1025 Operating restrictions and interim operating authorization.
top
(a) Vessels subject to this subpart may not perform the following functions, unless operating in compliance with a plan approved under §155.1065:
(1) Handling, storing, or transporting oil on the navigable waters of the United States; or
(2) Transferring oil in any other port or place subject to U.S. jurisdiction.
(b) Vessels subject to this subpart may not transfer oil in a port or place subject to the jurisdiction of the United States, where the oil to be transferred was received from another vessel subject to this subpart during a lightering operation referred to in §155.1015(b), unless both vessels engaged in the lightering operation were operating at the time in compliance with a plan approved under §155.1065.
(c)(1) Notwithstanding the requirements of paragraph (a) of this section, a vessel may continue to handle, store, transport, transfer, or lighter oil for 2 years after the date of submission of a response plan pending approval of that plan, if the vessel owner or operator has received written authorization for continued operations from the Coast Guard.
(2) To receive this authorization, the vessel owner or operator must certify in writing to the Coast Guard that the owner or operator has identified and ensured the availability of, through contract or other approved means, the necessary private response resources to respond, to the maximum extent practicable, to a worst case discharge or substantial threat of such a discharge from their vessel as described in §§155.1050, 155.1052, 155.1230, or 155.2230, as appropriate.
(d) With respect to paragraph (b) of this section, a vessel may not continue to handle, store, transport, transfer, or lighter oil if—
(1) The Coast Guard determines that the response resources identified in the vessel's certification statement do not meet the requirements of this subpart;
(2) The contracts or agreements cited in the vessel's certification statement are no longer valid;
(3) The vessel is not operating in compliance with the submitted plan; or
(4) The period of this authorization expires.
(e) An owner or operator of a vessel may be authorized by the applicable COTP to have that vessel make one voyage to transport or handle oil in a geographic specific area not covered by the vessel's response plan. All requirements of this subpart must be met for any subsequent voyages to that geographic specific area. To be authorized, the vessel owner or operator shall certify to the COTP in writing, prior to the vessel's entry into the COTP zone, that—
(1) A response plan meeting the requirements of this subpart (except for the applicable geographic specific appendix) or a shipboard oil pollution emergency plan approved by the flag state that meets the requirements of Regulation 26 of Annex I to the International Convention for the Prevention of Pollution from Ships, 1973 as modified by the Protocol of 1978 relating thereto, as amended (MARPOL 73/78) which is available from the National Technical Information Service, 5285 Port Royal Road, Springfield, VA 22161;
(2) The approved response plan or the required plan section(s) is aboard the vessel;
(3) The vessel owner or operator has identified and informed the vessel master and the COTP of the designated qualified individual prior to the vessel's entry into the COTP zone; and
(4) The vessel owner or operator has identified and ensured the availability of, through contract or other approved means, the private response resources necessary to respond, to the maximum extent practicable under the criteria in §§155.1050, 155.1052, 155.1230, or 155.2230, as appropriate, to a worst case discharge or substantial threat of discharge from the vessel in the applicable COTP zone.
§ 155.1026 Qualified individual and alternate qualified individual.
top
(a) The response plan must identify a qualified individual and at least one alternate who meet the requirements of this section. The qualified individual or alternate qualified individual must be available on a 24-hour basis.
(b) The qualified individual and alternate must—
(1) Speak fluent English;
(2) Except as set out in paragraph (c) of this section, be located in the United States;
(3) Be familiar with the implementation of the vessel response plan; and
(4) Be trained in the responsibilities of the qualified individual under the response plan.
(c) For Canadian flag vessels while operating on the Great Lakes or the Strait of Juan de Fuca and Puget Sound, WA, the qualified individual may be located in Canada if he or she meets all other requirements in paragraph (b) of this section.
(d) The owner operator shall provide each qualified individual and alternate qualified individual identified in the plan with a document designating them as a qualified individual and specifying their full authority to—
(1) Activate and engage in contracting with oil spill removal organization(s) and other response related resources identified in the plan;
(2) Act as a liaison with the predesignated Federal On-Scene Coordinator (OCS); and
(3) Obligate funds required to carry out response activities.
(e) The owner or operator of a vessel may designate an organization to fulfill the role of the qualified individual and alternate qualified individual. The organization must then identify a qualified individual and at least one alternate qualified individual who meet the requirements of this section. The vessel owner or operator is required to list in the response plan the organization, the person identified as the qualified individual, and the person or persons identified as the alternate qualified individual(s).
(f) The qualified individual is not responsible for—
(1) The adequacy of response plans prepared by the owner or operator; or
(2) Contracting or obligating funds for response resources beyond the full authority contained in their designation from the owner or operator of the vessel.
(g) The liability of a qualified individual is considered to be in accordance with the provisions of 33 U.S.C. 1321(c)(4).
§ 155.1030 General response plan requirements.
top
(a) The plan must cover all geographic areas of the United States in which the vessel intends to handle, store, or transport oil, including port areas and offshore transit areas.
(b) The plan must be written in English and, if applicable, in a language that is understood by the crew members with responsibilities under the plan.
(c) A vessel response plan must be divided into the following sections:
(1) General information and introduction.
(2) Notification procedures.
(3) Shipboard spill mitigation procedures.
(4) Shore-based response activities.
(5) List of contacts.
(6) Training procedures.
(7) Exercise procedures.
(8) Plan review and update procedures.
(9) On board notification checklist and emergency procedures (unmanned tank barges only).
(10) Geographic-specific appendix for each COTP zone in which the vessel or vessels operate.
(11) An appendix for vessel-specific information for the vessel or vessels covered by the plan.
(d) A vessel owner or operator with multiple vessels may submit one plan for each class of vessel (i.e., manned vessels carrying oil as primary cargo, unmanned vessels carrying oil as primary cargo, and vessels carrying oil as secondary cargo) with a separate vessel-specific appendix for each vessel covered by the plan and a separate geographic-specific appendix for each COTP zone in which the vessel(s) will operate.
(e) The required contents for each section of the plan are contained in §§155.1035, 155.1040, and 155.1045, as applicable to the type or service of the vessel.
(f) The response plan for a barge carrying nonhazardous oil field waste may follow the same format as that for a vessel carrying oil as a secondary cargo under §155.1045 in lieu of the plan required under §155.1035 or §155.1040.
(g) A response plan must be divided into the sections described in paragraph (c) of this section unless the plan is supplemented with a cross-reference table to identify the location of the information required by this subpart.
