47 C.F.R. PART 25—SATELLITE COMMUNICATIONS


Title 47 - Telecommunication


Title 47: Telecommunication

Browse Previous |  Browse Next

PART 25—SATELLITE COMMUNICATIONS

Section Contents

Subpart A—General

§ 25.101   Basis and scope.
§ 25.102   Station authorization required.
§ 25.103   Definitions.
§ 25.104   Preemption of local zoning of earth stations.
§§ 25.105-25.108   [Reserved]
§ 25.109   Cross-reference.

Subpart B—Applications and Licenses


General Application Filing Requirements

§ 25.110   Filing of applications, fees, and number of copies.
§ 25.111   Additional information.
§ 25.112   Defective applications.
§ 25.113   Station licenses and launch authority.
§ 25.114   Applications for space station authorizations.
§ 25.115   Application for earth station authorizations.
§ 25.116   Amendments to applications.
§ 25.117   Modification of station license.
§ 25.118   Modifications not requiring prior authorization.
§ 25.119   Assignment or transfer of control of station authorization.
§ 25.120   Application for special temporary authorization.
§ 25.121   License term and renewals.
§ 25.129   Equipment authorization for portable earth-station transceivers.

Earth Stations

§ 25.130   Filing requirements for transmitting earth stations.
§ 25.131   Filing requirements for receive-only earth stations.
§ 25.132   Verification of earth station antenna performance standards.
§ 25.133   Period of construction; certification of commencement of operation.
§ 25.134   Licensing provisions of Very Small Aperture Terminal (VSAT) and C-band Small Aperture Terminal (CSAT) networks.
§ 25.135   Licensing provisions for earth station networks in the non-voice, non-geostationary mobile-satellite service.
§ 25.136   Licensing provisions for user transceivers in the 1.6/2.4 GHz, 1.5/1.6 GHz, and 2 GHz Mobile Satellite Services.
§ 25.137   Application requirements for earth stations operating with non-U.S. licensed space stations.
§ 25.138   Blanket Licensing provisions of GSO FSS Earth Stations in the 18.3–18.8 GHz (space-to-Earth), 19.7–20.2 GHz (space-to-Earth), 28.35–28.6 GHz (Earth-to-space), and 29.25–30.0 GHz (Earth-to-space) bands.
§ 25.139   NGSO FSS coordination and information sharing between MVDDS licensees in the 12.2 GHz to 12.7 GHz band.

Space Stations

§ 25.140   Qualifications of fixed-satellite space station licensees.
§ 25.142   Licensing provisions for the non-voice, non-geostationary mobile-satellite service.
§ 25.143   Licensing provisions for the 1.6/2.4 GHz mobile-satellite service and 2 GHz mobile-satellite service.
§ 25.144   Licensing provisions for the 2.3 GHz satellite digital audio radio service.
§ 25.145   Licensing conditions for the Fixed-Satellite Service in the 20/30 GHz bands.
§ 25.146   Licensing and operating authorization provisions for the non-geostationary satellite orbit fixed-satellite service (NGSO FSS) in the bands 10.7 GHz to 14.5 GHz.
§ 25.147   Licensing provision for NGSO MSS feeder downlinks in the band 6700–6875 MHz.
§ 25.148   Licensing provisions for the Direct Broadcast Satellite Service.
§ 25.149   Application requirements for ancillary terrestrial components in the mobile-satellite service networks operating in the 1.5./1.6 GHz, 1.6/2.4 GHz and 2 GHz mobile-satellite service.

Processing of Applications

§ 25.150   Receipt of applications.
§ 25.151   Public notice period.
§ 25.152   Dismissal and return of applications.
§ 25.153   Repetitious applications.
§ 25.154   Opposition to applications and other pleadings.
§ 25.155   Mutually exclusive applications.
§ 25.156   Consideration of applications.
§ 25.157   Consideration of NGSO-like satellite applications.
§ 25.158   Consideration of GSO-like satellite applications.
§ 25.159   Limits on pending applications and unbuilt satellite systems.

Forfeiture, Termination, and Reinstatement of Station Authorization

§ 25.160   Administrative sanctions.
§ 25.161   Automatic termination of station authorization.
§ 25.162   Cause for termination of interference protection.
§ 25.163   Reinstatement.
§ 25.164   Milestones.
§ 25.165   Posting of bonds.

Subpart C—Technical Standards

§ 25.201   Definitions.
§ 25.202   Frequencies, frequency tolerance and emission limitations.
§ 25.203   Choice of sites and frequencies.
§ 25.204   Power limits.
§ 25.205   Minimum angle of antenna elevation.
§ 25.206   Station identification.
§ 25.207   Cessation of emissions.
§ 25.208   Power flux density limits.
§ 25.209   Antenna performance standards.
§ 25.210   Technical requirements for space stations in the Fixed-Satellite Service.
§ 25.211   Analog video transmissions in the Fixed-Satellite Services.
§ 25.212   Narrowband analog transmissions, digital transmissions, and video transmissions in the GSO Fixed-Satellite Service.
§ 25.213   Inter-Service coordination requirements for the 1.6/2.4 GHz mobile-satellite service.
§ 25.214   Technical requirements for space stations in the satellite digital audio radio service.
§ 25.215   Technical requirements for space stations in the Direct Broadcast Satellite Service.
§ 25.216   Limits on emissions from mobile earth stations for protection of aeronautical radionavigation-satellite service.
§ 25.217   Default service rules.
§§ 25.218-25.219   [Reserved]
§ 25.220   Non-conforming transmit/receive earth station operations.
§ 25.221   Blanket Licensing provisions for Earth Stations on Vessels (ESVs) receiving in the 3700–4200 MHz (space-to-Earth) frequency band and transmitting in the 5925–6425 MHz (Earth-to-space) frequency band, operating with Geostationary Satellites in the Fixed-Satellite Service.
§ 25.222   Blanket Licensing provisions for Earth Stations on Vessels (ESVs) receiving in the 10.95–11.2 GHz (space-to-Earth), 11.45–11.7 GHz (space-to-Earth), 11.7–12.2 GHz (space-to-Earth) frequency bands and transmitting in the 14.0–14.5 GHz (Earth-to-space) frequency band, operating with Geostationary Satellites in the Fixed-Satellite Service.
§§ 25.223-25.249   [Reserved]
§ 25.250   Sharing between NGSO MSS Feeder links Earth Stations in the 19.3–19.7 GHz and 29.1–29.5 GHz Bands.
§ 25.251   Special requirements for coordination.
§ 25.252   Special requirements for ancillary terrestrial components operating in the 2000–2020 MHz/2180–2200 MHz bands.
§ 25.253   Special requirements for ancillary terrestrial components operating in the 1626.5–1660.5 MHz/1525–1559 MHz bands.
§ 25.254   Special requirements for ancillary terrestrial components operating in the 1610–1626.5 MHz/2483.5–2500 MHz bands.
§ 25.255   Procedures for resolving harmful interference related to operation of ancillary terrestrial components operating in the 1.5./1.6 GHz, 1.6/2.4 GHz and 2 GHz bands.
§ 25.256   Special Requirements for operations in the 3.65–3.7 GHz band.
§ 25.257   Special requirements for operations in the band 29.1–29.25 GHz between NGSO MSS and LMDS.
§ 25.258   Sharing between NGSO MSS Feeder links Stations and GSO FSS services in the 29.25–29.5 GHz Bands.
§ 25.259   Time sharing between NOAA meteorological satellite systems and non-voice, non-geostationary satellite systems in the 137–138 MHz band.
§ 25.260   Time sharing between DoD meteorological satellite systems and non-voice, non-geostationary satellite systems in the 400.15–401 MHz band.
§ 25.261   Procedures for avoidance of in-line interference events for Non Geostationary Satellite Orbit (NGSO) Satellite Network Operations in the Fixed Satellite Service (FSS) Bands.

Subpart D—Technical Operations

§ 25.271   Control of transmitting stations.
§ 25.272   General inter-system coordination procedures.
§ 25.273   Duties regarding space communications transmissions.
§ 25.274   Procedures to be followed in the event of harmful interference.
§ 25.275   Particulars of operation.
§ 25.276   Points of communication.
§ 25.277   Temporary fixed earth station operations.
§ 25.278   Additional coordination obligation for non-geostationary and geostationary satellite systems in frequencies allocated to the fixed-satellite service.
§ 25.279   Inter-satellite service.
§ 25.280   Inclined orbit operations.
§ 25.281   Automatic Transmitter Identification System (ATIS).
§ 25.282   Orbit raising maneuvers.
§ 25.283   End-of-life disposal.
§ 25.284   Emergency Call Center Service.

Subpart E [Reserved]


Subpart F—Competitive Bidding Procedures for DARS

§ 25.401   Satellite DARS applications subject to competitive bidding.
§ 25.402   [Reserved]
§ 25.403   Bidding application and certification procedures.
§ 25.404   Submission of down payment and filing of long-form applications.
§§ 25.405-25.406   [Reserved]

Subparts G–H [Reserved]


Subpart I—Equal Employment Opportunities

§ 25.601   Equal employment opportunity requirement.

Subpart J—Public Interest Obligations

§ 25.701   Public interest obligations.


Authority:  47 U.S.C. 701–744. Interprets or applies Sections 4, 301, 302, 303, 307, 309 and 332 of the Communications Act, as amended, 47 U.S.C. Sections 154, 301, 302, 303, 307, 309 and 332, unless otherwise noted.

Subpart A—General
top
§ 25.101   Basis and scope.
top

(a) The rules and regulations in this part are issued pursuant to the authority contained in section 201(c)(11) of the Communications Satellite Act of 1962, as amended, section 501(c)(6) of the International Maritime Satellite Telecommunications Act, and titles I through III of the Communications Act of 1934, as amended.

(b) The rules and regulations in this part supplement, and are in addition to the rules and regulations contained in or to be added to, other parts of this chapter currently in force, or which may subsequently be promulgated, and which are applicable to matters relating to communications by satellites.

[28 FR 13037, Dec. 5, 1963, as amended at 56 FR 24015, May 28, 1991]

§ 25.102   Station authorization required.
top

(a) No person shall use or operate apparatus for the transmission of energy or communications or signals by space or earth stations except under, and in accordance with, an appropriate authorization granted by the Federal Communications Commission.

(b) Protection from impermissible levels of interference to the reception of signals by earth stations in the Fixed-Satellite Service from terrestrial stations in a co-equally shared band is provided through the authorizations granted under this part.

[56 FR 24016, May 28, 1991]

§ 25.103   Definitions.
top

(a) Communications common carrier. The term “communications common carrier” as used in this part means any person (individual, partnership, association, joint-stock company, trust, corporation, or other entity) engaged as a common carrier for hire, in interstate or foreign communication by wire or radio or in interstate or foreign radio transmission of energy, including such carriers as are described in subsection 2(b) (2) and (3) of the Communications Act of 1934, as amended, and, in addition, for purposes of subpart H of this part, includes any individual, partnership, association, joint-stock company, trust, corporation, or other entity which owns or controls, directly or indirectly, or is under direct or indirect common control with, any such carrier.

(b) Authorized carrier. The term “authorized carrier” means a communications common carrier which is authorized by the Federal Communications Commission under the Communications Act of 1934, as amended, to provide services by means of communications satellites.

(c) Communications satellite corporation. (1) The terms “communications satellite corporation” or “corporation” as used in this part mean the corporation created pursuant to the provisions of Title III of the Communications Satellite Act of 1962.

(2) The corporation shall be deemed to be a common carrier within the meaning of section 3(10) of the Communications Act of 1934, as amended.

(d) Communication-satellite earth station complex. The term communication-satellite earth station complex includes transmitters, receivers, and communications antennas at the earth station site together with the interconnecting terrestrial facilities (cables, lines, or microwave facilities) and modulating and demodulating equipment necessary for processing of traffic received from the terrestrial distribution system(s) prior to transmission via satellite and of traffic received from the satellite prior to transfer of channels of communication to terrestrial distribution system(s).

(e) Communication-satellite earth station complex functions. The communication-satellite earth station complex interconnects with terminal equipment of common carriers or authorized entities at the interface; accepts traffic from such entities at the interface, processes for transmission via satellite and performs the transmission function; receives traffic from a satellite or satellites, processes it in a form necessary to deliver channels of communication to terrestrial common carriers or such other authorized entities and delivers the processed traffic to such entities at the interface.

(f) Interface. The point of interconnection between two distinct but adjacent communications systems having different functions. The interface in the communication-satellite service is that point where communications terminal equipment of the terrestrial common carriers or other authorized entities interconnects with the terminal equipment of the communication-satellite earth station complex. The interface in the communication-satellite service shall be located at the earth station site, or if this is impracticable, as close thereto as possible.

(g) Emergency call center (ECC). A facility that subscribers of satellite commercial mobile radio services call when in need of emergency assistance by dialing “911” on their mobile satellite earth terminal.

[28 FR 13037, Dec. 5, 1963, as amended at 31 FR 3289, Mar. 2, 1966; 68 FR 63997, Nov. 12, 2003; 69 FR 6582, Feb. 11, 2004]

§ 25.104   Preemption of local zoning of earth stations.
top

(a) Any state or local zoning, land-use, building, or similar regulation that materially limits transmission or reception by satellite earth station antennas, or imposes more than minimal costs on users of such antennas, is preempted unless the promulgating authority can demonstrate that such regulation is reasonable, except that nonfederal regulation of radio frequency emissions is not preempted by this section. For purposes of this paragraph (a), reasonable means that the local regulation:

(1) Has a clearly defined health, safety, or aesthetic objective that is stated in the text of the regulation itself; and

(2) Furthers the stated health, safety or aesthetic objective without unnecessarily burdening the federal interests in ensuring access to satellite services and in promoting fair and effective competition among competing communications service providers.

(b)(1) Any state or local zoning, land-use, building, or similar regulation that affects the installation, maintenance, or use of a satellite earth station antenna that is two meters or less in diameter and is located or proposed to be located in any area where commercial or industrial uses are generally permitted by non-federal land-use regulation shall be presumed unreasonable and is therefore preempted subject to paragraph (b)(2) of this section. No civil, criminal, administrative, or other legal action of any kind shall be taken to enforce any regulation covered by this presumption unless the promulgating authority has obtained a waiver from the Commission pursuant to paragraph (e) of this section, or a final declaration from the Commission or a court of competent jurisdiction that the presumption has been rebutted pursuant to paragraph (b)(2) of this section.

(2) Any presumption arising from paragraph (b)(1) of this section may be rebutted upon a showing that the regulation in question:

(i) Is necessary to accomplish a clearly defined health or safety objective that is stated in the text of the regulation itself;

(ii) Is no more burdensome to satellite users than is necessary to achieve the health or safety objective; and

(iii) Is specifically applicable on its face to antennas of the class described in paragraph (b)(1) of this section.

(c) Any person aggrieved by the application or potential application of a state or local zoning or other regulation in violation of paragraph (a) of this section may, after exhausting all nonfederal administrative remedies, file a petition with the Commission requesting a declaration that the state or local regulation in question is preempted by this section. Nonfederal administrative remedies, which do not include judicial appeals of administrative determinations, shall be deemed exhausted when:

(1) The petitioner's application for a permit or other authorization required by the state or local authority has been denied and any administrative appeal and variance procedure has been exhausted;

(2) The petitioner's application for a permit or other authorization required by the state or local authority has been on file for ninety days without final action;

(3) The petitioner has received a permit or other authorization required by the state or local authority that is conditioned upon the petitioner's expenditure of a sum of money, including costs required to screen, pole-mount, or otherwise specially install the antenna, greater than the aggregate purchase or total lease cost of the equipment as normally installed; or

(4) A state or local authority has notified the petitioner of impending civil or criminal action in a court of law and there are no more nonfederal administrative steps to be taken.

(d) Procedures regarding filing of petitions requesting declaratory rulings and other related pleadings will be set forth in subsequent Public Notices. All allegations of fact contained in petitions and related pleadings must be supported by affidavit of a person or persons with personal knowledge thereof.

(e) Any state or local authority that wishes to maintain and enforce zoning or other regulations inconsistent with this section may apply to the Commission for a full or partial waiver of this section. Such waivers may be granted by the Commission in its sole discretion, upon a showing by the applicant that local concerns of a highly specialized or unusual nature create a necessity for regulation inconsistent with this section. No application for waiver shall be considered unless it specifically sets forth the particular regulation for which waiver is sought. Waivers granted in accordance with this section shall not apply to later-enacted or amended regulations by the local authority unless the Commission expressly orders otherwise.

(f) A satellite earth station antenna that is designed to receive direct broadcast satellite service, including direct-to-home satellite services, that is one meter or less in diameter or is located in Alaska is covered by the regulations in §1.4000 of this chapter.

[61 FR 10898, Mar. 18, 1996, as amended at 61 FR 46562, Sept. 4, 1996]

Effective Date Note:  At 61 FR 46562, Sept. 4, 1996, §25.104 was amended by revising paragraph (b)(1) and adding paragraph (f). These paragraphs contain information collection and recordkeeping requirements and will not become effective until approval has been given by the Office of Management and Budget.

§§ 25.105-25.108   [Reserved]
top
§ 25.109   Cross-reference.
top

The space radiocommunications stations in the following services are not licensed under this part:

(a) Amateur Satellite Service, see 47 CFR part 97.

(b) Ship earth stations in the Maritime Mobile Satellite Service, see 47 CFR part 83.

(c) Ship earth stations in the Maritime Mobile Satellite Service, see 47 CFR part 80.

[56 FR 24016, May 28, 1991, as amended at 67 FR 51113, Aug. 7, 2002; 70 FR 32253, June 2, 2005]

Subpart B—Applications and Licenses
top

Source:  56 FR 24016, May 28, 1991, unless otherwise noted.

General Application Filing Requirements
top
§ 25.110   Filing of applications, fees, and number of copies.
top

(a) You can obtain application forms for this part by going online at www.fcc.gov/ibfs, where you may complete the form prior to submission via IBFS, the IB electronic filing system.

(b) Submitting your application. All space station applications and all earth station applications must be filed electronically on Form 312. In this part, any party permitted or required to file information on Form 312 must file that information electronically through the International Bureau Filing System (IBFS) in accordance with the applicable provisions of part 1, subpart Y of this chapter.

(c) All correspondence and amendments concerning any application must identify:

(1) The satellite radio service;

(2) The applicant's name;

(3) Station location;

(4) The call sign or other identification of the station; and

(5) The file number of the application involved.

(d) Copies. Applications must be filed electronically though IBFS. The Commission will not accept any paper version of any application.

(e) Signing. Upon filing an application electronically, the applicant must print out the filed application, obtain the proper signatures, and keep the original in its files.

(f) The applicant must pay the appropriate fee for its application and submit it in accordance with part 1, subpart G of this chapter.

[69 FR 47793, Aug. 6, 2004]

§ 25.111   Additional information.
top

(a) The Commission may request from any party at any time additional information concerning any application, or any other submission or pleading regarding an application, filed under this part.

(b) Applicants, permittees and licensees of radio stations governed by this part shall provide the Commission with all information it requires for the Advance Publication, Coordination and Notification of frequency assignments pursuant to the international Radio Regulations. No protection from interference caused by radio stations authorized by other Administrations is guaranteed unless coordination procedures are timely completed or, with respect to individual administrations, by successfully completing coordination agreements. Any radio station authorization for which coordination has not been completed may be subject to additional terms and conditions as required to effect coordination of the frequency assignments with other Administrations.

(c) In the Direct Broadcast Satellite service, applicants and licensees shall also provide the Commission with all information it requires in order to modify the Appendix 30 Broadcasting-Satellite Service (“BSS”) Plans and associated Appendix 30A feeder-link Plans, if the system uses technical characteristics differing from those specified in the Appendix 30 BSS Plans, the Appendix 30A feederlink Plans, Annex 5 to Appendix 30 or Annex 3 to Appendix 30A. For such systems, no protection from interference caused by radio stations authorized by other Administrations is guaranteed until the agreement of all affected Administrations is obtained and the frequency assignment becomes a part of the appropriate Region 2 BSS and feeder-link Plans. Authorizations for which coordination is not completed and/or for which the necessary agreements under Appendices 30 and 30A have not been obtained may be subject to additional terms and conditions as required to effect coordination or obtain the agreement of other Administrations. Applicants and licensees shall also provide the Commission with the necessary Appendix 4 information required by the ITU Radiocommunication Bureau to advance publish, coordinate and notify the frequencies to be used for tracking, telemetry and control functions of DBS systems.

[56 FR 24016, May 28, 1991, as amended at 67 FR 51113, Aug. 7, 2002; 68 FR 63997, Nov. 12, 2003]

§ 25.112   Defective applications.
top

(a) An application will be unacceptable for filing and will be returned to the applicant with a brief statement identifying the omissions or discrepancies if:

(1) The application is defective with respect to completeness of answers to questions, informational showings, internal inconsistencies, execution, or other matters of a formal character; or

(2) The application does not substantially comply with the Commission's rules, regulations, specific requests for additional information, or other requirements.

(3) The application requests authority to operate a space station in a frequency band that is not allocated internationally for such operations under the Radio Regulations of the International Telecommunication Union.

(b) Applications for space station authority found defective under paragraph (a)(3) of this section will not be considered. Applications for authority found defective under paragraphs (a)(1) or (a)(2) of this section may be accepted for filing if:

(1) The application is accompanied by a request which sets forth the reasons in support of a waiver of (or an exception to), in whole or in part, any specific rule, regulation, or requirement with which the application is in conflict;

(2) The Commission, upon its own motion, waives (or allows an exception to), in whole or in part, any rule, regulation or requirement.

(c) If an applicant is requested by the Commission to file any additional information or any supplementary or explanatory information not specifically required in the prescribed application form or these rules, a failure to comply with the request within a specified time period will be deemed to render the application defective and will subject it to dismissal.

[56 FR 24016, May 28, 1991, as amended at 68 FR 51502, Aug. 27, 2003]

§ 25.113   Station licenses and launch authority.
top

(a) Construction permits are not required for satellite earth stations. Construction of such stations may commence prior to grant of a license at the applicant's own risk. Applicants must comply with the provisions of 47 CFR 1.1312 relating to environmental processing prior to commencing construction.

(b) [Reserved]

(c) FAA notification. Before the construction of new antenna structures or alteration in the height of existing antenna structures is authorized by the FCC, a Federal Aviation Administration (FAA) determination of “no hazard” may be required. To apply for this determination, the FAA must be notified of the planned construction. Criteria used to determine whether FAA notification is required for a particular antenna structure are contained in part 17 of this chapter. Applications proposing construction of one or more new antenna structures or alteration of the overall height of one or more existing antenna structures, where FAA notification prior to such construction or alteration is not required by part 17 of this chapter, must indicate such and, unless the reason is obvious (e.g. structure height is less than 6.10 meters AGL) must contain a statement explaining why FAA notification is not required.

(d) Painting and lighting. The owner of each antenna structure required to be painted and/or illuminated under the provisions of Section 303(q) of the Communications Act of 1934, as amended, shall operate and maintain the antenna structure painting and lighting in accordance with part 17 of this chapter. In the event of default by the owner, each licensee or permittee shall be individually responsible for conforming to the requirements pertaining to antenna structure painting and lighting.

(e) Antenna Structure Registration Number. Applications proposing construction of one or more new antenna structures or alteration of the overall height of one or more existing structures, where FAA notification prior to such construction or alteration is required by part 17 of this chapter, must include the FCC Antenna Structure Registration Number(s) for the affected structure(s). If no such number has been assigned at the time the application is filed, the applicant must state in the application whether or not the antenna structure owner has notified the FAA of the proposed construction or alteration and applied to the FCC for an Antenna Structure Registration Number in accordance with part 17 of this chapter for the antenna structure in question.

(f) Construction permits are not required for U.S.-licensed space stations. Construction of such stations may commence, at the applicant's own risk, prior to grant of a license. Prior to commencing construction, however, applicants must notify the Commission in writing they plan to begin construction at their own risk.

(g) Except as set forth in paragraph (h) of this section, a launch authorization and station license (i.e., operating authority) must be applied for and granted before a space station may be launched and operated in orbit. Request for launch authorization may be included in an application for space station license. However, an application for authority to launch and operate an on-ground spare satellite will be considered pursuant to the following procedures:

(1) Applications for launch and operation of an on-ground spare NGSO-like satellite will be considered pursuant to the procedures set forth in §25.157, except as set forth in paragraph (g)(3) of this section.

(2) Applications for launch and operation of an on-ground spare GSO-like satellite will be considered pursuant to the procedures set forth in §25.158, except as set forth in paragraph (g)(3) of this section.

(3) Neither paragraph (g)(1) nor (g)(2) of this section will apply in cases where the space station to be launched is determined to be an emergency replacement for a previously authorized space station that has been lost as a result of a launch failure or a catastrophic in-orbit failure.

(h) Licensees of Non-Geostationary Satellite Orbit (NGSO) satellite systems need not file separate applications to operate technically identical in-orbit spares authorized as part of a blanket license pursuant to §25.114(e) or any other satellite blanket licensing provision in this part. However, the licensee shall notify the Commission within 30 days of bringing the in-orbit spare into operation, and certify that operation of this space station did not cause the licensee to exceed the total number of operating space stations authorized by the Commission, and that the licensee will operate the space station within the applicable terms and conditions of its license. These notifications must be filed electronically on FCC Form 312.

[56 FR 24016, May 28, 1991, as amended at 61 FR 4366, Feb. 6, 1996; 61 FR 9951, Mar. 12, 1996; 61 FR 55582, Oct. 28, 1996; 62 FR 5927, Feb. 10, 1997; 62 FR 64172, Dec. 4, 1997; 68 FR 51502, Aug. 27, 2003; 69 FR 47794, Aug. 6, 2004; 70 FR 32253, June 2, 2005]

§ 25.114   Applications for space station authorizations.
top

(a) A comprehensive proposal shall be submitted for each proposed space station on FCC Form 312, Main Form and Schedule S, together with attached exhibits as described in paragraph (d) of this section.

(b) Each application for a new or modified space station authorization must constitute a concrete proposal for Commission evaluation. Each application must also contain the formal waiver required by section 304 of the Communications Act, 47 U.S.C. 304. The technical information for a proposed satellite system specified in paragraph (c) of this section must be filed on FCC Form 312, Main Form and Schedule S. The technical information for a proposed satellite system specified in paragraph (d) of this section need not be filed on any prescribed form but should be complete in all pertinent details. Applications for all new space station authorizations must be filed electronically through the International Bureau Filing System (IBFS) in accordance with the applicable provisions of part 1, subpart Y of this chapter.

(c) The following information shall be filed on FCC Form 312, Main Form and Schedule S:

(1) Name, address, and telephone number of the applicant;

(2) Name, address, and telephone number of the person(s), including counsel, to whom inquiries or correspondence should be directed;

(3) Type of authorization requested (e.g., launch authority, station license, modification of authorization);

(4)(i) Radio frequencies and polarization plan (including beacon, telemetry, and telecommand functions), center frequency and polarization of transponders (both receiving and transmitting frequencies),

(ii) Emission designators and allocated bandwidth of emission, final amplifier output power (identify any net losses between output of final amplifier and input of antenna and specify the maximum EIRP for each antenna beam),

(iii) Identification of which antenna beams are connected or switchable to each transponder and TT&C function,

(iv) Receiving system noise temperature,

(v) The relationship between satellite receive antenna gain pattern and gain-to-temperature ratio and saturation flux density for each antenna beam (may be indicated on antenna gain plot),

(vi) The gain of each transponder channel (between output of receiving antenna and input of transmitting antenna) including any adjustable gain step capabilities, and

(vii) Predicted receiver and transmitter channel filter response characteristics.

(5) For satellites in geostationary-satellite orbit,

(i) Orbital location, or locations if alternatives are proposed, requested for the satellite,

(ii) The factors that support the orbital assignment or assignments proposed in paragraph (c)(5)(i) of this section,

(iii) Longitudinal tolerance or east-west station-keeping capability;

(iv) Inclination incursion or north-south station-keeping capability.

(6) For satellites in non-geostationary-satellite orbits,

(i) The number of space stations and applicable information relating to the number of orbital planes,

(ii) The inclination of the orbital plane(s),

(iii) The orbital period,

(iv) The apogee,

(v) The perigee,

(vi) The argument(s) of perigee,

(vii) Active service arc(s), and

(viii) Right ascension of the ascending node(s).

(7) For satellites in geostationary-satellite orbit, accuracy with which the orbital inclination, the antenna axis attitude, and longitudinal drift will be maintained;

(8) Calculation of power flux density levels within each coverage area and of the energy dispersal, if any, needed for compliance with §25.208, for angles of arrival of 5°, 10°, 15°, 20°, and 25° above the horizontal;

(9) Arrangement for tracking, telemetry, and control;

(10) Physical characteristics of the space station including weight and dimensions of spacecraft, detailed mass (on ground and in-orbit) and power (beginning and end of life) budgets, and estimated operational lifetime and reliability of the space station and the basis for that estimate;

(11) A clear and detailed statement of whether the space station is to be operated on a common carrier basis, or whether non-common carrier transactions are proposed. If non-common carrier transactions are proposed, describe the nature of the transactions and specify the number of transponders to be offered on a non-common carrier basis;

(12) Dates by which construction will be commenced and completed, launch date, and estimated date of placement into service.

(13) The polarization information specified in §§25.210(a)(1), (a)(3), and (i), to the extent applicable.

(d) The following information in narrative form shall be contained in each application:

(1) General description of overall system facilities, operations and services;

(2) If applicable, the feeder link and inter-satellite service frequencies requested for the satellite, together with any demonstration otherwise required by this chapter for use of those frequencies (see, e.g., §§25.203(j) and (k));

(3) Predicted space station antenna gain contour(s) for each transmit and each receive antenna beam and nominal orbital location requested. These contour(s) should be plotted on an area map at 2 dB intervals down to 10 dB below the peak value of the parameter and at 5 dB intervals between 10 dB and 20 dB below the peak values, with the peak value and sense of polarization clearly specified on each plotted contour. For applications for geostationary orbit satellites, this information must be provided in the .gxt format.

(4) A description of the types of services to be provided, and the areas to be served, including a description of the transmission characteristics and performance objectives for each type of proposed service, details of the link noise budget, typical or baseline earth station parameters, modulation parameters, and overall link performance analysis (including an analysis of the effects of each contributing noise and interference source);

(5) Calculation of power flux density levels within each coverage area and of the energy dispersal, if any, needed for compliance with §25.208; Calculation of power flux density levels within each coverage area and of the energy dispersal, if any, needed for compliance with §25.208, for angles of arrival other than 5°, 10°, 15°, 20°, and 25° above the horizontal.

(6) Public interest considerations in support of grant;

(7) Applications for authorizations for fixed-satellite space stations shall also include the information specified in §25.140;

(8) Applications for authorizations in the Mobile-Satellite Service in the 1545–1559/1646.5–1660.5 MHz frequency bands shall also provide all information necessary to comply with the policies and procedures set forth in Rules and Policies Pertaining to the Use of Radio Frequencies in a Land Mobile Satellite Service, 2 FCC Rcd 485 (1987) (Available at address in §0.445 of this chapter.);

(9) Applications to license multiple space station systems in the non-voice, non-geostationary mobile-satellite service under blanket operating authority shall also provide all information specified in §25.142; and

(10) Applications for authorizations in the 1.6/2.4 GHz Mobile-Satellite Service shall also provide all information specified in §25.143.

(11) In addition to a statement of whether the space station is to be operated on a common carrier basis, or whether non-common carrier transactions are proposed, as specified in paragraph (c)(11) of this section, satellite applications in the Direct Broadcast Satellite service must provide a clear and detailed statement of whether the space station is to be operated on a broadcast or non-broadcast basis.

(12) Applications for authorizations in the non-geostationary satellite orbit fixed-satellite service (NGSO FSS) in the bands 10.7 GHz to 14.5 GHz shall also provide all information specified in §25.146.

(13) For satellite applications in the Direct Broadcast Satellite service, if the proposed system's technical characteristics differ from those specified in the Appendix 30 BSS Plans, the Appendix 30A feeder link Plans, Annex 5 to Appendix 30 or Annex 3 to Appendix 30A, each applicant shall provide:

(i) The information requested in Appendix 4 of the ITU's Radio Regulations. Further, applicants shall provide sufficient technical showing that the proposed system could operate satisfactorily if all assignments in the BSS and feeder link Plans were implemented.

(ii) Analyses of the proposed system with respect to the limits in Annex 1 to Appendices 30 and 30A.

(14) A description of the design and operational strategies that will be used to mitigate orbital debris, including the following information:

(i) A statement that the space station operator has assessed and limited the amount of debris released in a planned manner during normal operations, and has assessed and limited the probability of the space station becoming a source of debris by collisions with small debris or meteoroids that could cause loss of control and prevent post-mission disposal;

(ii) A statement that the space station operator has assessed and limited the probability of accidental explosions during and after completion of mission operations. This statement must include a demonstration that debris generation will not result from the conversion of energy sources on board the spacecraft into energy that fragments the spacecraft. Energy sources include chemical, pressure, and kinetic energy. This demonstration should address whether stored energy will be removed at the spacecraft's end of life, by depleting residual fuel and leaving all fuel line valves open, venting any pressurized system, leaving all batteries in a permanent discharge state, and removing any remaining source of stored energy, or through other equivalent procedures specifically disclosed in the application;

(iii) A statement that the space station operator has assessed and limited the probability of the space station becoming a source of debris by collisions with large debris or other operational space stations. Where a space station will be launched into a low-Earth orbit that is identical, or very similar, to an orbit used by other space stations, the statement must include an analysis of the potential risk of collision and a description of what measures the space station operator plans to take to avoid in-orbit collisions. If the space station operator is relying on coordination with another system, the statement must indicate what steps have been taken to contact, and ascertain the likelihood of successful coordination of physical operations with, the other system. The statement must disclose the accuracy—if any—with which orbital parameters of non-geostationary satellite orbit space stations will be maintained, including apogee, perigee, inclination, and the right ascension of the ascending node(s). In the event that a system is not able to maintain orbital tolerances, i.e., it lacks a propulsion system for orbital maintenance, that fact should be included in the debris mitigation disclosure. Such systems must also indicate the anticipated evolution over time of the orbit of the proposed satellite or satellites. Where a space station requests the assignment of a geostationary-Earth orbit location, it must assess whether there are any known satellites located at, or reasonably expected to be located at, the requested orbital location, or assigned in the vicinity of that location, such that the station keeping volumes of the respective satellites might overlap. If so, the statement must include a statement as to the identities of those parties and the measures that will be taken to prevent collisions;

(iv) A statement detailing the post-mission disposal plans for the space station at end of life, including the quantity of fuel—if any—that will be reserved for post-mission disposal maneuvers. For geostationary-Earth orbit space stations, the statement must disclose the altitude selected for a post-mission disposal orbit and the calculations that are used in deriving the disposal altitude. The statement must also include a casualty risk assessment if planned post-mission disposal involves atmospheric re-entry of the space station. In general, an assessment should include an estimate as to whether portions of the spacecraft will survive re-entry and reach the surface of the Earth, as well as an estimate of the resulting probability of human casualty.

