43 C.F.R. § 3274.11 What must I give BLM to approve my commercial use permit application?
Title 43 - Public Lands: Interior
Submit a complete and signed commercial permit form with the following information: (a) The design, specifications, inspection, and calibration schedule of production, injection, and royalty meters; (b) A schematic diagram of the utilization site or individual well showing the location of each production and royalty meter. If the sales point is located off the utilization site, give us a generalized schematic diagram of the electrical transmission or pipeline system, including meter locations; (c) A copy of the sales contract for the sale and/or utilization of geothermal resources; (d) A description and analysis of reservoir, production, and injection characteristics, including the flow rates, temperatures, and pressures of each production and injection well; (e) A schematic diagram of each production or injection well showing the wellhead configuration, including meters; (f) A schematic flow diagram of the utilization facility, including interconnections with other facilities, if applicable; (g) A description of the utilization process in sufficient detail to enable BLM to determine if the resource will be utilized in an acceptable manner; (h) The planned safety provisions for emergency shutdown to protect public health, safety, property and the environment. This should include a schedule for the testing and maintenance of safety devices; (i) The environmental and operational parameters that will be monitored during the operation of the facility and/or well(s); and (j) Any additional information or data that we may require.
Title 43: Public Lands: Interior
PART 3200—GEOTHERMAL RESOURCE LEASING
Subpart 3274—Applying for and Obtaining a Commercial Use Permit
§ 3274.11 What must I give BLM to approve my commercial use permit application?