(h) The information contained in a response plan must be consistent with the—
(1) National Oil and Hazardous Substances Pollution Contingency Plan (NCP) (40 CFR part 300) and the Area Contingency Plan(s) (ACP) in effect on the date 6 months prior to the submission date of the response plan; or
(2) More recent NCP and ACP(s).
(i) Copies of the submitted and approved response plan must be available as follows:
(1) The owner or operator of all vessels, except for unmanned tank barges, shall ensure that one English language copy of the plan sections listed in paragraph (c) (1), (2), (3), (5), (10) and (11) of this section and the Coast Guard approval letter or notarized copy of the approval letter are maintained aboard the vessel. If applicable, additional copies of the required plan sections must be in the language understood by crew members with responsibilities under the plan and maintained aboard the vessel.
(2) The owner or operator of all unmanned tank barges shall ensure that one English language copy of the plan section listed in paragraph (c)(9) of this section and the Coast Guard approval letter or notarized copy of the approval letter are maintained aboard the barge.
(3) The vessel owner or operator shall maintain a current copy of the entire plan, and ensure that each person identified as a qualified individual and alternate qualified individual in the plan has a current copy of the entire plan.
(j) If an owner or operator of a United States flag vessel informs the Coast Guard in writing at the time of the plan submission according to the procedures of §155.1065, the owner or operator may address the provisions of Regulation 26 of MARPOL 73/78 if the owner or operator—
(1) Develops a vessel response plan under §155.1030 and §§155.1035, 155.1040, or 155.1045, as applicable;
(2) Expands the plan to cover discharges of all oils defined under MARPOL, including fuel oil (bunker) carried on board. The owner or operator is not required to include these additional oils in calculating the planning volumes that are used to determine the quantity of response resources that the owner or operator must ensure through contract or other approved means;
(3) Provides the information on authorities or persons to be contacted in the event of an oil pollution incident as required by Regulation 26 of MARPOL 73/78. This information must include—
(i) An appendix containing coastal State contacts for those coastal States the exclusive economic zone of which the vessel regularly transits. The appendix should list those agencies or officials of administrations responsible for receiving and processing pollution incident reports; and
(ii) An appendix of port contacts for those ports at which the vessel regularly calls; and
(4) Expands the plan to include the procedures and point of contact on the ship for coordinating shipboard activities with national and local authorities in combating an oil spill incident. The plan should address the need to contact the coastal State to advise them of action(s) being implemented and determine what authorization(s), if any, are needed.
(5) Provides a cross reference section to identify the location of the information required by §155.1030(j).
(k) A vessel carrying oil as a secondary cargo may comply with the requirements of §155.1045 by having a response plan approved under Regulation 26 of MARPOL 73/78 with the addition of the following—
(1) Identification of the qualified individual and alternate that meets the requirements of §155.1026;
(2) A geographic specific appendix meeting the requirements of §155.1045(i), including the identification of a contracted oil spill removal organization;
(3) Identification of a spill management team;
(4) An appendix containing the training procedures required by 155.1045(f); and
(5) An appendix containing the exercise procedures required by 155.1045(g).
(l) For plans submitted prior to the effective date of this final rule, the owner or operator of each vessel may elect to comply with any or all of the provisions of this final rule by amending or revising the appropriate section of the previously submitted plan.
§ 155.1035 Response plan requirements for manned vessels carrying oil as a primary cargo.
top
(a) General information and introduction. This section of the response plan must include—
(1) The vessel's name, country of registry, call sign, official number, and International Maritime Organization (IMO) international number (if applicable). If the plan covers multiple vessels, this information must be provided for each vessel;
(2) The name, address, and procedures for contacting the vessel's owner or operator on a 24-hour basis;
(3) A list of the COTP zones in which the vessel intends to handle, store, or transport oil;
(4) A table of contents or index of sufficient detail to permit personnel with responsibilities under the response plan to locate the specific sections of the plan; and
(5) A record of change(s) page to record information on plan reviews, updates or revisions.
(b) Notification procedures. This section of the response plan must include the following notification information:
(1) A checklist with all notifications, including telephone or other contact numbers, in order of priority to be made by shipboard or shore-based personnel and the information required for those notifications. Notifications must include those required by—
(i) MARPOL 73/78 and 33 CFR part 153; and
(ii) Any applicable State.
(2) Identification of the person(s) to be notified of a discharge or substantial threat of a discharge of oil. If the notifications vary due to vessel location, the persons to be notified also must be identified in a geographic-specific appendix. This section must separately identify—
(i) The individual(s) or organization(s) to be notified by shipboard personnel; and
(ii) The individual(s) or organization(s) to be notified by shore-based personnel.
(3) The procedures for notifying the qualified individual(s) designated by the vessel's owner or operator.
(4) Descriptions of the primary and, if available, secondary communications methods by which the notifications will be made that should be consistent with the regulations in §155.1035(b)(1).
(5) The information that is to be provided in the initial and any follow up notifications required by paragraph (b)(1) of this section.
(i) The initial notification may be submitted in accordance with IMO Resolution A648(16) “General Principles for Ship Reporting Systems and Ship Reporting Requirements” which is available through COMDT G-MSO–4, U.S. Coast Guard Headquarters, 2100 Second Street SW., Washington, DC 20593–0001. It must include at least the following information:
(A) Vessel name, country of registry, call sign, and official number (if any);
(B) Date and time of the incident;
(C) Location of the incident;
(D) Course, speed, and intended track of vessel;
(E) Radio station(s) and frequencies guarded;
(F) Date and time of next report;
(G) Type and quantity of oil on board;
(H) Nature and detail of defects, deficiencies, and damage (e.g. grounding, collision, hull failure, etc.);
(I) Details of pollution, including estimate of oil discharged or threat of discharge;
(J) Weather and sea conditions on scene;
(K) Ship size and type;
(L) Actions taken or planned by persons on scene;
(M) Current conditions of the vessel; and
(N) Number of crew and details of injuries, if any.
(ii) After the transmission of the initial notification, as much as possible of the information essential for the protection of the marine environment as is appropriate to the incident must be reported to the appropriate on-scene coordinator in a follow-up report. This information must include—
(A) Additional details on the type of cargo on board;
(B) Additional details on the condition of the vessel and ability to transfer cargo, ballast, and fuel;
(C) Additional details on the quantity, extent and movement of the pollution and whether the discharge is continuing;
(D) Any changes in the on-scene weather or sea conditions; and
(E) Actions being taken with regard to the discharge and the movement of the ship.