(e) Applicants requesting authority to launch and operate a system comprised of technically identical, non-geostationary satellite orbit space stations may file a single “blanket” application containing the information specified in paragraphs (c) and (d) of this section for each representative space station.

[68 FR 63997, Nov. 12, 2003, as amended at 69 FR 29901, May 26, 2004; 69 FR 47794, Aug. 6, 2004; 69 FR 54587, Sept. 9, 2004]

§ 25.115   Application for earth station authorizations.
top

(a)(1) Transmitting earth stations. Commission authorization must be obtained for authority to operate a transmitting earth station. Applications shall be filed electronically on FCC Form 312, Main Form and Schedule B, and include the information specified in §25.130, except as set forth in paragraph (a)(2) of this section.

(2) Applicants for licenses for transmitting earth station facilities are required to file on Form 312EZ, to the extent that form is available, in the following cases:

(i) The earth station will transmit in the 3700–4200 MHz and 5925–6425 MHz band, and/or the 11.7–12.2 GHz and 14.0–14.5 GHz band; and

(ii) The earth station will meet all the applicable technical specifications set forth in part 25 of this chapter.

(iii) The earth station is not an ESV.

(3) If Form 312EZ is not available, earth station license applicants specified in paragraph (a)(2) must file on FCC Form 312, Main Form and Schedule B, and include the information specified in §25.130.

(4) Applications for earth station authorizations must be filed in accordance with the pleading limitations, periods and other applicable provisions of §§1.41 through 1.52 of this chapter, except that such earth station applications must be filed electronically through the International Bureau Filing System (IBFS) in accordance with the applicable provisions of part 1, subpart Y of this chapter;

(b) Receive-only earth stations. Applications to license or register receive only earth stations shall be filed on FCC Form 312, Main Form and Schedule B, and conform to the provisions of §25.131.

(c)(1) Large Networks of Small Antennas operating in the 11.7–12.2 GHz and 14.0–14.5 GHz frequency bands with U.S.-licensed or non-U.S.-licensed satellites for domestic or international services. Applications to license small antenna network systems operating in the 11.7–12.2 GHz and 14.0–14.5 GHz frequency band under blanket operating authority shall be filed on FCC Form 312 and Schedule B, for each large (5 meters or larger) hub station, and Schedule B for each representative type of small antenna (less than 5 meters) operating within the network.

(c)(2) Large Networks of Small Antennas operating in the 4/6 GHz frequency bands with U.S.-licensed or non-U.S. licensed satellites for domestic services (CSATs). Applications to license small antenna network systems operating in the standard C-Band, 3700–4200 MHz and 5925–6425 MHz frequency band shall be filed electronically on FCC Form 312, Main Form and Schedule B.

(i) An initial lead application providing a detailed overview of the complete network shall be filed. Such lead applications shall fully identify the scope and nature of the service to be provided, as well as the complete technical details of each representative type of small antenna (less than 4.5 meters) that will operate within the network. Such lead applications for a single CSAT system must identify:

(A) No more than three discrete geostationary satellites to be accessed;

(B) The amount of frequency bandwidth sought, up to a maximum of 20 MHz of spectrum in each direction at each of the satellites (The same 20 MHz of uplink and 20 MHz of downlink spectrum at each satellite would be accessible by all CSAT earth stations in the system. The 20 MHz of uplink and 20 MHz of downlink spectrum need not be the same at each satellite location);

(C) The maximum number of earth station sites;

(ii) Following the issuance of a license for the lead application, the licensee shall notify the Commission of the complete technical parameters of each individual earth station site before that site is bought into operation under the lead authorization. Full frequency coordination of each individual site (e.g., for each satellite and the spectrum associated therewith) shall be completed prior to filing Commission notification. The coordination must be conducted in accordance with §25.203. Such notification shall be done by electronic filing and shall be consistent with the technical parameters of Schedule B of FCC Form 312.

(iii) Following successful coordination of such an earth station, if the earth station operator does not file a lead application or a Schedule B within six months after it successfully completes coordination, it will be assumed that such frequency use is no longer desired, unless a second notification has been received within ten days prior to the end of the six month period. Such renewal notifications must be sent to all parties concerned. If the lead application or Schedule B, or renewal notification, is not timely received, the coordination will lapse and the licensee must re-coordinate the relevant earth stations if it still wishes to bring them into operation.

(iv) Operation of each individual site may commence immediately after the public notice is released that identifies the notification sent to the Commission and if the requirements of paragraph (c)(2)(vi) of this section are met. Continuance of operation of each station for the duration of the lead license term shall be dependent upon successful completion of the normal public notice process. If any objections are received to the new station prior to the end of the 30 day comment period of the Public Notice, the licensee shall immediately cease operation of those particular stations until the coordination dispute is resolved and the CSAT licensee informs the Commission of the resolution. If the requirements of paragraph (c)(2)(vi) of this section are not met, operation may not commence until the Commission issues the public notice acting on the CSAT terminal authorization.

(v) Each CSAT licensee shall annually provide the Commission an updated list of all operational earth stations in its system. The annual list shall also include a list of all earth stations deactivated during the year and identification of the satellites providing service to the network as of the date of the report.

(vi) Conditional authorization. (A) An applicant for a new CSAT radio station or modification of an existing CSAT station authorized under paragraph (c)(2)(i) of this section in the 3700–4200; or 5925–6425 MHz bands may operate the proposed station during the pendency of its application after the release of the public notice accepting the notification for filing that complies with paragraph (c)(2)(ii) of this section. The applicant, however, must first certify that the following conditions are satisfied:

(1) The frequency coordination procedures of §25.203 have been successfully completed;

(2) The antenna structure has been previously studied by the Federal Aviation Administration and determined to pose no hazard to aviation safety as required by subpart B of part 17 of this chapter; or the antenna or tower structure does not exceed 6.1 meters above ground level or above an existing man-made structure (other than an antenna structure), if the antenna or tower has not been previously studied by the Federal Aviation Administration and cleared by the FCC;

(3) The grant of the application(s) does not require a waiver of the Commission's rules (with the exception of a request for waiver pertaining to fees);

(4) The applicant has determined that the facility(ies) will not significantly affect the environment as defined in §1.1307 of this chapter;

(5) The station site does not lie within 56.3 kilometers of any international border or within a radio “Quiet Zone” identified in §1.924 of this chapter; and

(6) The filed application is consistent with the proposal that was coordinated pursuant to §25.251.

(B) Conditional authority ceases immediately if the Schedule B is returned by the Commission because it is not accepted for filing.

(C) A conditional authorization pursuant to paragraphs (c)(2)(vi)(A) and (c)(2)(vi)(B) of this section is evidenced by retaining a copy of the Schedule B notification with the station records. Conditional authorization does not prejudice any action the Commission may take on the subject application(s) or the Schedule B notifications.

(D) Conditional authority is accepted with the express understanding that such authority may be modified or cancelled by the Commission at any time without hearing if, in the Commission's discretion, the need for such action arises. An applicant operating pursuant to this conditional authority assumes all risks associated with such operation, the termination or modification of the conditional authority, or the subsequent dismissal or denial of its application(s).

(E) The copy of the Schedule B notification form must be posted at each station operating pursuant to this section.

(vii) Period of construction. Construction of each earth station must be completed and the station must be brought into regular operation within twelve months from the date that action is taken to authorize that station to operate under the lead authorization, except as may be otherwise determined by the Commission for any particular application.

(d) User transceivers in the NVNG, 1.6/2.4 GHz Mobile-Satellite Service, and 2 GHz Mobile-Satellite Service need not be individually licensed. Service vendors may file blanket applications for transceivers units using FCC Form 312, Main Form and Schedule B, and specifying the number of units to be covered by the blanket license. Each application for a blanket license under this section shall include the information described in §25.136.

(e) Earth stations operating in the 20/30 GHz Fixed-Satellite Service with U.S.-licensed or non-U.S. licensed satellites: Applications to license individual earth stations operating in the 20/30 GHz band shall be filed on FCC Form 312, Main Form and Schedule B, and shall also include the information described in §25.138. Earth stations belonging to a network operating in the 18.3–18.8 GHz, 19.7–20.2 GHz, 28.35–28.6 GHz or 29.25–30.0 GHz bands may be licensed on a blanket basis. Applications for such blanket authorization may be filed using FCC Form 312, Main Form and Schedule B, and specifying the number of terminals to be covered by the blanket license. Each application for a blanket license under this section shall include the information described in §25.138.

(f) User transceivers in the non-geostationary satellite orbit fixed-satellite service in the 11.7–12.2 GHz, 12.2–12.7 GHz and 14.0–14.5 GHz bands need not be individually licensed. Service vendors may file blanket applications for transceiver units using FCC Form 312, Main Form and Schedule B, and shall specify the number of terminals to be covered by the blanket license. Each application for a blanket license under this section shall include the information described in §25.146. Any earth stations that are not user transceivers, and which transmit in the non-geostationary satellite orbit fixed-satellite service in the 10.7–11.7 GHz, 12.75–13.15 GHz, 13.2125–13.25 GHz, and 13.75–14.0 GHz bands must be individually licensed, pursuant to paragraph (a) of this section.

[62 FR 5928, Feb. 10, 1997, as amended at 62 FR 64172, Dec. 4, 1997; 65 FR 54169, Sept. 7, 2000; 65 FR 59142, Oct. 4, 2000; 66 FR 31559, June 12, 2001; 67 FR 53510, Aug. 16, 2002; 68 FR 16966, Apr. 8, 2003; 68 FR 63998, Nov. 12, 2003; 69 FR 29901, May 26, 2004; 69 FR 47794, Aug. 6, 2004; 70 FR 4783, Jan. 31, 2005; 70 FR 32253, June 2, 2005]

§ 25.116   Amendments to applications.
top

(a) Unless otherwise specified, any pending application may be amended until designated for hearing, a public notice is issued stating that a substantive disposition of the application is to be considered at a forthcoming Commission meeting, or a final order disposing of the matter is adopted by the Commission.

(b) Major amendments submitted pursuant to paragraph (a) of this section are subject to the public notice requirements of §25.151. An amendment will be deemed to be a major amendment under the following circumstances:

(1) If the amendment increases the potential for interference, or changes the proposed frequencies or orbital locations to be used.

(2) If the amendment would convert the proposal into an action that may have a significant environmental effect under §1.1307 of this chapter.

(3) [Reserved]

(4) If the amendment, or the cumulative effect of the amendment, is determined by the Commission otherwise to be substantial pursuant to section 309 of the Communications Act.

(5) Amendments to “defective” space station applications, within the meaning of §25.112 will not be considered.

(c) Any application for an NGSO-like satellite license within the meaning of §25.157 will be considered to be a newly filed application if it is amended by a major amendment (as defined by paragraph (b) of this section) after a “cut-off” date applicable to the application, except under the following circumstances:

(1) The amendment resolves frequency conflicts with authorized stations or other pending applications but does not create new or increased frequency conflicts;

(2) The amendment reflects only a change in ownership or control found by the Commission to be in the public interest and, for which a requested exemption from a “cut-off” date is granted;

(3) The amendment corrects typographical, transcription, or similar clerical errors which are clearly demonstrated to be mistakes by reference to other parts of the application, and whose discovery does not create new or increased frequency conflicts; or

(4) The amendment does not create new or increased frequency conflicts, and is demonstrably necessitated by events which the applicant could not have reasonably foreseen at the time of filing.

(d) Any application for a GSO-like satellite license within the meaning of §25.158 will be considered to be a newly filed application if it is amended by a major amendment (as defined by paragraph (b) of this section), and will cause the application to lose its status relative to later-filed applications in the “queue” as described in §25.158.

(e) Any amendment to an application shall be filed electronically through the International Bureau Filing System (IBFS) in accordance with the applicable provisions of part 1, subpart Y of this chapter. Amendments to space station applications must be filed on Form 312 and Schedule S. Amendments to space station applications must be filed on Form 312 and Schedule B.

[56 FR 24016, May 28, 1991, as amended at 68 FR 51503, Aug. 27, 2003; 69 FR 47794, Aug. 6, 2004]

§ 25.117   Modification of station license.
top

(a) Except as provided for in §25.118 (Modifications not requiring prior authorization), no modification of a radio station governed by this part which affects the parameters or terms and conditions of the station authorization shall be made except upon application to and grant of such application by the Commission.

(b) [Reserved]

(c) Applications for modification of earth station authorizations shall be submitted on FCC Form 312, Main Form and Schedule B. Applications for modification of space station authorizations shall be submitted on FCC Form 312, Main Form and Schedule S. Both earth station and space station modification applications must be filed electronically through the International Bureau Filing System (IBFS) in accordance with the applicable provisions of part 1, subpart Y of this chapter. In addition, any application for modification of authorization to extend a required date of completion, as set forth in §25.133 for earth station authorization or §25.164 for space stations, or included as a condition of any earth station or space station authorization, must include a verified statement from the applicant:

(1) That states the additional time is required due to unforeseeable circumstances beyond the applicant's control, describes these circumstances with specificity, and justifies the precise extension period requested; or

(2) That states there are unique and overriding public interest concerns that justify an extension, identifies these interests and justifies a precise extension period.

(d)(1) Except as set forth in §25.118(e), applications for modifications of space station authorizations shall be filed in accordance with §25.114, but only those items of information listed in §25.114 that change need to be submitted, provided the applicant certifies that the remaining information has not changed.

(2) Applications for modifications of space station authorizations will be granted except under the following circumstances:

(i) Granting the modification would make the applicant unqualified to operate a space station under the Commission's rules.

(ii) Granting the modification request would not serve the public interest, convenience, and necessity.

(iii) Except as set forth in paragraph (d)(2)(iv) of this section, applications for modifications of GSO-like space station authorizations granted pursuant to the procedure set forth in §25.158, which seek to relocate a GSO satellite or add a frequency band to the authorization, will be placed in a queue pursuant to §25.158 and considered only after previously filed space station license applications or space station modification applications have been considered.

(iv) Applications for modifications of space station authorizations to increase the authorized bandwidth will not be considered in cases in which the original space station authorization was granted pursuant to the procedures set forth in §25.157(e) or §25.158(c)(4).

(3) In the event that a space station licensee provides notification of a planned license modification pursuant to §25.118(e), and the Commission finds that the proposed modification does not meet the requirements of §25.118(e), the Commission will issue a public notice announcing that the proposed license modification will be considered pursuant to the procedure specified in paragraphs (d)(1) and (d)(2) of this section.

(e) [Reserved]

(f) An application for modification of a space station license to add an ancillary terrestrial component to an eligible satellite network will be treated as a request for a minor modification if the particulars of operations provided by the applicant comply with the criteria specified in §25.149. Notwithstanding the treatment of such an application as a minor modification, the Commission shall place any initial application for the modification of a space station license to add an ancillary terrestrial component on notice for public comment. Except as provided for in §25.149(f), no application for authority to add an ancillary terrestrial component to an eligible satellite network shall be granted until the applicant has demonstrated actual compliance with the criteria specified in §25.149(b).

(g) In cases where an earth station licensee proposes additional transmitters, facilities, or modifications, the resulting transmissions of which can reasonably be expected to cause the power density to exceed the RF exposure limits specified in part 1, subpart I of this chapter by five percent, the licensee must submit an environmental assessment pursuant to §1.1307(b)(3)(i) of this chapter as an attachment to its modification application.

[56 FR 24016, May 28, 1991, as amended at 61 FR 9952, Mar. 12, 1996; 62 FR 5928, Feb. 10, 1997; 68 FR 33649, June 5, 2003; 68 FR 47858, Aug. 12, 2003; 68 FR 51503, Aug. 27, 2003; 68 FR 62248, Nov. 3, 2003; 68 FR 63998, Nov. 12, 2003; 69 FR 47794, Aug. 6, 2004; 70 FR 32253, June 2, 2005]

§ 25.118   Modifications not requiring prior authorization.
top

(a) Earth station license modifications, notification required. Authorized earth station operators may make the following modifications to their licenses without prior Commission authorization, provided that the operators notify the Commission, using FCC Form 312 and Schedule B, within 30 days of the modification. This notification must be filed electronically through the International Bureau Filing System (IBFS) in accordance with the applicable provisions of part 1, subpart Y of this chapter:

(1) Licensees may make changes to their authorized earth stations without obtaining prior Commission authorization, provided that they have complied with all applicable frequency coordination procedures in accordance with §25.251, and the modification does not involve:

(i) An increase in EIRP or EIRP density (both main lobe and side lobe);

(ii) An increase in transmitted power;

(iii) A change in coordinates of more than 1 second in latitude or longitude for stations operating in frequency bands that are shared with terrestrial systems; or

(iv) A change in coordinates of 10 seconds or greater in latitude or longitude for stations operating in frequency bands that are not shared with terrestrial systems.

(2) Except for replacement of equipment where the new equipment is electrically identical to the existing equipment, an authorized earth station licensee may add, change or replace transmitters or antenna facilities without prior authorization, provided:

(i) The added, changed, or replaced facilities conform to §25.209;

(ii) The particulars of operations remain unchanged;

(iii) Frequency coordination is not required; and

(iv) The maximum power and power density delivered into any antenna at the earth station site shall not exceed the values calculated by subtracting the maximum antenna gain specified in the license from the maximum authorized e.i.r.p. and e.i.r.p. density values.

(3) Authorized VSAT earth station operators may add VSAT remote terminals without prior authorization, provided that they have complied with all applicable frequency coordination procedures in accordance with §25.251.

(4) A licensee providing service on a private carrier basis may change its operations to common carrier status without obtaining prior Commission authorization. The licensee must notify the Commission using Form 312 within 30 days after the completed change to common carrier status.

(5) Earth station operators may change their points of communication without prior authorization, provided that the change results from a space station license modification described in paragraph (e) of this section, and the earth station operator does not repoint its antenna. Otherwise, any modification of an earth station license to add or change a point of communication will be considered under §25.117.

(b) Earth station license modifications, notification not required. Notwithstanding paragraph (a)(2) of this section, equipment in an authorized earth station may be replaced without prior authorization and without notifying the Commission if the new equipment is electrically identical to the existing equipment.

(c)–(d) [Reserved]

(e) Space station modifications. A space station operator may modify its license without prior authorization, but upon 30 days prior notice to the Commission and any potentially affected licensed spectrum user, provided that the operator meets the following requirements. This notification must be filed electronically on Form 312 through the International Bureau Filing System (IBFS) in accordance with the applicable provisions of part 1, subpart Y of this chapter:

(1) The space station licensee will relocate a Geostationary Satellite Orbit (GSO) space station to another orbit location that is assigned to that licensee;

(2) The relocated space station licensee will operate with the same technical parameters as the space station initially assigned to that location, or within the original satellite's authorized and/or coordinated parameters;

(3) The space station licensee certifies that it will comply with all the conditions of its original license and all applicable rules after the relocation;

(4) The space station licensee certifies that it will comply with all applicable coordination agreements at the newly occupied orbital location;

(5) The space station licensee certifies that it has completed any necessary coordination of its space station at the new location with other potentially affected space station operators;

(6) The space station licensee certifies that it will limit operations of the space station to Tracking, Telemetry, and Control (TT&C) functions during the relocation and satellite drift transition period; and

(7) The space station licensee certifies that the relocation of the space station does not result in a lapse of service for any current customer.

(8) For DBS licensees, the space station licensee must certify that it will not cause greater interference than that which would occur from the current U.S. assignments in the International Telecommunication Union (ITU) Region 2 BSS Plan and its associated Feeder Link Plan.

(9) For DBS licensees, the space station licensee must certify that it will meet the geographic service requirements in §25.148(c).

[62 FR 5928, Feb. 10, 1997, as amended at 68 FR 62248, Nov. 3, 2003; 68 FR 63999, Nov. 12, 2003; 69 FR 47794, Aug. 6, 2004; 70 FR 32253, June 2, 2005]

§ 25.119   Assignment or transfer of control of station authorization.
top

(a) You must file an application for Commission authorization before you can transfer, assign, dispose of (voluntarily or involuntarily, directly or indirectly, or by transfer of control of any corporation or any other entity) your station license or accompanying rights. The Commission will grant your application only if it finds that doing so will serve the public interest, convenience and necessity.

(b) For purposes of this section, transfers of control requiring Commission approval shall include any and all transactions that:

(1) Change the party controlling the affairs of the licensee, or

(2) Affect any change in a controlling interest in the ownership of the licensee, including changes in legal or equitable ownership.

(c) Assignment of license. You must submit an FCC Form 312, Main Form and Schedule A to voluntarily assign (e.g., as by contract or other agreement) or involuntarily assign (e.g., as by death, bankruptcy, or legal disability) your station authorization. You must file these forms electronically through IBFS.

(d) Transfer of control of corporation holding license. If you want to transfer control of a corporation, which holds one or more licenses voluntarily or involuntarily (de jure or de facto), you must submit an FCC Form 312, Main Form and Schedule A. You must file these forms electronically through IBFS. For involuntary transfers, you must file your application within 10 days of the event causing the transfer of control. You can also use FCC Form 312, Main Form and Schedule A for non-substantial (pro forma) transfers of control.

(e) Whenever a group of station licenses in the same radio service for the same class of facility licensed to the same entity is to be assigned or transferred to a single assignee or transferee, a single application may be filed to cover the entire group, if the application identifies in an exhibit each station by call sign, station location and expiration date of license.

(f) Assignments and transfers of control shall be completed within 60 days from the date of authorization. Within 30 days of consumation, the Commission shall be notified by letter of the date of consummation and the file numbers of the applications involved in the transaction.

(g) The Commission retains discretion in reviewing assignments and transfers of control of space station licenses to determine whether the initial license was obtained in good faith with the intent to construct a satellite system.

[56 FR 24016, May 20, 1991; 56 FR 29757, June 20, 1991. Redesignated and amended at 62 FR 5928, 5929, Feb. 10, 1997; 68 FR 51503, Aug. 27, 2003; 69 FR 29901, May 26, 2004]

§ 25.120   Application for special temporary authorization.
top

(a) In circumstances requiring immediate or temporary use of facilities, request may be made for special temporary authority to install and/or operate new or modified equipment. The request must contain the full particulars of the proposed operation including all facts sufficient to justify the temporary authority sought and the public interest therein. No request for temporary authority will be considered unless it is received by the Commission at least 3 working days prior to the date of proposed construction or operation or, where an extension is sought, the expiration date of the existing temporary authorization. A request received within less than 3 working days may be accepted only upon due showing of extraordinary reasons for the delay in submitting the request which could not have been earlier foreseen by the applicant. A copy of the request for special temporary authority also shall be forwarded to the Commission's Columbia Operations Center, 9200 Farm House Lane, Columbia, MD 21046–1609.

(b)(1) The Commission may grant a temporary authorization only upon a finding that there are extraordinary circumstances requiring temporary operations in the public interest and that delay in the institution of these temporary operations would seriously prejudice the public interest. Convenience to the applicant, such as marketing considerations or meeting scheduled customer in-service dates, will not be deemed sufficient for this purpose.

(2) The Commission may grant a temporary authorization for a period not to exceed 180 days, with additional periods not exceeding 180 days, if the Commission has placed the special temporary authority (STA) request on public notice.

(3) The Commission may grant a temporary authorization for a period not to exceed 60 days, if the STA request has not been placed on public notice, and the applicant plans to file a request for regular authority for the service.

(4) The Commission may grant a temporary authorization for a period not to exceed 30 days, if the STA request has not been placed on public notice, and an application for regular authority is not contemplated.

(c) Each application proposing construction of one or more earth station antennas or alteration of the overall height of one or more existing earth station antenna structures, where FAA notification prior to such construction or alteration is required by part 17 of this chapter, must include the FCC Antenna Structure Registration Number(s) for the affected satellite earth station antenna(s). If no such number has been assigned at the time the application(s) is filed, the applicant must state in the application whether the satellite earth station antenna owner has notified the FAA of the proposed construction or alteration and applied to the FCC for an Antenna Structure Registration Number in accordance with part 17 of this chapter. Applications proposing construction of one or more earth station antennas or alteration of the overall height of one or more existing earth station antennas, where FAA notification prior to such construction or alteration is not required by part 17 of this chapter, must indicate such and, unless the satellite earth station antenna is 6.10 meters or less above ground level (AGL), must contain a statement explaining why FAA notification is not required.

[56 FR 24016, May 28, 1991, as amended at 61 FR 4367, Feb. 6, 1996. Redesignated and amended at 62 FR 5928, 5929, Feb. 10, 1997; 66 FR 9973, Feb. 13, 2001; 68 FR 51503, Aug. 27, 2003]

§ 25.121   License term and renewals.
top

(a) License Term. Except for licenses for DBS facilities, licenses for facilities governed by this part will be issued for a period of 15 years. Licenses for DBS space stations licensed as broadcast facilities will be issued for a period of 8 years. Licenses for DBS space stations not licensed as broadcast facilities will be issued for a period of 10 years.

(b) The Commission reserves the right to grant or renew station licenses for less than 15 years if, in its judgment, the public interest, convenience and necessity will be served by such action.

(c) For earth stations, the license term will be specified in the instrument of authorization.

(d) Space stations. (1) For geostationary satellite orbit satellites, the license term will begin at 3 a.m. EST on the date the licensee certifies to the Commission that the satellite has been successfully placed into orbit and that the operations of the satellite fully conform to the terms and conditions of the space station radio authorization.

(2) For non-geostationary satellite orbit satellites, the license term will begin at 3 a.m. EST on the date that the licensee certifies to the Commission that its initial space station has been successfully placed into orbit and that the operations of that satellite fully conform to the terms and conditions of the space station system authorization. All space stations launched and brought into service during the 15-year license term shall operate pursuant to the system authorization, and the operating authority for all space stations will terminate upon the expiration of the system license.

(e) Renewal of licenses. Applications for renewals of earth station licenses must be submitted on FCC Form 312R no earlier than 90 days, and no later than 30 days, before the expiration date of the license. Applications for space station system replacement authorization for non-geostationary orbit satellites shall be filed no earlier than 90 days, and no later than 30 days, prior to the end of the twelfth year of the existing license term.

[56 FR 24016, May 28, 1991, as amended at 58 FR 68059, Dec. 23, 1993; 59 FR 53327, Oct. 21, 1994. Redesignated and amended at 62 FR 5928, 5929, Feb. 10, 1997; 65 FR 59142, Oct. 4, 2000; 67 FR 12485, Mar. 19, 2002; 67 FR 51113, Aug. 7, 2002; 68 FR 51503, Aug. 27, 2003; 68 FR 63999, Nov. 12, 2003]

§ 25.129   Equipment authorization for portable earth-station transceivers.
top

(a) Except as expressly permitted by §2.803 or §2.1204 of this chapter, prior authorization must be obtained pursuant to the equipment certification procedure in part 2, Subpart J of this chapter for importation, sale or lease in the United States, or offer, shipment, or distribution for sale or lease in the United States of portable earth-station transceivers subject to regulation under part 25. This requirement does not apply, however, to devices imported, sold, leased, or offered, shipped, or distributed for sale or lease before November 20, 2004.

(b) For purposes of this section, an earth-station transceiver is portable if it is a “portable device” as defined in §2.1093(b) of this chapter, i.e., if its radiating structure(s) would be within 20 centimeters of the operator's body when the transceiver is in operation.

(c) In addition to the information required by §1.1307(b) and §2.1033(c) of this chapter, applicants for certification required by this section shall submit any additional equipment test data necessary to demonstrate compliance with pertinent standards for transmitter performance prescribed in §25.138, §25.202(f), §25.204, §25.209, and §25.216 and shall submit the statements required by §2.1093(c) of this chapter.

(d) Applicants for certification required by this section must submit evidence that the devices in question are designed for use with a satellite system that may lawfully provide service to users in the United States pursuant to an FCC license or order reserving spectrum.

[69 FR 5709, Feb. 6, 2004]

Earth Stations
top
§ 25.130   Filing requirements for transmitting earth stations.
top

(a) Applications for a new or modified transmitting earth station facility shall be submitted on FCC Form 312, Main Form and Schedule B, accompanied by any required exhibits, except for those earth station applications filed on FCC Form 312EZ pursuant to §25.115(a). All such earth station license applications must be filed electronically through the International Bureau Filing System (IBFS) in accordance with the applicable provisions of part 1, subpart Y of this chapter. Additional filing requirements for ESVs are described in §§25.221 and 25.222. In addition, applicants not required to submit applications on Form 312EZ, other than ESV applicants, must submit the following information to be used as an “informative” in the public notice issued under §25.151 as an attachment to their application:

(1) A detailed description of the service to be provided, including frequency bands and satellites to be used. The applicant must identify either the specific satellite(s) with which it plans to operate, or the eastern and western boundaries of the arc it plans to coordinate.

(2) The diameter or equivalent diameter of the antenna.

(3) Proposed power and power density levels.

(4) Identification of any random access technique, if applicable.

(5) Identification of a specific rule or rules for which a waiver is requested.

(b) A frequency coordination analysis in accordance with §25.203 shall be provided for earth stations transmitting in the frequency bands shared with equal rights between terrestrial and space services, except that applications for user transceiver units associated with the NVNG mobile-satellite service shall instead provide the information required by §25.135 and applications for user transceiver units associated with the 1.6/2.4 GHz Mobile-Satellite Service shall demonstrate that user transceiver operations comply with the requirements set forth in §25.213.

(c) In those cases where an applicant is filing a number of essentially similar applications, showings of a general nature applicable to all of the proposed stations may be submitted in the initial application and incorporated by reference in subsequent applications.

(d) Transmissions of signals or programming to non-U.S. licensed satellites, and to and/or from foreign points by means of U.S.-licensed fixed satellites may be subject to restrictions as a result of international agreements or treaties. The Commission will maintain public information on the status of any such agreements.

(e) Each application proposing construction of one or more earth station antennas or alteration of the overall height of one or more existing earth station antennas, where FAA notification prior to such construction or alteration is required by part 17 of this chapter, must include the FCC Antenna Structure Registration Number(s) for the affected satellite earth station antenna(s). If no such number has been assigned at the time the application(s) is filed, the applicant must state in the application whether the satellite earth station antenna owner has notified the FAA of the proposed construction or alteration and applied to the FCC for an antenna Structure Registration Number in accordance with part 17 of this chapter. Applications proposing construction of one or more earth station antennas or alteration of the overall height of one or more existing earth station antennas, where FAA notification prior to such construction or notification or alteration is not required by part 17 of this chapter, must indicate such and, unless the satellite earth station antenna is 6.10 meters or less above ground level (AGL), must contain a statement explaining why FAA notification is not required.

(f) Applicants seeking to operate in a shared government/non-government band must provide the half-power beam width of their proposed earth station antenna, as an attachment to their applications.

[56 FR 24016, May 28, 1991, as amended at 58 FR 68059, Dec. 23, 1993; 59 FR 53327, Oct. 21, 1994; 61 FR 4367, Feb. 6, 1996; 61 FR 9952, Mar. 12, 1996; 62 FR 5929, Feb. 10, 1997; 62 FR 64172, Dec. 4, 1997; 69 FR 29901, May 26, 2004; 69 FR 47795, Aug. 6, 2004; 70 FR 4783, Jan. 31, 2005; 70 FR 32253, June 2, 2005]

§ 25.131   Filing requirements for receive-only earth stations.
top

(a) Except as provided in paragraphs (b) and (j) of this section, and §25.115(a), applications for a license for a receive-only earth station shall be submitted on FCC Form 312, Main Form and Schedule B, accompanied by any required exhibits and the information described in §§25.130(a)(1) through 25.130(a)(5). All such earth station license applications must be filed electronically through the International Bureau Filing System (IBFS) in accordance with the applicable provisions of part 1, subpart Y of this chapter.

(b) Except as provided in paragraph (j) of this section, receive-only earth stations in the fixed-satellite service that operate with U.S.-licensed satellites may be registered with the Commission in order to protect them from interference from terrestrial microwave stations in bands shared co-equally with the fixed service in accordance with the procedures of §§25.203 and 25.251.

(c) Licensing or registration of receive-only earth stations with the Commission confers no authority to receive and use signals or programming received from satellites. See section 705 of the Communications Act. 47 U.S.C. 605.

(d) Applications for registration shall be filed on FCC Form 312, Main Form and Schedule B, accompanied by the coordination exhibit required by §25.203, and any other required exhibits. Any application that is deficient or incomplete in any respect shall be immediately returned to the applicant without processing.

(e) Complete applications for registration will be placed on public notice for 30 days and automatically granted if no objection is submitted to the Commission and served on the applicant. Additional pleadings are authorized in accordance with §1.45 of this chapter.

(f) The registration of a receive-only earth station results in the listing of an authorized frequency band at the location specified in the registration. Interference protection levels are those agreed to during coordination.

(g) Reception of signals or programming from non-U.S. satellites may be subject to restrictions as a result of international agreements or treaties. The Commission will maintain public information on the status of any such agreements.

