43 C.F.R. § 3276.12 What information must I give BLM in the monthly report for facility operations?
Title 43 - Public Lands: Interior
(a) For all electrical generation facilities, include in your monthly report of facility operations: (1) Mass of steam and/or hot water used or brought into the facility, in klbs. For facilities using both steam and hot water, you must report the mass of each; (2) The temperature of the steam or hot water in deg.F; (3) The pressure of the steam or hot water in psi. You must also specify whether this is psig or psia; (4) Gross generation in kiloWatt hours (kWh); (5) Net generation at the tailgate of the facility in kWh; (6) Temperature in deg.F and volume of the steam or hot water exiting the facility; (7) The number of hours the plant was on line; (8) A brief description of any outages; and (9) Any other information we may require. (b) For electrical generation facilities where Federal royalty is based on the sale of electricity to a utility, you must include the following additional information in your monthly report of facility operations: (1) Amount of electricity delivered to the sales point in kWh, if the sales point is different from the tailgate of the facility; (2) Amount of electricity lost to transmission; (3) A report from the utility purchasing the electricity which documents the total number of kWhs delivered to the sales point during the month, or monthly reporting period if it is not a calendar month, and the number of kWhs delivered during diurnal and seasonal pricing periods; and (4) Any other information we may require.
Title 43: Public Lands: Interior
PART 3200—GEOTHERMAL RESOURCE LEASING
Subpart 3276—Reports: Utilization Operations
§ 3276.12 What information must I give BLM in the monthly report for facility operations?