(6) Identification of the person(s) to be notified of a vessel casualty potentially affecting the seaworthiness of a vessel and the information to be provided by the vessel's crew to shore-based personnel to facilitate the assessment of damage stability and stress.
(c) Shipboard spill mitigation procedures. This section of the response plan must include—
(1) Procedures for the crew to mitigate or prevent any discharge or a substantial threat of such discharge of oil resulting from shipboard operational activities associated with internal or external cargo transfers. Responsibilities of vessel personnel should be identified by job title. These procedures must address personnel actions in the event of a—
(i) Transfer system leak;
(ii) Tank overflow; or
(iii) Suspected cargo tank or hull leak;
(2) Procedures in the order of priority for the crew to mitigate or prevent any discharge or a substantial threat of such a discharge in the event of the following casualties or emergencies:
(i) Grounding or stranding.
(ii) Collision.
(iii) Explosion or fire, or both.
(iv) Hull failure.
(v) Excessive list.
(vi) Equipment failure (e.g. main propulsion, steering gear, etc.);
(3) Procedures for the crew to deploy discharge removal equipment as required under subpart B of this part;
(4) The procedures for internal transfers of cargo in an emergency;
(5) The procedures for ship-to-ship transfers of cargo in an emergency:
(i) The format and content of the ship-to-ship transfer procedures must be consistent with the Ship to Ship Transfer Guide (Petroleum) published jointly by the International Chamber of Shipping and the Oil Companies International Marine Forum (OCIMF).
(ii) The procedures must identify the response resources necessary to carry out the transfers, including—
(A) Fendering equipment (ship-to-ship only);
(B) Transfer hoses and connection equipment;
(C) Portable pumps and ancillary equipment;
(D) Lightering and mooring masters (ship-to-ship only); and
(E) Vessel and barge brokers (ship-to-ship only).
(iii) Reference can be made to a separate oil transfer procedure and lightering plan carried aboard the vessel, provided that safety considerations are summarized in the response plan.
(iv) The location of all equipment and fittings, if any, carried aboard the vessel to perform such transfers must be identified;
(6) The procedures and arrangements for emergency towing, including the rigging and operation of any emergency towing equipment, including that required by subpart B of this part, aboard the vessel;
(7) The location, crew responsibilities, and procedures for use of shipboard equipment which may be carried to mitigate an oil discharge;
(8) The crew responsibilities, if any, for recordkeeping and sampling of spilled oil. Any requirements for sampling must address safety procedures to be followed by the crew;
(9) The crew's responsibilities, if any, to initiate a response and supervise shore-based response resources;
(10) Damage stability and hull stress considerations when performing shipboard mitigation measures. This section must identify and describe—
(i) Activities in which the crew is trained and qualified to execute absent shore-based support or advice; and
(ii) The information to be collected by the vessel's crew to facilitate shore-based assistance; and
(11)(i) Location of vessel plans necessary to perform salvage, stability, and hull stress assessments. A copy of these plans must be maintained ashore by either the vessel owner or operator or the vessel's recognized classification society unless the vessel has prearranged for a shore-based damage stability and residual strength calculation program with the vessel's baseline strength and stability characteristics pre-entered. The response plan must indicate the shore location and 24-hour access procedures of the calculation program or the following plans:
(A) General arrangement plan.
(B) Midship section plan.
(C) Lines plan or table of offsets.
(D) Tank tables.
(E) Load line assignment.
(F) Light ship characteristics.
(ii) The plan must identify the shore location and 24-hour access procedures for the computerized, shore-based damage stability and residual structural strength calculation programs required by §155.240.
(d) Shore-based response activities. This section of the response plan must include the following information:
(1) The qualified individual's responsibilities and authority, including immediate communication with the Federal on-scene coordinator and notification of the oil spill removal organization(s) identified in the plan.
(2) If applicable, procedures for transferring responsibility for direction of response activities from vessel personnel to the shore-based spill management team.
(3) The procedures for coordinating the actions of the vessel owner or operator or qualified individual with the predesignated Federal on-scene coordinator responsible for overseeing or directing those actions.
(4) The organizational structure that will be used to manage the response actions. This structure must include the following functional areas and must further include information for key components within each functional area:
(i) Command and control;
(ii) Public information;
(iii) Safety;
(iv) Liaison with government agencies;
(v) Spill response operations;
(vi) Planning;
(vii) Logistics support; and
(viii) Finance.
(5) The responsibilities of, duties of, and functional job descriptions for each oil spill management team position within the organizational structure identified in paragraph (d)(4) of this section.
(e) List of contacts. The name, location, and 24-hour contact information for the following key individuals and organizations must be included in this section of the response plan or, if more appropriate, in a geographic-specific appendix and referenced in this section of the response plan:
(1) Vessel owner or operator.
(2) Qualified individual and alternate qualified individual for the vessel's area of operation.
(3) Applicable insurance representatives or surveyors for the vessel's area of operation.
(4) The vessel's local agent(s) for the vessel's area of operation.
(5) Person(s) within the oil spill removal organization to notify for activation of that oil spill removal organization for the three spill scenarios identified in paragraph (i)(5) of this section for the vessel's area of operation.
(6) Person(s) within the identified response organization to notify for activating that organization to provide:
(i) The required emergency lightering required by §155.1050(l), §155.1052(g), §155.1230(g), or §155.2230(g), as applicable to the type of service of the vessel; and
(ii) The required salvage and firefighting required by §155.1050(k), §155.1052(e), §155.1230(e), and §155.2230(e), as applicable to the type of service of the vessel.
(7) Person(s) to notify for activation of the spill management team for the spill response scenarios identified in paragraph (i)(5) of this section for the vessel's area of operation.
(f) Training procedures. This section of the response plan must address the training procedures and programs of the vessel owner or operator to meet the requirements in §155.1055.
(g) Exercise procedures. This section of the response plan must address the exercise program to be carried out by the vessel owner or operator to meet the requirements in §155.1060.
(h) Plan review, update, revision, amendment, and appeal procedure. This section of the response plan must address—
(1) The procedures to be followed by the vessel owner or operator to meet the requirements of §155.1070; and
(2) The procedures to be followed for any post-discharge review of the plan to evaluate and validate its effectiveness.