(h) Registration term: Registrations for receive-only earth stations governed by this section will be issued for a period of 15 years from the date on which the application was filed. Applications for renewals of registrations must be submitted on FCC Form 312R (Application for Renewal of Radio Station License in Specified Services) no earlier than 90 days and no later than 30 days before the expiration date of the registration.

(i) Applications for modification of license or registration of receive-only earth stations shall be made in conformance with §§25.117 and 25.118. In addition, registrants are required to notify the Commission when a receive-only earth station is no longer operational or when it has not been used to provide any service during any 6-month period.

(j)(1) Except as set forth in paragraph (j)(2) of this section, receive-only earth stations operating with non-U.S. licensed space stations shall file an FCC Form 312 requesting a license or modification to operate such station.

(2) Receive-only earth stations used to receive transmissions from non-U.S.-licensed space stations on the Permitted Space Station List need not file for licenses, provided that:

(i) The earth station antenna meets the antenna performance standards set forth in §§25.209(a) and (b), and

(ii) The space station operator and earth station operator comply with all applicable rules set forth in this chapter, and the conditions on the Permitted Space Station List applicable to that space station.

[56 FR 24016, May 28, 1991, as amended at 61 FR 9952, Mar. 12, 1996; 62 FR 5929, Feb. 10, 1997; 62 FR 64172, Dec. 4, 1997; 65 FR 58466, Sept. 29, 2000; 67 FR 12485, Mar. 19, 2002; 68 FR 62249, Nov. 3, 2003; 68 FR 63999, Nov. 12, 2003; 69 FR 29901, May 26, 2004; 69 FR 47795, Aug. 6, 2004; 70 FR 32253, June 2, 2005]

§ 25.132   Verification of earth station antenna performance standards.
top

(a)(1) All applications for transmitting earth stations, except for earth stations operating in the 20/30 GHz band, must be accompanied by a certificate pursuant to §2.902 of this chapter from the manufacturer of each antenna that the results of a series of radiation pattern tests performed on representative equipment in representative configurations by the manufacturer demonstrates that the equipment complies with the performance standards set forth in §25.209. The licensee must be prepared to demonstrate the measurements to the Commission on request.

(2) All applications for transmitting earth stations operating in the 20/30 GHz band must be accompanied by the measurements specified in §§25.138(d) and (e).

(b)(1) In order to demonstrate compliance with §25.209 (a) and (b), the following measurements on a production antenna performed on calibrated antenna range, as a minimum, shall be made at the bottom, middle and top of each allocated frequency band and submitted to the Commission:

(i) Co-polarized patterns for each of two orthogonal senses of polarizations in two orthogonal cuts of the antenna.

(A) In the azimuth plane, plus and minus 7 degrees and plus and minus 180 degrees.

(B) In the elevation plane, zero to forty-five degrees.

(ii) Cross-polarization patterns in the E- and H-planes, plus and minus 9 degrees.

(iii) Main beam gain.

(2) The FCC envelope specified in §25.209 shall be superimposed on each pattern. The minimum tests specified above are recognized as representative of the performance of the antenna in most planes although some increase in sidelobe levels should be expected in the spar planes and orthogonal spar planes.

(3) Applicants seeking authority to use an antenna that does not meet the standards set forth in §25.209(a) and (b), pursuant to the procedure set forth in §25.220, are required to submit a copy of the manufacturer's range test plots of the antenna gain patterns specified in paragraph (b)(1) of this section.

(c) The tests specified in paragraph (b) of this section are normally performed at the manufacturer's facility; but for those antennas that are very large and only assembled on-site, on-site measurements may be used for product qualification data. If on-site data is to be used for qualification, the test frequencies and number of patterns should follow, where possible, the recommendations in paragraph (b) of this section, and the test data is to be submitted in the same manner as described in paragraph (a) of this section.

(d) For each new or modified transmitting antenna over 3 meters in diameter, the following on-site verification measurements must be completed at one frequency on an available transponder in each frequency band of interest and submitted to the Commission.

(1) Co-polarized patterns in the elevation plane, plus and minus 7 degrees, in the transmit band.

(2) Co-polarized patterns in the azimuth and elevation planes, plus and minus 7 degrees, in the receive band.

(3) System cross-polarization discrimination on-axis. The FCC envelope specified in §25.209 shall be superimposed on each pattern. The transmit patterns are to be measured with the aid of a co-operating earth station in coordination with the satellite system control center under the provisions of §25.272.

(e) Certification that the tests required by paragraph (c) of this section have been satisfactorily performed shall be provided to the Commission in notification that construction of the facilities has been completed as required by §25.133.

(f) Antennas less than 3 meters in diameter and antennas on simple (manual) drive mounts that are operated at a fixed site are exempt from the requirements of paragraphs (c) and (d) of this section provided that a detailed technical showing is made that confirms proper installation, pointing procedures, and polarization alignment and manufacturing quality control. These showing must also include a plan for periodic testing and field installation procedures and precautions.

(g) Records of the results of the tests required by this section must be maintained at the antenna site or the earth station operator's control center and be available for inspection.

[58 FR 13419, Mar. 11, 1993, as amended at 69 FR 5710, Feb. 6, 2004; 70 FR 32253, June 2, 2005]

§ 25.133   Period of construction; certification of commencement of operation.
top

(a)(1) Each license for an earth station governed by this part, except for mobile satellite earth station terminals (METs), shall specify as a condition therein the period in which construction of facilities must be completed and station operation commenced. Construction of the earth station must be completed and the station must be brought into operation within 12 months from the date of the license grant except as may be determined by the Commission for any particular application.

(2) Each license for mobile satellite earth station terminals (METs) shall specify as a condition therein the period in which station operation must be commenced. The networks in which the METs will be operated must be brought into operation within 12 months from the date of the license grant except as may be determined by the Commission for any particular application.

(b)(1) Each license for a transmitting earth station included in this part, except for earth stations licensed under a blanket licensing provision, shall also specify as a condition therein that upon the completion of construction, each licensee must file with the Commission a certification containing the following information:

(i) The name of the licensee;

(ii) File number of the application;

(iii) Call sign of the antenna;

(iv) Date of the license;

(v) A certification that the facility as authorized has been completed and that each antenna facility has been tested and is within 2 dB of the pattern specified in §25.209, §25.135 (NVNG MSS earth stations), or §25.213 (1.6/2.4 GHz Mobile-Satellite Service earth stations);

(vi) The date on which the earth station became operational; and

(vii) A statement that the station will remain operational during the license period unless the license is submitted for cancellation.

(2) For earth stations authorized under any blanket licensing provision in this chapter, a certification containing the information in paragraph (b)(1) of this section must be filed when the network is put into operation.

(c) If the facility does not meet the technical parameters set forth in §25.209, a request for a waiver must be submitted and approved by the Commission before operations may commence.

(d) Each receiving earth station licensed or registered pursuant to §25.131 must be constructed and placed into service within 6 months after coordination has been completed. Each licensee or registrant must file with the Commission a certification that the facility is completed and operating as provided in paragraph (b) of this section, with the exception of certification of antenna patterns.

[56 FR 24016, May 28, 1991, as amended at 58 FR 68059, Dec. 23, 1993; 59 FR 53327, Oct. 21, 1994; 65 FR 59142, Oct. 4, 2000; 70 FR 32254, June 2, 2005]

§ 25.134   Licensing provisions of Very Small Aperture Terminal (VSAT) and C-band Small Aperture Terminal (CSAT) networks.
top

(a)(1) VSAT networks operating in the 12/14 GHz bands. All applications for digital VSAT networks granted on or before September 15, 2005, with a maximum outbound downlink EIRP density of +10.0 dBW/4 kHz per carrier and earth station antennas with maximum input power density of -14 dBW/4 kHz will be processed routinely. All applications for analog VSAT networks with maximum outbound downlink power densities of +17.0 dBW/4 kHz per carrier and maximum antenna input power densities of -8.0 dBW/4 kHz shall be processed routinely in accordance with Declaratory Order in the Matter of Routine Licensing of Earth Stations in the 6 GHz and 14 GHz Bands Using Antennas Less than 9 Meters and 5 Meters in Diameter, Respectively, for Both Full Transponder and Narrowband Transmissions, 2 FCC Rcd 2149 (1987) (Declaratory Order).

(a)(2) Large Networks of Small Antennas operating in the 4/6 GHz frequency bands. All applications for digital and/or analog operations will be routinely processed provided the network employs antennas that are 4.5 meter or larger in diameter, that are consistent with §25.209, the power levels are consistent with §§25.211(d) and 25.212(d), and frequency coordination has been satisfactorily completed. The use of smaller antennas or non-consistent power levels require the filing of an initial lead application (§25.115(c)(2)) that includes all technical analyses required to demonstrate that unacceptable interference will not be caused to any and all affected adjacent satellite operators by the operation of the non-conforming earth station.

(b) VSAT networks operating in the 11.7–12.2 GHz and 14.0–14.5 GHz band. Each applicant for digital and/or analog VSAT network authorization proposing to use transmitted satellite carrier EIRP densities and/or maximum antenna input power in excess of those specified in paragraph (a) of this Section must comply with the procedures set forth in §25.220.

(c) [Reserved]

(d) An application for VSAT authorization shall be filed on FCC Form 312, Main Form and Schedule B.

(e) VSAT operators in the 11.7–12.2 GHz and 14.0–14.5 GHz frequency bands are permitted to use more than one hub earth station in their networks.

(f) VSAT operators in the 11.7–12.2 GHz and 14.0–14.5 GHz frequency bands are permitted to use temporary fixed earth stations as either hub earth stations or remote earth stations in their networks, but must specify the number of temporary fixed earth stations they plan to use in their networks at the time of their applications.

(g) Starting March 10, 2005, all applications for VSAT service in the 12/14 GHz band that meet the following requirements will be routinely processed: (1) The maximum transmitter power spectral density of a digital modulated carrier into any GSO FSS earth station antenna shall not exceed −14.0 − 10log(N) dB(W/4 kHz). For a VSAT network using frequency division multiple access (FDMA) or time division multiple access (TDMA) technique, N is equal to one. For a VSAT network using code division multiple access (CDMA) technique, N is the maximum number of co-frequency simultaneously transmitting earth stations in the same satellite receiving beam.

(2) The maximum GSO FSS satellite EIRP spectral density of the digital modulated emission shall not exceed 10 dB (W/4kHz) for all methods of modulation and accessing techniques.

(3) The maximum transmitter power spectral density of an analog carrier into any GSO FSS earth station antenna shall not exceed −8.0 dB(W/4kHz) and the maximum GSO FSS satellite EIRP spectral density shall not exceed +17.0 dB(W/4kHz).

(h) VSAT operators licensed pursuant to this section are prohibited from using remote earth stations in their networks that are not designed to stop transmissions from their remote earth stations when synchronization with the target satellite fails.

[56 FR 66001, Dec. 20, 1991, as amended at 62 FR 5929, Feb. 10, 1997; 66 FR 31560, June 12, 2001; 70 FR 32254, June 2, 2005; 70 FR 33376, June 8, 2005]

§ 25.135   Licensing provisions for earth station networks in the non-voice, non-geostationary mobile-satellite service.
top

(a) Each applicant for a blanket earth station license in the non-voice, non-geostationary mobile-satellite service shall demonstrate that transceiver operations will not cause unacceptable interference to other authorized users of the spectrum, based on existing system information publicly available at the Commission at the time of filing, and will comply with operational conditions placed upon the systems with which they are to operate in accordance with §25.142(b). This demonstration shall include a showing as to all the technical parameters, including duty cycle and power limits, under which the individual user transceivers will operate.

(b) Transceiver units associated with the non-voice, non-geostationary mobile-satellite service may not be operated on civil aircraft. All portable or hand-held transceiver units (including transceiver units installed in other devices that are themselves portable or hand-held) having a receiver operating in the 137–138 MHz band shall bear the following statement in a conspicuous location on the device: “This device may not be operated while on board a civil aircraft. It must be turned off at all times while on board such an aircraft.” This subsection shall not apply to transceiver units whose receivers are incapable of radiating in the 108–137 MHz frequency bands.

(c) Transceiver units in this service are authorized to communicate with and through U.S. authorized space stations only. No person without an FCC license for such operation may transmit to a space station in this service from anywhere in the United States except to receive service from the holder of a pertinent FCC blanket license or from another party with the permission of such a blanket licensee.

(d) The holder of an FCC blanket license for operation of transceivers for communication via a non-voice, non-geostationary mobile-satellite system shall be responsible for operation of any such transceiver to receive service provided by the blanket licensee or provided by another party with the blanket licensee's consent. Operators of non-voice, non-geostationary mobile-satellite systems shall not transmit communications to or from user transceivers in the United States unless such communications are authorized under a service contract with the holder of a pertinent FCC blanket license or under a service contract another party with authority for such transceiver operation delegated by such a blanket licensee.

[58 FR 68059, Dec. 23, 1993, as amended at 69 FR 5710, Feb. 6, 2004]

§ 25.136   Licensing provisions for user transceivers in the 1.6/2.4 GHz, 1.5/1.6 GHz, and 2 GHz Mobile Satellite Services.
top

In addition to the technical requirements specified in §25.213, earth stations operating in the 1.6/2.4 GHz and 1.5/1.6 GHz Mobile Satellite Services are subject to the following operating conditions:

(a) User transceiver units associated with the 1.6/2.4 GHz Mobile-Satellite Service or 2 GHz Mobile-Satellite Service may not be operated on civil aircraft unless the earth station has a direct physical connection to the aircraft cabin or cockpit communication system.

(b) No person without an FCC license for such operation may transmit to a space station in this service from anywhere in the United States except to receive service from the holder of a pertinent FCC blanket license or from another party with the permission of such a blanket licensee.

(c) The holder of an FCC blanket license for operation of transceivers for communication via a 1.6/2.4 GHz, 1.5/1.6 GHz, or 2 GHz Mobile Satellite Service system shall be responsible for operation of any such transceiver to receive service provided by that licensee or provided by another party with the blanket licensee's consent. Operators of such satellite systems shall not transmit communications to or from user transceivers in the United States unless such communications are authorized under a service contract with the holder of a pertinent FCC blanket license for transceiver operation or under a service contract with another party with authority for such transmission delegated by such a blanket licensee.

(d) Any mobile earth station (MES) associated with the Mobile Satellite Service operating in the 1530–1544 MHz and 1626.5–1645.5 MHz bands shall have the following minimum set of capabilities to ensure compliance with Footnote S5.353A and the priority and real-time preemption requirements imposed by Footnote US315.

(1) All MES transmissions shall have a priority assigned to them that preserves the priority and preemptive access given to maritime distress and safety communications sharing the band.

(2) Each MES with a requirement to handle maritime distress and safety data communications shall be capable of either:

(i) Recognizing message and call priority identification when transmitted from its associated Land Earth Station (LES) or

(ii) Accepting message and call priority identification embedded in the message or call when transmitted from its associated LES and passing the identification to shipboard data message processing equipment.

(3) Each MES shall be assigned a unique terminal identification number that will be transmitted upon any attempt to gain access to a system.

(4) After an MES has gained access to a system, the mobile terminal shall be under control of a LES and shall obtain all channel assignments from it.

(5) All MESs that do not continuously monitor a separate signalling channel or signalling within the communications channel shall monitor the signalling channel at the end of each transmission.

(6) Each MES shall automatically inhibit its transmissions if it is not correctly receiving separate signalling channel or signalling within the communications channel from its associated LES.

(7) Each MES shall automatically inhibit its transmissions on any or all channels upon receiving a channel-shut-off command on a signalling or communications channel it is receiving from its associated LES.

(8) Each MES with a requirement to handle maritime distress and safety communications shall have the capability within the station to automatically preempt lower precedence traffic.

(e) Any Land Earth Station (LES) associated with the Mobile Satellite Service operating in the 1530–1544 MHz and 1626.5–1645.5 MHz bands shall have the following minimum set of capabilities to ensure that the MSS system complies with Footnote S5.353A and the priority and real-time preemption requirements imposed by Footnote US315. It should be noted that the LES operates in the Fixed-Satellite Service (“FSS”) as a feeder-link for the MSS (Radio Regulations 71) and that the following capabilities are to facilitate the priority and preemption requirements. The FSS feeder-link stations fulfilling these MSS requirements shall not have any additional priority with respect to FSS stations operating with other FSS systems.

(1) All LES transmissions to mobile earth stations (MESs) shall have a priority assigned to them that preserves the priority and preemptive access given to maritime distress and safety communications.

(2) The LES shall recognize the priority of calls to and from MES and make channel assignments taking into account the priority access that is given to maritime distress and safety communications.

(3) The LES shall be capable of receiving the MES identification number when transmitted and verifying that it is an authorized user of the system to prohibit unauthorized access.

(4) The LES shall be capable of transmitting channel assignment commands to the MESs.

(5) The communications channels used between the LES and the MES shall have provision for signalling within the voice/data channel, for an MES, which does not continuously monitor the LES signalling channel during the time of a call.

(6) The LES shall transmit periodic control signalling signals to MES, which do not continuously monitor the LES signalling channel.

(7) The LES shall automatically inhibit all transmissions to MESs to which it is not transmitting a signalling channel or signalling within the communications channel.

(8) The LES shall be capable of transmitting channel-shut-off commands to the MESs on signalling or communications channels.

(9) Each LES shall be capable of interrupting, and if necessary, preempting ongoing routine traffic from an MES in order to complete a maritime distress, urgency or safety call to that particular MES.

(10) Each LES shall be capable of automatically turning off one or more of its associated channels in order to complete a maritime distress, urgency or safety call.

(f) Incorporation of ancillary terrestrial component base station into an L-band mobile-satellite service system. Any licensee authorized to construct and launch an L-band mobile-satellite system may construct ancillary terrestrial component (ATC) base stations as defined in §25.201 at its own risk and subject to the conditions specified in this subpart any time after commencing construction of the mobile-satellite service system.

(g) Pre-operational build-out and testing. An MSS licensee may, without further authority from the Commission and at its own risk engage in pre-operational build-out and, conduct equipment tests for the purpose of making such adjustments and measurements as may be necessary to assure compliance with the terms of the technical provisions of its MSS license, ATC operation requirements, the rules and regulations in this Part and the applicable engineering standards. Prior to engaging in such pre-operational build-out and testing, an MSS licensee must notify the Commission concerning the initiation of MSS system satellite construction and the MSS operator's intent to construct and test ATC facilities. This notification must take the form of a letter formally filed with the Commission in the appropriate MSS license docket. Such letter shall specify the frequencies on which the MSS licensee proposes to engage in pre-operational testing and shall specify the name, address, telephone number and other such information as may be necessary to contact a MSS licensee representative for the reporting and mitigation of any interference that may occur as a result of such pre-operational testing and build-out. MSS licensees engaging in pre-operational build-out and testing must also comply with §§5.83, 5.85(c), 5.111, and 5.117 of this chapter relating to experimental operations. An MSS licensee may not offer ATC service to the public for compensation during pre-operational testing. In order to operate any ATC base stations, such a licensee must meet all the requirements set forth in §25.147 and must have been granted ATC authority.

(h) Aircraft. All portable or hand-held transceiver units (including transceiver units installed in other devices that are themselves portable or hand-held) having operating capabilities in the 1626.5–1660.5 MHz and 1525–1559 MHz bands shall bear the following statement in a conspicuous location on the device: “This device may not be operated while on board aircraft. It must be turned off at all times while on board aircraft.”

[65 FR 59142, Oct. 4, 2000, as amended at 67 FR 46604, July 16, 2002; 67 FR 51110, Aug. 7, 2002; 68 FR 43645, July 24, 2003; 68 FR 47858, Aug. 12, 2003; 69 FR 5710, Feb. 6, 2004]

§ 25.137   Application requirements for earth stations operating with non-U.S. licensed space stations.
top

(a) Earth station applicants or entities filing a “letter of intent” or “Petition for Declaratory Ruling” requesting authority to operate with a non-U.S. licensed space station to serve the United States must attach an exhibit with their FCC Form 312 application with information demonstrating that U.S.-licensed satellite systems have effective competitive opportunities to provide analogous services in:

(1) The country in which the non-U.S. licensed space station is licensed; and

(2) All countries in which communications with the U.S. earth station will originate or terminate. The applicant bears the burden of showing that there are no practical or legal constraints that limit or prevent access of the U.S. satellite system in the relevant foreign markets. The exhibit required by this paragraph must also include a statement of why grant of the application is in the public interest. This paragraph shall not apply with respect to requests for authority to operate using a non-U.S. licensed satellite that is licensed by or seeking a license from a country that is a member of the World Trade Organization for services covered under the World Trade Organization Basic Telecommunications Agreement.

(b) Earth station applicants, or entities filing a “letter of intent,” or “Petition for Declaratory Ruling,” requesting authority to operate with a non-U.S. licensed space station must attach to their FCC Form 312 an exhibit providing legal and technical information for the non-U.S. licensed space station in accordance with part 25. Applications addressed in this paragraph must be filed electronically through the International Bureau Filing System (IBFS).

(c) A non-U.S. licensed NGSO-like satellite system seeking to serve the United States can be considered contemporaneously with other U.S. NGSO-like satellite system pursuant to §25.157 and considered before later-filed applications of other U.S. satellite system operators, and a non-U.S.-licensed GSO-like satellite system seeking to serve the United States can have its request placed in a queue pursuant to §25.158 and considered before later-filed applications of other U.S. satellite system operators, if the non-U.S. licensed satellite system is:

(1) In orbit and operating;

(2) Has a license from another administration; or

(3) Has been submitted for coordination to the International Telecommunication Union.

(d) Earth station applicants requesting authority to operate with a non-U.S.-licensed space station and non-U.S.-licensed satellite operators filing letters of intent or petitions for declaratory ruling to access the U.S. market must demonstrate that the non-U.S.-licensed space station has complied with all applicable Commission requirements for non-U.S. licensed systems to operate in the United States, including but not limited to the following:

(1) Milestones;

(2) Reporting requirements;

(3) Any other applicable service rules;

(4) For non-U.S.-licensed satellites that are not in orbit and operating, a bond must be posted. This bond must be in the amount of $5 million for NGSO satellite systems, or $3 million for GSO satellites, denominated in U.S. dollars, and compliant with the terms of §25.165 of this chapter. The party posting the bond will be permitted to reduce the amount of the bond upon a showing that a milestone has been met, in accordance with the terms of §25.165(d) of this chapter.

(5) Non-U.S. licensed GSO-like space station operators with a total of five requests for access to the U.S. market in a particular frequency band, or a total of five previously granted requests for access to the U.S. market with unbuilt GSO-like space stations in a particular frequency band, or a combination of pending GSO-like requests and granted requests for unbuilt GSO-like space stations in a particular frequency band that equals five, will not be permitted to request access to the U.S. market with another GSO-like space station license in that frequency band. In addition, non-U.S.-licensed NGSO-like satellite system operators with one request on file with the Commission in a particular frequency band, or one granted request for an unbuilt NGSO-like satellite system in a particular frequency band, will not be permitted to request access to the U.S. market with another NGSO-like satellite system in that frequency band.

(e) A non-U.S.-licensed satellite operator that is seeking to serve the United States pursuant to a Letter of Intent may amend its request by submitting an additional Letter of Intent. Such additional Letters of Intent will be treated as amendments filed by U.S. space station applicants for purposes of determining the order in which the Letters of Intent will be considered relative to other pending applications.

(f) A non-U.S.-licensed satellite operator that has been permitted to serve the United States pursuant to a Letter of Intent or Petition for Declaratory Ruling, may modify its U.S. operations under the procedures set forth in §25.117(d). In addition, a non-U.S.-licensed satellite operator that has been permitted to serve the United States pursuant to a Petition for Declaratory Ruling, may modify its U.S. operations under the procedures set forth in §25.118(e).

(g) A non-U.S.-licensed satellite operator that has been permitted to serve the United States pursuant to a Petition for Declaratory Ruling must notify the Commission if it plans to transfer control or assign its license to another party, so that the Commission can afford interested parties an opportunity to comment on whether the proposed transaction affects any of the considerations we made when we allowed the satellite operator to enter the U.S. market. If the transferee or assignee is not licensed by or seeking a license from a country that is a member of the World Trade Organization for services covered under the World Trade Organization Basic Telecommunications Agreement, the non-U.S.-licensed satellite operator will be required to make the showing described in paragraph (a) of this section.

[62 FR 64172, Dec. 4, 1997, as amended at 64 FR 61792, Nov. 15, 1999; 65 FR 16327, Mar. 28, 2000; 65 FR 59143, Oct. 4, 2000; 68 FR 51503, Aug. 27, 2003; 68 FR 62249, Nov. 3, 2003; 69 FR 51587, Aug. 20, 2004]

§ 25.138   Blanket Licensing provisions of GSO FSS Earth Stations in the 18.3–18.8 GHz (space-to-Earth), 19.7–20.2 GHz (space-to-Earth), 28.35–28.6 GHz (Earth-to-space), and 29.25–30.0 GHz (Earth-to-space) bands.
top

(a) All applications for a blanket earth station license in the GSO FSS in the 18.3–18.8 GHz, 19.7–20.2 GHz, 28.35–28.6 GHz, and 29.25–30.0 GHz bands that meet the following requirements shall be routinely processed:

(1) GSO FSS earth station antenna off-axis EIRP spectral density for co-polarized signals shall not exceed the following values, within ±3° of the GSO arc, under clear sky conditions:

   18.5-25log(Θ)-         dBW/40kHz...........  for 2.0° [le] 10log(N).                                           Θ [le]                                                     7°-2.63-10log(N)..............  dBW/40kHz...........  for 7° [le]                                                     Θ [le]                                                     9.23°21.5-25log(Θ)-         dBW/40kHz...........  for 9.23° [le] 10log(N).                                           Θ [le]                                                     48°-10.5-10log(N)..............  dBW/40kHz...........  for 48° <                                                     Θ [le]                                                     180° 

Where:

Θ is the angle in degrees from the axis of the main lobe; for systems where more than one earth station is expected to transmit simultaneously in the same bandwidth, e.g., CDMA systems,

N is the likely maximum number of simultaneously transmitting co-frequency earth stations in the receive beam of the satellite; N=1 for TDMA and FDMA systems.

(2) GSO FSS earth station antenna off-axis EIRP spectral density for co-polarized signals shall not exceed the following values, for all directions other than within ±3° of the GSO arc, under clear sky conditions:

   21.5-25log(Θ)-         dBW/40kHz...........  for 3.5° [le] 10log(N).                                           Θ [le]                                                     7°0.37-10log(N)...............  dBW/40kHz...........  for 7° <                                                     Θ [le]                                                     9.23°24.5-25log(Θ)-         dBW/40kHz...........  for 9.23° < 10log(N).                                           Θ [le]                                                     48°-7.5-10log(N)...............  dBW/40kHz...........  for 48° <                                                     Θ [le]                                                     180° 

Where:

Θ: is the angle in degrees from the axis of the main lobe; for systems where more than one earth station is expected to transmit simultaneously in the same bandwidth, e.g., CDMA systems.

N: is the likely maximum number of simultaneously transmitting co-frequency earth stations in the receive beam of the satellite; N=1 for TDMA and FDMA systems.

(3) The values given in paragraphs (a) (1) and (2) of this section may be exceeded by 3 dB, for values of Θ >10°, provided that the total angular range over which this occurs does not exceed 20° when measured along both sides of the GSO arc.

(4) GSO FSS earth station antenna off-axis EIRP spectral density for cross-polarized signals shall not exceed the following values, in all directions relative to the GSO arc, under clear sky conditions:

   8.5-25log(Θ)-10log(N)  dBW/40kHz...........  for 2.0° [le]                                                     Θ [le]                                                     7°12.63-10log(N)..............  dBW/40kHz...........  for 7° <                                                     Θ [le]                                                     9.23° 

Where:

Θ: is the angle in degrees from the axis of the main lobe; for systems where more than one earth station is expected to transmit simultaneously in the same bandwidth, e.g., CDMA systems.

N: is the likely maximum number of simultaneously transmitting co-frequency earth stations in the receive beam of the satellite; N=1 for TDMA and FDMA systems.

(5) For earth stations employing uplink power control, the values in paragraphs (a) (1), (2), and (4) of this section may be exceeded by up to 20 dB under conditions of uplink fading due to precipitation. The amount of such increase in excess of the actual amount of monitored excess attenuation over clear sky propagation conditions shall not exceed 1.5 dB or 15 % of the actual amount of monitored excess attenuation in dB, whichever is larger, with a confidence level of 90 percent except over transient periods accounting for no more than 0.5% of the time during which the excess is no more than 4.0 dB.

(6) Power flux-density (PFD) at the Earth's surface produced by emissions from a space station for all conditions, including clear sky, and for all methods of modulation shall not exceed a level of −118 dBW/m2 /MHz, in addition to the limits specified in §25.208 (d).

(b) Each applicant for earth station license(s) that proposes levels in excess of those defined in paragraph (a) of this section shall submit link budget analyses of the operations proposed along with a detailed written explanation of how each uplink and each transmitted satellite carrier density figure is derived. Applicants shall also submit a narrative summary which must indicate whether there are margin shortfalls in any of the current baseline services as a result of the addition of the applicant's higher power service, and if so, how the applicant intends to resolve those margin short falls. Applicants shall certify that all potentially affected parties (i.e., those GSO FSS satellite networks that are 2, 4, and 6 degrees apart) acknowledge and do not object to the use of the applicant's higher power densities.

(c) Licensees authorized pursuant to paragraph (b) of this section shall bear the burden of coordinating with any future applicants or licensees whose proposed compliant operations at 6 degrees or smaller orbital spacing, as defined by paragraph (a) of this section, is potentially or actually adversely affected by the operation of the non-compliant licensee. If no good faith agreement can be reached, however, the non-compliant licensee shall reduce its earth station and space station power density levels to be compliant with those specified in paragraph (a) of this section.

(d) The applicant shall provide for each earth station antenna type, a series of radiation patterns measured on a production antenna performed on a calibrated antenna range and, as a minimum, shall be made at the bottom, middle, and top frequencies of the 30 GHz band. The radiation patterns are:

(1) Co-polarized patterns for each of two orthogonal senses of polarizations in two orthogonal planes of the antenna.

(i) In the azimuth plane, plus and minus 10 degrees and plus and minus 180 degrees.

(ii) In the elevation plane, zero to 30 degrees.

(2) Cross-polarization patterns in the E- and H-planes, plus and minus 10 degrees.

(3) Main beam gain.

(e) Protection of receive earth stations from adjacent satellite interference is based on either the antenna performance specified in §25.209 (a) and (b), or the actual receiving earth station antenna performance, if actual performance provides greater isolation from adjacent satellite interference. For purposes of insuring the correct level of protection, the applicant shall provide, for each earth station antenna type, the antenna performance plots for the 20 GHz band, including the format specified in paragraph (d) of this section.

(f) The earth station licensee shall not transmit towards a GSO FSS satellite unless it has prior authorization from the satellite operator or a space segment vendor authorized by the satellite operator. The specific transmission shall be conducted in accordance with the operating protocol specified by the satellite operator. The holder of an FCC blanket license pursuant to this section shall be responsible for operation of any transceiver to receive GSO FSS service provided by that licensee or provided by another party with the blanket licensee's consent. Operators of GSO FSS systems shall not transmit communications to or from user transceivers in the United States unless such communications are authorized under a service contract with the holder of a pertinent FCC blanket license or under a service contract with another party with authority for such transceiver operation delegated by such a blanket licensee.

(g) A licensee applying to renew its license must include on FCC Form 405 the number of constructed earth stations.

[65 FR 54169, Sept. 7, 2000, as amended at 66 FR 63515, Dec. 7, 2001; 68 FR 16966, Apr. 8, 2003; 69 FR 5710, Feb. 6, 2004]

§ 25.139   NGSO FSS coordination and information sharing between MVDDS licensees in the 12.2 GHz to 12.7 GHz band.
top

(a) NGSO FSS licensees shall maintain a subscriber database in a format that can be readily shared with MVDDS licensees for the purpose of determining compliance with the MVDDS transmitting antenna spacing requirement relating to qualifying existing NGSO FSS subscriber receivers set forth in §101.129 of this chapter. This information shall not be used for purposes other than set forth in §101.129 of this chapter. Only sufficient information to determine compliance with §101.129 of this chapter is required.

(b) Within ten business days of receiving notification of the location of a proposed MVDDS transmitting antenna, the NGSO FSS licensee shall provide sufficient information from the database to enable the MVDDS licensee to determine whether the proposed MVDDS transmitting site meets the minimum spacing requirement.

(c) If the location of the proposed MVDDS transmitting antenna site does not meet the separation requirements of §101.129 of this chapter, then the NGSO FSS licensee shall also indicate to the MVDDS licensee within the same ten day period specified in paragraph (b) of this section whether the proposed MVDDS transmitting site is acceptable at the proposed location.

(d) Nothing in this section shall preclude NGSO FSS and MVDDS licensees from entering into an agreement to accept MVDDS transmitting antenna locations that are shorter-spaced from existing NGSO FSS subscriber receivers than the distance set forth in §101.129 of this chapter.

[67 FR 43037, June 26, 2002, as amended at 68 FR 43945, July 25, 2003]

Space Stations
top
§ 25.140   Qualifications of fixed-satellite space station licensees.
top

(a) New fixed-satellites shall comply with the requirements established in Report and Order, CC Docket No. 81–704 (available at address in §0.445 of this chapter.) Applications must also meet the requirements in paragraphs (b) through (d) of this section. The Commission may require additional or different information in the case of any individual application. Applications will be unacceptable for filing and will be returned to the applicant if they do not meet the requirements referred to in this paragraph.

