44 C.F.R. § 61.9 Establishment of chargeable rates.
Title 44 - Emergency Management and Assistance
(a) Under section 1308 of the Act, we are establishing annual chargeable rates for each $100 of flood insurance coverage as follows for Pre-FIRM, A zone properties, Pre-FIRM, V-zone properties, and emergency program properties. (b) We will charge rates for contents in pre-FIRM buildings according to the use of the building. (c) A-zone rates for buildings without basements or enclosures apply uniformly to all buildings throughout emergency program communities. [64 FR 13116, Mar. 17, 1999, as amended at 67 FR 8905, Feb. 27, 2002; 68 FR 15668, Apr. 1, 2003]
Title 44: Emergency Management and Assistance
PART 61—INSURANCE COVERAGE AND RATES
§ 61.9 Establishment of chargeable rates.
---------------------------------------------------------------------------------------------------------------- A zone \1\ rates per year per V zone \2\ rates per year per $100 coverage on: $100 coverage on: --------------------------------------------------------------- structure Structure Type of structure --------------------- --------------------- RCBAP \3\ RCBAP \3\ -------------- All Contents -------------- All Contents High Low other High Low other rise rise rise rise----------------------------------------------------------------------------------------------------------------1. Residential: No Basement or Enclosure.................... .85 .70 .76 .96 1.08 .93 .99 1.23 With Basement or Enclosure.................. .90 .75 .81 .96 1.15 1.00 1.06 1.232. All other including hotels and motels with normal occupancy of less than 6 months duration: No Basement or Enclosure.................... N/A N/A .83 1.62 N/A N/A 1.10 2.14 With Basement or Enclosure.................. N/A N/A .88 1.62 N/A N/A 1.16 2.14----------------------------------------------------------------------------------------------------------------\1\ 1 A zones are zones A1-A30, AE, AO, AH, and unnumbered A zones.\2\ V zones are zones V1-V30, VE, and unnumbered V zones.\3\ Residential Condominium Building Association Policies (RCBAP) are distinguished between High Rise (those structures that have 3 or more floors and 5 or more units) and Low Rise (those structures that have either less than 3 floors or less than 5 units).