(i) Geographic-specific appendices for each COTP zone in which a vessel operates. A geographic-specific appendix must be included for each COTP zone identified. The appendices must include the following information or identify the location of such information within the plan:
(1) A list of the geographic areas (port areas, rivers and canals, Great Lakes, inland, nearshore, offshore, and open ocean areas) in which the vessel intends to handle, store, or transport oil within the applicable COTP zone.
(2) The volume and group of oil on which the required level of response resources are calculated.
(3) Required Federal or State notifications applicable to the geographic areas in which a vessel operates.
(4) Identification of the qualified individuals.
(5) Identification of the oil spill removal organization(s) that are identified and ensured available, through contract or other approved means, and the spill management team to respond to the following spill scenarios:
(i) Average most probable discharge.
(ii) Maximum most probable discharge.
(iii) Worst case discharge.
(6) The organization(s) identified to meet the requirements of paragraph (i)(5) of this section must be capable of providing the equipment and supplies necessary to meet the requirements of §§155.1050, 155.1052, 155.1230, and 155.2230, as appropriate, and sources of trained personnel to continue operation of the equipment and staff the oil spill removal organization(s) and spill management team identified for the first 7 days of the response.
(7) The appendix must list the response resources and related information required under §§155.1050, 155.1052, 155.1230, 155.2230, and Appendix B of this part, as appropriate.
(8) If an oil spill removal organization(s) has been evaluated by the Coast Guard and their capability has been determined to equal or exceed the response capability needed by the vessel, the appendix may identify only the organization and their applicable classification and not the information required in paragraph (i)(7) of this section.
(9) The appendix must also separately list the companies identified to provide the salvage, vessel firefighting, lightering, and if applicable, dispersant capabilities required in this subpart.
(j) Appendices for vessel-specific information. This section must include for each vessel covered by the plan the following information:
(1) List of the vessel's principal characteristics.
(2) Capacities of all cargo, fuel, lube oil, ballast, and fresh water tanks.
(3) The total volume and cargo groups of oil cargo that would be involved in the—
(i) Maximum most probable discharge; and
(ii) Worst case discharge.
(4) Diagrams showing location of all tanks.
(5) General arrangement plan (can be maintained separately aboard the vessel providing the response plan identifies the location).
(6) Midships section plan (can be maintained separately aboard the vessel providing the response plan identifies the location).
(7) Cargo and fuel piping diagrams and pumping plan, as applicable (can be maintained separately aboard the vessel providing the response plan identifies the location).
(8) Damage stability data (can be maintained separately providing the response plan identifies the location).
(9) Location of cargo and fuel stowage plan for vessel (normally maintained separately aboard the vessel).
(10) Location of information on the name, description, physical and chemical characteristics, health and safety hazards, and spill and firefighting procedures for the oil cargo aboard the vessel. A material safety data sheet meeting the requirements of 29 CFR 1910.1200, cargo information required by 33 CFR 154.310, or equivalent will meet this requirement. This information can be maintained separately.
[CGD 91–034, 61 FR 1081, Jan. 12, 1996, as amended by CGD 96–026, 61 FR 33666, June 28, 1996; USCG–2005–21531, 70 FR 36349, June 23, 2005]
§ 155.1040 Response plan requirements for unmanned tank barges carrying oil as a primary cargo.
top
(a) General information and introduction. This section of the response plan must include—
(1) A list of tank barges covered by the plan, which must include the country of registry, call sign, IMO international numbers (if applicable), and official numbers of the listed tank barges;
(2) The name, address, and procedures for contacting the barge's owner or operator on a 24-hour basis;
(3) A list of the COTP zones in which the tank barges covered by the plan intend to handle, store, or transport oil;
(4) A table of contents or index of sufficient detail to permit personnel with responsibilities under the response plan to locate the specific sections of the plan; and
(5) A record of change(s) page used to record information on plan reviews, updates or revisions.
(b) Notification procedures. This section of the response plan must include the following notification information:
(1) A checklist with all notifications. The checklist must include notifications required by MARPOL 73/78, 33 CFR part 153, and any applicable State, including telephone or other contact numbers, in the order of priority and the information required for those notifications to be made by the—
(i) Towing vessel;
(ii) Vessel owner or operator; or
(iii) Qualified individual.
(2) Identification of the person(s) to be notified of a discharge or substantial threat of a discharge of oil. If the notifications vary due to the location of the barge, the persons to be notified also must be identified in a geographic-specific appendix. This section must separately identify—
(i) The individual(s) or organization(s) to be notified by the towing vessel; and
(ii) The individual(s) or organization(s) to be notified by shore-based personnel.
(3) The procedures for notifying the qualified individuals designated by the barge's owner or operator.
(4) Identification of the primary and, if available, secondary communications methods by which the notifications will be made, consistent with the requirements of paragraph (b)(1) of this section.
(5) The information that is to be provided in the initial and any follow-up notifications required by paragraph (b)(1) of this section.
(i) The initial notification information must include at least the following information:
(A) Towing vessel name (if applicable);
(B) Tank barge name, country of registry, and official number;
(C) Date and time of the incident;
(D) Location of the incident;
(E) Course, speed, and intended track of towing vessel (if applicable);
(F) Radio station(s) frequencies guarded by towing vessel (if applicable);
(G) Date and time of next report;
(H) Type and quantity of oil on board;
(I) Nature and details of defects, deficiencies, and damage (e.g., grounding, collision, hull failure, etc.);
(J) Details of pollution, including estimate of oil discharged or threat of discharge;
(K) Weather and sea conditions on scene;
(L) Barge size and type;
(M) Actions taken or planned by persons on scene;
(N) Current condition of the barge; and
(O) Details of injuries, if any.
(ii) After the transmission of the initial notification, as much as possible of the information essential for the protection of the marine environment as is appropriate to the incident must be reported to the appropriate on-scene coordinator in a follow-up report. This information must include—
(A) Additional detail on the type of cargo on board;
(B) Additional details on the condition of the barge and ability to transfer cargo, ballast, and fuel;
(C) Additional details on the quantity, extent and movement of the pollution and whether the discharge is continuing;
(D) Any changes in the on-scene weather or sea conditions; and
(E) Actions being taken with regard to the discharge and the movement of the vessel.
(6) Identification of the person(s) to be notified of a vessel casualty potentially affecting the seaworthiness of a vessel and the information to be provided by the towing vessel personnel or tankermen, as applicable, to shore-based personnel to facilitate the assessment of damage stability and stress.
