43 C.F.R. § 3264.12 What must I give BLM after I abandon a well?
Title 43 - Public Lands: Interior
Send us a well abandonment report within 30 days after you abandon a well. If you plan to restore the site at a later date, you may submit a separate report within 30 days after completing site restoration. The well abandonment report must contain: (a) A complete chronology of all work done; (b) A description of each plug, including: (1) Amount of cement used; (2) Type of cement used; (3) Depth that the drill pipe or tubing was run to set the plug; (4) Depth to top of plug; and (5) If the plug was verified, whether it was done by tagging or pressure testing; and (c) A description of surface restoration procedures.
Title 43: Public Lands: Interior
PART 3200—GEOTHERMAL RESOURCE LEASING
Subpart 3264—Reports—Drilling Operations
§ 3264.12 What must I give BLM after I abandon a well?