(b) Each applicant for a space station authorization in the fixed-satellite service must demonstrate, on the basis of the documentation contained in its application, that it is legally, technically, and otherwise qualified to proceed expeditiously with the construction, launch and/or operation of each proposed space station facility immediately upon grant of the requested authorization. Each applicant must provide the following information:

(1) The information specified in §25.114; and

(2) An interference analysis to demonstrate the compatibility of its proposed system 2 degrees from any authorized space station. An applicant should provide details of its proposed r.f. carriers which it believes should be taken into account in this analysis. At a minimum, the applicant must include, for each type of r.f. carrier, the link noise budget, modulation parameters, and overall link performance analysis. (See, e.g., appendices B and C to Licensing of Space Stations in the Domestic Fixed-Satellite Service (available at address in §0.445)).

(c)–(g) [Reserved]

[62 FR 5929, Feb. 10, 1997, as amended at 68 FR 51504, Aug. 27, 2003]

§ 25.142   Licensing provisions for the non-voice, non-geostationary mobile-satellite service.
top

(a) Space station application requirements. (1) Each application for a space station system authorization in the non-voice, non-geostationary mobile-satellite service shall describe in detail the proposed non-voice, non-geostationary mobile-satellite system, setting forth all pertinent technical and operational aspects of the system, and the technical and legal qualifications of the applicant. In particular, each application shall include the information specified in §25.114. Applicants must also file information demonstrating compliance with all requirements of this section, and showing, based on existing system information publicly available at the Commission at the time of filing, that they will not cause unacceptable interference to any non-voice, non-geostationary mobile-satellite service system authorized to construct or operate.

(2) Applicants for a non-voice, non-geostationary mobile-satellite must identify the power flux density produced at the Earth's surface by each space station of their system in the frequency bands 137–138 MHz and 400.15–401 MHz, to allow determination of whether coordination with terrestrial services is required under international footnotes 599A and 647B of §2.106 of the Commission's Rules. In addition, applicants must identify the measures they would employ to protect the radio astronomy service in the 150.05–153 MHz and 406.1–410 MHz bands from harmful interference from unwanted emissions.

(3) Emission limitations. (i) Applicants in the non-voice, non-geostationary mobile-satellite service shall show that their space stations will not exceed the emission limitations of §25.202(f) (1), (2) and (3), as calculated for a fixed point on the Earth's surface in the plane of the space station's orbit, considering the worst-case frequency tolerance of all frequency determining components, and maximum positive and negative Doppler shift of both the uplink and downlink signals, taking into account the system design.

(ii) Applicants in the non-voice, non-geostationary mobile-satellite service shall show that no signal received by their satellites from sources outside of their system shall be retransmitted with a power flux density level, in the worst 4 kHz, higher than the level described by the applicants in paragraph (a)(2) of this section.

(4) [Reserved]

(5) Replacement of space stations within the system license term. The licensee need not file separate applications to construct, launch and operate technically identical replacement satellites within the term of the system authorization. However, the licensee shall certify to the Commission, at least thirty days prior to launch of such replacement(s) that:

(i) The licensee intends to launch a space station that is technically identical to those authorized in its system license, and

(ii) Launch of this space station will not cause the licensee to exceed the total number of operating space stations authorized by the Commission.

(b) Operating conditions. In order to ensure compatible operations with authorized users in the frequency bands to be utilized for operations in the non-voice, non-geostationary mobile-satellite service, non-voice, non-geostationary mobile-satellite service systems must operate in accordance with the conditions specified in this section.

(1) Service limitation. Voice services may not be provided.

(2) Coordination requirements with Federal government users.

(i) The frequency bands allocated for use by the non-voice, non-geostationary mobile-satellite service are also authorized for use by agencies of the Federal government. The Federal use of frequencies in the non-voice, non-geostationary mobile-satellite service frequency bands is under the regulatory jurisdiction of the National Telecommunications and Information Administration (NTIA).

(ii) The Commission will use its existing procedures for liaison with NTIA to reach agreement with respect to achieving compatible operations between Federal government users under the jurisdiction of NTIA and non-voice, non-geostationary mobile-satellite service systems (including user transceivers subject to blanket licensing under §25.115(d)) through the frequency assignment and coordination practices established by NTIA and the Interdepartment Radio Advisory Committee (IRAC). In order to facilitate such frequency assignment and coordination, applicants shall provide the Commission with sufficient information to evaluate electromagnetic compatibility with the Federal government use of the spectrum, and any additional information requested by the Commission. As part of the coordination process, applicants shall show that they will not cause unacceptable interference to authorized Federal government users, based upon existing system information provided by the Government. The frequency assignment and coordination of the satellite system with Federal government users shall be completed prior to grant of construction authorization.

(iii) The Commission shall also coordinate with NTIA/IRAC with regard to the frequencies to be shared by those earth stations of non-voice, non-geostationary mobile-satellite service systems that are not subject to blanket licensing under §25.115(d), and authorized Federal government stations in the fixed and mobile services, through the exchange of appropriate systems information.

(3) Coordination among non-voice, non-geostationary mobile-satellite service systems. Applicants for authority to establish non-voice, non-geostationary mobile-satellite service systems are encouraged to coordinate their proposed frequency usage with existing permittees and licensees in the non-voice, non-geostationary mobile-satellite service whose facilities could be affected by the new proposal in terms of frequency interference or restricted system capacity. All affected applicants, permittees, and licensees shall, at the direction of the Commission, cooperate fully and make every reasonable effort to resolve technical problems and conflicts that may inhibit effective and efficient use of the radio spectrum; however, the permittee or licensee being coordinated with is not obligated to suggest changes or re-engineer an applicant's proposal in cases involving conflicts.

(4) Safety and distress communications. Stations operating in the non-voice, non-geostationary mobile-satellite service that are used to comply with any statutory or regulatory equipment carriage requirements may also be subject to the provisions of sections 321(b) and 359 of the Communications Act of 1934, as amended. Licensees are advised that these provisions give priority to radio communications or signals relating to ships in distress and prohibit a charge for the transmission of maritime distress calls and related traffic.

(c) Reporting requirements. All operators of non-voice, non-geostationary mobile-satellite service systems shall, on June 30 of each year, file a report with the International Bureau and the Commission's Columbia Operations Center in Columbia, Maryland, containing the following information current as of May 31st of that year:

(1) A listing of any non-scheduled space station outages for more than thirty minutes and the cause(s) of such outages;

(2) A detailed description of the utilization made of the in-orbit satellite system. That description should identify the percentage of time that the system is actually used for domestic transmission, the amount of capacity (if any) sold but not in service, and the amount of unused system capacity; and

(3) Identification of any space stations not available for service or otherwise not performing to specifications, the cause(s) of these difficulties, and the date any space station was taken out of service or the malfunction identified.

(d) Prohibition of certain agreements. No license shall be granted to any applicant for a non-voice, non-geostationary mobile-satellite service system if that applicant, or any companies controlling or controlled by the applicant, shall acquire or enjoy any right, for the purpose of handling traffic to or from the United States, its territories or possessions, to construct or operate space segment or earth stations in the non-voice, non-geosynchronous mobile-satellite service, or to interchange traffic, which is denied to any other United States company by reason of any concession, contract, understanding, or working arrangement to which the licensee or any persons or companies controlling or controlled by the licensee are parties.

(e) Spectrum priority. (1) The non-voice, non-geosynchronous mobile-satellite service system that is authorized in the second application processing round to operate in the 148–148.25 MHz, 148.75–148.855 MHz, 148.905–149.81 MHz and 150–150.05 MHz uplink frequency bands and the 400.505–400.5517 MHz, 400.5983–400.645 MHz, 137.025–137.175 MHz, 137.333–137.4125 MHz, 137.475–137.525 MHz, 137.595–137.645 MHz, 137.753–137.787 MHz and 137.825–138 MHz downlink frequency bands (the “System 2 licensee”) will have a first priority to apply for and use a limited amount of downlink spectrum duly allocated worldwide and domestically to the non-voice, non-geosynchronous mobile-satellite service by the ITU, at WRC–97 or a subsequent World Radiocommunication Conference, and by the Commission, respectively (the “Future Spectrum”). The System 2 licensee will be eligible to apply for and use the first 210 kHz of Future Spectrum plus spectrum sufficient to account for Doppler frequency shift in the Future Spectrum (the “Supplemental Spectrum”) to implement its non-voice, non-geosynchronous mobile-satellite service system. The System 2 licensee's application for and use of the Supplemental Spectrum is subject to the Commission's Rules and policies, such reasonable operating conditions as may be imposed by the Commission, and international spectrum coordination requirements. For so long as the System 2 licensee is permitted by the Government of France to operate in the 400.5517–400.5983 MHz band coordinated with the French system S80–1, the Supplemental Spectrum shall be reduced to an amount equivalent to 150 kHz of Future Spectrum plus spectrum sufficient to account for Doppler frequency shift in the Future Spectrum.

(2) The System 2 licensee's priority to apply for and use the Supplemental Spectrum is conditioned on the System 2 licensee's compliance with the terms and conditions of its second processing round authorization, including, but not limited to, its system construction, launch and operation milestones, and any modifications thereto, and the Commission's Rules. The System 2 licensee's priority to apply for and use the Supplemental Spectrum shall automatically terminate upon the occurrence of any of the following events:

(i) The System 2 licensee being permitted to operate in the Supplemental Spectrum;

(ii) The expiration or revocation of the System 2 licensee's second processing round authorization;

(iii) The discontinuance of use of the spectrum assigned to the System 2 licensee under its second processing round authorization; or

(iv) The surrender of the System 2 licensee's second processing round authorization to the Commission.

[58 FR 68060, Dec. 23, 1993, as amended at 62 FR 5930, Feb. 10, 1997; 62 FR 59295, Nov. 3, 1997; 68 FR 51504, Aug. 27, 2003]

§ 25.143   Licensing provisions for the 1.6/2.4 GHz mobile-satellite service and 2 GHz mobile-satellite service.
top

(a) System license. Applicants authorized to construct and launch a system of technically identical satellites will be awarded a single “blanket” license. In the case of non-geostationary satellites, the blanket license will cover a specified number of space stations to operate in a specified number of orbital planes. In the case of geostationary satellites, as part of a geostationary-only satellite system or a geostationary/non-geostationary hybrid satellite system, an individual license will be issued for each satellite to be located at a geostationary orbital location.

(b) Qualification Requirements—(1) General Requirements. Each application for a space station system authorization in the 1.6/2.4 GHz Mobile-Satellite Service or 2 GHz Mobile-Satellite Service shall describe in detail the proposed satellite system, setting forth all pertinent technical and operational aspects of the system, and the technical and legal qualifications of the applicant. In particular, each application shall include the information specified in §25.114. Non-U.S. licensed systems shall comply with the provisions of §25.137.

(2) Technical qualifications. In addition to providing the information specified in paragraph (b)(1) of this section, each applicant and letter of intent filer shall demonstrate the following:

(i) That a proposed system in the 1.6/2.4 GHz MSS frequency bands employs a non-geostationary constellation or constellations of satellites;

(ii) That a system proposed to operate using non-geostationary satellites be capable of providing mobile satellite services to all locations as far north as 70 deg. North latitude and as far south as 55 deg. South latitude for at least 75% of every 24-hour period, i.e., that at least one satellite will be visible above the horizon at an elevation angle of at least 5 deg. for at least 18 hours each day within the described geographic area;

(iii) That a system proposed to operate using non-geostationary satellites be capable of providing mobile satellite services on a continuous basis throughout the fifty states, Puerto Rico and the U.S. Virgin Islands, i.e., that at least one satellite will be visible above the horizon at an elevation angle of at least 5 deg. at all times within the described geographic areas; and

(iv) That a system only using geostationary orbit satellites, at a minimum, be capable of providing mobile satellite services on a continuous basis throughout the 50 states, Puerto Rico, and the U.S. Virgin Islands, if technically feasible.

(v) That operations will not cause unacceptable interference to other authorized users of the spectrum. In particular, each application in the 1.6/2.4 GHz frequency bands shall demonstrate that the space station(s) comply with the requirements specified in §25.213.

(3) [Reserved]

(c) Replacement of Space Stations Within the System License Term. Licensees of 1.6/2.4 GHz mobile-satellite systems authorized through a blanket license pursuant to paragraph (a) of this section need not file separate applications to construct, launch and operate technically identical replacement satellites within the term of the system authorization. However, the licensee shall certify to the Commission, at least thirty days prior to launch of such replacement(s) that:

(1) The licensee intends to launch a space station that is technically identical to those authorized in its system authorization, and

(2) Launch of this space station will not cause the licensee to exceed the total number of operating space stations authorized by the Commission.

(d) In-Orbit Spares. Licensees need not file separate applications to operate technically identical in-orbit spares authorized as part of the blanket license pursuant to paragraph (a) of this section. However, the licensee shall certify to the Commission, within 10 days of bringing the in-orbit spare into operation, that operation of this space station did not cause the licensee to exceed the total number of operating space stations authorized by the Commission.

(e) Reporting requirements. (1) All operators of 1.6/2.4 GHz Mobile-Satellite Service systems and 2 GHz Mobile-Satellite Service systems shall, on October 15 of each year, file with the International Bureau and the Commission's Columbia Operations Center, Columbia, Maryland, a report containing the following information current as of September 30 of that year:

(i) Status of satellite construction and anticipated launch dates, including any major problems or delays encountered;

(ii) A listing of any non-scheduled space station outages for more than 30 minutes and the cause or causes of the outage;

(iii) A detailed description of the utilization made of the in-orbit satellite system. That description should identify the percentage of time that the system is actually used for U.S. domestic or transborder transmission, the amount of capacity (if any) sold but not in service within U.S. territorial geographic areas, and the amount of unused system capacity. 2 GHz Mobile Satellite systems receiving expansion spectrum as part of the unserved areas spectrum incentive must provide a report on the actual number of subscriber minutes originating or terminating in unserved areas as a percentage of the actual U.S. system use; and

(iv) Identification of any space stations not available for service or otherwise not performing to specifications, the cause or causes of these difficulties, and the date any space station was taken out of service or the malfunction identified.

(2) All operators of 1.6/2.4 GHz mobile-satellite systems shall, within 10 days after a required implementation milestone as specified in the system authorization, certify to the Commission by affidavit that the milestone has been met or notify the Commission by letter that it has not been met. At its discretion, the Commission may require the submission of additional information (supported by affidavit of a person or persons with knowledge thereof) to demonstrate that the milestone has been met.

(3) All operators of 2 GHz Mobile-Satellite Service systems must begin system construction upon award of a service link license to U.S.-based applicants, or upon designation of spectrum for non-U.S.-based systems, in accordance with milestones set forth in the respective system's authorization. All operators of 2 GHz Mobile-Satellite Service systems shall, within 10 days after a required implementation milestone as specified in the system authorization, certify to the Commission by affidavit that the milestone has been met or notify the Commission by letter that it has not been met. At its discretion, the Commission may require the submission of additional information (supported by affidavit of a person or persons with knowledge thereof) to demonstrate that the milestone has been met. Failure to file timely certification of milestones, or filing disclosure of non-compliance, will result in automatic cancellation of the authorization with no further action required on the Commission's part.

(f) Safety and distress communications. (1) Stations operating in the 1.6/2.4 GHz Mobile-Satellite Service and 2 GHz Mobile-Satellite Service that are voluntarily installed on a U.S. ship or are used to comply with any statute or regulatory equipment carriage requirements may also be subject to the requirements of sections 321(b) and 359 of the Communications Act of 1934. Licensees are advised that these provisions give priority to radio communications or signals relating to ships in distress and prohibits a charge for the transmission of maritime distress calls and related traffic.

(2) Licensees offering distress and safety services should coordinate with the appropriate search and rescue organizations responsible for the licensees service area.

(g) [Reserved]

(h) Prohibition of certain agreements. No license shall be granted to any applicant for a space station in the mobile satellite service operating at 1610–1626.5/2483.5–2500 MHz if that applicant, or any persons or companies controlling or controlled by the applicant, shall acquire or enjoy any right, for the purpose of handling traffic to or from the United States, its territories or possession, to construct or operate space segment or earth stations, or to interchange traffic, which is denied to any other United States company by reason of any concession, contract, understanding, or working arrangement to which the Licensee or any persons or companies controlling or controlled by the Licensee are parties.

(i) Incorporation of ancillary terrestrial component base stations into a 1.6/2.4 GHz mobile-satellite service network or a 2 GHz mobile-satellite service network. Any licensee authorized to construct and launch a 1.6/2.4 GHz or a 2 GHz mobile-satellite system may construct ancillary terrestrial component (ATC) base stations as defined in §25.201 at its own risk and subject to the conditions specified in this subpart any time after commencing construction of the mobile-satellite service system.

(j) Pre-operational build-out and testing. An MSS licensee may, without further authority from the Commission and at its own risk, engage in pre-operational build-out and conduct equipment tests for the purpose of making such adjustments and measurements as may be necessary to assure compliance with the terms of the technical provisions of its MSS license, ATC operation requirements, the rules and regulations in this Part and the applicable engineering standards. Prior to engaging in such pre-operational build-out and testing, an MSS licensee must notify the Commission concerning the initiation of MSS system satellite construction and the MSS operator's intent to construct and test ATC facilities. This notification must take the form of a letter formally filed with the Commission in the appropriate MSS license docket. Such letter shall specify the frequencies on which the MSS licensee proposes to engage in pre-operational testing and shall specify the name, address, telephone number and other such information as may be necessary to contact a MSS licensee representative for the reporting and mitigation of any interference that may occur as a result of such pre-operational testing and build-out. MSS licensees engaging in pre-operational build-out and testing must also comply with §§5.83, 5.85(c), 5.111, and 5.117 of this chapter relating to experimental operations. An MSS licensee may not offer ATC service to the public for compensation during pre-operational testing. In order to operate any ATC base stations, such a licensee must meet all the requirements set forth in §25.149 and must have been granted ATC authority.

(k) Aircraft. ATC mobile terminals must be operated in accordance with 25.136(a). All portable or hand-held transceiver units (including transceiver units installed in other devices that are themselves portable or hand-held) having operating capabilities in the 2000–2020/2180–2200 MHz or 1610–1626.5 MHz/2483.5–2500 MHz bands shall bear the following statement in a conspicuous location on the device: “This device may not be operated while on board aircraft. It must be turned off at all times while on board aircraft.”

[59 FR 53328, Oct. 21, 1994, as amended at 61 FR 9945, Mar. 12, 1996; 62 FR 5930, Feb. 10, 1997; 65 FR 59143, Oct. 4, 2000; 68 FR 33649, June 5, 2003; 68 FR 47858, Aug. 12, 2003; 68 FR 51504, Aug. 27, 2003; 70 FR 59277, Oct. 12, 2005]

§ 25.144   Licensing provisions for the 2.3 GHz satellite digital audio radio service.
top

(a) Qualification Requirements:

(1) [Reserved]

(2) General Requirements: Each application for a system authorization in the satellite digital audio radio service in the 2310–2360 MHz band shall describe in detail the proposed satellite digital audio radio system, setting forth all pertinent technical and operational aspects of the system, and the technical, legal, and financial qualifications of the applicant. In particular, applicants must file information demonstrating compliance with §25.114 and all of the requirements of this section.

(3) Technical Qualifications: In addition to the information specified in paragraph (a)(1) of this section, each applicant shall:

(i) Demonstrate that its system will, at a minimum, service the 48 contiguous states of the United States (full CONUS);

(ii) Certify that its satellite DARS system includes a receiver that will permit end users to access all licensed satellite DARS systems that are operational or under construction; and

(iii) Identify the compression rate it will use to transmit audio programming. If applicable, the applicant shall identify the compression rate it will use to transmit services that are ancillary to satellite DARS.

(b) Milestone requirements. Each applicant for system authorization in the satellite digital audio radio service must demonstrate within 10 days after a required implementation milestone as specified in the system authorization, and on the basis of the documentation contained in its application, certify to the Commission by affidavit that the milestone has been met or notify the Commission by letter that it has not been met. At its discretion, the Commission may require the submission of additional information (supported by affidavit of a person or persons with knowledge thereof) to demonstrate that the milestone has been met. The satellite DARS milestones are as follows, based on the date of authorization:

(1) One year: Complete contracting for construction of first space station or begin space station construction;

(2) Two years: If applied for, complete contracting for construction of second space station or begin second space station construction;

(3) Four years: In orbit operation of at least one space station; and

(4) Six years: Full operation of the satellite system.

(c) Reporting requirements. All licensees of satellite digital audio radio service systems shall, on June 30 of each year, file a report with the International Bureau and the Commission's Laurel, Maryland field office containing the following information:

(1) Status of space station construction and anticipated launch date, including any major problems or delay encountered;

(2) A listing of any non-scheduled space station outages for more than thirty minutes and the cause(s) of such outages; and

(3) Identification of any space station(s) not available for service or otherwise not performing to specifications, the cause(s) of these difficulties, and the date any space station was taken out of service or the malfunction identified.

(d) The license term for each digital audio radio service satellite shall commence when the satellite is launched and put into operation and the term will run for eight years.

[62 FR 11105, Mar. 11, 1997, as amended at 68 FR 51504, Aug. 27, 2003; 70 FR 32254, June 2, 2005]

§ 25.145   Licensing conditions for the Fixed-Satellite Service in the 20/30 GHz bands.
top

(a) Except as provided in §25.210(b), in general all rules contained in this part apply to Fixed-Satellite Service in the 20/30 GHz bands.

(b) System License. Applicants authorized to construct and launch a system of technically identical non-geostationary satellite orbit satellites will be awarded a single “blanket” license covering a specified number of space stations to operate in a specified number of orbital planes.

(c) In addition to providing the information specified in §25.114, each non-geostationary satellite orbit applicant shall demonstrate the following:

(1) That the proposed system be capable of providing fixed-satellite services to all locations as far north as 70 deg. latitude and as far south as 55 deg. latitude for at least 75% of every 24-hour period; and

(2) That the proposed system is capable of providing fixed-satellite services on a continuous basis throughout the fifty states, Puerto Rico and the U.S. Virgin Islands, U.S.

(3) [Reserved]

(d) [Reserved]

(e) Prohibition of certain agreements. No license shall be granted to any applicant for a space station in the fixed-satellite service operating in the 20/30 GHz band if that applicant, or any persons or companies controlling or controlled by the applicant, shall acquire or enjoy any right, for the purpose of handling traffic to or from the United States, its territories or possession, to construct or operate space segment or earth stations, or to interchange traffic, which is denied to any other United States company by reason of any concession, contract, understanding, or working arrangement to which the Licensee or any persons or companies controlling or controlled by the Licensee are parties.

(f)(1) Reporting Requirements. All licensees in the 20/30 GHz band shall, on June 30 of each year, file a report with the International Bureau and the Commission's Columbia Operations Center, 9200 Farm House Lane, Columbia, MD 21046 containing the following information:

(i) Status of space station construction and anticipated launch date, including any major problems or delay encountered;

(ii) A listing of any non-scheduled space station outages for more than thirty minutes and the cause(s) of such outages; and

(iii) Identification of any space station(s) not available for service or otherwise not performing to specifications, the cause(s) of these difficulties, and the date any space station was taken out of service or the malfunction identified.

(iv) All operators of NGSO FSS systems in the 18.8–19.3 GHz and 28.6–29.1 GHz bands shall, within 10 days after a required implementation milestone as specified in the system authorization certify to the Commission by affidavit that the milestone has been met or notify the Commission by letter that it has not been met. At its discretion, the Commission may require the submission of additional information (supported by affidavit of a person or person with knowledge thereof) to demonstrate that the milestone has been met. Failure to file a timely certification of milestones, or filing disclosure of non-compliance, will result in automatic cancellation of the authorization with no further action required on the Commission's part.

(2) Licensees shall submit to the Commission a yearly report indicating the number of earth stations actually brought into service under its blanket licensing authority. The annual report is due to the Commission no later than the first day of April of each year and shall indicate the deployment figures for the preceding calendar year.

(g) Policy governing the relocation of terrestrial services from the 18.3 to 19.3 GHz band. Frequencies in the 18.3–19.3 GHz band listed in parts 21, 74, 78, and 101 of this chapter have been reallocated for primary use by the Fixed-Satellite Service, subject to various provisions for the existing terrestrial licenses. Fixed-Satellite Service operations are not entitled to protection from the co-primary operations until after the period during which terrestrial stations remain co-primary has expired. (see §§21.901(e), 74.502(c), 74.602(g), 78.18(a)(4), and 101.147(r) of this chapter).

(h) Replacement of Space Stations within the System License Term. Licensees of NGSO FSS systems in the 18.8–19.3 GHz and 28.6–29.1 GHz frequency bands authorized through a blanket license pursuant to paragraph (b) of this section need not file separate applications to launch and operate technically identical replacement satellites within the term of the system authorization. However, the licensee shall certify to the Commission, at least thirty days prior to launch of such replacement(s) that:

(1) The licensee intends to launch a space station into the previously-authorized orbit that is technically identical to those authorized in its system authorization and

(2) Launch of this space station will not cause the license to exceed the total number of operating space stations authorized by the Commission.

(i) In-Orbit Spares. Licensees need not file separate applications to operate technically identical in-orbit spares authorized as part of the blanket license pursuant to paragraph (b) of this section. However, the licensee shall certify to the Commission, within 10 days of bringing the in-orbit spare into operation, that operation of this space station did not cause the licensee to exceed the total number of operating space stations authorized by the Commission.

[62 FR 61456, Nov. 18, 1997, as amended at 65 FR 54171, Sept. 7, 2000; 66 FR 63515, Dec. 7, 2001; 67 FR 39310, June 7, 2002; 68 FR 16966, Apr. 8, 2003; 68 FR 51505, Aug. 27, 2003; 68 FR 59129, Oct. 14, 2003; 70 FR 59277, Oct. 12, 2005]

§ 25.146   Licensing and operating authorization provisions for the non-geostationary satellite orbit fixed-satellite service (NGSO FSS) in the bands 10.7 GHz to 14.5 GHz.
top

(a) A comprehensive technical showing shall be submitted for the proposed non-geostationary satellite orbit fixed-satellite service (NGSO FSS) system in the bands 10.7 GHz to 14.5 GHz. The technical information shall demonstrate that the proposed NGSO FSS system would not exceed the validation equivalent power flux-density (EPFD) limits as specified in §25.208 (g), (k), and (l) for EPFDdown, and EPFDup. If the technical demonstration exceeds the validation EPFD limits at any test points within the U.S. for domestic service and at any points outside of the U.S. for international service or at any points in the geostationary satellite orbit, as appropriate, the application would be unacceptable for filing and will be returned to the applicant with a brief statement identifying the non-compliance technical demonstration. The technical showing consists of the following:

(1) Single-entry validation equivalent power flux-density, in the space-to-Earth direction, (EPFDdown) limits. (i) Provide a set of power flux-density (pfd) masks, on the surface of the Earth, for each space station in the NGSO FSS system. The pfd masks shall be generated in accordance with the specification stipulated in the ITU-R Recommendation BO.1503, “Functional Description to be used in Developing Software Tools for Determining Conformity of Non-GSO FSS Networks with Limits Contained in Article S22 of the Radio Regulations.” In particular, the pfd mask must encompass the power flux-density radiated by the space station regardless of the satellite transmitter power resource allocation and traffic/beam switching strategy that are used at different periods of a NGSO FSS system life. The pfd masks shall also be in an electronic form that can be accessed by the computer program contained in paragraph (a)(1)(iii) of this section.

(ii) Identify and describe in detail the assumptions and conditions used in generating the power flux-density masks.

(iii) If a computer program that has been approved by the ITU for determining compliance with the single-entry EPFDdown validation limits is not yet available, the applicant shall provide a computer program for the single-entry EPFDdown validation computation, including both the source code and the executable file. This computer program shall be developed in accordance with the specification stipulated in Recommendation ITU-R S.1503 (2000). If the applicant uses the ITU approved software, the applicant shall indicate the program name and the version used.

(iv) Identify and describe in detail the necessary input parameters for the execution of the computer program identified in paragraph (a)(1)(iii) of this section.

(v) Provide the result, the cumulative probability distribution function of EPFD, of the execution of the computer program described in paragraph (a)(1)(iii) of this section by using only the input parameters contained in paragraphs (a)(1)(i) and (a)(1)(iv) of this section.

(2) Single-entry validation equivalent power flux-density, in the Earth-to-space direction, EPFDup limits. (i) Provide a set of NGSO FSS earth station maximum equivalent isotropically radiated power (e.i.r.p.) mask as a function of the off-axis angle generated by a NGSO FSS earth station. The maximum e.i.r.p. mask shall be generated in accordance with the specification stipulated in the ITU-R Recommendation BO.1503. In particular, the results of calculations encompass what would be radiated regardless of the earth station transmitter power resource allocation and traffic/beam switching strategy are used at different periods of a NGSO FSS system life. The e.i.r.p. masks shall also be in an electronic form that can be accessed by the computer program contained in paragraph (a)(2)(iii) of this section.

(ii) Identify and describe in detail the assumptions and conditions used in generating the maximum earth station e.i.r.p. mask.

(iii) If a computer program that has been approved by the ITU for determining compliance with the single-entry EPFDup validation limits is not yet available, the applicant shall provide a computer program for the single-entry EPFDup validation computation, including both the source code and the executable file. This computer program shall be developed in accordance with the specification stipulated in Recommendation ITU-R S.1503 (2000). If the applicant uses the ITU approved software, the applicant shall indicate the program name and the version used.

(iv) Identify and describe in detail the necessary input parameters for the execution of the computer program identified in paragraph (a)(2)(iii) of this section.

(v) Provide the result of the execution of the computer program described in paragraph (a)(2)(iii) of this section by using only the input parameters contained in paragraphs (a)(2)(i) and (a)(2)(iv) of this section.

(b) Ninety days prior to the initiation of service to the public, the NGSO FSS system licensee shall submit a comprehensive technical showing for the non-geostationary satellite orbit fixed-satellite service (NGSO FSS) system in the bands 10.7 GHz to 14.5 GHz. The technical information shall demonstrate that the NGSO FSS system is expected not to operate in excess of the additional operational EPFDdown limits and the operational EPFDdown limits as specified in §25.208 (i), (j) and notes 2 and 3 to the table in paragraph (l). If the technical demonstration exceeds the additional operational EPFDdown limits or the operational EPFDdown limits at any test points with the U.S. for domestic service and at any test points out side of the U.S. for international service, the NGSO FSS system licensee shall not initiate service to the public until the deficiency has been rectified by reducing satellite transmission power or other adjustments. This must be substantiated by subsequent technical showings. The technical showings consist of the following:

(1) Single-entry additional operational equivalent power flux-density, in the space-to-Earth direction, (additional operational EPFDdown) limits. (i) Provide a set of anticipated operational power flux-density (pfd) masks, on the surface of the Earth, for each space station in the NGSO FSS system. The anticipated operational power flux-density masks could be generated by using the method specified in ITU-R Recommendation BO.1503. In particular, the anticipated operational pfd mask shall take into account the expected maximum traffic loading distributions and geographic specific scheduling of the actual measured space station antenna patterns (see §25.210(k)). The anticipated operational power flux-density masks shall also be in an electronic form that can be accessed by the computer program contained in paragraph (b)(1)(iii) of this section.

(ii) Identify and describe in detail the assumptions and conditions used in generating the anticipated operational power flux-density masks.

(iii) Provide a computer program for the single-entry additional operational EPFDdown verification computation, including both the source code and the executable file. This computer program could be developed by using the method specified in ITU-R Recommendation BO.1503.

(iv) Identify and describe in detail the necessary input parameters for the execution of the additional operational EPFDdown verification computer program identified in paragraph (b)(1)(iii) of this section.

(v) Provide the result, the cumulative probability distribution function of EPFD, of the execution of the verification computer program described in paragraph (b)(1)(iii) of this section by using only the input parameters contained in paragraphs (b)(1)(i) and (b)(1)(iv) of this section for each of the submitted test points provided by the Commission. These test points are based on information from U.S.-licensed geostationary satellite orbit fixed-satellite service and broadcast satellite service operators in the bands 10.7 GHz to 14.5 GHz. Each U.S.-licensed geostationary satellite orbit fixed satellite service and broadcast satellite service operator in the bands 10.7 GHz to 14.5 GHz may submit up to 10 test points for this section containing the latitude, longitude, altitude, azimuth, elevation angle, antenna size, efficiency to be used by non-geostationary satellite orbit fixed-satellite service licensees in the bands 10.7 GHz to 14.5 GHz during the upcoming year.

(2) Operational equivalent power flux-density, space-to-Earth direction, (operational EPFDdown) limits. Using the information contained in (b)(1) of this section plus the measured space station antenna patterns, provide the result of the execution of the computer simulation for the anticipated in-line operational EPFDdown levels for each of the submitted test points provided by the Commission. Submitted test points are based on inputs from U.S.-licensed geostationary satellite orbit fixed-satellite service and broadcast satellite service operators in the bands 10.7 GHz to 14.5 GHz. Each U.S.-licensed geostationary satellite orbit fixed-satellite service and broadcast satellite service operator in the bands 10.7 GHz to 14.5 GHz may submit up to 10 test points for this section containing the latitude, longitude, altitude, azimuth, elevation angle, antenna size, efficiency to be used by non-geostationary satellite orbit fixed-satellite service licensees in the bands 10.7 GHz to 14.5 GHz during the upcoming year.

(c) The NGSO FSS system licensee shall, on June 30 of each year, file a report with the International Bureau and the Commission's Columbia Operations Center in Columbia, Maryland, certifying that the system continues to operate within the bounds of the masks and other input parameters specified under 25.146(a) and 25.146(b) as well as certifying the status of the additional operational EPFDdown levels into the 3 m and 10 m geostationary satellite orbit fixed-satellite service receiving Earth station antennas, the operational EPFDdown levels into the 3 m, 4.5 m, 6.2 m and 10 m geostationary satellite orbit fixed-satellite service receiving Earth station antennas and the operational EPFDdown levels into the 180 cm geostationary satellite orbit broadcast satellite service receiving Earth station antennas in Hawaii and 240 cm geostationary satellite orbit broadcast satellite service receiving Earth station antennas in Alaska.