(c) Shipboard spill mitigation procedures. This section of the response plan must include—
(1) Procedures to be followed by the tankerman, as defined in 46 CFR 35.35–1, to mitigate or prevent any discharge or a substantial threat of such a discharge of oil resulting from operational activities and casualties. These procedures must address personnel actions in the event of a—
(i) Transfer system leak;
(ii) Tank overflow; or
(iii) Suspected cargo tank or hull leak;
(2) Procedures in the order of priority for the towing vessel or barge owner or operator to mitigate or prevent any discharge or a substantial threat of such a discharge of oil in the event of the following casualties or emergencies:
(i) Grounding or stranding;
(ii) Collision;
(iii) Explosion or fire, or both;
(iv) Hull failure;
(v) Excessive list; and
(3) Procedures for tankermen or towing vessel crew to employ discharge removal equipment required by subpart B of this part;
(4) The procedures for the internal transfer of cargo in an emergency;
(5) The procedures for ship-to-ship transfers of cargo in an emergency:
(i) The procedures must identify the response resources necessary to carry out the transfers, including—
(A) Fendering equipment (ship-to-ship only);
(B) Transfer hoses and connection equipment;
(C) Portable pumps and ancillary equipment; and
(D) Lightering vessels (ship-to-ship only).
(ii) Reference can be made to separate oil transfer procedures or a lightering plan provided that safety considerations are summarized in the response plan.
(iii) The location of all equipment and fittings, if any, to perform such transfers must be identified;
(6) The procedures and arrangements for emergency towing, including the rigging and operation of any emergency towing equipment, including that required by subpart B of this part aboard the barge;
(7) The location and procedures for use of equipment stowed aboard either the barge or towing vessel to mitigate an oil discharge;
(8) The responsibilities of the towing vessel crew and facility or fleeting area personnel, if any, to initiate a response and supervise shore-based response resources;
(9) Damage stability, if applicable, and hull stress considerations when performing on board mitigation measures. This section must identify and describe—
(i) Activities in which the towing vessel crew or tankerman is trained and qualified to execute absent shore-based support or advice;
(ii) The individuals who shall be notified of a casualty potentially affecting the seaworthiness of the barge; and
(iii) The information that must be provided by the towing vessel to facilitate the assessment of damage stability and stress; and
(10)(i) Location of barge plans necessary to perform salvage, stability, and hull stress assessments. A copy of these barge plans must be maintained ashore by either the barge owner or operator or the vessel's recognized classification society. The response plan must indicate the shore location and 24-hour access procedures of the following plans:
(A) General arrangement plan.
(B) Midship section plan.
(C) Lines plan or table of offsets, as available.
(D) Tank tables; and
(ii) Plans for offshore oil barges must identify the shore location and 24-hour access procedures for the computerized shore-based damage stability and residual structural strength calculation programs required by §155.240.
(d) Shore-based response activities. This section of the response plan must include the following information:
(1) The qualified individual's responsibilities and authority, including immediate communication with the Federal on-scene coordinator and notification of the oil spill removal organization(s) identified in the plan.
(2) If applicable, procedures for transferring responsibility for direction of response activities from towing vessel personnel or tankermen to the shore-based spill management team.
(3) The procedures for coordinating the actions of the barge owner or operator of qualified individual with the action of the predesignated Federal on-scene coordinator responsible for overseeing or directing those actions.
(4) The organizational structure that will manage the barge owner or operator's response actions. This structure must include the following functional areas and must further include information for key components within each functional area:
(i) Command and control;
(ii) Public information;
(iii) Safety;
(iv) Liaison with government agencies;
(v) Spill response operations;
(vi) Planning;
(vii) Logistics support; and
(viii) Finance.
(5) The responsibilities of, duties of, and functional job descriptions for each oil spill management team position within the organizational structure identified in paragraph (d)(4) of this section.
(e) List of contacts. The name, location, and 24-hour contact information for the following key individuals and organizations must be included in this section or, if more appropriate, in a geographic-specific appendix and referenced in this section:
(1) Barge owner or operator.
(2) Qualified individual and alternate qualified individual for the tank barge's area of operation.
(3) Applicable insurance representatives or surveyors for the barge's area(s) of operation.
(4) Person(s) within the oil spill removal organization to notify for activation of that oil spill removal organization for the spill scenarios identified in paragraph (j)(5) of this section for the barges's area(s) of operation.
(5) Person(s) within the identified response organization to notify for activating that organization to provide:
(i) The required emergency lightering required by §§155.1050(l), 155.1052(g), 155.1230(g), and 155.2230(g), as applicable to the type of service of the barge(s); and
(ii) The required salvage and fire fighting required by §§155.1050(k), 155.1052(e), 155.1230(e), and 155.2230(e), as applicable to the type of service of the barge(s).
(6) Person(s) to notify for activation of the spill management team for the spill response scenarios identified in paragraph (j)(5) of this section for the vessel's area of operation.
(f) Training procedures. This section of the response plan must address the training procedures and programs of the barge owner or operator to meet the requirements in §155.1055.
(g) Exercise procedures. This section of the response plan must address the exercise program carried out by the barge owner or operator to meet the requirements in §155.1060.
(h) Plan review, update, revisions amendment, and appeal procedure. This section of the response plan must address—
(1) The procedures to be followed by the barge owner or operator to meet the requirements of §155.1070; and
(2) The procedures to be followed for any post-discharge review of the plan to evaluate and validate its effectiveness.
(i) On board notification checklist and emergency procedures. This portion of the response plan must be maintained in the documentation container aboard the unmanned barge. The owner or operator of an unmanned tank barge subject to this section shall provide the personnel of the towing vessel, fleeting area, or facility that the barge may be moored at with the information required by this paragraph and the responsibilities that the plan indicates will be carried out by these personnel. The on board notification checklist and emergency procedures must include—
(1) The toll-free number of the National Response Center;
(2) The name and procedures for contacting a primary qualified individual and at least one alternate on a 24-hour basis;
(3) The name, address, and procedure for contacting the vessel's owner or operator on a 24-hour basis;
(4) The list of information to be provided in the notification by the reporting personnel;
(5) A statement of responsibilities of and actions to be taken by reporting personnel after an oil discharge or substantial threat of such discharge; and
(6) The information contained in paragraph (c)(1) of this section.
