46 C.F.R. § 172.235   Extent of damage.


Title 46 - Shipping


Title 46: Shipping
PART 172—SPECIAL RULES PERTAINING TO BULK CARGOES
Subpart H—Special Rules Pertaining to Great Lakes Dry Bulk Cargo Vessels

Browse Previous |  Browse Next

§ 172.235   Extent of damage.

For the purpose of the calculations required in §172.225—

(a) Design calculations must include both side and bottom damage, applied separately; and

(b) Damage must consist of the penetrations having the dimensions given in Table 172.235 except that, if the most disabling penetrations would be less than the penetrations described in this paragraph, the smaller penetration must be assumed.

                     Table 172.235_Extent of Damage  ------------------------------------------------              Collision Penetration------------------------------------------------------------------------Longitudinal     0.495 L2/3 or 47.6 feet.  extent                 (1/3 L2/3 or 14.5 m), whichever                  is less.Transverse       4 feet 2 inches (1.25 m).\1\  extentVertical extent  From the baseline upward                  without limit.------------------------------------------------------------------------  Grounding Penetration Forward of a Point 0.3L        Aft of the Forward Perpendicular------------------------------------------------------------------------Longitudinal     0.495 L2/3 or 47.6 feet.                 (1/3 L2/3 or 14.5 m), whichever                  is less.Transverse       B/6 or 32.8 feet (10 m),                  whichever is less, but not                  less than 16.4 feet (5 m).\1\Vertical extent  0.75 m from the baseline.------------------------------------------------------------------------ Grounding Penetration at Any Other Longitudinal                    Position------------------------------------------------------------------------Longitudinal     L/10 or 16.4 feet (5 m),  extent          whichever is less.Transverse       4 feet 2 inches (1.25 m).Vertical extent  2 feet 6 inches (0.75 m) from                  the baseline.------------------------------------------------------------------------\1\ Damage applied inboard from the vessel's side at right angles to the  centerline at the level of the summer load line assigned under  Subchapter E of this chapter.

Browse Previous |  Browse Next

chanrobles.com