(d) The Commission may request at any time additional information from the NGSO FSS system applicant or licensee concerning the EPFD levels and the related technical showings.

(e) A NGSO FSS system licensee operating a system in compliance with the limits specified in §25.208 (g), (i), (j), (k), (l) and (m) shall be considered as having fulfilled its obligations under ITU Radio Regulations provision S22.2 with respect to any GSO network. However, such NGSO FSS system shall not claim protection from GSO FSS and BSS networks operating in accordance with this part 25 or part 100 of this chapter, respectively, and the ITU Radio Regulations.

(f) Coordination will be required between NGSO FSS systems and GSO FSS earth stations in the frequency band 10.7–12.75 GHz when all of the following threshold conditions are met:

(1) Bandwidth overlap; and

(2) The satellite network using the GSO has specific receive earth stations which meet all of the following conditions: earth station antenna maximum isotropic gain greater than or equal to 64 dBi; G/T of 44 dB/K or higher; and emission bandwidth of 250 MHz; and the EPFDdown radiated by the satellite system using the NGSO into the GSO specific receive earth station, either within the U.S. for domestic service or any points outside the U.S. for international service, as calculated using the ITU software for examining compliance with EPFD limits set forth in Article 22 of the ITU Radio Regulations exceeds −174.5 dB(W/(m2/40kHz)) for any percentage of time for NGSO systems with all satellites only operating at or below 2500 km altitude, or −202 dB(W/(m2/40kHz)) for any percentage of time for NGSO systems with any satellites operating above 2500 km altitude.

(3) If there is no ITU software for examining compliance with EPFD limits set forth in Article 22 of the ITU Radio Regulations, then the EPFDdown coordination trigger is suspended and the requirement for coordination will be based on bandwidth overlap and the satellite network using the GSO has specific receive earth stations which meet all of the following conditions: earth station antenna maximum isotropic gain greater than or equal to 64 dBi; G/T of 44 dB/K or higher; and emission bandwidth of 250 MHz.

(g) Operational power flux density, space-to-Earth direction, limits. Ninety days prior to the initiation of service to the public, the NGSO FSS system licensee shall submit a technical showing for the NGSO FSS system in the band 12.2–12.7 GHz. The technical information shall demonstrate that the NGSO FSS system is capable of meeting the limits as specified in §25.208(o). Licensees may not provide service to the public if they fail to demonstrate compliance with the PFD limits.

(h) System License. Applicants authorized to construct and launch a system of technically identical non-geostationary satellite orbit fixed satellite service satellites will be awarded a single “blanket” license covering a specified number of space stations to operate in a specified number of orbital planes.

(i) In addition to providing the information specified in §25.114, each NGSO FSS applicant shall provide the following:

(1) A demonstration that the proposed system is capable of providing fixed-satellite services on a continuous basis throughout the fifty states, Puerto Rico and the U.S. Virgin Islands, U.S.; and

(2) A demonstration that the proposed system be capable of providing fixed-satellite services to all locations as far north as 70 deg. latitude and as far south as 55 deg. latitude for at least 75 percent of every 24-hour period; and

(3) Sufficient information on the NGSO FSS system characteristics to properly model the system in computer sharing simulations, including, at a minimum, NGSO hand-over and satellite switching strategies, NGSO satellite beam patterns, NGSO satellite antenna patterns and NGSO earth station antenna patterns. In particular, each NGSO FSS applicant must explain the switching protocols it uses to avoid transmitting while passing through the geostationary satellite orbit arc, or provide an explanation as to how the power-flux density limits in §25.208 are met without using geostationary satellite orbit arc avoidance. In addition, each NGSO FSS applicant must provide the orbital parameters contained in Section A.3 of Annex 1 to Resolution 46. Further, each NGSO FSS applicant must provide a sufficient technical showing to demonstrate that the proposed non-geostationary satellite orbit system meets the power-flux density limits contained in §25.208, as applicable, and

(4) [Reserved]

(j) [Reserved]

(k) Implementation Milestone Schedule. Each NGSO FSS licensee in the 10.7–12.7 GHz, 12.75–13.25 GHz and 13.75–14.5 GHz frequency bands will be required to enter into a non-contingent satellite manufacturing contract for the system within one year of authorization, to complete critical design review within two years of authorization, to begin physical construction of all satellites in the system within two and a half years of authorization, to complete construction and launch of the first two satellites within three and a half years of grant, and to launch and operate its entire authorized system within six years of authorization. Each NGSO FSS licensee in the 10.7–12.7 GHz, 12.75–13.25 GHz and 13.75–14.5 GHz frequency bands must submit certifications of milestone compliance within 10 days following a milestone specified in its authorization.

(l) Reporting Requirements. All NGSO FSS licensees in the 10.7–12.7 GHz, 12.75–13.25 GHz and 13.75–14.5 GHz frequency bands shall, on June 30th of the first year following launch of the first two space stations in their system, and annually thereafter, file a report with the International Bureau and the Commission's Laurel, Maryland field office containing the following information:

(1) Status of space station construction and anticipated launch date, including any major problems or delay encountered;

(2) Identification of any space station(s) not available for service or otherwise not performing to specifications, the cause(s) of these difficulties, and the date any space station was taken out of service or the malfunction identified.

(m) Replacement of Space Stations within the System License Term. Licensees of NGSO FSS systems in the 10.7–12.7 GHz, 12.75–13.25 GHz and 13.75–14.5 GHz frequency bands authorized through a blanket license pursuant to paragraph (g) of this section need not file separate applications to launch and operate technically identical replacement satellites within the term of the system authorization. However, the licensee shall certify to the Commission, at least thirty days prior to launch of such replacement(s) that:

(1) The licensee intends to launch a space station into the previously-authorized orbit that is technically identical to those authorized in its system authorization and

(2) Launch of this space station will not cause the licensee to exceed the total number of operating space stations authorized by the Commission.

(n) In-Orbit Spares. Licensees need not file separate applications to operate technically identical in-orbit spares authorized as part of the blanket license pursuant to paragraph (g) of this section. However, the licensee shall certify to the Commission, within 10 days of bringing the in-orbit spare into operation, that operation of this space station did not cause the licensee to exceed the total number of operating space stations authorized by the Commission.

[66 FR 10619, Feb. 16, 2001, as amended at 67 FR 53510, Aug. 16, 2002; 68 FR 16447, Apr. 4, 2003; 68 FR 43946, July 25, 2003; 68 FR 51505, Aug. 27, 2003; 69 FR 31302, June 3, 2004; 70 FR 59277, Oct. 12, 2005]

Effective Date Note:  At 68 FR 43946, July 25, 2003, §25.146 was amended by redesignating paragraphs (g) through (m) as paragraphs (h) through (n) and by adding a new paragraph (g). This paragraph contains information collection and recordkeeping requirements and will not become effective until approval has been given by the Office of Management and Budget.

§ 25.147   Licensing provision for NGSO MSS feeder downlinks in the band 6700–6875 MHz.
top

If an NGSO MSS satellite transmitting in the band 6700–6875 MHz causes harmful interference to previously licensed co-frequency Public Safety facilities, then that satellite licensee is obligated to remedy the interference complaint.

[67 FR 17299, Apr. 10, 2002]

§ 25.148   Licensing provisions for the Direct Broadcast Satellite Service.
top

(a) License terms. License terms for DBS facilities are specified in §25.121(a).

(b) Due diligence. (1) All persons granted DBS authorizations shall proceed with due diligence in constructing DBS systems. Permittees shall be required to complete contracting for construction of the satellite station(s) within one year of the grant of the authorization. The satellite stations shall also be required to be in operation within six years of the authorization grant.

(2) In addition to the requirements stated in paragraph (b)(1) of this section, all persons who receive new or additional DBS authorizations after January 19, 1996 shall complete construction of the first satellite in their respective DBS systems within four years of grant of the authorization. All satellite stations in such a DBS system shall be in operation within six years of the grant of the authorization.

(3) DBS licensees shall be required to proceed consistent with all applicable due diligence obligations, unless otherwise determined by the Commission upon proper showing in any particular case. Transfer of control of the authorization shall not be considered to justify extension of these deadlines.

(c) Geographic service requirements. Those entities acquiring DBS authorizations after January 19, 1996, or who after January 19, 1996 modify a previous DBS authorization to launch a replacement satellite, must provide DBS service to Alaska and Hawaii where such service is technically feasible from the authorized orbital location. This requirement does not apply to DBS satellites authorized to operate at the 61.5° W.L. orbital location. DBS applicants seeking to operate from locations other than 61.5° W.L. who do not provide service to Alaska and Hawaii, must provide technical analyses to the Commission demonstrating that such service is not feasible as a technical matter, or that while technically feasible such services would require so many compromises in satellite design and operation as to make it economically unreasonable.

(d) DBS subject to competitive bidding. Mutually exclusive initial applications to provide DBS are subject to competitive bidding procedures. The general competitive bidding procedures set forth in part 1, subpart Q of this chapter will apply unless otherwise provided in this part.

(e) DBS long form application. Winning bidders are subject to the provisions of §1.2107 of this chapter except that in lieu of a FCC Form 601 each winning bidder shall submit the long-form satellite service application (FCC Form 312) within thirty (30) days after being notified by Public Notice that it is the winning bidder. Each winning bidder will also be required to submit by the same deadline the information described in §25.215 (Technical) and §25.601 (EEO), and in paragraph (f) of this section. Each winner also will be required to file, by the same deadline, a signed statement describing its efforts to date and future plans to come into compliance with any applicable spectrum limitations, if it is not already in compliance. Such information shall be submitted pursuant to the procedures set forth in §25.114 and any associated Public Notices.

(f) Technical qualifications. DBS operations must be in accordance with the sharing criteria and technical characteristics contained in Appendices 30 and 30A of the ITU's Radio Regulations. Operation of systems using differing technical characteristics may be permitted, with adequate technical showing, and if a request has been made to the ITU to modify the appropriate Plans to include the system's technical parameters.

[67 FR 51113, Aug. 7, 2002]

§ 25.149   Application requirements for ancillary terrestrial components in the mobile-satellite service networks operating in the 1.5./1.6 GHz, 1.6/2.4 GHz and 2 GHz mobile-satellite service.
top

(a) Applicants for ancillary terrestrial component authority shall demonstrate that the applicant does or will comply with the following through certification or explanatory technical exhibit, as appropriate:

(1) ATC shall be deployed in the forward-band mode of operation whereby the ATC mobile terminals transmit in the MSS uplink bands and the ATC base stations transmit in the MSS downlink bands in portions of the 2000–2020 MHz/2180–2200 MHz bands (2 GHz band), the 1626.5–1660.5 MHz/1525–1559 MHz bands (L-band), and the 1610–1626.5 MHz/2483.5–2500 MHz bands (Big LEO band).

Note to paragraph (a)(1): An L-band MSS licensee is permitted to apply for ATC authorization based on a non-forward-band mode of operation provided it is able to demonstrate that the use of a non-forward-band mode of operation would produce no greater potential interference than that produced as a result of implementing the rules of this section.

(2) ATC operations shall be limited to certain frequencies:

(i) In the 2000–2020 MHz/2180–2200 MHz bands (2 GHz MSS band), ATC operations are limited to the selected assignment of the 2 GHz MSS licensee that seeks ATC authority.

(ii) In the 1626.5–1660.5 MHz/1525–1559 MHz bands (L-band), ATC operations are limited to the frequency assignments authorized and internationally coordinated for the MSS system of the MSS licensee that seeks ATC authority.

(iii) In the 1610–1626.5 MHz/2483.5–2500 MHz bands (Big LEO bands), ATC operations are limited to the 1610–1615.5 MHz, 1621.35–1626.5 MHz, and 2487.5–2493.0 MHz bands and to the specific frequencies authorized for use by the MSS licensee that seeks ATC authority.

(3) ATC operations shall not exceed the geographical coverage area of the mobile satellite service network of the applicant for ATC authority.

(4) ATC base stations shall comply with all applicable antenna and structural clearance requirements established in part 17 of this chapter.

(5) ATC base stations and mobile terminals shall comply with part 1 of this chapter, Subpart I—Procedures Implementing the National Environmental Policy Act of 1969, including the guidelines for human exposure to radio frequency electromagnetic fields as defined in §§1.1307(b) and 1.1310 of this chapter for PCS networks.

(6) ATC base station operations shall use less than all available MSS frequencies when using all available frequencies for ATC base station operations would exclude otherwise available signals from MSS space-stations.

(b) Applicants for an ancillary terrestrial component shall demonstrate that the applicant does or will comply with the following criteria through certification:

(1) Geographic and temporal coverage. (i) For the 2 GHz MSS band, an applicant must demonstrate that it can provide space-segment service covering all 50 states, Puerto Rico, and the U.S. Virgin Islands one-hundred percent of the time, unless it is not technically possible, consistent with the coverage requirements for 2 GHz MSS GSO operators.

(ii) For the L-band, an applicant must demonstrate that it can provide space-segment service covering all 50 states, Puerto Rico, and the U.S. Virgin Islands one-hundred percent of the time, unless it is not technically possible for the MSS operator to meet the coverage criteria from its orbital position.

(iii) For the Big LEO band, an applicant must demonstrate that it can provide space-segment service to all locations as far north as 70° North latitude and as far south as 55° South latitude for at least seventy-five percent of every 24-hour period, i.e., that at least one satellite will be visible above the horizon at an elevation angle of at least 5° for at least 18 hours each day, and on a continuous basis throughout the fifty states, Puerto Rico and the U.S. Virgin Islands, i.e., that at least one satellite will be visible above the horizon at an elevation angle of at least 5° at all times.

(2) Replacement satellites. (i) Operational NGSO MSS ATC systems shall maintain an in-orbit spare satellite.

(ii) Operational GSO MSS ATC systems shall maintain a spare satellite on the ground within one year of commencing operations and launch it into orbit during the next commercially reasonable launch window following a satellite failure.

(iii) All MSS ATC licensees must report any satellite failures, malfunctions or outages that may require satellite replacement within ten days of their occurrence.

(3) Commercial availability. Mobile-satellite service must be commercially available (viz., offering services for a fee) in accordance with the coverage requirements that pertain to each band as a prerequisite to an MSS licensee's offering ATC service.

(4) Integrated services. MSS ATC licensees shall offer an integrated service of MSS and MSS ATC. Applicants for MSS ATC may establish an integrated service offering by affirmatively demonstrating that:

(i) The MSS ATC operator will use a dual-mode handset that can communicate with both the MSS network and the MSS ATC component to provide the proposed ATC service; or

(ii) Other evidence establishing that the MSS ATC operator will provide an integrated service offering to the public.

(5) In-band operation. (i) In the 2 GHz MSS band, MSS ATC is limited to an MSS licensee's selected assignment. MSS ATC operations on frequencies beyond the MSS licensee's selected assignment are prohibited.

(ii) In the Big LEO band, MSS ATC is limited to no more than 5.5 MHz of spectrum in each direction of operation. Licensees in these bands may implement ATC only on those channels on which MSS is authorized, consistent with the Big LEO band-sharing arrangement.

(iii) In the L-band, MSS ATC is limited to those frequency assignments available for MSS use in accordance with the Mexico City Memorandum of Understanding, its successor agreements or the result of other organized efforts of international coordination.

(c) Equipment certification. (1) Each ATC MET utilized for operation under this part and each transmitter marketed, as set forth in §2.803 of this chapter, must be of a type that has been authorized by the Commission under its certification procedure for use under this part.

(2) Any manufacturer of radio transmitting equipment to be used in these services may request equipment authorization following the procedures set forth in subpart J of part 2 of this chapter. Equipment authorization for an individual transmitter may be requested by an applicant for a station authorization by following the procedures set forth in part 2 of this chapter.

(3) Licensees and manufacturers are subject to the radiofrequency radiation exposure requirements specified in §§1.1307(b), 2.1091 and 2.1093 of this chapter, as appropriate. MSS ATC base stations must comply with the requirements specified in §1.1307(b) of this chapter for PCS base stations. MSS ATC mobile terminals must comply with the requirements specified for mobile and portable PCS transmitting devices in §1.1307(b) of this chapter. MSS ATC mobile terminals must also comply with the requirements in §§2.1091 and 2.1093 of this chapter for Satellite Communications Services devices. Applications for equipment authorization of mobile or portable devices operating under this section must contain a statement confirming compliance with these requirements for both fundamental emissions and unwanted emissions. Technical information showing the basis for this statement must be submitted to the Commission upon request.

(d) Applicants for an ancillary terrestrial component authority shall demonstrate that the applicant does or will comply with the provisions of §§1.924 and 25.203(e) through 25.203(g) and with §§25.252, 25.253, or 25.254, as appropriate, through certification or explanatory technical exhibit.

(e) Except as provided for in paragraph (f) of this section, no application for an ancillary terrestrial component shall be granted until the applicant has demonstrated actual compliance with the provisions of paragraph (b) of this section. Upon receipt of ATC authority, all ATC licensees must ensure continued compliance with this section and §§25.252, 25.253, or 25.254, as appropriate.

(f) Special provision for operational MSS systems. Applicants for MSS ATC authority with operational MSS systems that are in actual compliance with the requirements prescribed in paragraphs (b)(1), (b)(2), and (b)(3) of this section at the time of application may elect to satisfy the requirements of paragraphs (b)(4) and (b)(5) of this section prospectively by providing a substantial showing in its certification regarding how the applicant will comply with the requirements of paragraphs (b)(4) and (b)(5) of this section. Notwithstanding §25.117(f) and paragraph (e) of this section, the Commission may grant an application for ATC authority based on such a prospective substantial showing if the Commission finds that operations consistent with the substantial showing will result in actual compliance with the requirements prescribed in paragraphs (b)(4) and (b)(5) of this section. An MSS ATC applicant that receives a grant of ATC authority pursuant to this paragraph (f) shall notify the Commission within 30 days once it begins providing ATC service. This notification must take the form of a letter formally filed with the Commission in the appropriate MSS license docket and shall contain a certification that the MSS ATC service is consistent with its ATC authority.

[68 FR 47859, Aug. 12, 2003, as amended at 69 FR 48162, Aug. 9, 2004; 70 FR 19318, Apr. 13, 2005]

Processing of Applications
top
§ 25.150   Receipt of applications.
top

Applications received by the Commission are given a file number and (domestic only) a unique station identifier for administrative convenience. Neither the assignment of a file number and/or other identifier nor the listing of the application on public notice as received for filing indicates that the application has been found acceptable for filing or precludes the subsequent return or dismissal of the application if it is found to be defective or not in accordance with the Commission's rules.

§ 25.151   Public notice period.
top

(a) At regular intervals, the Commission will issue public notices listing:

(1) The receipt of applications for new station authorizations;

(2) The receipt of applications for license or registration of receive-only earth stations;

(3) The receipt of applications for major modifications to station authorizations;

(4) The receipt of major amendments to pending applications;

(5) The receipt of applications to assign or transfer control of space station facilities, transmitting earth station facilities, or international receive-only earth station facilities;

(6) Significant Commission actions regarding applications;

(7) Information which the Commission in its discretion believes to be of public significance; and

(8) Special environmental considerations as required by part 1 of this chapter.

(b) Special public notices may also be issued at other times under special circumstances involving non-routine matters where speed is of the essence and efficiency of Commission process will be served thereby.

(c) A public notice will not normally be issued for receipt of any of the following applications:

(1) For authorization of a minor technical change in the facilities of an authorized station;

(2) For temporary authorization pursuant to §25.120.

(3) For an authorization under any of the proviso clauses of section 308(a) of the Communications Act of 1934, as amended [47 U.S.C. 308(a)];

(4) For consent to an involuntary assignment or transfer of control of a transmitting earth station authorization; or

(5) For consent to an assignment or transfer of control of a space station authorization or a transmitting earth station authorization, where the assignment or transfer does not involve a substantial change in ownership or control; or

(6) For change in location of an earth station operating in the 4/6 GHz and 10.95–11.7 GHz bands by no more than 1" in latitude and/or longitude and for change in location of an earth station operating in the 12/14 GHz bands by no more than 10" in latitude and/or longitude.

(d) Except as specified in paragraph (e) of this section, no application that has appeared on public notice will be granted until the expiration of a period of thirty days following the issuance of the public notice listing the application, or any major amendment thereto. Any comments or petitions must be delivered to the Commission by that date in accordance with §25.154.

(e)(1) Applicants seeking authority to operate a temporary fixed earth station pursuant to §25.277 may consider their applications “provisionally granted,” and may initiate operations upon the placement of the complete FCC Form 312 application on public notice, provided that

(i) The temporary fixed earth station will operate only in the conventional Ku-band (14.0–14.5 GHz and 11.7–12.2 GHz bands);

(ii) The temporary fixed earth station's operations will be consistent with all routine-licensing requirements for the conventional Ku-band; and

(iii) The temporary fixed earth station's operations will be limited to satellites on the Permitted Space Station List.

(2) Applications for authority granted pursuant to paragraph (e)(1) of this section shall be placed on public notice pursuant to paragraph (a)(1) of this section. If no comments or petitions are filed within 30 days of the public notice date, the authority granted will be considered a regular temporary fixed earth station authorization as of 30 days after the public notice date. If a comment or petition is filed within 30 days of the public notice date, the applicant must suspend operations immediately pending resolution of the issues raised in that comment or petition.

[56 FR 24016, May 28, 1991, as amended at 58 FR 68061, Dec. 23, 1993; 70 FR 32254, June 2, 2005]

§ 25.152   Dismissal and return of applications.
top

(a) Any application may be dismissed without prejudice as a matter of right if the applicant requests its dismissal prior to final Commission action.

(b) The Commission will dismiss an application for failure to prosecute or for failure to respond substantially within a specified time period to official correspondence or requests for additional information. Dismissal will be without prejudice unless the application is mutually exclusive pursuant to §25.155, in which case it will be dismissed with prejudice.

§ 25.153   Repetitious applications.
top

(a) Where an application has been denied or dismissed with prejudice, the Commission will not consider a like application involving service of the same kind to the same area by the same applicant, or by its successor or assignee, or on behalf of or for the benefit of any of the original parties in interest, until after the lapse of 12 months from the effective date of the Commission's action. The Commission may, for good cause shown, waive the requirements of this section.

(b) Where an appeal has been taken from the action of the Commission denying a particular application, another application for the same class of station and for the same area, in whole or in part, filed by the same applicant or by his successor or assignee, or on behalf or for the benefit of the original parties in interest, will not be considered until the final disposition of the appeal.

§ 25.154   Opposition to applications and other pleadings.
top

(a) Petitions to deny, petitions for other forms of relief, and other objections or comments must:

(1) Identify the application or applications (including applicant's name, station location, Commission file numbers, and radio service involved) with which it is concerned;

(2) Be filed within thirty (30) days after the date of public notice announcing the acceptance for filing of the application or major amendment thereto (unless the Commission otherwise extends the filing deadline);

(3) Filed in accordance with the pleading limitations, periods and other applicable provisions of §§1.41 through 1.52 of this chapter, except that such petitions must be filed electronically through the International Bureau Filing System (IBFS) in accordance with the applicable provisions of part 1, subpart Y of this chapter;

(4) Contain specific allegations of fact (except for those of which official notice may be taken) to support the specific relief requested, which shall be supported by affidavit of a person or persons with personal knowledge thereof, and which shall be sufficient to demonstrate that the petitioner (or respondent) is a party of interest and that a grant of, or other Commission action regarding, the application would be prima facie inconsistent with the public interest; and

(5) Contain a certificate of service showing that it has been mailed to the applicant no later than the date the pleading is filed with the Commission.

(b) The Commission will classify as informal objections:

(1) Any pleading not filed in accordance with paragraph (a) of this section;

(2) Any pleading to which the thirty (30) day public notice period of §25.151 does not apply; or

(3) Any objections to the grant of an application when the objections do not conform to either paragraph (a) of this section or to other Commission rules and requirements.

(c) Except for opposition to petitions to deny an application filed pursuant to §25.220, oppositions to petitions to deny an application or responses to comments and informal objections regarding an application may be filed within 10 days after the petition, comment, or objection is filed and must be in accordance with other applicable provisions of §§1.41 through 1.52 of this chapter, except that such oppositions must be filed electronically through the International Bureau Filing System (IBFS) in accordance with the applicable provisions of part 1, subpart Y of this chapter.

(d) Except for opposition to petitions to deny an application filed pursuant to §25.220, reply comments by the party that filed the original petition may be filed with respect to pleadings filed pursuant to paragraph (c) of this section within 5 days after the time for filing oppositions has expired unless the Commission otherwise extends the filing deadline and must be in accordance with other applicable provisions of §§1.41 through 1.52 of this chapter, except that such reply comments must be filed electronically through the International Bureau Filing System (IBFS) in accordance with the applicable provisions of part 1, subpart Y of this chapter.

(e) If a petition to deny an application filed pursuant to §25.220 is filed, the applicant must file a statement with the Commission explaining whether the applicant has resolved all outstanding issues raised by the petitioner, within 30 days of the date the petition for deny is filed. This statement must be in accordance with the provisions of §§1.41 through 1.52 of this chapter applicable to oppositions to petitions to deny, except that such reply comments must be filed electronically through the International Bureau Filing System (IBFS) in accordance with the applicable provisions of part 1, subpart Y of this chapter.

[56 FR 24016, May 28, 1991, as amended at 69 FR 47795, Aug. 6, 2004; 70 FR 32254, June 2, 2005]

§ 25.155   Mutually exclusive applications.
top

(a) The Commission will consider applications to be mutually exclusive if their conflicts are such that the grant of one application would effectively preclude by reason of harmful electrical interference, or other practical reason, the grant of one or more other applications.

(b) An application for an NGSO-like space station license, within the meaning of §25.157, will be entitled to comparative consideration with one or more conflicting applications only if:

(1) The application is mutually exclusive with another NGSO-like space station application; and

(2) The application is received by the Commission in a condition acceptable for filing by the “cut-off” date specified in a public notice.

(c) An application for a GSO-like space station license, within the meaning of §25.158, will be entitled to comparative consideration with one or more conflicting applications only if:

(1) The application is mutually exclusive with another GSO-like space station application; and

(2) The application is received by the Commission in a condition acceptable for filing at the same millisecond as another GSO-like space station application with which it is mutually exclusive.

[68 FR 51505, Aug. 27, 2003]

§ 25.156   Consideration of applications.
top

(a) Applications for a radio station authorization, or for modification or renewal of an authorization, will be granted if, upon examination of the application, any pleadings or objections filed, and upon consideration of such other matters as it may officially notice, the Commission finds that the applicant is legally, technically, and otherwise qualified, that the proposed facilities and operations comply with all applicable rules, regulations, and policies, and that grant of the application will serve the public interest, convenience and necessity.

(b) Whenever the Commission grants any application in part, or subject to any terms or conditions other than those routinely applied to applications of the same type, the grant shall be considered final unless the Commission should revise its action (either by granting the application as originally requested, or by designating the application for hearing) in response to a petition for reconsideration which:

(1) Is filed by the applicant within thirty (30) days from the release date of the conditioned grant; and

(2) Rejects the grant as made and explains the reasons why the application should be granted as originally requested.

(c) Reconsideration or review of any final action taken by the Commission will be in accordance with subpart A of part 1 of this chapter.

(d)(1) Applications for NGSO-like satellite systems will be considered pursuant to the procedures set forth in §25.157.

(2) Applications for GSO-like satellite systems will be considered pursuant to the procedures set forth in §25.158.

(3) Applications for NGSO-like satellite and GSO-like systems employing two or more service bands will be treated like separate applications for each service band, and each service band request will be considered pursuant to §25.157 or §25.158, as appropriate.

(4) Applications for feeder link authority or intersatellite link authority will be treated like an application separate from its associated service band. Each feeder link request or intersatellite link request will be considered pursuant to the procedure for GSO-like service or NGSO-like service, as applicable.

(5) In cases where the Commission has not adopted frequency-band specific service rules, the Commission will not consider NGSO-like applications after it has granted a GSO-like application, and it will not consider GSO-like applications after it has granted an NGSO-like application, unless and until the Commission establishes NGSO/GSO sharing criteria for that frequency band. In the event that the Commission receives NGSO-like applications and GSO-like applications at the same time, and the Commission has not adopted sharing criteria in that band, the Commission will divide the spectrum between GSO-like and NGSO-like licensees based on the proportion of qualified GSO-like and NGSO-like applicants.

(6) An application for DBS or DARS services will be entitled to comparative consideration with one or more conflicting applications only if:

(i) The application is mutually exclusive with another application; and

(ii) The application is received by the Commission in a condition acceptable for filing by the “cut-off” date specified in a public notice.

[56 FR 24016, May 28, 1991, as amended at 68 FR 51505, Aug. 27, 2003]

§ 25.157   Consideration of NGSO-like satellite applications.
top

(a) This section specifies the Commission's procedures for considering license applications for “NGSO-like satellite systems.” For purposes of this section, the term “NGSO-like satellite system” is defined as:

(1) All NGSO satellite systems, and

(2) All GSO MSS satellite systems, in which the satellites are designed to communicate with earth stations with omni-directional antennas.

(b) Each NGSO-like satellite system application will be reviewed to determine whether it is acceptable for filing within the meaning of §25.112. Any application that is not acceptable for filing would be returned to the applicant.

(c) Each NGSO-like satellite system application that is acceptable for filing will be reviewed to determine whether it is a “competing application,” i.e., filed in response to a public notice initiating a processing round, or a “lead application,” i.e., all other NGSO-like satellite system applications.

(1) Competing applications that are acceptable for filing will be placed on public notice to provide interested parties an opportunity to file pleadings in response to the application pursuant to §25.154.

(2) Lead applications that are acceptable for filing will be placed on public notice. This public notice will initiate a processing round, establish a cut-off date for competing NGSO-like satellite system applications, and provide interested parties an opportunity to file pleadings in response to the application pursuant to §25.154.

(d) After review of each of the applications in the processing round, and all the pleadings filed in response to each application, the Commission will grant all the applications that meet the standards of §25.156(a), and deny the other applications.

(e)(1) In the event that there is insufficient spectrum in the frequency band available to accommodate all the qualified applicants in a processing round, the available spectrum will be divided equally among the licensees whose applications are granted pursuant to paragraph (d) of this section, except as set forth in paragraph (e)(2) or (e)(3) of this section.

(2) In cases where there are only one or two applications in a processing round granted pursuant to paragraph (d) of this section, each applicant will be assigned 1/3 of the available spectrum, and the remaining spectrum will be made available to other licensees in an additional processing round pursuant to paragraph (c) of this section.

(3) In cases where there are three or more applications in a processing round granted pursuant to paragraph (d) of this section, and one or more applicants apply for less spectrum than they would be warranted under paragraph (e)(1) of this section, those applicants will be assigned the bandwidth amount they requested in their applications. In those cases, the remaining qualified applicants will be assigned the lesser of the amount of spectrum they requested in their applications and the amount spectrum that they would be assigned if the available spectrum were divided equally among the remaining qualified applicants.

(f)(1) Each licensee will be allowed to select the particular band segment it wishes to use no earlier than 60 days before they plan to launch the first satellite in its system, and no later than 30 days before that date, by submitting a letter to the Secretary of the Commission. The licensee shall serve copies of this letter to the other participants in the processing round pursuant to §1.47 of this chapter.

(2) The licensee shall request contiguous bandwidth in both the uplink and downlink band. Each licensee's bandwidth selection in both the uplink and downlink band shall not preclude other licensees from selecting contiguous bandwidth.

(3) If two or more licensees in a processing round request the same band segment, all licensees other than the first one to request that particular band segment will be required to make another selection.

(g)(1) In the event that an applicants' license is cancelled for any reason, the Commission will redistribute the bandwidth allocated to that applicant equally among the remaining applicants whose licenses were granted concurrently with the cancelled license, unless the Commission determines that such a redistribution would not result in a sufficient number of licensees remaining to make reasonably efficient use of the frequency band.

(2) In the event that the redistribution of bandwidth set forth in paragraph (g)(1) of this section would not result in a sufficient number of licensees remaining to make reasonably efficient use of the frequency band, the Commission will issue a public notice initiating a processing round, as set forth in paragraph (c) of this section, to invite parties to apply for an NGSO-like satellite system license to operate in a portion of the bandwidth made available as a result of the cancellation of the initial applicant's license. Parties already holding licenses to operate an NGSO-like satellite system in that frequency band will not be permitted to participate in that processing round.

(3) There is a presumption that three satellite licensees in a frequency band are sufficient to make reasonably efficient use of the frequency band.

(h) Services offered pursuant to an NGSO-like license in a frequency band granted before the Commission has adopted frequency-band-specific service rules for that band will be subject to the default service rules in §25.217.

[68 FR 51505, Aug. 27, 2003]

§ 25.158   Consideration of GSO-like satellite applications.
top

(a) This section specifies the Commission's procedures for considering license applications for “GSO-like satellite systems.” For purposes of this section, the term “GSO-like satellite system” is defined as a GSO satellite designed to communicate with earth stations with directional antennas. Examples of GSO-like satellite systems are those which use earth stations with antennas with directivity towards the satellites, such as FSS, and MSS feeder links which use GSO satellites. GSO-like satellite systems are satellite systems that are not NGSO-like satellite systems within the meaning of §25.157(a).

(b) Applications for GSO-like satellite system licenses will be placed in a queue and considered in the order that they are filed, pursuant to the following procedure:

(1) The application will be reviewed to determine whether it is acceptable for filing within the meaning of §25.112. If not, the application will be returned to the applicant.

(2) If the application is acceptable for filing, the application will be placed on public notice pursuant to §25.151, and interested parties will be given an opportunity to file pleadings pursuant to §25.154.

(3) The application will be granted only if it meets each of the following criteria:

(i) After review of the application and any pleadings filed in response to that application, the Commission finds that the application meets the standards of §25.156(a); and

(ii) The proposed satellite will not cause harmful interference to any previously licensed operations.

(c) An applicant for a GSO-like satellite system license is not allowed to transfer, assign, or otherwise permit any other entity to assume its place in any queue.