(j) Geographic-specific appendices for each COTP zone in which a tank barge operates. A geographic-specific appendix must be included for each COTP zone identified. The appendices must include the following information or identify the location of such information within the plan:
(1) A list of the geographic areas (port areas, rivers and canals, Great Lakes, inland, nearshore, offshore, and open ocean areas) in which the barge intends to handle, store, or transport oil within the applicable COTP zone.
(2) The volume and group of oil on which the required level of response resources are calculated.
(3) Required Federal or State notifications applicable to the geographic areas in which the barge operates.
(4) Identification of the qualified individuals.
(5) Identification of the oil spill removal organization(s) that are identified and ensured available, through contract or other approved means and the spill management team to provide the response resources necessary to respond to the following spill scenarios:
(i) An average most probable discharge.
(ii) A maximum most probable discharge.
(iii) A worst case discharge to the maximum extent practicable.
(6) The organization(s) identified to meet the provisions of paragraph (j)(5) of this section must be capable of providing the equipment and supplies necessary to meet the provisions of §§155.1050, 155.1052, 155.1230, and 155.2230, as appropriate, and sources of trained personnel to continue operation of the equipment and staff the oil spill removal organization(s) and spill management team identified for the first seven days of the response.
(7) The appendix must list the response resources and related information required under §§155.1050, 155.1052, 155.1230, 155.2230, and Appendix B of this part, as appropriate.
(8) If the oil spill removal organization(s) providing the necessary response resources has been evaluated by the Coast Guard and their capability has been determined to equal or exceed the response capability needed by the vessel, the appendix may identify only the organization and their applicable classification and not the information required in paragraph (j)(7) of this section.
(9) The appendix must also separately list the companies identified to provide the salvage, barge firefighting, lightering, and if applicable, dispersant capabilities required in this subpart.
(k) Appendices for barge-specific information. Because many of the tank barges covered by a response plan may be of the same design, this information does not need to be repeated provided the plan identifies the tank barges to which the same information would apply. The information must be part of the response plan unless specifically noted. This section must include for each barge covered by the plan the following information:
(1) List of the principal characteristics of the vessel.
(2) Capacities of all cargo, fuel, lube oil, and ballast tanks.
(3) The total volumes and cargo group(s) of oil cargo that would be involved in the—
(i) Maximum most probable discharge; and
(ii) Worst case discharge.
(4) Diagrams showing location of all tanks aboard the barge.
(5) General arrangement plan (can be maintained separately providing that the location is identified).
(6) Midships section plan (can be maintained separately providing that the location is identified).
(7) Cargo and fuel piping diagrams and pumping plan, as applicable (can be maintained separately providing that the location is identified).
(8) Damage stability data, if applicable.
(9) Location of cargo and fuel stowage plan for barge(s) (normally maintained separately).
(10) Location of information on the name, description, physical and chemical characteristics, health and safety hazards, and spill and firefighting procedures for the oil cargo aboard the barge. A material safety data sheet meeting the requirements of 29 CFR 1910.1200, cargo information required by 33 CFR 154.310, or equivalent will meet this requirement. This information can be maintained separately.
§ 155.1045 Response plan requirements for vessels carrying oil as a secondary cargo.
top
(a) General information and introduction. This section of the response plan must include—
(1) The vessel's name, country of registry, call sign, official number, and IMO international number (if applicable). If the plan covers multiple vessels, this information must be provided for each vessel;
(2) The name, address, and procedures for contacting the vessel's owner or operator on a 24-hour basis;
(3) A list of COTP zones in which the vessel intends to handle, store, or transport oil;
(4) A table of contents or index of sufficient detail to permit personnel with responsibilities under the response plan to locate the specific sections of the plan; and
(5) A record of change(s) page used to record information on plan updates or revisions.
(6) As required in paragraph (c) of this section, the vessel owner or operator must list in his or her plan the total volume of oil carried in bulk as cargo.
(i) For vessels that transfer a portion of their fuel as cargo, 25 percent of the fuel capacity of the vessel plus the capacity of any oil cargo tank(s) will be assumed to be the cargo volume for determining applicable response plan requirements unless the vessel owner or operator indicates otherwise.
(ii) A vessel owner or operator can use a volume less than 25 percent if he or she submits historical data with the plan that substantiates the transfer of a lower percentage of its fuel capacity between refuelings.
(b) Notification procedures. This section of the response plan must include the following notification information:
(1) A checklist with all notifications, including telephone or other contact numbers, in the order of priority to be made by shipboard or shore-based personnel and the information required for those notifications. Notifications must include those required by—
(i) MARPOL 73/78 and 33 CFR part 153; and
(ii) Any applicable State.
(2) Identification of the person(s) to be notified of a discharge or substantial threat of discharge of oil. If notifications vary due to vessel location, the person(s) to be notified also must be identified in a geographic-specific appendix. This section must separately identify—
(i) The individual(s) or organization(s) to be notified by shipboard personnel; and
(ii) The individual(s) or organization(s) to be notified by shore-based personnel.
(3) The procedures for notifying the qualified individual and alternate qualified individual.
(4) Descriptions of the primary and, if available, secondary communication methods by which the notifications will be made, consistent with the requirements in paragraph (b)(1) of this section.
(5) The information that is to be provided in the initial and any follow-up notifications required by paragraph (b)(1) of this section.
(i) The initial notification may be submitted in accordance with IMO Resolution A648(16) “General Principles for Ship Reporting Systems and Ship Reporting Requirements.” It must include at least the following information:
(A) Vessel name, country of registry, call sign, IMO international number (if applicable), and official number (if any);
(B) Date and time of the incident;
(C) Location of the incident;
(D) Course, speed, and intended track of vessel;
(E) Radio station(s) and frequencies guarded;
(F) Date and time of next report;
(G) Type and quantity of oil on board;
(H) Nature and detail of defects, deficiencies, and damage (e.g., grounding, collision, hull failure, etc.);
(I) Details of pollution, including estimate of oil discharged or threat of discharge;
(J) Weather and sea conditions on scene;
(K) Ship size and type;
(L) Actions taken or planned by persons on scene;
(M) Current conditions of the vessel; and
(N) Number of crew and details of injuries, if any.
(ii) After the transmission of the initial notification, as much as possible of the information essential for the protection of the marine environment as is appropriate to the incident must be reported to the appropriate on-scene coordinator in a follow-up report. This information must include—
(A) Additional details on the type of cargo on board;
(B) Additional details on the condition of the vessel and ability to transfer cargo, ballast, and fuel;
(C) Additional details on the quantity, extent and movement of the pollution and whether the discharge is continuing;
(D) Any changes in the on-scene weather or sea conditions; and
(E) Actions being taken with regard to the discharge and the movement of the ship.
