46 C.F.R. Subpart 160.044—Pumps, Bilge, Lifeboat, for Merchant Vessels
Title 46 - Shipping
Source: CGFR 50–30, 16 FR 1085, Feb. 6, 1951, unless otherwise noted.
(a) There are no other specifications applicable to this subpart. (b) [Reserved] (a) Type. Bilge pumps covered by this subpart shall be manually operated, either oscillating, wing type, or full rotary type, with mountings so arranged as to permit attachment to a thwart or other part of the lifeboat structure without interference with the seating arrangement. Alternate types, arrangements or materials, which meet the performance requirements of this subpart will be given special consideration. (b) Sizes. Bilge pumps covered by this subpart shall be of three sizes, having capacities as follows: (1) Size No. 1. 5 gallons per minute at 65 double strokes,1 1 A double stroke is a complete cycle from one extreme to the other and back again to the original starting point, or, for rotary type, one complete revolution. 2 The capacity of a lifeboat for determining the size of the bilge pump shall be 0.6 times the product of the length, breadth, and depth of the lifeboat, in feet. (2) Size No. 2. 6 gallons per minute at 50 double strokes, for lifeboats from 330 cubic feet up to 700 cubic feet capacity. (3) Size No. 3. 15 gallons per minute at 50 double strokes, for lifeboats of 700 cubic feet or more capacity. (a) Bilge pumps shall be of rugged construction, of first class workmanship in every respect, and free from any defects affecting serviceability. Where a choice of materials is permitted, the materials used shall be of good quality and suitable for the purpose intended, and shall be corrosion-resistant or protected against corrosion by acceptable means, except that parts subject to wear shall not depend upon coatings for corrosion resistance. (b) Bilge pumps covered by this subpart shall be capable of operating against a head pressure of 20 pounds per square inch when tested in accordance with §160.044–4(c). (c) The bilge pump body shall be of bronze and shall be provided with a cover plate or plates, attached by means of wing nuts at least 1 (d) The operating lever shall have a steel or bronze core through its entire length, but for comfort may have a gripping surface of wood or other suitable material. The lever shall be removable and shall be attached to the pump shaft which is to be square ended, by means of a set screw with 1 (e) The suction line shall be fitted with an intake check valve and a suitable strainer. The strainer shall be removable for cleaning without the use of tools. The suction line shall contain no hose or fittings subject to collapsing when the pump is in service. (f) Suction and discharge outlets shall be not less than 1 inch inside diameter for pump sizes Nos. 1 and 2, and not less than 1 (a) Capacity. The bilge pump being tested shall be set up over a source of water for operation with all the required fittings and connections, the set-up to simulate an installation in a lifeboat. The bilge pump shall be operated at the standard speed specified for its size, and the flow of water measured. The amount of water discharged shall not be less than that required by §160.044–2(b). (b) Head pressure. After the successful completion of the test outlined in paragraph (b) of this section, a pressure gage capable of registering 20 pounds per square inch, and a variable restriction, such as a nozzle, valve, etc., shall be fitted in the discharge line. The pump shall be put in operation with the discharge line open, and then the restriction shall be gradually closed until the pressure builds up to at least 20 pounds per square inch. This pressure shall be maintained for at least 15 seconds, after which the pump shall be disassembled and inspected. No destruction or deformation of parts sufficient to affect the serviceability of the pump shall be permitted as a result of this test. (c) Operating lever. With the pump firmly secured in such a position that both the shaft and operating lever are in a horizontal position, apply a downward load of 200 pounds for a period of 5 minutes at the free end of the operating lever and perpendicular to its axis and the axis of the shaft. There shall be no slippage of the lever around the shaft, nor any evidence of permanent set or undue stress in any part of the pump. In cases where the design of the pump is such that this test may not be applicable to the complete pump, the pump shall be disassembled and the 200-pound load applied to the shaft and operating lever while the free end of the shaft is held in a vise or check so that both the shaft and the operating lever are in a horizontal position. [CGFR 65–9, 30 FR 11467, Sept. 8, 1965, as amended by CGD 95–028, 62 FR 51213, Sept. 30, 1997] (a) Each pump shall be permanently and legibly marked, in letters not less than (b) [Reserved]
Title 46: Shipping
PART 160—LIFESAVING EQUIPMENT
Subpart 160.044—Pumps, Bilge, Lifeboat, for Merchant Vessels
§ 160.044-1 Applicable specifications.
§ 160.044-2 Types and sizes.
§ 160.044-3 General requirements.
§ 160.044-4 Inspection and tests.
§ 160.044-5 Marking.