(d) In the event that two or more GSO-like satellite system license applications are mutually exclusive within the meaning of §25.155(c), the Commission will consider those applications pursuant to the following procedure:

(1) Each application will be reviewed to determine whether it is acceptable for filing within the meaning of §25.112. Any application not found acceptable for filing will be returned to the applicant.

(2) All applications that are acceptable for filing will be placed on public notice pursuant to §25.151, and interested parties will be given an opportunity to file pleadings pursuant to §25.154.

(3) Each application will be granted if it meets the criteria of paragraph (b)(3) of this section, and otherwise will be denied.

(4) In the event that two or more applications are granted pursuant to paragraph (d)(3) of this section, the available bandwidth at the orbital location or locations in question will be divided equally among those licensees.

(5) Licensees whose licenses are granted pursuant to paragraph (d)(4) of this section will be allowed to select the particular band segment it wishes to use no earlier than 60 days before they plan to launch the first satellite in its system, and no later than 30 days before that date, by submitting a letter to the Secretary of the Commission. The licensee shall serve copies of this letter to the other participants in the processing round pursuant to §1.47 of this chapter.

(6) Licensees whose licenses are granted pursuant to paragraph (d)(4) of this section shall request contiguous bandwidth in both the uplink and downlink band. Each licensee's bandwidth selection shall not preclude other licensees from selecting contiguous bandwidth.

(7) If two or more licensees whose licenses are granted pursuant to paragraph (d)(4) of this section request the same band segment, all licensees other than the first one to request that particular band segment will be required to make another selection.

(e) Services offered pursuant to a GSO-like license in a frequency band granted before the Commission has adopted frequency-band-specific service rules for that band will be subject to the default service rules in §25.217.

[68 FR 51506, Aug. 27, 2003]

§ 25.159   Limits on pending applications and unbuilt satellite systems.
top

(a) Applicants with a total of five applications for GSO-like space station licenses on file with the Commission in a particular frequency band, or a total of five licensed-but-unbuilt GSO-like space stations in a particular frequency band, or a combination of pending GSO-like applications and licensed-but-unbuilt GSO-like space stations in a particular frequency band that equals five, will not be permitted to apply for another GSO-like space station license in that frequency band.

(b) Applicants with an application for one NGSO-like satellite system license on file with the Commission in a particular frequency band, or one licensed-but-unbuilt NGSO-like satellite system in a particular frequency band, will not be permitted to apply for another NGSO-like satellite system license in that frequency band.

(c) If an applicant has an attributable interest in one or more other entities seeking one or more space station licenses, the pending applications and licensed-but-unbuilt satellite systems filed by those other entities will be counted as filed by the applicant for purposes of the limits on the number of pending space station applications and licensed-but-unbuilt satellite systems in this paragraph. For purposes of this paragraph, an applicant has an “attributable interest” in another entity if:

(1) It holds equity (including all stockholdings, whether voting or nonvoting, common or preferred) and debt interest or interests, in the aggregate, exceed thirty-three (33) percent of the total asset value (defined as the aggregate of all equity plus all debt) of that entity, or

(2) It holds a controlling interest in that entity, or is the subsidiary of a party holding a controlling interest in that entity, within the meaning of 47 CFR 1.2110(b)(2).

(3) For purposes of paragraphs (c)(1) and (c)(2) of this section, ownership interests shall be calculated on a fully diluted basis, i.e., all agreements, such as warrants, stock options, and convertible debentures, will generally be treated as if the rights thereunder already have been fully exercised.

(d) In the event that a licensee misses three or more milestones within any three-year period, the Commission will presume that the licensee obtained one or more of those licenses for speculative purposes. Unless the licensee rebuts this presumption, it will not be permitted to apply for a GSO-like satellite or an NGSO-like satellite system in any frequency band if it has two or more satellite applications pending, or two licensed-but-unbuilt satellite systems of any kind. This limit will remain in effect until the licensee provides adequate information to demonstrate that it is very likely to construct its licensed facilities if it were allowed to file more applications.

(e) For purposes of this section, “frequency band” means one of the paired frequency bands available for satellite service listed in §25.202.

[68 FR 51506, Aug. 27, 2003]

Forfeiture, Termination, and Reinstatement of Station Authorization
top
§ 25.160   Administrative sanctions.
top

(a) A forfeiture may be imposed for failure to operate in conformance with the Communications Act, license specifications, any conditions imposed on an authorization, or any of the Commission's rules and regulations; or for failure to comply with Commission requests for information needed to complete international coordination or for failure to cooperate in Commission investigations with respect to international coordination.

(b) A forfeiture will be imposed and the station license may be terminated for the malicious transmissions of any signal that causes harmful interference with any other radio communications or signals.

(c) A station license may be revoked for any repeated and willful violation of the kind set forth in paragraphs (a) and (b) of this section.

(d) The sanctions specified in paragraphs (a), (b), and (c) of this section will be imposed only after the licensee has been provided an opportunity to be heard pursuant to titles III and V of the Communications Act of 1934, as amended.

(e) For purposes of this section, the term “repeated” and “willful” are defined as set out in section 312(f) of the Communications Act, 47 U.S.C. 312(f).

§ 25.161   Automatic termination of station authorization.
top

A station authorization shall be automatically terminated in whole or in part without further notice to the licensee upon:

(a)(1) Failure to meet any applicable milestone for implementation of the licensed satellite system specified in §§25.164(a) and/or (b), without demonstrating that the failure was caused by circumstances beyond the licensee's control, or

(2) If there are no applicable milestones for implementation of the licensed satellite system specified in §§25.164(a) and/or (b), the expiration of the required date of completion of construction or other required action specified in the authorization, or after any additional time authorized by the Commission, if a certification of completion of the required action has not been filed with the Commission unless a request for an extension of time has been filed with the Commission but has not been acted on.

(b) The expiration of the license period, unless an application for renewal of the license has been filed with the Commission pursuant to §25.120(e); or

(c) The removal or modification of the facilities which renders the station not operational for more than 90 days, unless specific authority is requested.

[56 FR 24016, May 28, 1991, as amended at 68 FR 51507, Aug. 27, 2003]

§ 25.162   Cause for termination of interference protection.
top

The protection from interference afforded by the registration of a receiving earth station shall be automatically terminated if:

(a) The request for registration is not submitted to the Commission within 3 months of the completion of the frequency coordination process, except as provided for in §25.203;

(b) The receiving earth station is not constructed and placed into service within 6 months after completion of coordination;

(c) The Commission finds that the station has been used less than 50% of the time during any 12 month period;

(d) The Commission finds that the station has been used for an unlawful purpose or otherwise in violation of the Commission's rules, regulations or policies;

(e) The Commission finds that the actual use of the facility is inconsistent with what was set forth in the registrant's application; or

(f) The Commission finds that the frequency coordination exhibit, upon which the granted registration is based, is incomplete or does not conform with established coordination procedures.

§ 25.163   Reinstatement.
top

(a) A station authorization terminated in whole or in part under the provisions of §25.161 may be reinstated if the Commission, in its discretion, determines that reinstatement would best serve the public interest, convenience and necessity. Petitions for reinstatement will be considered only if:

(1) The petition is filed within 30 days after the expiration date set forth in §25.161(a) or §25.161(b), whichever is applicable;

(2) The petition explains the failure to file a timely notification or renewal application; and

(3) The petition sets forth with specificity the procedures which have been established to insure timely filings in the future.

(b) A special temporary authorization shall automatically terminate upon the expiration date specified therein, or upon failure of the grantee to comply with any special terms or conditions set forth in the authorization. Temporary operation may be extended beyond the termination date only upon application to the Commission.

§ 25.164   Milestones.
top

(a) Licensees of geostationary orbit satellite systems other than DBS and DARS satellite systems, including GSO MSS satellite systems, licensed on or after August 27, 2003 will be required to comply with the schedule set forth in paragraphs (a)(1) through (a)(4) of this section in implementing their satellite systems, unless a different schedule is established by Title 47, Chapter I, or by Commission Order, or by Order adopted pursuant to delegated authority. These dates are to be measured from the date the license is issued.

(1) One year: Enter into a binding non-contingent contract to construct the licensed satellite system.

(2) Two years: Complete the critical design review of the licensed satellite system.

(3) Three years: Begin the construction of the satellite.

(4) Five years: Launch and operate the satellite.

(b) Licensees of non-geostationary orbit satellite systems other than DBS and DARS satellite systems licensed on or after September 11, 2003, will be required to comply with the schedule set forth in paragraphs (b)(1) through (b)(5) of this section in implementing their satellite systems, unless a different schedule is established by Title 47, Chapter I, or by Commission Order, or by Order adopted pursuant to delegated authority. These dates are to be measured from the date the license is issued.

(1) One year: Enter into a binding non-contingent contract to construct the licensed satellite system.

(2) Two years: Complete the critical design review of the licensed satellite system.

(3) Two years, six months: Begin the construction of the first satellite in the licensed satellite system.

(4) Three years, six months: Launch and operate the first satellite in the licensed satellite system.

(5) Six years: Bring all the satellites in the licensed satellite system into operation.

(c) Licensees of all satellite systems, other than DBS and DARS satellite systems, licensed on or after September 11, 2003, will be required to submit a copy of their binding non-contingent contract with the Commission on or before the date scheduled for entering into such a contract.

(d) Licensees of all satellite systems, other than DBS and DARS satellite systems, licensed on or after September 11, 2003, will be required to submit information to the Commission sufficient to demonstrate that the licensee has completed the critical design review of the licensed satellite system on or before the date scheduled for entering into such completion.

(e) Licensees of all satellite systems, other than DBS and DARS satellite systems, licensed on or after September 11, 2003, will be required to submit information to the Commission sufficient to demonstrate that the licensee has commenced physical construction of its licensed spacecraft on or before the date scheduled for such commencement.

(f) In cases where the Commission grants a satellite authorization in different stages, such as a license for a satellite system using feeder links or intersatellite links, the earliest of the milestone schedules shall be applied to the entire satellite system.

(g) Licensees of satellite systems that include both non-geostationary orbit satellites and geostationary orbit satellites, other than DBS and DARS satellite systems, and licensed on or after September 20, 2004 will be required to comply with the schedule set forth in paragraph (a) of this section with respect to the geostationary orbit satellites, and with the schedule set forth in paragraph (b) of this section with respect to the non-geostationary orbit satellites.

[68 FR 51507, Aug. 27, 2003, as amended at 69 FR 51587, Aug. 20, 2004]

§ 25.165   Posting of bonds.
top

(a) For all satellite licenses issued after September 20, 2004, other than DBS licenses, DARS licenses, and replacement satellite licenses as defined in paragraph (e), the licensee is required to post a bond within 30 days of the grant of its license. Failure to post a bond will render the license null and void automatically.

(1) NGSO licensees are required to post a bond in the amount of $5 million.

(2) GSO licensees are required to post a bond in the amount of $3 million.

(3) Licensees of satellite systems including both NGSO satellites and GSO satellites that operate in the same frequency bands as the NGSO satellites are required to post a bond in the amount of $5 million.

(b) The licensee must use a surety company deemed acceptable within the meaning of 31 U.S.C. 9304 et seq. (See, e.g., Department of Treasury Fiscal Service, Companies Holding Certificates of Authority as Acceptable Sureties on Federal Bonds and As Acceptable Reinsurance Companies, 57 FR 29356, July 1, 1992.) The bond must name the U.S. Treasury as beneficiary in the event of the licensee's default. The licensee must provide the Commission with a copy of the performance bond, including all details and conditions.

(c) A licensee will be considered to be in default if it fails to meet any milestone deadline set forth in §25.164, and, at the time of milestone deadline, the licensee has not provided a sufficient basis for extending the milestone.

(d) A GSO licensee will be permitted to reduce the amount of the bond by $750,000 upon successfully meeting a milestone deadline set forth in section 25.164(a) of this chapter. An NGSO licensee will be permitted to reduce the amount of the bond by $1 million upon successfully meeting a milestone deadline set forth in section 25.164(b) of this chapter.

(e) A replacement satellite is one that is:

(1) Authorized to be operated at the same orbit location, in the same frequency bands, and with the same coverage area as one of the licensee's existing satellites, and

(2) Scheduled to be launched so that it will be brought into use at approximately the same time as, but no later than, the existing satellite is retired.

[68 FR 51507, Aug. 27, 2003, as amended at 69 FR 51587, Aug. 20, 2004]

Subpart C—Technical Standards
top

Source:  30 FR 7176, May 28, 1965; 36 FR 2562, Feb. 6, 1971, unless otherwise noted.

§ 25.201   Definitions.
top

Definitions for terms in subpart C of this part appear in this section, and in §2.1 of this chapter.

Active satellite. An earth satellite carrying a station intended to transmit or re-transmit radiocommunication signals.

Ambulatory. Not stationary. Baselines from which maritime boundaries are measured change with accretion- and erosion-caused ambulation of the boundaries themselves.

Ancillary terrestrial component. The term “ancillary terrestrial component” means a terrestrial communications network used in conjunction with a qualifying satellite network system authorized pursuant to these rules and the conditions established in the Orders issued in IB Docket No. 01–185, Flexibility for Delivery of Communications by Mobile Satellite Service Providers in the 2 GHz Band, the L-Band, and the 1.6/2.4 GHz Band.

Ancillary terrestrial component base station. The term “ancillary terrestrial component base station” means a terrestrial fixed facility used to transmit communications to or receive communications from one or more ancillary terrestrial component mobile terminals.

Ancillary terrestrial component mobile terminal. The term “ancillary terrestrial component mobile terminal” means a terrestrial mobile facility used to transmit communications to or receive communications from an ancillary terrestrial component base station or a space station.

Base Earth Station. An earth station in the fixed-satellite service or, in some cases, in the land mobile-satellite service, located at a specified fixed point or within a specified area on land to provide a feeder link for the land mobile-satellite service. (RR)

Baseline. The line from which maritime zones are measured, also known as the coast line. The baseline is a combination of the low-water line (“low-tide elevation”) and closing lines across the mouths of inland water bodies. The baseline is defined by a series of baseline points. The baseline points are not just the low-water marks of the shore of mainland but also includes islands and “low-water elevations” (i.e., natural rocks). Baseline points are ambulatory, and thus, require adjustment from time-to-time by the U.S. Department of State's Baseline Committee.

C-band. For purposes of this part, the terms “C-band” and “conventional C-band” refer specifically to the 3700–4200 MHz downlink and 5925–6425 MHz uplink frequency bands. These paired bands are allocated to the Fixed-Satellite Service and are also referred to as the 4/6 GHz band(s).

Coordination distance. For the purposes of this part, the expression “coordination distance” means the distance from an earth station, within which there is a possibility of the use of a given transmitting frequency at this earth station causing harmful interference to stations in the fixed or mobile service, sharing the same band, or of the use of a given frequency for reception at this earth station receiving harmful interference from such stations in the fixed or mobile service.

Direct Broadcast Satellite Service. A radiocommunication service in which signals transmitted or retransmitted by space stations, using frequencies specified in §25.202(a)(7), are intended for direct reception by the general public. For the purposes of this definition, the term direct reception shall encompass both individual reception and community reception.

Earth station. A station located either on the Earth's surface or within the major portion of the Earth's atmosphere intended for communication:

(a) With one or more space stations; or

(b) With one or more stations of the same kind by means of one or more reflecting satellites or other objects in space.

Earth Station on Vessel (“ESV”). An ESV is an earth station onboard a craft designed for traveling on water receiving from and transmitting to fixed-satellite space stations.

Electronic filing. The submission of applications, exhibits, pleadings, or other filings to the Commission in an electronic form using Internet or World Wide Web on-line filing forms.

Equivalent diameter. When circular aperture reflector antennas are employed, the size of the antenna is generally expressed as the diameter of the antenna's main reflector. When non-reflector or non-circular aperture antennas are employed, an equivalent diameter can be computed for the antenna. The equivalent diameter is the diameter of a hypothetical circular aperture antenna with the same aperture area as the actual antenna. For example, an elliptical aperture antenna with major axis, a, and minor axis, b, will have an equivalent diameter of [a × b]1/2. A rectangular aperture antenna with length, l, and width, w, will have an equivalent diameter of [4(l × w)/π]1/2.

Equivalent power flux-density. The equivalent power flux-density (EPFD) is the sum of the power flux-densities produced at a geostationary satellite orbit (GSO) receive earth or space station on the Earth's surface or in the geostationary satellite orbit, as appropriate, by all the transmit stations within a non-geostationary satellite orbit fixed-satellite service (NGSO FSS) system, taking into account the off-axis discrimination of a reference receiving antenna assumed to be pointing in its nominal direction. The equivalent power flux-density, in dB(W/m2 ) in the reference bandwidth, is calculated using the following formula:

Where:

Na is the number of transmit stations in the non-geostationary satellite orbit system that are visible from the GSO receive station considered on the Earth's surface or in the geostationary satellite orbit, as appropriate;

i is the index of the transmit station considered in the non-geostationary satellite orbit system;

Pi is the RF power at the input of the antenna of the transmit station, considered in the non-geostationary satellite orbit system in dBW in the reference bandwidth;

2i is the off-axis angle between the boresight of the transmit station considered in the non-geostationary satellite orbit system and the direction of the GSO receive station;

Gt(2i) is the transmit antenna gain (as a ratio) of the station considered in the non-geostationary satellite orbit system in the direction of the GSO receive station;

di is the distance in meters between the transmit station considered in the non-geostationary satellite orbit system and the GSO receive station;

Ni is the off-axis angle between the boresight of the antenna of the GSO receive station and the direction of the ith transmit station considered in the non-geostationary satellite orbit system;

Gr(Ni) is the receive antenna gain (as a ratio) of the GSO receive station in the direction of the ith transmit station considered in the non-geostationary satellite orbit system;

Gr,max is the maximum gain (as a ratio) of the antenna of the GSO receive station;

Fixed earth station. An earth station intended to be used at a specified fixed point.

Fixed-Satellite Service. A radiocommunication service between earth stations at given positions, when one or more satellites are used; the given position may be a specified fixed point or any fixed point within specified areas; in some cases this service includes satellite-to-satellite links, which may also be operated in the inter-satellite service; the fixed-satellite service may also include feeder links of other space radiocommunication services. (RR)

Geostationary satellite. A geosynchronous satellite whose circular and direct orbit lies in the plane of the Earth's equator and which thus remains fixed relative to the Earth; by extension, a satellite which remains approximately fixed relative to the Earth.

2 GHz Mobile Satellite Service. A mobile-satellite service that operated in the 2000–2020 MHz and 2180–2200 MHz frequency bands, or in any portion thereof.

Inter-Satellite Service. A radiocommunication service providing links between artificial earth satellites.

Land Earth Station. An earth station in the fixed-satellite service or, in some cases, in the mobile-satellite service, located at a specified fixed point or within a specified area on land to provide a feeder link for the mobile-satellite service. (RR)

Land Mobile Earth Station. A mobile earth station in the land mobile-satellite service capable of surface movement within the geographical limits of a country or continent. (RR)

Ku-band. In this rule part, the terms “Ku-band” and “conventional Ku-band” refer specifically to the 11700–12200 MHz downlink and 14000–14500 MHz uplink frequency bands. These paired bands are allocated to the Fixed-Satellite Service and are also referred to as the 12/14 GHz band(s).

Low-Tide Elevation. A naturally formed area of land that is surrounded by and above water at low tide but below water at high tide. Low-tide elevations serve as part of the coast line when they are within the breath of the territorial sea of the mainland (either uplands or inland waters) or an island. 1958 Convention on the Territorial Sea, Article 11.

Mobile earth station. An earth station intended to be used while in motion or during halts at unspecified points.

Mobile-Satellite Service. A radiocommunication service:

(1) Between mobile earth stations and one or more space stations, or between space stations used by this service; or

(2) Between mobile earth stations, by means of one or more space stations.

This service may also include feeder links necessary for its operation. (RR)

NGSO FSS gateway earth station. A gateway earth station is an earth station complex consisting of multiple interconnecting earth station antennas supporting the communication routing and switching functions of a non-geostationary satellite orbit fixed-satellite service (NGSO FSS) system as a whole. A gateway earth station in the NGSO FSS:

(1) Does not originate or terminate radiocommunication traffic, but interconnects multiple non-collocated user earth stations operating in frequency bands other than designated gateway bands, through a satellite with other primary terrestrial networks, such as the public switched telephone network (PSTN) and/or Internet networks.

(2) Shall not be for the exclusive use of any customer.

(3) May also be used for telemetry, tracking, and command transmissions for the same NGSO FSS system.

(4) May include multiple antennas, each required to meet the antenna performance standard in §25.209(h), located within an area of one second latitude by one second longitude.

(5) Is considered as a separate gateway earth station complex if it is out side of the area of one second latitude by one second longitude of paragraph (4) of this definition, for the purposes of coordination with terrestrial services.

Non-Voice, Non-Geostationary Mobile-Satellite Service. A mobile-satellite service reserved for use by non-geostationary satellites in the provision of non-voice communications which may include satellite links between land earth stations at fixed locations.

1.6/2.4 GHz Mobile-Satellite Service. A mobile-satellite service that operates in the 1610–1626.5 MHz and 2483.5–2500 MHz frequency bands, or in any portion thereof.

Passive satellite. An earth satellite intended to transmit radio communication signals by reflection.

Permitted Space Station List. A list of satellites operating in the C-band and/or Ku-band including all U.S.-licensed satellites and those non-U.S.-licensed satellites for which the Commission has authorized routine U.S.-licensed earth stations to communicate with that satellite, and the satellite operator has requested the Commission to place its satellite on the Permitted Space Station List.

Power flux density. The amount of power flow through a unit area within a unit bandwidth. The units of power flux density are those of power spectral density per unit area, namely watts per hertz per square meter. These units are generally expressed in decibel form as dB(W/Hz/m2 ), dB(W/m2 ) in a 4 kHz band, or dB(W/m2 ) in a 1 MHz band.

Power spectral density. The amount of an emission's transmitted carrier power falling within the stated reference bandwidth. The units of power spectral density are watts per hertz and are generally expressed in decibel form as dB(W/Hz), dB(W/4kHz), or dB(W/1MHz).

Protection areas. The geographic regions on the surface of the Earth where United States Department of Defense (“DoD”) meteorological satellite systems or National Oceanic and Atmospheric Administration (“NOAA”) meteorological satellite systems, or both such systems, are receiving signals from low earth orbiting satellites.

Radiodetermination-Satellite Service. A radiocommunication service for the purpose of radiodetermination involving the use of one of more space stations. This service may also include feeder links necessary for its own operation. (RR)

Routine processing or licensing. A licensing process whereby applications are processed in an expedited fashion. Such applications must be complete in all regards and consistent with all Commission Rules and must not raise any policy issues. With respect to earth station licensing, an application is “routine” only if it conforms to all antenna, power, coordination, radiation hazard, and FAA notification rules, and accesses only “Permitted Space Station List” satellites in the conventional C-band or Ku-band frequency bands.

Satellite Digital Audio Radio Service (“DARS”). A radiocommunication service in which audio programming is digitally transmitted by one or more space stations directly to fixed, mobile, and/or portable stations, and which may involve complementary repeating terrestrial transmitters, telemetry, tracking and control facilities.

Satellite system. A space system using one or more artificial earth satellites.

Selected assignment. The term “selected assignment” means a spectrum assignment voluntarily identified by a 2 GHz MSS licensee at the time that the licensee's first 2 GHz mobile-satellite service satellite reaches its intended orbit, or other mobile-satellite service spectrum in which the Commission permits a 2 GHz mobile-satellite service licensee to conduct mobile-satellite service operations with authority superior to that of other in-band, mobile-satellite service licensees.

Spacecraft. A man-made vehicle which is intended to go beyond the major portion of the Earth's atmosphere.

Space operation service. A radiocommunication service concerned exclusively with the operation of spacecraft, in particular space tracking, space telemetry and space telecommand. These functions will normally be provided within the service in which the space station is operating.

Space radiocommunication. Any radiocommunication involving the use of one or more space stations or the use of one or more reflecting satellites or other objects in space.

Space station. A station located on an object which is beyond, is intended to go beyond, or has been beyond, the major portion of the Earth's atmosphere.

Space system. Any group of cooperating earth stations and/or space stations employing space radiocommunication for specific purposes.

Space telecommand. The use of radiocommunication for the transmission of signals to a space station to initiate, modify or terminate function of the equipment on a space object, including the space station.

Space telemetering. The use of telemetering for the transmission from a space station of results of measurements made in a spacecraft, including those relating to the functioning of the spacecraft.

Space tracking. Determination of the orbit, velocity or instantaneous position of an object in space by means of radiodetermination, excluding primary radar, for the purpose of following the movement of the object.

Structural attenuation. The term “structural attenuation” means the signal attenuation caused by transmitting to and from mobile terminals which are located in buildings or other man-made structures that attenuate the transmission of radiofrequency radiation.

Terrestrial radiocommunication. Any radiocommunication other than space radiocommunication or radio astronomy.

Terrestrial station. A station effecting terrestrial radiocommunication.

[30 FR 7176, May 28, 1965, as amended at 36 FR 2562, Feb. 6, 1971; 48 FR 40254, Sept. 6, 1983; 51 FR 18445, May 20, 1986; 54 FR 49993, Dec. 4, 1989; 56 FR 42706, Aug. 29, 1991; 58 FR 68059, Dec. 23, 1993; 59 FR 53329, Oct. 21, 1994; 62 FR 11105, Mar. 11, 1997; 62 FR 59296, Nov. 3, 1997; 65 FR 59143, Oct. 4, 2000; 66 FR 10621, Feb. 16, 2001; 67 FR 51114, Aug. 7, 2002; 68 FR 11993, Mar. 13, 2003; 68 FR 33650, June 5, 2003; 68 FR 34338, June 9, 2003; 70 FR 4783, Jan. 31, 2005; 70 FR 19318, Apr. 13, 2005; 70 FR 32255, June 2, 2005]

§ 25.202   Frequencies, frequency tolerance and emission limitations.
top

(a)(1) Frequency band. The following frequencies are available for use by the fixed-satellite service. Precise frequencies and bandwidths of emission shall be assigned on a case-by-case basis. The Table follows:

 ------------------------------------------------------------------------        Space-to-earth (GHz)                 Earth-to-space (GHz)------------------------------------------------------------------------3.65-3.7 \17\3.7-4.2 \1\                          5.925-6.425 \1\10.7-10.95 \1,12\                    12.75-13.25 \1,12,14\10.95-11.2 \1,2,12\                  13.75-14 \4,12\11.2-11.45 \1,12\                    14-14.2 \5\11.45-11.7 \1,2,12\                  14.2-14.511.7-12.2 \3\                        17.3-17.8 \9\12.2-12.7 \13\                       27.5-29.5 \1\18.3-18.58 \1,10\                    29.5-3018.58-18.8 \6,10,11\                 \1\ 47.2-50.218.8-19.3 \7,10\19.3-19.7 \8,10\19.7-20.2 \10\37.5-40 \15,16\37.6-38.640-42 \16\------------------------------------------------------------------------\1\ This band is shared coequally with terrestrial radiocommunication  services.\2\ Use of this band by geostationary satellite orbit satellite systems  in the fixed-satellite service is limited to international systems;  i.e., other than domestic systems.\3\ Fixed-satellite transponders may be used additionally for  transmissions in the broadcasting-satellite service.\4\ This band is shared on an equal basis with the Government  radiolocation service and grandfathered space stations in the Tracking  and Data Relay Satellite System.\5\ In this band, stations in the radionavigation service shall operate  on a secondary basis to the fixed-satellite service.\6\ The band 18.58-18.8 GHz is shared co-equally with existing  terrestrial radiocommunication systems until June 8, 2010.\7\ The band 18.8-19.3 GHz is shared co-equally with terrestrial  radiocommunication services, until June 8, 2010. After this date, the  sub-band 19.26-19.3 GHz is shared co-equally with existing terrestrial  radiocommunication systems.\8\ The use of the band 19.3-19.7 GHz by the fixed-satellite service  (space-to-Earth) is limited to feeder links for the mobile-satellite  service.\9\ The use of the band 17.3-17.8 GHz by the fixed-satellite service  (Earth-to-space) is limited to feeder links for broadcasting-satellite  service, and the sub-band 17.7-17.8 GHz is shared co-equally with  terrestrial fixed services.\10\ This band is shared co-equally with the Federal Government fixed-  satellite service.\11\ The band 18.6-18.8 GHz is shared co-equally with the non-Federal  Government and Federal Government Earth exploration-satellite  (passive) and space research (passive) services.\12\ Use of this band by non-geostationary satellite orbit systems in  the fixed-satellite service is limited to gateway earth station  operations.\13\ Use of this band by the fixed-satellite service is limited to non-  geostationary satellite orbit systems.\14\ Use of this band by NGSO FSS gateway earth station uplink  operations is subject to the provisions of § 2.106 NG53.\15\ Use of this band by the fixed-satellite service is limited to  ``gateway'' earth station operations, provided the licensee under this  Part obtains a license under Part 101 of this Chapter or an agreement  from a Part 101 licensee for the area in which an earth station is to  be located. Satellite earth station facilities in this band may not be  ubiquitously deployed and may not be used to serve individual  consumers.\16\ The band 37.5-40.0 GHz is designated as being available for use by  the fixed and mobile services and the band 40.0-42.0 GHz is designated  as being available for use by the fixed-satellite service.\17\ FSS earth stations in this band must operate on a secondary basis  to terrestrial radiocommunication services, except that the band is  shared co-equally between certain grandfathered earth stations and the  terrestrial radiocommunication services.

(2) [Reserved]

(3) The following frequencies are available for use by the non-voice, non-geostationary mobile-satellite service:

137–138 MHz: Space-to-Earth

148–150.05 MHz: Earth-to-space

399.9–400.05 MHz: Earth-to-space

400.15–401 MHz: Space-to-Earth

(4)(i) The following frequencies are available for use by the 1.6/2.4 GHz Mobile-Satellite Service:

1610–1626.5 MHz: User-to-Satellite Link

1613.8–1626.5 MHz: Satellite-to-User Link (secondary)

2483.5–2500 MHz: Satellite-to-User Link

(ii) The following frequencies are available for use by the 2 GHz Mobile-Satellite Service: 2000–2020 MHz: User-to-Satellite Link; 2180–2200 MHz: Satellite-to-User Link.

(iii)(A) The following frequencies are available for use by the L-band Mobile-Satellite Service:

1525–1559 MHz: Space-to-Earth

1626.5–1660.5 MHz: Earth-to-space

(B) The use of the frequencies 1544–1545 MHz and 1645.5–1646.5 MHz is limited to distress and safety communications.

(5) The following frequencies are available for use by the inter-satellite service:

22.55–23.00 GHz

23.00–23.55 GHz

24.45–24.65 GHz

24.65–24.75 GHz

(6) The following spectrum is available for exclusive use by the satellite digital audio radio service:

2320–2345 MHz: space-to-Earth (primary).

(7) The following frequencies are available for use by the Direct Broadcast Satellite service:

12.2–12.7 GHz: Space-to-Earth.

(8) The following frequencies are available for use by ESVs:

3700–4200 MHz (space-to-Earth)

5925–6425 MHz (Earth-to-space)

10.95–11.2 GHz (space-to-Earth)

11.45–11.7 GHz (space-to-Earth)

11.7–12.2 GHz (space-to-Earth)

14.0–14.5 GHz (Earth-to-space)

ESVs shall be authorized and coordinated as set forth in §§25.221 and 25.222. ESV operators, collectively, may coordinate up to 180 megahertz of spectrum in the 5925–6425 MHz (Earth-to-space) band for all ESV operations at any given location subject to coordination.

(b) Other frequencies and associated bandwidths of emission may be assigned on a case-by-case basis to space systems under this part in conformance with §2.106 of this chapter and the Commission's rules and policies.

(c) Orbital locations assigned to space stations licensed under this part by the commission are subject to change by summary order of the Commission on 30 days notice. An authorization to construct and/or to launch a space station becomes null and void if the construction is not begun or is not completed, or if the space station is not launched and positioned at its assigned orbital location and operations commenced in accordance with the station authorization, by the respective date(s) specified in the authorization. Frequencies and orbital location assignments are subject to the policies set forth in the Report and Order, FCC 83–184, adopted April 27, 1983 in CC Docket No. 81–704 and the Report and Order, adopted July 25, 1985 in CC Docket No. 84–1299 as modified by the Report and Order, adopted January 19, 1996 in IB Docket No. 95–41.

(d) Frequency tolerance, Earth stations. The carrier frequency of each earth station transmitter authorized in these services shall be maintained within 0.001 percent of the reference frequency.

(e) Frequency tolerance, space stations. The carrier frequency of each space station transmitter authorized in these services shall be maintained within 0.002 percent of the reference frequency.

(f) Emission limitations. The mean power of emissions shall be attenuated below the mean output power of the transmitter in accordance with the following schedule:

(1) In any 4 kHz band, the center frequency of which is removed from the assigned frequency by more than 50 percent up to and including 100 percent of the authorized bandwidth: 25 dB;

(2) In any 4 kHz band, the center frequency of which is removed from the assigned frequency by more than 100 percent up to and including 250 percent of the authorized bandwidth: 35 dB;

(3) In any 4 kHz band, the center frequency of which is removed from the assigned frequency by more than 250 percent of the authorized bandwidth: An amount equal to 43 dB plus 10 times the logarithm (to the base 10) of the transmitter power in watts;

(4) In any event, when an emission outside of the authorized bandwidth causes harmful interference, the Commission may, at its discretion, require greater attenuation than specified in paragraphs (f) (1), (2) and (3) of this section.

(g) Telemetry, tracking and telecommand functions for U.S. domestic satellites shall be conducted at either or both edges of the allocated band(s). Frequencies, polarization and coding shall be selected to minimize interference into other satellite networks and within their own satellite system.