(c) Shipboard spill mitigation procedures. This section of the response plan must identify the vessel's total volumes of oil carried in bulk as cargo and meet the applicable requirements of this paragraph as in paragraph (a)(6) of this section.
(1) For vessels carrying 100 barrels or less of oil in bulk as cargo, the plan must include a basic emergency action checklist for vessel personnel including notification and actions to be taken to prevent or mitigate any discharge or substantial threat of such a discharge of oil from the vessel.
(2) For vessels carrying over 100 barrels of oil but not exceeding 5,000 barrels of oil in bulk as cargo, the plan must include—
(i) Detailed information on actions to be taken by vessel personnel to prevent or mitigate any discharge or substantial threat of such a discharge of oil from the vessel due to operational activities or casualties;
(ii) Detailed information on damage control procedures to be followed by vessel personnel;
(iii) Detailed procedures for internal or external transfer of oil in bulk as cargo in an emergency; and
(iv) Procedures for use of any equipment carried aboard the vessel for spill mitigation.
(3) For vessels carrying over 5,000 barrels of oil as a secondary cargo, the plan must provide the information required by §155.1035(c) for shipboard spill mitigation procedures.
(4) For all vessels, the plan must include responsibilities and actions to be taken by vessel personnel, if any, to initiate a response and supervise shore-based response resources.
(d) Shore-based response activities. This section of the response plan must include the following information:
(1) The qualified individual's responsibilities and authority, including immediate communication with the Federal on-scene coordinator and notification of the oil spill removal organization(s) identified in the plan.
(2) If applicable, procedures for transferring responsibility for direction of response activities from vessel personnel to the shore-based spill management team.
(3) The procedures for coordinating the actions of the vessel owner or operator with the actions of the predesignated Federal on-scene coordinator responsible for overseeing or directing those actions.
(4) The organizational structure that will be used to manage the response actions. This structure must include the following functional areas and must further include information for key components within each functional area:
(i) Command and control;
(ii) Public information;
(iii) Safety;
(iv) Liaison with government agencies;
(v) Spill response operations;
(vi) Planning;
(vii) Logistics support; and
(viii) Finance.
(5) The responsibilities, duties, and functional job description for each oil spill management team member within the organizational structure identified in paragraph (d)(4) of this section.
(e) List of contacts. The name, location, and 24-hour contact information for the following key individuals or organizations must be included in this section or, if more appropriate, in a geographic-specific appendix and referenced in this section:
(1) Vessel owner or operator, and if applicable, charterer.
(2) Qualified individual and alternate qualified individual for the vessel's area of operation.
(3) Vessel's local agent(s), if applicable, for the vessel's area of operation.
(4) Applicable insurance representatives or surveyors for the vessel's area of operation.
(5) Person(s) within the identified oil spill removal organization(s) to notify for activation of the oil spill removal organization(s) identified under paragraph (i)(3) of this section for the vessel's area of operation.
(6) Person(s) to notify for activation of the spill management team.
(f) Training procedures. (1) This section of the response plan must address the training procedures and programs of the vessel owner or operator. The vessel owner or operator shall ensure that—
(i) All personnel with responsibilities under the plan receive training in their assignments and refresher training as necessary, and participate in exercises required under paragraph (g) of this section. Documented work experience can be used instead of training; and
(ii) Records of this training are maintained aboard the vessel, at the U.S. location of the spill management team, or with the qualified individual. The plan must specify where the records are located.
(2) Nothing in this section relieves the vessel owner or operator from responsibility to ensure that all private shore-based response personnel are trained to meet the Occupational Safety and Health Administration (OSHA) standards for emergency response operations in 29 CFR 1910.120.
(g) Exercise procedures. This section of the response plan must address the exercise program carried out by the vessel owner or operator to evaluate the ability of vessel and shore-based personnel to perform their identified functions in the plan. The required exercise frequency for each category of vessel is as follows:
(1) For vessels carrying 100 barrels or less of oil as cargo—
(i) On board spill mitigation procedures and qualified individual notification exercises must be conducted annually; and
(ii) Shore-based oil spill removal organization exercises must be conducted biennially.
(2) For vessels carrying over 100 barrels and up to 5,000 barrels of oil in bulk as cargo—
(i) On board emergency procedures and qualified individual notification exercises must be conducted quarterly; and
(ii) Shore-based oil spill removal organization exercises must be conducted annually.
(3) Vessels carrying over 5,000 barrels of oil in bulk as cargo must meet the exercise requirement of §155.1060.
(h) Plan review, update, revision, amendment, and appeal procedures. This section of the response plan must address—
(1) The procedures to be followed by the vessel owner or operator to meet the requirement of §155.1070; and
(2) The procedures to be followed for any post-discharge review of the plan to evaluate and validate its effectiveness
(i) Geographic-specific appendices for each COTP zone in which a vessel operates. A geographic-specific appendix must be included for each COTP zone identified. The appendix must include the following information or identify the location of such information within the plan:
(1) Required Federal or State notifications applicable to the geographic areas in which a vessel operates.
(2) Identification of the qualified individuals.
(3) A list of the oil spill removal organization(s) and the spill management team(s) available to respond to the vessel's worst case oil discharge in each COTP zone in which a vessel operates. The oil spill removal organization(s) identified must be capable of commencing oil spill containment and on-water recovery within the response times listed for Tier 1 in §155.1050(g); providing temporary storage of recovered oil; and conducting shoreline protection and cleanup operations. An oil spill removal organization may not be identified in the plan unless the organization has provided written consent to being identified in the plan as an available resource.
(j) Appendices for vessel-specific information. This section must include for each vessel covered by the plan the following information:
(1) List of the vessel's principal characteristics (i.e., length, beam, gross tonnage, etc.).
(2) Capacities of all cargo, fuel, lube oil, ballast, and fresh water tanks.
(3) The total volume and cargo groups of oil cargo that would be involved in the—
(i) Maximum most probable discharge; and
(ii) Worst case discharge.
(4) Diagrams showing location of all tanks.
(5) Cargo and fuel piping diagrams and pumping plan as applicable. These diagrams and plans can be maintained separately aboard the vessel providing the response plan identifies the location.
