46 C.F.R. § 53.10-3 Inspection and tests (modifies HG–500 through HG–540).
Title 46 - Shipping
(a) The inspections required by HG–500 through HG–540 must be performed by the “Authorized Inspector” as defined in HG–575 of the ASME Code. The Authorized Inspector shall hold a valid commission issued by the National Board of Boiler and Pressure Vessel Inspectors. After installation, heating boilers must be inspected for compliance with this part by a marine inspector. (b) Automatically controlled boilers must be subjected to the operating tests prescribed in part 63 of this subchapter. (c) All heating boilers must have the operation of their pressure relieving devices checked after the final installation. [CGD 81–79, 50 FR 9436, Mar. 8, 1985]
Title 46: Shipping
PART 53—HEATING BOILERS
Subpart 53.10—Tests, Inspection, Stamping, and Reporting (Article 5)
§ 53.10-3 Inspection and tests (modifies HG–500 through HG–540).