[30 FR 7176, May 28, 1965, as amended at 36 FR 2562, Feb. 6, 1971; 38 FR 8573, Apr. 4, 1973; 39 FR 33527, Sept. 18, 1974; 48 FR 40254, Sept. 6, 1983; 50 FR 36079, Sept. 5, 1985; 51 FR 18445, May 20, 1986; 51 FR 20975, June 10, 1986; 54 FR 49993, Dec. 4, 1989; 56 FR 24024, May 28, 1991; 58 FR 13419, Mar. 11, 1993; 58 FR 68061, Dec. 23, 1993; 59 FR 53329, Oct. 21, 1994; 61 FR 9952, Mar. 12, 1996; 61 FR 52307, Oct. 7, 1996; 62 FR 11105, Mar. 11, 1997; 64 FR 2591, Jan. 15, 1999; 64 FR 6565, Feb. 10. 1999; 65 FR 54171, Sept. 7, 2000; 65 FR 59144, Oct. 4, 2000; 66 FR 10622, Feb. 16, 2001; 66 FR 63515, Dec. 7, 2001; 67 FR 17299, Apr. 10, 2002; 67 FR 39862, June 11, 2002; 67 FR 51114, Aug. 7, 2002; 68 FR 11993, Mar. 13, 2003; 68 FR 16966, Apr. 8, 2003; 68 FR 34338, June 9, 2003; 68 FR 74387, Dec. 23, 2003; 69 FR 52206, Aug. 25, 2004; 70 FR 4783, Jan. 31, 2005; 70 FR 24725, May 11, 2005; 70 FR 32255, June 2, 2005]

§ 25.203   Choice of sites and frequencies.
top

(a) Sites and frequencies for earth stations, other than ESVs, operating in frequency bands shared with equal rights between terrestrial and space services, shall be selected, to the extent practicable, in areas where the surrounding terrain and existing frequency usage are such as to minimize the possibility of harmful interference between the sharing services.

(b) An applicant for an earth station authorization, other than an ESV, in a frequency band shared with equal rights with terrestrial microwave services shall compute the great circle coordination distance contour(s) for the proposed station in accordance with the procedures set forth in §25.251. The applicant shall submit with the application a map or maps drawn to appropriate scale and in a form suitable for reproduction indicating the location of the proposed station and these contours. These maps, together with the pertinent data on which the computation of these contours is based, including all relevant transmitting and/or receiving parameters of the proposed station that is necessary in assessing the likelihood of interference, an appropriately scaled plot of the elevation of the local horizon as a function of azimuth, and the electrical characteristics of the earth station antenna(s), shall be submitted by the applicant in a single exhibit to the application. The coordination distance contour plot(s), horizon elevation plot, and antenna horizon gain plot(s) required by this section may also be submitted in tabular numerical format at 5° azimuthal increments instead of graphical format. At a minimum, this exhibit shall include the information listed in paragraph (c)(2) of this section. An earth station applicant shall also include in the application relevant technical details (both theoretical calculations and/or actual measurements) of any special techniques, such as the use of artificial site shielding, or operating procedures or restrictions at the proposed earth station which are to be employed to reduce the likelihood of interference, or of any particular characteristics of the earth station site which could have an effect on the calculation of the coordination distance.

(c) Prior to the filing of its application, an applicant for operation of an earth station, other than an ESV, shall coordinate the proposed frequency usage with existing terrestrial users and with applicants for terrestrial station authorizations with previously filed applications in accordance with the following procedure:

(1) An applicant for an earth station authorization shall perform an interference analysis in accordance with the procedures set forth in §25.251 for each terrestrial station, for which a license or construction permit has been granted or for which an application has been accepted for filing, which is or is to be operated in a shared frequency band to be used by the proposed earth station and which is located within the great circle coordination distance contour(s) of the proposed earth station.

(2) The earth station applicant shall provide each such terrestrial station licensee, permittee, and prior filed applicant with the technical details of the proposed earth station and the relevant interference analyses that were made. At a minimum, the earth station applicant shall provide the terrestrial user with the following technical information:

(i) The geographical coordinates of the proposed earth station antenna(s),

(ii) Proposed operating frequency band(s) and emission(s),

(iii) Antenna center height above ground and ground elevation above mean sea level,

(iv) Antenna gain pattern(s) in the plane of the main beam,

(v) Longitude range of geostationary satellite orbit (GSO) satellites at which antenna may be pointed, for proposed earth station antenna(s) accessing GSO satellites,

(vi) Horizon elevation plot,

(vii) Antenna horizon gain plot(s) determined in accordance with §25.251 for satellite longitude range specified in paragraph (c)(2)(v) of this section, taking into account the provisions of §25.251 for earth stations operating with non-geostationary satellites,

(viii) Minimum elevation angle,

(ix) Maximum equivalent isotropically radiated power (e.i.r.p.) density in the main beam in any 4 kHz band, (dBW/4 kHz) for frequency bands below 15 GHz or in any 1 MHz band (dBW/MHz) for frequency band above 15 GHz,

(x) Maximum available RF transmit power density in any 1 MHz band and in any 4 kHz band at the input terminals of the antenna(s),

(xi) Maximum permissible RF interference power level as determined in accordance with §25.251 for all applicable percentages of time, and

(xii) A plot of great circle coordination distance contour(s) and rain scatter coordination distance contour(s) as determined by §25.251.

(3) The coordination procedures specified in §101.103 of this chapter and §25.251 shall be applicable except that the information to be provided shall be that set forth in paragraph (c)(2) of this section, and that the 30-day period allowed for response to a request for coordination may be increased to a maximum of 45 days by mutual consent of the parties.

(4) Where technical problems are resolved by an agreement or operating arrangement between the parties that would require special procedures be taken to reduce the likelihood of harmful interference (such as the use of artificial site shielding) or would result in lessened quality or capacity of either system, the details thereof shall be contained in the application.

(5) The Commission may, in the course of examining any application, require the submission of additional showings, complete with pertinent data and calculations in accordance with §25.251, showing that harmful interference is not likely to result from the proposed operation.

(d) An applicant for operation of an earth station, other than an ESV, shall also ascertain whether the great circle coordination distance contours and rain scatter coordination distance contours, computed for those values of parameters indicated in §25.251 (Appendix 7 of the ITU RR) for international coordination, cross the boundaries of another Administration. In this case, the applicant shall furnish to the Commission copies of these contours on maps drawn to appropriate scale for use by the Commission in effecting coordination of the proposed earth station with the Administration(s) affected.

(e) Protection for Table Mountain Radio Receiving Zone, Boulder County, Colorado.

(1) Applicants for a station authorization to operate in the vicinity of Boulder County, Colorado under this part are advised to give due consideration, prior to filing applications, to the need to protect the Table Mountain Radio Receiving Zone from harmful interference. These are the research laboratories of the Department of Commerce, Boulder County, Colorado. To prevent degradation of the present ambient radio signal level at the site, the Department of Commerce seeks to ensure that the field strengths of any radiated signals (excluding reflected signals) received on this 1800 acre site (in the vicinity of coordinates 40°07'50" N Latitude, 105°14'40" W Longitude) resulting from new assignments (other than mobile stations) or from the modification or relocation of existing facilities do not exceed the following values:

 ------------------------------------------------------------------------                                                 In authorized bandwidth                                                       of service                                               -------------------------                Frequency range                    Field      Power flux                                                  strength   density \1\                                                   (mV/m)     (dBW/m\2\)------------------------------------------------------------------------Below 540 kHz.................................           10        -65.8540 to 1600 kHz...............................           20        -59.81.6 to 470 MHz................................           10     \2\-65.8470 to 890 MHz................................           30     \2\-56.2Above 890 MHz.................................            1     \2\-85.8------------------------------------------------------------------------\1\ Equivalent values of power flux density are calculated assuming free  space characteristic impedance of 376.7=120π ohms.\2\ Space stations shall conform to the power flux density limits at the  earth's surface specified in appropriate parts of the FCC rules, but  in no case should exceed the above levels in any 4 kHz band for all  angles of arrival.

(2) Advance consultation is recommended particularly for those applicants who have no reliable data which indicates whether the field strength or power flux density figures in the above table would be exceeded by their proposed radio facilities (except mobile stations). In such instances, the following is a suggested guide for determining whether coordination is recommended:

(i) All stations within 2.5 kilometers;

(ii) Stations within 5 kilometers with 50 watts or more average effective radiated power (ERP) in the primary plane of polarization in the azimuthal direction of the Table Mountain Radio Receiving Zone;

(iii) Stations within 15 kilometers with 1 kW or more average ERP in the primary plane of polarization in the azimuthal direction of Table Mountain Receiving Zone;

(iv) Stations within 80 kilometers with 25 kW or more average ERP in the primary plane of polarization in the azimuthal direction of Table Mountain Receiving Zone.

(3) Applicants concerned are urged to communicate with the Radio Frequency Management Coordinator, Department of Commerce, Research Support Services, NOAA R/E5X2, Boulder Laboratories, Boulder, CO 80303; telephone (303) 497–6548, in advance of filing their applications with the Commission.

(4) The Commission will not screen applications to determine whether advance consultation has taken place. However, applicants are advised that such consultation can avoid objections from the Department of Commerce or proceedings to modify any authorization which may be granted which, in fact, delivers a signal at the site in excess of the field strength specified herein.

(f) Notification to the National Radio Astronomy Observatory: In order to minimize possible harmful interference at the National Radio Astronomy Observatory site located at Green Bank, Pocahontas County, W. Va., and at the Naval Radio Research Observatory site at Sugar Grove, Pendleton County, W. Va. any applicant for a station authorization other than mobile, temporary base, temporary fixed, Personal Radio, Civil Air Patrol, or amateur seeking a station license for a new station, a construction permit to construct a new station or to modify an existing station license in a manner which would change either the frequency, power, antenna height or directivity, or location of such a station within the area bounded by 39°15' N. on the north, 78°30' W. on the east, 37°30' N. on the south and 80°30' W. on the west shall, at the time of filing such application with the Commission, simultaneously notify the Director, National Radio Astronomy Observatory, P.O. Box No. 2, Green Bank, W. Va. 24944, in writing, of the technical particulars of the proposed station. Such notification shall include the geographical coordinates of the antenna, antenna height, antenna directivity if any, proposed frequency, type of emission, and power. In addition, the applicant shall indicate in his application to the Commission the date notification was made to the observatory. After receipt of such applications, the Commission will allow a period of 20 days for comments or objections in response to the notifications indicated. If an objection to the proposed operation is received during the 20-day period from the National Radio Astronomy Observatory for itself or on behalf of the Naval Radio Research Observatory, the Commission will consider all aspects of the problem and take whatever action is deemed appropriate.

(g) Protection for Federal Communications Commission monitoring stations:

(1) Applicants in the vicinity of an FCC monitoring station for a radio station authorization to operate new transmitting facilities or changed transmitting facilities which would increase the field strength produced over the monitoring station over that previously authorized are advised to give consideration, prior to filing applications, to the possible need to protect the FCC stations from harmful interference. Geographical coordinates of the facilities which require protection are listed in §0.121(c) of the Commission's Rules. Applications for stations (except mobile stations) which will produce on any frequency a direct wave fundamental field strength of greater than 10 mV/m in the authorized bandwidth of service (−65.8 dBW/m2 power flux density assuming a free space characteristic impedance of 120 ohms) at the referenced coordinates, may be examined to determine extent of possible interference. Depending on the theoretical field strength value and existing root-sum-square or other ambient radio field signal levels at the indicated coordinates, a clause protecting the monitoring station may be added to the station authorization.

(2) In the event that calculated value of expected field exceeds 10 mV/m (−65.8 dBW/m2 ) at the reference coordinates, or if there is any question whether field strength levels might exceed the threshold value, advance consultation with the FCC to discuss any protection necessary should be considered. Prospective applicants may communicate with: Chief, Compliance and Information Bureau, Federal Communications Commission, Washington, DC 20554, Telephone (202) 632–6980.

(3) Advance consultation is suggested particularly for those applicants who have no reliable data which indicates whether the field strength or power flux density figure indicated would be exceeded by their proposed radio facilities (except mobile stations). In such instances, the following is a suggested guide for determining whether an applicant should coordinate:

(i) All stations within 2.5 kilometers;

(ii) Stations within 5 kilometers with 50 watts or more average effective radiated power (ERP) in the primary plane of polarization in the azimuthal direction of the Monitoring Station;

(iii) Stations within 15 kilometers with 1 kW or more average ERP in the primary plane of polarization in the azimuthal direction of the Monitoring Station;

(iv) Stations within 80 kilometers with 25 kW or more average ERP in the primary plane of polarization in the azimuthal direction of the Monitoring Station.

(4) Advance coordination for stations operating above 1000 MHz is recommended only where the proposed station is in the vicinity of a monitoring station designated as a satellite monitoring facility in §0.121(c) of the Commission's Rules and also meets the criteria outlined in paragraphs (h)(2) and (3) of this section.

(5) The Commission will not screen applications to determine whether advance consultation has taken place. However, applicants are advised that such consultation can avoid objections from the Federal Communications Commission or modification of any authorization which will cause harmful interference.

(h) Sites and frequencies for GSO and NGSO earth stations, operating in a frequency band where both have a co-primary allocation, shall be selected to avoid earth station antenna mainlobe-to-satellite antenna mainlobe coupling, between NGSO systems and between NGSO and GSO systems, in order to minimize the possibility of harmful interference between these services. Prior to filing an earth station application, in bands with co-primary allocations to NGSO and GSO earth stations, the applicant shall coordinate the proposed site and frequency usage with existing earth station licensees and with current earth station authorization applicants.

(i) Any applicant for a new permanent transmitting fixed earth station authorization to be located on the islands of Puerto Rico, Desecheo, Mona, Vieques, and Culebra, or for a modification of an existing authorization which would change the frequency, power, antenna height, directivity, or location of such station on these islands and would increase the likelihood of the authorized facility causing interference, shall notify the Interference Office, Arecibo Observatory, HC3 Box 53995, Arecibo, Puerto Rico 00612, in writing or electronically, of the technical parameters of the proposal. Applicants may wish to consult interference guidelines, which will be provided by Cornell University. Applicants who choose to transmit information electronically should e-mail to: [email protected].

(1) The notification to the Interference Office, Arecibo Observatory shall be made prior to, or simultaneously with, the filing of the application with the Commission. The notification shall state the geographical coordinates of the antenna (NAD–83 datum), antenna height above ground, ground elevation at the antenna, antenna directivity and gain, proposed frequency and FCC Rule Part, type of emission, effective radiated power, and whether the proposed use is itinerant. Generally, submission of the information in the technical portion of the FCC license application is adequate notification. In addition, the applicant shall indicate in its application to the Commission the date notification was made to the Arecibo Observatory.

(2) After receipt of such applications, the Commission will allow the Arecibo Observatory a period of 20 days for comments or objections in response to the notification indicated. The applicant will be required to make reasonable efforts in order to resolve or mitigate any potential interference problem with the Arecibo Observatory and to file either an amendment to the application or a modification application, as appropriate. If the Commission determines that an applicant has satisfied its responsibility to make reasonable efforts to protect the Observatory from interference, its application may be granted.

(3) The provisions of this paragraph do not apply to operations that transmit on frequencies above 15 GHz.

(j) Applicants for non-geostationary 1.6/2.4 GHz Mobile-Satellite Service/ Radiodetermination satellite service feeder links in the bands 17.7–20.2 GHz and 27.5–30.0 GHz shall indicate the frequencies and spacecraft antenna gain contours towards each feeder-link earth station location and will coordinate with licensees of other fixed-satellite service and terrestrial-service systems sharing the band to determine geographic protection areas around each non-geostationary mobile-satellite service/radiodetermination satellite service feeder-link earth station.

(k) An applicant for operation of an earth station, other than an ESV, that will operate with a geostationary satellite or non-geostationary satellite in a shared frequency band in which the non-geostationary system is (or is proposed to be) licensed for feeder links, shall demonstrate in its applications that its proposed earth station will not cause unacceptable interference to any other satellite network that is authorized to operate in the same frequency band, or certify that the operations of its earth station shall conform to established coordination agreements between the operator(s) of the space station(s) with which the earth station is to communicate and the operator(s) of any other space station licensed to use the band.

[30 FR 7176, May 28, 1965, as amended at 36 FR 2562, Feb. 6, 1971; 38 FR 8573, Apr. 4, 1973; 42 FR 8329, Feb. 9, 1977; 44 FR 77167, Dec. 31, 1979; 50 FR 40862, Oct. 7, 1985; 58 FR 13419, Mar. 11, 1993; 58 FR 44904, Aug. 25, 1993; 59 FR 53329, Oct. 21, 1994; 61 FR 8477, Mar. 5, 1996; 61 FR 9945, Mar. 12, 1996; 61 FR 44181, Aug. 28, 1996; 62 FR 55531, Oct. 27, 1997; 65 FR 38325, June 20, 2000; 65 FR 59144, Oct. 4, 2000; 66 FR 10622, Feb. 16, 2001; 70 FR 4784, Jan. 31, 2005; 70 FR 31373, June 1, 2005]

§ 25.204   Power limits.
top

(a) In bands shared coequally with terrestrial radio communication services, the equivalent isotropically radiated power transmitted in any direction towards the horizon by an earth station, other than an ESV, operating in frequency bands between 1 and 15 GHz, shall not exceed the following limits except as provided for in paragraph (c) of this section:

+40 dBW in any 4 kHz band for Θ ≤ 0°

+40 + 3Θ dBW in any 4 kHz band for 0° < Θ ≤ 5°

where Θ is the angle of elevation of the horizon viewed from the center of radiation of the antenna of the earth station and measured in degrees as positive above the horizontal plane and negative below it.

(b) In bands shared coequally with terrestrial radiocommunication services, the equivalent isotropically radiated power transmitted in any direction towards the horizon by an earth station operating in frequency bands above 15 GHz shall not exceed the following limits except as provided for in paragraph (c) of this section:

+64 dBW in any 1 MHz band for Θ ≤ 0°

+64 + 3 Θ dBW in any 1 MHz band for 0° < Θ ≤ 5°

where Θ is as defined in paragraph (a) of this section.

(c) For angles of elevation of the horizon greater than 5° there shall be no restriction as to the equivalent isotropically radiated power transmitted by an earth station towards the horizon.

(d) Notwithstanding the e.i.r.p. and e.i.r.p. density limits specified in the station authorization, each earth station transmission shall be conducted at the lowest power level that will provide the required signal quality as indicated in the application and further amended by coordination agreements.

(e) For operations at frequencies above 10 GHz, earth station operators may exceed the uplink e.i.r.p. and e.i.r.p. density limits specified in the station authorization under the conditions of uplink fading due to precipitation by an amount not to exceed 1 dB above the actual amount of monitored excess attenuation over clear sky propagation conditions. The e.i.r.p. levels shall be returned to normal as soon as the attenuating weather pattern subsides. The maximum power level for power control purposes shall be coordinated between and among adjacent satellite operators.

(f) In the band 13.75–14 GHz, an earth station in the fixed-satellite service shall have a minimum antenna diameter of 4.5 m and the e.i.r.p. of any emission should be at least 68 dBW and should not exceed 85 dBW. The e.i.r.p. density of emissions from any earth station in the FSS operating with a space station in geostationary-satellite orbit shall not exceed 71 dBW in any 6 MHz band from 13.77 to 13.78 GHz. The e.i.r.p. density of emissions from any earth station in the FSS operating with a space station in non-geostationary-satellite orbit shall not exceed 51 dBW in any 6 MHz band from 13.77 to 13.78 GHz. Automatic power control may be used to increase the e.i.r.p. density in the 6 MHz band in this frequency range to compensate for rain attenuation, to the extent that the power flux-density at the FSS space station does not exceed the value resulting from use by an earth station of an e.i.r.p. of 71 dBW or 51 dBW, as appropriate, in the 6 MHz band in clear-sky conditions.

(g) All earth stations in the Fixed Satellite Service in the 20/30 GHz band shall employ uplink adaptive power control or other methods of fade compensation such that the earth station transmissions shall be conducted at the power level required to meet the desired link performance while reducing the level of mutual interference between networks.

(h) ESV transmissions in the 5925–6425 MHz (Earth-to-space) band shall not exceed an e.i.r.p. spectral density towards the radio-horizon of 17 dBW/MHz, and shall not exceed an e.i.r.p. towards the radio-horizon of 20.8 dBW. The ESV network shall shut-off the ESV transmitter if the e.i.r.p. spectral density towards the radio-horizon or e.i.r.p. towards the radio-horizon are exceeded.

(i) Within 125 km of the TDRSS sites identified in §25.222(d), ESV transmissions in the 14.0–14.2 GHz (Earth-to-space) band shall not exceed an e.i.r.p. spectral density towards the horizon of 12.5 dBW/MHz, and shall not exceed an e.i.r.p. towards the horizon of 16.3 dBW.

[48 FR 40255, Sept. 6, 1983, as amended at 58 FR 13420, Mar. 11, 1993; 61 FR 52307, Oct. 7, 1996; 62 FR 61457, Nov. 18, 1997; 66 FR 10623, Feb. 16, 2001; 70 FR 4784, Jan. 31, 2005; 70 FR 32255, June 2, 2005]

§ 25.205   Minimum angle of antenna elevation.
top

(a) Earth station antennas shall not normally be authorized for transmission at angles less than 5° measured from the horizontal plane to the direction of maximum radiation. However, upon a showing that the transmission path will be seaward and away from land masses or upon special showing of need for lower angles by the applicant, the Commission will consider authorizing transmissions at angles between 3° and 5° in the pertinent directions. In certain instances, it may be necessary to specify minimum angles greater than 5° because of interference considerations.

(b) ESVs making a special showing requesting angles of elevation less than 5° measured from the horizontal plane to the direction of maximum radiation pursuant to (a) of this Section must still meet the effective isotropically radiated power (e.i.r.p.) and e.i.r.p. density towards the horizon limits contained in §25.204(h) and (i).

[70 FR 4784, Jan. 31, 2005]

§ 25.206   Station identification.
top

The requirement for transmission of station identification is waived for all radio stations licensed under this part with the exception of satellite uplinks carrying broadband video information which are required to incorporate ATIS in accordance with the provisions set forth under §25.308 of these rules.

[55 FR 21551, May 25, 1990]

§ 25.207   Cessation of emissions.
top

Space stations shall be made capable of ceasing radio emissions by the use of appropriate devices (battery life, timing devices, ground command, etc.) that will ensure definite cessation of emissions.

§ 25.208   Power flux density limits.
top

(a) In the band 3650–4200 MHz, the power flux density at the Earth's surface produced by emissions from a space station for all conditions and for all methods of modulation shall not exceed the following values:

−152 dB(W/m2 ) in any 4 kHz band for angles of arrival between 0 and 5 degrees above the horizontal plane;

−152+(δ−5)/2 dB(W/m2 ) in any 4 kHz band for angles of arrival δ (in degrees) between 5 and 25 degrees above the horizontal plane; and

−142 dB(W/m2 ) in any 4 kHz band for angles of arrival between 25 and 90 degrees above the horizontal plane

These limits relate to the power flux density which would be obtained under assumed free-space propagation conditions.

(b) In the bands 10.95–11.2 and 11.45–11.7 GHz for GSO FSS space stations and 10.7–11.7 GHz for NGSO FSS space stations, the power flux-density at the Earth's surface produced by emissions from a space station for all conditions and for all methods of modulation shall not exceed the lower of the following values:

(1) −150 dB(W/m2 ) in any 4 kHz band for angles of arrival between 0 and 5 degrees above the horizontal plane; −150 + (δ−5)/2 dB(W/m2 ) in any 4 kHz band for angles of arrival (δ) (in degrees) between 5 and 25 degrees above the horizontal plane; and −140 dB(W/m2 ) in any 4 kHz band for angles of arrival between 25 and 90 degrees above the horizontal plane; or

(2) −126 dB(W/m2 ) in any 1 MHz band for angles of arrival between 0 and 5 degrees above the horizontal plane; −126 + (δ−5)/2 dB(W/m2 ) in any 1 MHz band for angles of arrival (δ) (in degrees) between 5 and 25 degrees above the horizontal plane; and −116 dB(W/m2 ) in any 1 MHz band for angles of arrival between 25 and 90 degrees above the horizontal plane.

Note to paragraph (b): These limits relate to the power flux density, which would be obtained under assumed free-space propagation conditions.

(c) In the 18.3–18.8 GHz, 19.3–19.7 GHz, 22.55–23.00 GHz, 23.00–23.55 GHz, and 24.45–24.75 GHz frequency bands, the power flux-density at the Earth's surface produced by emissions from a space station for all conditions for all methods of modulation shall not exceed the following values:

(1) −115 dB (W/m2 ) in any 1 MHz band for angles of arrival between 0 and 5 degrees above the horizontal plane.

(2) −115 + 0.5 (d–5) dB (W/m2 ) in any 1 MHz band for angles of arrival d (in degrees) between 5 and 25 degrees above the horizontal plane.

(3) −105 dB (W/m2 ) in any 1 MHz band for angles of arrival between 25 and 90 degrees above the horizontal plane.

(d) In addition to the limits specified in paragraph (c) of this section, the power flux-density across the 200 MHz band 18.6–18.8 GHz produced at the Earth's surface by emissions from a space station under assumed free-space propagation conditions shall not exceed −95 dB (W/m2 ) for all angles of arrival. This limit may be exceeded by up to 3 dB for no more than 5% of the time.

(e) In the 18.8–19.3 GHz frequency band, the power flux-density at the Earth's surface produced by emissions from a space station for all conditions and for all methods of modulation shall not exceed the following values:

-115-X dB(W/m\2\÷MHz).........  for 0° [le] δ < 5°-115-X+((10+X)/20)(δ-5)dB(W/   for 5° [le] δ < m\2\÷MHz).                      25°-105 dB(W/m\2\÷MHz)...........  for 25° [le] δ <                                      90° 

Where:

δ: is the angle of arrival above the horizontal plane; and

X is defined as a function of the number of satellites in the non-GSO FSS constellation, n, as follows:

for n [le] 50............................  X = 0 (dB)for 50 < n [le] 288...................  X = (5/119) (n - 50) (dB)for n > 288...........................  X = (1/69) (n + 402) (dB) 

(f) [Reserved]

(g) In the frequency bands 10.7–11.7 GHz and 11.7–12.2 GHz, the single-entry equivalent power-flux density in the space-to-Earth direction (EPFDdown), at any point on the Earth's surface, produced by emissions from all co-frequency space stations of a single non-geostationary-satellite orbit (NGSO) system operating in the fixed-satellite service (FSS) shall not exceed the following limits for the given percentages of time. Tables 1G and 2G follow:

 Table 1G_Single-Entry EPFDdown Limits for Protection of 0.6, 1.2, 3 and 10 Meter GSO FSS Earth Station Antennas                                                      \1,2\----------------------------------------------------------------------------------------------------------------                                                         Percentage of                                         Single-entry     time during      Reference        Reference antennaFrequency band (GHz) for International  EPFDdown dB(W/  which EPFDdown     bandwidth     diameter and reference              Allocations                    m\2\)       level may not       (kHz)        radiation pattern \3\                                                          be exceeded----------------------------------------------------------------------------------------------------------------10.7-11.7 in all Regions; 11.7-12.2 in          -175.4               0          60 cm, Region 2; 12.2-12.5 in Region 3; and             -174              90  Recommendation 12.5-12.75 in Regions 1 and 3.                 -170.8              99   ITU-R S.1428.                                                -165.3           99.73                                                -160.4          99.991                                                  -160          99.997                                                  -160             100                                                                    40----------------------------------------------------------------------------------------------------------------10.7-11.7 in all Regions; 11.7-12.2 in          -181.9               0          1.2 m, Region 2; 12.2-12.5 in Region 3; and           -178.4            99.5  Recommendation 12.5-12.75 in Regions 1 and 3.                 -173.4           99.74   ITU-R S.1428.                                                  -173          99.857                                                  -164          99.954                                                -161.6          99.984                                                -161.4          99.991                                                -160.8          99.997                                                -160.5          99.997                                                  -160         99.9993                                                  -160             100                                                                    40----------------------------------------------------------------------------------------------------------------10.7-11.7 in all Regions; 11.7-12.2 in         -190.45               0            3 m, Region 2; 12.2-12.5 in Region 3; and          -189.45              90  Recommendation 12.5-12.75 in Regions 1 and 3.                -187.45            99.5   ITU-R S.1428.                                                -182.4            99.7                                                  -182          99.855                                                  -168          99.971                                                  -164          99.988                                                  -162          99.995                                                  -160          99.999                                                  -160             100                                                                    40----------------------------------------------------------------------------------------------------------------10.7-11.7 in all Regions; 11.7-12.2 in         -195.45               0           10 m, Region 2; 12.2-12.5 in Region 3; and          -195.45              99  Recommendation 12.5-12.75 in Regions 1 and 3.                   -190           99.65   ITU-R S.1428.                                                  -190           99.71                                                -172.5           99.99                                                  -160          99.998                                                  -160             100                                                                    40----------------------------------------------------------------------------------------------------------------\1\ In addition to the limits shown in Table 1G, the limits shown in Table 2G shall apply to all antenna sizes  greater than 60 cm in the frequency bands listed in Table 1G.\2\ For each reference antenna diameter, the limit consists of the complete curve on a plot which is linear in  decibels for the EPFD levels and logarithmic for the time percentages, with straight lines joining the data  points.\3\ The earth station antenna reference radiation patterns are to be used only for the calculation of  interference from NGSO FSS systems into GSO FSS systems.
Table 2G_Single-Entry EPFDdown Limits Radiated By Non-GSO FSS Systems At                            Certain Latitudes------------------------------------------------------------------------100% of the time EPFDdown dB(W/(m\2\/40    Latitude (North or South in                 kHz))                               degrees)-------------------------------------------------------------------------160...................................  0 < [verbar] Latitude                                          [verbar] [le] 57.5.-160 + 3.4 (57.5 - [verbar] Latitude     57.5 < [verbar] Latitude [verbar] )/4.                            [verbar] [le] 63.75-165.3.................................  63.75 [le] [verbar] Latitude                                          [verbar]------------------------------------------------------------------------

Note to paragraph (g): These limits relate to the equivalent power flux density, which would be obtained under free-space propagation conditions, for all conditions and for all methods of modulation.

(h) In the frequency bands 10.7–11.7 GHz and 11.7–12.2 GHz, the aggregate equivalent power-flux density in the space-to-Earth direction (EPFDdown), at any point on the Earth's surface, produced by emissions from all co-frequency space stations of all non-geostationary-satellite orbit systems operating in the fixed-satellite service (FSS) shall not exceed the following limits for the given percentages of time. Tables 1H and 2H follow:

Table 1H_Aggregate EPFDdown Limits for Protection of 0.6, 1.2, 3 and 10 Meter GSO FSS Earth Station Antennas \1\----------------------------------------------------------------------------------------------------------------                                                         Percentage of                                           Aggregate      time during      Reference        Reference antennaFrequency band (GHz) for International  EPFDdown dB(W/  which EPFDdown     bandwidth     diameter and reference              Allocations                    m\2\)        may not be         (kHz)        radiation pattern \2\                                                           exceeded----------------------------------------------------------------------------------------------------------------10.7-11.7 in all Regions; 11.7-12.2 in            -170               0          60 cm, Region 2; 12.2-12.5 in Region 3; and           -168.6              90  Recommendation 12.5-12.75 in Regions 1 and 3.                 -165.3              99   ITU-R S.1428.                                                -160.4           99.97                                                  -160           99.99                                                  -160             100                                                                    40----------------------------------------------------------------------------------------------------------------10.7-11.7 in all Regions; 11.7-12.2 in          -176.5               0          1.2 m, Region 2; 12.2-12.5 in Region 3; and             -173            99.5  Recommendation 12.5-12.75 in Regions 1 and 3.                   -164           99.84   ITU-R S.1428.                                                -161.6          99.945                                                -164.4           99.97                                                -160.8           99.99                                                -160.5           99.99                                                  -160         99.9975                                                  -160             100                                                                    40----------------------------------------------------------------------------------------------------------------10.7-11.7 in all Regions; 11.7-12.2 in            -185               0            3 m, Region 2; 12.2-12.5 in Region 3; and             -184              90  Recommendation 12.5-12.75 in Regions 1 and 3.                   -182            99.5   ITU-R S.1428.                                                  -168            99.9                                                  -164           99.96                                                  -162          99.982                                                  -160          99.997                                                  -160             100                                                                    40----------------------------------------------------------------------------------------------------------------10.7-11.7 in all Regions; 11.7-12.2 in            -190               0           10 m, Region 2; 12.2-12.5 in Region 3; and             -190              99  Recommendation 12.5-12.75 in Regions 1 and 3.                   -166           99.99   ITU-R S.1428.                                                  -160          99.998                                                  -160             100                                                                    40----------------------------------------------------------------------------------------------------------------\1\ In addition to the limits shown in Table 1H, the aggregate EPFDdown limits shown in Table 2H shall apply to  all antenna sizes greater than 60 cm in the frequency bands listed in Table 1H.\2\ The earth station antenna reference patterns are to be used only for the calculation of interference from  NGSO FSS systems into GSO FSS systems.
Table 2H_Single-Entry EPFDdown Limits Radiated By Non-GSO FSS Systems At                            Certain Latitudes------------------------------------------------------------------------100% of the time EPFDdown dB(W/(m\2\/40    Latitude (North or South in                 kHz))                               degrees)-------------------------------------------------------------------------160...................................  0 < [verbar] Latitude                                          [verbar] [le] 57.5-160 + 3.4 (57.5 - [verbar] Latitude     57.5 < [verbar] Latitude [verbar])/4.                             [verbar] [le] 63.75-165.3.................................  63.75 [le] [verbar] Latitude                                          [verbar]------------------------------------------------------------------------

Note to paragraph (h): These limits relate to the equivalent power flux density, which would be obtained under free-space propagation conditions, for all conditions and for all methods of modulation.