(6) Location of information on the name, description, physical and chemical characteristics, health and safety hazards, and spill and firefighting procedures for the oil cargo aboard the vessel. A material safety data sheet meeting the requirements of 29 CFR 1910.1200, cargo information required by 33 CFR 154.310, or the equivalent, will meet this requirement. This information can be maintained separately on board the vessel, providing the response plan identifies the location.
§ 155.1050 Response plan development and evaluation criteria for vessels carrying groups I through IV petroleum oil as a primary cargo.
top
(a) The following criteria must be used to evaluate the operability of response resources identified in the response plan for the specified operating environment:
(1) Table 1 of Appendix B of this part.
(i) The criteria in Table 1 of Appendix B of this part are to be used solely for identification of appropriate equipment in a response plan.
(ii) These criteria reflect conditions used for planning purposes to select mechanical response equipment and are not conditions that would limit response actions or affect normal vessel operations.
(2) Limitations that are identified in the Area Contingency Plans for the COTP zones in which the vessel operates, including—
(i) Ice conditions;
(ii) Debris;
(iii) Temperature ranges; and
(iv) Weather-related visibility.
(b) The COTP may reclassify a specific body of water or location within the COTP zone. Any reclassifications will be identified in the applicable Area Contingency Plan. Reclassifications may be to—
(1) A more stringent operating environment if the prevailing wave conditions exceed the significant wave height criteria during more than 35 percent of the year; or
(2) A less stringent operating environment if the prevailing wave conditions do not exceed the significant wave height criteria for the less stringent operating environment during more than 35 percent of the year.
(c) Response equipment must—
(1) Meet or exceed the criteria listed in Table 1 of Appendix B of this part;
(2) Be capable of functioning in the applicable operating environment; and
(3) Be appropriate for the petroleum oil carried.
(d) The owner or operator of a vessel that carries groups I through IV petroleum oil as a primary cargo shall identify in the response plan and ensure the availability of, through contract or other approved means, the response resources that will respond to a discharge up to the vessel's average most probable discharge.
(1) For a vessel that carries groups I through IV petroleum oil as its primary cargo, the response resources must include—
(i) Containment boom in a quantity equal to twice the length of the largest vessel involved in the transfer and capable of being deployed at the site of oil transfer operations—
(A) Within 1 hour of detection of a spill, when the transfer is conducted between 0 and 12 miles from the nearest shoreline; or
(B) Within 1 hour plus travel time from the nearest shoreline, based on an on-water speed of 5 knots, when the transfer is conducted over 12 miles up to 200 miles from the nearest shoreline; and
(ii) Oil recovery devices and recovered oil storage capacity capable of being at the transfer site—
(A) Within 2 hours of the detection of a spill during transfer operations, when the transfer is conducted between 0 and 12 miles from the nearest shoreline; or
(B) Within 1 hour plus travel time from the nearest shoreline, based on an on-water speed of 5 knots, when the transfer is conducted over 12 miles up to 200 miles from the nearest shoreline.
(2) For locations of multiple vessel transfer operations, a vessel may identify the same equipment as identified by other vessels, provided that each vessel has ensured access to the equipment through contract or other approved means. Under these circumstances, prior approval by the Coast Guard is not required for temporary changes in the contracted oil spill removal organization under §155.1070(c)(5).
(3) The owner or operator of a vessel conducting transfer operations at a facility required to submit a response plan under 33 CFR 154.1017 is required to plan for and identify the response resources required in paragraph (d)(1) of this section. However, the owner or operator is not required to ensure by contract or other means the availability of such resources.
(e) The owner or operator of a vessel carrying groups I through IV petroleum oil as a primary cargo must identify in the response plan and ensure the availability of, through contract or other approved means, the response resources necessary to respond to a discharge up to the vessel's maximum most probable discharge volume.
(1) These resources must be positioned such that they can arrive at the scene of a discharge within—
(i) 12 hours of the discovery of a discharge in higher volume port areas and the Great Lakes;
(ii) 24 hours of the discovery of a discharge in all rivers and canals, inland, nearshore and offshore areas; and
(iii) 24 hours of the discovery of a discharge plus travel time from shore for open ocean areas.
(2) The necessary response resources include sufficient containment boom, oil recovery devices, and storage capacity for any recovery of up to the maximum most probable discharge planning volume.
(3) The response plan must identify the storage location, make, model, and effective daily recovery capacity of each oil recovery device that is identified for plan credit.
(4) The response resources identified for responding to a maximum most probable discharge must be positioned to be capable of meeting the planned arrival times in this paragraph. The COTP with jurisdiction over the area in which the vessel is operating must be notified whenever the identified response resources are not capable of meeting the planned arrival times.
(f) The owner or operator of a vessel carrying groups I through IV petroleum oil as a primary cargo must identify in the response plan and ensure the availability of, through contract or other approved means, the response resources necessary to respond to discharges up to the worst case discharge volume of the oil cargo to the maximum extent practicable.
(1) The location of these resources must be suitable to meet the response times identified for the applicable geographic area(s) of operation and response tier.
(2) The response resources must be appropriate for—
(i) The capacity of the vessel;
(ii) Group(s) of petroleum oil carried as cargo; and
(iii) The geographic area(s) of vessel operation.
(3) The resources must include sufficient boom, oil recovery devices, and storage capacity to recover the planning volumes.
(4) The response plan must identify the storage location, make, model, and effective daily recovery capacity of each oil recovery device that is identified for plan credit.
(5) The guidelines in Appendix B of this part must be used for calculating the quantity of response resources required to respond at each tier to the worst case discharge to the maximum extent practicable.
(6) When determining response resources necessary to meet the requirements of this paragraph (f)(6), a portion of those resources must be capable of use in close-to-shore response activities in shallow water. The following percentages of the response equipment identified for the applicable geographic area must be capable of operating in waters of 6 feet or less depth:
(i) Open ocean—none.
(ii) Offshore—10 percent.
(iii) Nearshore, inland, Great Lakes, and rivers and canals—20 percent.
(7) Response resources identified to meet the requirements of paragraph (f)(6) of this section are exempt from the significant wave height planning requirements of Table 1 of Appendix B of this part.
(g) Response equipment identified to respond to a worst case discharge must be capable of arriving on scene within the times specified in this paragraph for the applicable response tier in a higher volume port area, Great Lakes, and in other areas. Response times for these tiers from the time of discovery of a discharge are—
|