(i) In the frequency bands 10.7–11.7 GHz and 11.7–12.2 GHz, the additional operational equivalent power-flux density, in the space-to-Earth direction, (additional operational EPFDdown) at any point on the Earth's surface, produced by actual operational emissions from all co-frequency space stations of a non-geostationary-satellite orbit (NGSO) system operating in the fixed-satellite service (FSS) shall not exceed the following operational limits for the given percentages of time:

  Additional Operational Limits on the EPFDdown Radiated by Non-GSO FSS Systems Into 3 m and 10 m GSO FSS Earth                                                Station Antennas----------------------------------------------------------------------------------------------------------------                                                      Percentage of time during           EPFDdown dB(W/(m\2\/40 kHz))               which EPFDdown may not be      Receive GSO earth station                                                               exceeded                 antenna diameter (m)-----------------------------------------------------------------------------------------------------------------182..............................................                          99.9-179..............................................                         99.94-176..............................................                         99.97-171..............................................                         99.98-168..............................................                        99.984                              3-165..............................................                        99.993-163..............................................                        99.999-161.25...........................................                      99.99975���������������������������������������������������-161.25...........................................                           100-185..............................................                         99.97-183..............................................                         99.98-179..............................................                         99.99-175..............................................                        99.996-171..............................................                        99.998                             10-168..............................................                        99.999-166..............................................                       99.9998-166..............................................                           100----------------------------------------------------------------------------------------------------------------

Note to paragraph (i): These limits relate to the equivalent power flux density, which is obtained under free-space propagation conditions, for all conditions and for all methods of modulation.

(j) In the frequency bands 10.7–11.7 GHz and 11.7–12.2 GHz, the operational equivalent power-flux density, in the space-to-Earth direction, (operational EPFDdown) at any point on the Earth's surface, produced by actual operational emissions from the in-line co-frequency space station of a non-geostationary-satellite orbit (NGSO) system operating in the fixed-satellite service (FSS) shall not exceed the following operational limits for 100% of the time:

        Operational Limits to the EPFDdown Radiated by Non-GSO FSS Systems in Certain Frequency Bands\1\----------------------------------------------------------------------------------------------------------------                                                          Percentage                                                           of time                 Receive GSO                                                            during     Reference      earth          Orbital  Frequency band (GHz) for International      EPFDdown      which      bandwidth     station     inclination of                allocations                  dB(W/m\2\)    EPFDdown      (kHz)       antenna      GSO satelite                                                          may not be                 diameter       (degrees)                                                           exceeded                  \2\ (m)----------------------------------------------------------------------------------------------------------------Prior to 31 December 2005: 10.7-11.7 in            -163            3 all Regions; 11.7-12.2 in Regions 2; 12.2-        -166            6 12.5 in Region 3; and 12.5;-12.75 in            -167.5            9 Regions 1 and 3..........................       -169.5         >=18                                                    100      [le]2.5                                                     40Prior to 31 December 2005: 10.7-11.7 in            -160            3 all Regions; 11.7-12.2 in Region 2; 12.2-         -163            6 12.5 in Region 3; and 12.5-12.75 in             -164.5            9 Regions 1 and 3..........................       -166.5         >=18                                                    100  >2.5 and                                                     40      [le]4.5----------------------------------------------------------------------------------------------------------------From 31 December 2005: 10.7-11.7 in all         -161.25            3 Regions; 11.7-12.2 in Region 2; 12.2-12.5         -164            6 in Region 3; and 12.5-12.75 in Regions 1        -165.5            9 and 3....................................       -167.5         >=18                                                    100      [le]2.5                                                     40----------------------------------------------------------------------------------------------------------------From 31 December 2005: 10.7-11.7 in all         -158.25            3 Regions; 11.7-12.2 in Region 2; 12.2-12.5         -161            6 in Region 3; and 12.5-12.75 in Regions 1        -162.5            9 and 3....................................       -164.5         >=18                                                    100  >2.5 and                                                     40      [le]4.5--------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------\1\ The operational limits on the EPFDdown radiated by non-GSO FSS systems shall be the values given in Table 2G  or this table, whichever are the more stringent.\2\ For antenna diameters between the values given in this table, the limits are given by linear interpolation  using a linear scale for EPFDdown in decibels and a logarithmic scale for antenna diameter in meters.

Note to paragraph (j): These limits relate to the operational equivalent power flux-density which would be obtained under free-space propagation conditions, for all conditions, for all methods of modulation and for the specified inclined GSO FSS operations.

(k) In the frequency bands 12.75–13.15 GHz, 13.2125–13.25 GHz and 13.75–14.5 GHz, the equivalent power flux-density, in the Earth-to-space direction, (EPFDup) produced at any point on the geostationary satellite orbit (GSO) by the emissions from all co-frequency earth stations in a non-geostationary satellite orbit fixed-satellite service (NGSO FSS) system, for all conditions and for all methods of modulation, shall not exceed the following limits for the specified percentages of time limits:

                  Limits to the EPFDup Radiated by NGSO FSS Systems in Certain Frequency Bands----------------------------------------------------------------------------------------------------------------                                                      Percentage                                                       of time                                                        during     ReferenceFrequency band (GHz) for International  EPFDup dB(W/    which      bandwidth    Reference antenna beamwidth and              Allocations                  m\2\)      EPFDup may     (kHz)      reference radiation pattern \1\                                                        not be                                                       exceeded----------------------------------------------------------------------------------------------------------------12.5-12.75; 12.75-13.25; 13.75-14.5...         -160          100           40  4°                                                                               ITU-R S.672-4,                                                                               Ls=-20----------------------------------------------------------------------------------------------------------------\1\ For the case of Ls = -10, the values a = 1.83 and b = 6.32 should be used in the equations in the Annex of  Recommendation ITU-R S.672-4 for single-feed circular beams. In all cases of Ls, the parabolic main beam  equation should start at zero.

Note to paragraph (k): These limits relate to the uplink equivalent power flux density, which would be obtained under free-space propagation conditions, for all conditions and for all methods of modulation.

(l) In the frequency bands 11.7–12.2 GHz and 12.5–12.75 GHz in Region 3, 11.7–12.5 GHz in Region 1 and 12.2–12.7 GHz in Region 2, the single-entry equivalent power-flux density, in the space-to-Earth direction, (EPFDdown), at any point on the Earth's surface, produced by emissions from all co-frequency space stations of a single non-geostationary-satellite orbit (NGSO) system operating in the fixed-satellite service (FSS) shall not exceed the following limits in Tables 1L and 2L for the given percentages of time:

 Table 1L_Single-Entry EPFD Down Limits for Protection of 30, 45, 60, 90, 120, 180, 240 and 300 CM GSO BSS Earth                                           Station Antennas \1,2,3,5\----------------------------------------------------------------------------------------------------------------                                                         Percentage of                                                          time during      Reference        Reference antennaFrequency band (GHz) for international  EPDF down dB(W/ which EPFDdown     bandwidth     diameter and reference              allocations                    m\2\)       level may not       (kHz)        radiation pattern \4\                                                          be exceeded----------------------------------------------------------------------------------------------------------------11.7-12.5 in Region 1; 1.7-12.2 and           -165.841               0              40  30 cm 12.5-12.75 in Region 3; 12.2-12.7 in         -165.541              25                  Recommendation ITU-R Region 2.                                    -164.041              96                  BO.1443 Annex 1                                                -158.6          98.857                                                -158.6          99.429                                               -158.33          99.429                                               -158.33          99.429                                                                   10011.7-12.5 in Region 1; 1.7-12.2 and           -175.441               0              40  45 cm 12.5-12.75 in Region 3; 12.2-12.7 in         -172.441              66                  Recommendation ITU-R Region 2.                                    -169.441           97.75                  BO.1443 Annex 1                                                  -164          99.357                                               -160.75          99.809                                                  -160          99.986                                                  -160             100----------------------------------------------------------------------------------------------------------------11.7-12.5 in Region 1; 1.7-12.2 and           -176.441               0              40  60 cm 12.5-12.75 in Region 3; 12.2-12.7 in         -173.191            97.8                  Recommendation ITU-R Region 2.                                     -167.75          99.371                  BO. 1443 Annex 1                                                  -162          99.886                                                  -161          99.943                                                -160.2          99.971                                                  -160          99.997                                                  -160             100----------------------------------------------------------------------------------------------------------------11.7-12.5 in Region 1; 1.7-12.2 and            -178.94               0              40  90 cm 12.5-12.75 in Region 3; 12.2-12.7 in          -178.44              33                  Recommendation ITU-R Region 2.                                     -176.44              98                  BO.1443 Annex 1                                                  -171          99.429                                                -165.5          99.714                                                  -163          99.857                                                  -161          99.943                                                  -160          99.991                                                  -160             100----------------------------------------------------------------------------------------------------------------11.7-12.5 in Region 1; 1.7-12.2 and            -182.44               0              40  120 cm 12.5-12.75 in Region 3; 12.2-12.7 in          -180.69              90                  Recommendation ITU-R Region 2.                                     -179.19            98.9                  BO.1443 Annex 1                                               -178.44            98.9                                               -174.94            99.5                                               -173.75           99.68                                                  -173           99.68                                                -169.5           99.85                                                -167.8          99.915                                                  -164           99.94                                                -161.9           99.97                                                  -161           99.99                                                -160.4          99.998                                                  -160             100----------------------------------------------------------------------------------------------------------------11.7-12.5 in Region 1; 1.7-12.2 and           -184.941               0              40  180 cm \3\ 12.5-12.75 in Region 3; 12.2-12.7 in         -184.101              33                  Recommendation ITU-R Region 2.                                    -181.691            98.5                  BO.1443 Annex 1                                               -176.25          99.571                                               -163.25          99.946                                                -161.5          99.974                                               -160.35          99.993                                                  -160          99.999                                                  -160             100----------------------------------------------------------------------------------------------------------------11.7-12.5 in Region 1; 1.7-12.2 and           -187.441               0              40  240 cm \2\ 12.5-12.75 in Region 3; 12.2-12.7 in         -186.341              33                  Recommendation ITU-R Region 2.                                    -183.441           99.25                  BO.1443 Annex 1                                                  -178          99.786                                                -161.4          99.957                                                -161.9          99.983                                                -160.5          99.994                                                  -160          99.999                                                  -160             100----------------------------------------------------------------------------------------------------------------11.7-12.5 in Region 1; 1.7-12.2 and           -191.941               0              40  300 cm 12.5-12.75 in Region 3; 12.2-12.7 in         -189.441              33                  Recommendation ITU-R Region 2.                                    -185.941            99.5                  BO.1443 Annex 1                                                -180.5          99.857                                                  -173          99.914                                                  -167          99.951                                                  -162          99.983                                                  -160          99.991                                                  -160             100----------------------------------------------------------------------------------------------------------------\1\ For BSS antenna diameters 180 cm, 240 cm and 300 cm, in addition to the single-entry limits shown in Table  1L, the limits in Table 2L shall also apply in the frequency band listed in Table 1L.\2\ For 240 cm GSO BSS earth station antennas located in Alaska, communicating with GSO BSS satellites at the  91° W.L., 101° W.L., 110° W.L., 119° W.L. and 148° W.L. nominal orbital locations with  elevation angles greater than 5°, -167 dB(W/(m\2\/40 kHz)) single-entry 100% of the time operational  EPFDdown limit also applies to receive antennas.\3\ For 180 cm GSO BSS earth station antennas located in Hawaii communicating with GSO BSS satellites that are  operational as of December 30, 1999 at the 110° W.L., 119° W.L. and 148° W.L. nominal orbital  positions, -162.5 dB(W/(m\2\/40 kHz)) single-entry 100% of the time operational EPFDdown limit also applies.\4\ Under the section reference pattern of Annex 1 to Recommendation ITU-R BO.1443 shall be used only for the  calculation of interference from non-GSO FSS systems into BSS systems.\5\ For each reference antenna diameter, the limit consists of the complete curve on a plot which is linear in  decibels for the EPFD levels and logarithmic for the time percentages, with straight line joining the data  points.
Table 2L_Single-Entry EPFDdown Limits Radiated By Non-GSO FSS Systems At                            Certain Latitudes------------------------------------------------------------------------100% of the time EPFDdown dB(W/(m\2\/40    Latitude (North or South in                 kHz))                               degrees)-------------------------------------------------------------------------160.0.................................  0 [le] [verbar] Latitude                                          [verbar] [le] 57.5-160.0 + 3.4 (57.5 - [verbar] Latitude   57.5 [le] [verbar] Latitude [verbar])/4.                             [verbar] [le] 63.75-165.3.................................  63.75 [le] [verbar] Latitude                                          [verbar]------------------------------------------------------------------------

Note to paragraph (l): These limits relate to the equivalent power flux density, which would be obtained under free-space propagation conditions, for all conditions and for all methods of modulation.

(m) In the frequency bands 11.7–12.2 GHz and 12.5–12.75 GHz in Region 3, 11.7–12.5 GHz in Region 1 and 12.2–12.7 GHz in Region 2, the aggregate equivalent power-flux density, in the space-to-Earth direction, (EPFDdown) at any point on the Earth's surface, produced by emissions from all co-frequency space stations of all non-geostationary-satellite orbit systems operating in the fixed-satellite service (FSS) shall not exceed the following limits in Tables 1M and 2M for the given percentages of time:

   Table 1M_Aggregate EPFDdown Limits for Protection of 30, 45, 60, 90, 120, 180, 240 and 300 cm GSO BSS Earth                                           Station Antennas \1,2,3,5\----------------------------------------------------------------------------------------------------------------                                                     Percentage                                                      of time                                                       during       Frequency band (GHz) for        EPFDdown dB     which      Reference     Reference antenna diameter, and      international allocations          (W/m\2\)     EPFDdown    bandwidth     reference radiation pattern \4\                                                     level may      (kHz)                                                       not be                                                      exceeded----------------------------------------------------------------------------------------------------------------11.7-12.5 in Region 1; 11.7-12.2 and        -160.4            0  ...........  30 cm 12.5-12.75 in Region 3; 12.2-12.7 in       -160.1           25           40  Recommendation ITU-R Region 2.                                  -158.6           96               BO.1443                                            -158.6           98               Annex 1.                                           -158.33           98                                           -158.33          100----------------------------------------------------------------------------------------------------------------11.7-12.5 in Region 1; 11.7-12.2 and          -170            0  ...........  45 cm 12.5-12.75 in Region 3; 12.2-12.7 in         -167           66           40  Recommendation ITU-R Region 2.                                    -164        97.75               BO.1443                                           -160.75        99.33               Annex 1.                                              -160        99.95                                              -160          100----------------------------------------------------------------------------------------------------------------11.7-12.5 in Region 1; 11.7-12.2 and          -171            0  ...........  60 cm 12.5-12.75 in Region 3; 12.2-12.7 in      -168.75           90           40  Recommendation ITU-R Region 2.                                 -167.75         97.8               BO.1443                                              -162         99.6               Annex 1.                                              -161         99.8                                            -160.2         99.9                                              -160        99.99                                              -160          100----------------------------------------------------------------------------------------------------------------11.7-12.5 in Region 1; 11.7-12.2 and       -173.75            0  ...........  90 cm 12.5-12.75 in Region 3; 12.2-12.7 in         -173           33           40  Recommendation ITU-R Region 2.                                    -171           98               BO.1443                                            -165.5         99.1               Annex 1.                                              -163         99.5                                              -161         99.8                                              -160        99.97                                              -160          100----------------------------------------------------------------------------------------------------------------11.7-12.5 in Region 1; 11.7-12.2 and          -177            0  ...........  120 cm 12.5-12.75 in Region 3; 12.2-12.7 in      -175.25           90           40  Recommendation ITU-R Region 2.                                 -173.75         98.9               BO.1443                                              -173         98.9               Annex 1.                                            -169.5         99.5                                            -167.8         99.7                                              -164        99.82                                            -161.9         99.9                                              -161       99.965                                            -160.4       99.993                                              -160          100----------------------------------------------------------------------------------------------------------------11.7-12.5 in Region 1; 11.7-12.2 and        -179.5            0  ...........  180 cm 12.5-12.75 in Region 3; 12.2-12.7 in      -178.66           33           40  Recommendation ITU-R Region 2.                                 -176.25         98.5               BO.1443                                           -163.25        99.81               Annex 1.                                            -161.5        99.91                                           -160.35       99.975                                              -160       99.995                                              -160          100----------------------------------------------------------------------------------------------------------------11.7-12.5 in Region 1; 11.7-12.2 and          -182            0  ...........  240 cm 12.5-12.75 in Region 3; 12.2-12.7 in       -180.9           33           40  Recommendation ITU-R Region 2.                                    -178        99.25               BO.1443                                            -164.4        99.85               Annex 1.                                            -161.9        99.94                                            -160.5        99.98                                              -160       99.995                                              -160          100----------------------------------------------------------------------------------------------------------------11.7-12.5 in Region 1; 11.7-12.2 and        -186.5            0  ...........  300 cm 12.5-12.75 in Region 3; 12.2-12.7 in         -184           33           40  Recommendation ITU-R Region 2.                                  -180.5         99.5               BO.1443                                              -173         99.7               Annex 1.                                              -167        99.83                                              -162        99.94                                              -160        99.97                                              -160          100----------------------------------------------------------------------------------------------------------------\1\ For BSS antenna diameters 180 cm, 240 cm and 300 cm, in addition to the aggregate limit shown in Table 1M,  the limits in Table 2M shall also apply.\2\ For 240 cm GSO BSS earth station antennas located in Alaska, communicating with GSO BSS satellites at the  91° W.L., 101° W.L., 110° W.L., 119° W.L. and 148° W.L. nominal orbital locations with  elevation angles greater than 5°, -167 dB(W/(m\2\/40 kHz)) aggregate 100% of the time operational EPFDdown  limit also applies to receive antennas.\3\ For 180 cm GSO BSS earth station antennas located in Hawaii communicating with GSO BSS satellites that are  operational as of December 30, 1999 at the 110° W.L., 119° W.L. and 148° W.L. nominal orbital  positions, -162.5 dB(W/(m\2\/40 kHz)) aggregate 100% of the time operational EPFDdown limit also applies.\4\ Under the section reference pattern of Annex 1 to Recommendation ITU-R BO.1443 shall be used only for the  calculation of interference from non-GSO FSS systems into GSO BSS systems.\5\ For each reference antenna diameter, the limit consists of the complete curve on a plot which is linear in  decibels for the EPFD levels and logarithmic for the time percentages, with straight line joining the data  points.
  Table 2M_Aggregate EPFDdown Limits Radiated by Non-GSO FSS Systems At                            Certain Latitudes------------------------------------------------------------------------ 00% of the time EPFDdown dB(W/(m\2\/40    Latitude (North or South in                 kHz))                               degrees)------------------------------------------------------------------------160.0..................................  0 [le] [verbar] Latitude                                          [verbar] [le] 57.5.160.0 + 3.4 (57.5 - [verbar] Latitude    57.5 [le] [verbar] Latitude [verbar] )/4.                            [verbar] [le] 63.75.165.3..................................  63.75 [le] [verbar] Latitude                                          [verbar].------------------------------------------------------------------------

Note to paragraph (m): These limits relate to the equivalent power flux density, which would be obtained under free-space propagation conditions, for all conditions and for all methods of modulation.

(n) The power-flux density at the Earth's surface produced by emissions from a space station in the fixed-satellite service (space-to-Earth), for all conditions and for all methods of modulation, shall not exceed the limits given in Table N. These limits relate to the power flux-density which would be obtained under assumed free-space conditions.

               Table N_Limits of Power-Flux Density From Space Stations in the Band 6700-7075 MHz----------------------------------------------------------------------------------------------------------------                                  Limit in dB(W/m2) for angle of arrival (δ) above the                                                       horizontal plane                            Reference         Frequency band          ------------------------------------------------------------      bandwidth                                       0\0\-5\0\          5\0\-25\0\          25\0\-90\0\----------------------------------------------------------------------------------------------------------------6700-6825 MHz...................  -137..............  -137 + 0.5(δ- -127..............  1 MHz                                                       5).6825-7075 MHz...................  -154..............  -154 + 0.5(δ- 144...............  4 kHz                                  and...............   5).                and...............  1 MHz                                  -134..............  and...............  -124..............                                                      -134 + 0.5(δ-                                                       5).----------------------------------------------------------------------------------------------------------------

(o) In the band 12.2–12.7 GHz, for NGSO FSS space stations, the specified low-angle power flux-density at the Earth's surface produced by emissions from a space station shall not be exceeded into an operational MVDDS receiver:

(1) −158 dB(W/m2 ) in any 4 kHz band for angles of arrival between 0 and 2 degrees above the horizontal plane; and

(2) −158 + 3.33(δ−2) dB(W/m2 ) in any 4 kHz band for angles of arrival (δ) (in degrees) between 2 and 5 degrees above the horizontal plane.

Note to paragraph (o): These limits relate to the power flux density, which would be obtained under assumed free-space propagation conditions.

(p) The power flux-density at the Earth's surface produced by emissions from a space station in either the Earth exploration-satellite service in the band 25.5–27 GHz or the inter-satellite service in the band 25.25–27.5 GHz for all conditions and for all methods of modulation shall not exceed the following values:

−115 dB(W/m2 ) in any 1 MHz band for angles of arrival between 0 and 5 degrees above the horizontal plane;

−115 + 0.5(−5) dB(W/m2 ) in any 1 MHz band for angles of arrival between 5 and 25 degrees above the horizontal plane;

−105 dB(W/m2 ) in any 1 MHz band for angles of arrival between 25 and 90 degrees above the horizontal plane.

These limits relate to the power flux-density which would be obtained under assumed free-space propagation conditions.

(q) In the band 37.5–40.0 GHz, the power flux-density at the Earth's surface produced by emissions from a geostationary space station for all methods of modulation shall not exceed the following values.

(1) This limit relates to the power flux-density which would be obtained under assumed free space conditions (that is, when no allowance is made for propogation impairments such as rain-fade):

−139 dB(W/m2 ) in any 1 MHz band for angles of arrival between 0 and 5 degrees above the horizontal plane;

−139 + 4/3 (δ−5) dB(W/m2 ) in any 1 MHz band for angles of arrival δ (in degrees) between 5 and 20 degrees above the horizontal plane; and

−119 + 0.4 (δ−20) dB(W/m2 ) in any 1 MHz band for angles of arrival δ (in degrees) between 20 and 25 degrees above the horizontal plane;

−117 dB(W/m2 ) in any 1 MHz band for angles of arrival between 25 and 90 degrees above the horizontal plane;

(2) This limit relates to the maximum power flux-density which would be obtained anywhere on the surface of the Earth during periods when FSS system raises power to compensate for rain-fade conditions at the FSS Earth station:

−127 dB(W/m2 ) in any 1 MHz band for angles of arrival between 0 and 5 degrees above the horizontal plane;

−127 + 4/3 (δ−5) dB(W/m2 ) in any 1 MHz band for angles of arrival δ (in degrees) between 5 and 20 degrees above the horizontal plane; and

−107 + 0.4 (δ−20) dB(W/m2 ) in any 1 MHz band for angles of arrival δ (in degrees) between 20 and 25 degrees above the horizontal plane;

−105 dB(W/m2 ) in any 1 MHz band for angles of arrival between 25 and 90 degrees above the horizontal plane.

Note to paragraph (q): The conditions under which satellites may exceed the power flux-density limits for normal free space propagation described in paragraph (p)(1) to compensate for the effects of rain fading are under study and have therefore not yet been defined. Such conditions and the extent to which these limits can be exceeded will be the subject of a further rulemaking by the Commission on the satellite service rules.

(r) In the band 37.5–40.0 GHz, the power flux-density at the Earth's surface produced by emissions from a non-geostationary space station for all methods of modulation shall not exceed the following values:

(1) This limit relates to the power flux-density which would be obtained under assumed free space conditions (that is, when no allowance is made for propogation impairments such as rain-fade):

−132 dB(W/m2 ) in any 1 MHz band for angles of arrival between 0 and 5 degrees above the horizontal plane;

−132 + 0.75 (δ−5) dB(W/m2 ) in any 1 MHz band for angles of arrival δ (in degrees) between 5 and 25 degrees above the horizontal plane; and

−117 dB(W/m2 ) in any 1 MHz band for angles of arrival between 25 and 90 degrees above the horizontal plane;

(2) This limit relates to the maximum power flux-density which would be obtained anywhere on the surface of the Earth during periods when FSS system raises power to compensate for rain-fade conditions at the FSS Earth station:

−120 dB(W/m2 ) in any 1 MHz band for angles of arrival between 0 and 5 degrees above the horizontal plane;

−120 + 0.75 (δ−5) dB(W/m2 ) in any 1 MHz band for angles of arrival δ (in degrees) between 5 and 25 degrees above the horizontal plane; and

−105 dB(W/m2 ) in any 1 MHz band for angles of arrival between 25 and 90 degrees above the horizontal plane.

Note to paragraph (r): The conditions under which satellites may exceed these power flux-density limits for normal free space propagation described in paragraph (q)(1) to compensate for the effects of rain fading are under study and have therefore not yet been defined. Such conditions and the extent to which these limits can be exceeded will be the subject of a further rulemaking by the Commission on the satellite service rules.

(s) In the band 40.04 0.5 GHz, the power flux-density at the Earth's surface produced by emissions from a space station for all conditions and for all methods of modulation shall not exceed the following values:

−115 dB(W/m2 ) in any 1 MHz band for angles of arrival between 0 and 5 degrees above the horizontal plane;

−115 + 0.5 (δ−5) dB(W/m2 ) in any 1 MHz band for angles of arrival δ (in degrees) between 5 and 25 degrees above the horizontal plane; and

−105 dB(W/m2 ) in any 1 MHz band for angles of arrival between 25 and 90 degrees above the horizontal plane;

Note to paragraph (s): These limits relate to the power flux-density that would be obtained under assumed free-space propagation conditions.

(t) In the band 40.5–42.0 GHz, the power flux density at the Earth's surface produced by emissions from a non-geostationary space station for all conditions and for all methods of modulation shall not exceed the following values:

−115 dB(W/m2 ) in any 1 MHz band for angles of arrival between 0 and 5 degrees above the horizontal plane;

−115 + 0.5 (δ−5) dB(W/m2 ) in any 1 MHz band for angles of arrival δ (in degrees) between 5 and 25 degrees above the horizontal plane; and

−105 dB(W/m2 ) in any 1 MHz band for angles of arrival between 25 and 90 degrees above the horizontal plane;

Note to paragraph (t): These limits relate to the power flux density that would be obtained under assumed free-space propagation conditions.

(u) In the band 40.5–42.0 GHz, the power flux-density at the Earth's surface produced by emissions from a geostationary space station for all conditions and for all methods of modulation shall not exceed the following values:

−120 dB(W/m2 ) in any 1 MHz band for angles of arrival between 0 and 5 degrees above the horizontal plane;

−120 + (δ−5) dB(W/m2 ) in any 1 MHz band for angles of arrival δ (in degrees) between 5 and 15 degrees above the horizontal plane;

−110 + 0.5 (δ−15) dB(W/m2 ) in any 1 MHz band for angles of arrival δ (in degrees) between 15 and 25 degrees above the horizontal plane; and

−105 dB(W/m2 ) in any 1 MHz band for angles of arrival between 25 and 90 degrees above the horizontal plane;

Note to paragraph (u): These limits relate to the power flux-density that would be obtained under assumed free-space propagation conditions.

(v) In the band 2496–2500 MHz, the power flux-density at the Earth's surface produced by emissions from non-geostationary space stations for all conditions and all methods of modulation shall not exceed the following values (these values are obtained under assumed free-space propagation conditions):

(1) −144 dB (W/m&supcaret;2) in 4 kHz for all angles of arrival between 0 and 5 degrees above the horizontal plane; −144 dB (W/m&supcaret;2) + 0.65(δ −5) in 4 kHz for all angles of arrival between 5 and 25 degrees above the horizontal plane; and

−131 dB (W/m&supcaret;2) in 4 kHz and for all angles of arrival between 25 and 90 degrees above the horizontal plane.

(2) −126 dB (W/m&supcaret;2) in 1 MHz for all angles of arrival between 0 and 5 degrees above the horizontal plane; −126 dB (W/m&supcaret;2) + 0.65(δ −5) in 1 MHz for all angles of arrival between 5 and 25 degrees above the horizontal plane; and

−113 dB (W/m&supcaret;2) in 1 MHz and for all angles of arrival between 25 and 90 degrees above the horizontal plane.

[48 FR 40255, Sept. 6, 1983, as amended at 52 FR 45636, Dec. 1, 1987; 59 FR 53329, Oct. 21, 1994; 65 FR 54171, Sept. 7, 2000; 66 FR 10623, Feb. 16, 2001; 66 FR 63515, Dec. 7, 2001; 67 FR 17299, Apr. 10, 2002; 67 FR 46911, July 17, 2002; 68 FR 16448, Apr. 4, 2003; 68 FR 43946, July 25, 2003; 69 FR 31745, June 7, 2004; 69 FR 52207, Aug. 25, 2004; 70 FR 24725, May 11, 2005; 70 FR 46675, Aug. 10, 2005; 71 FR 35188, June 19, 2006]

§ 25.209   Antenna performance standards.
top

(a) The gain of any antenna to be employed in transmission from an earth station in the geostationary satellite orbit fixed-satellite service (GSO FSS) shall lie below the envelope defined as follows:

(1) In the plane of the geostationary satellite orbit as it appears at the particular earth station location:

where Theta is the angle in degrees from the axis of the main lobe, and dBi refers to dB relative to an isotropic radiator. For the purposes of this section, the peak gain of an individual sidelobe may not exceed the envelope defined above for Theta between 1.0 and 7.0 degrees. For Theta greater than 7.0 degrees, the envelope may be exceeded by no more than 10% of the sidelobes, provided no individual sidelobe exceeds the gain envelope given above by more than 3 dB.

(2) In all other directions, or in the plane of the horizon including any out-of-plane potential terrestrial interference paths:

Outside the main beam, the gain of the antenna shall lie below the envelope defined by:

where Theta and dBi are defined above. For the purposes of this section, the envelope may be exceeded by no more than 10% of the sidelobes provided no individual sidelobe exceeds the gain envelope given above by more than 6 dB. The region of the main reflector spillover energy is to be interpreted as a single lobe and shall not exceed the envelope by more than 6 dB.

(b) The off-axis cross-polarization gain of any antenna to be employed in transmission from an earth station to a space station in the domestic fixed-satellite service shall be defined by:

(c) Earth station antennas licensed for reception of radio transmissions from a space station in the fixed-satellite service are protected from radio interference caused by other space stations only to the degree to which harmful interference would not be expected to be caused to an earth station employing an antenna conforming to the referenced patterns defined in paragraphs (a) and (b) of this section, and protected from radio interference caused by terrestrial radio transmitters identified by the frequency coordination process only to the degree to which harmful interference would not be expected to be caused to an earth station conforming to the reference pattern defined in paragraph (a)(2) of this section.

(d) The patterns specified in paragraphs (a) and (b) of this section shall apply to all new earth station antennas initially authorized after February 15, 1985 and shall apply to all earth station antennas after March 11, 1994.

(e) The operations of any earth station with an antenna not conforming to the standards of paragraphs (a) and (b) of this section shall impose no limitations upon the operation, location or design of any terrestrial station, any other earth station, or any space station beyond those limitations that would be expected to be imposed by an earth station employing an antenna conforming to the reference patterns defined in paragraphs (a) and (b) of this section.

(f) An earth station with an antenna not conforming to the standards of paragraphs (a) and (b) of this section will be authorized after February 15, 1985 upon a finding by the Commission that unacceptable levels of interference will not be caused under conditions of uniform 2° orbital spacing. An earth station antenna initially authorized on or before February 15, 1985 will be authorized by the Commission to continue to operate as long as such operations are found not to cause unacceptable levels of adjacent satellite interference. In either case, the Commission will impose appropriate terms and conditions in its authorization of such facilities and operations. The applicant has the burden of demonstrating that its antenna not conforming to the standards of paragraphs (a) and (b) of this section will not cause unacceptable interference. This demonstration must comply with the procedures set forth in §25.220.

(g) The antenna performance standards of small antennas operating in the 12/14 GHz band with diameters as small as 1.2 meters starts at 1.25° instead of 1° as stipulated in paragraph (a) of this section.

(h)(1) The gain of any antennas to be employed in transmission from a gateway earth station antenna operating in the frequency bands 10.7–11.7 GHz, 12.75–13.15 GHz, 13.2125–13.25 GHz, 13.8–14.0 GHz, and 14.4–14.5 GHz and communicating with NGSO FSS satellites shall lie below the envelope defined as follows:

29 − 25log10 (Θ) dBi − 10 dBi

1B ≤ Θ ≤ 36B

36B ≤ Θ ≤ 180B

Where: Θ is the angle in degrees from the axis of the main lobe, and dBi refers to dB relative to an isotropic radiator.

(2) For the purposes of this section, the peak gain of an individual sidelobe may not exceed the envelope defined in paragraph (h)(1) of this section.

[48 FR 40255, Sept. 6, 1983, as amended at 50 FR 2675, Jan. 18, 1985; 50 FR 39004, Sept. 26, 1985; 58 FR 13420, Mar. 11, 1993; 66 FR 10630, Feb. 16, 2001; 70 FR 32255, June 2, 2005]

§ 25.210   Technical requirements for space stations in the Fixed-Satellite Service.
top

(a) All space stations in the Fixed-Satellite Service used for domestic service in the 3700–4200 MHz and 5925–6425 MHz frequency bands shall:

(1) Use orthogonal linear polarization with one of the planes defined by the equatorial plane;

(2) Be designed so that the polarization sense of uplink transmissions is opposite to that of downlink transmissions on the same transponder; and

(3) Shall be capable of switching polarization sense upon ground command.

(b) All space stations in the Fixed-Satellite Service in the 20/30 GHz band shall use either orthogonal linear or orthogonal circular polarization. Those space stations utilizing orthogonal linear polarization shall also comply with paragraph (a) of this section.

(c) All space stations in the Fixed-Satellite Service shall have a minimum capability to change transponder saturation flux densities by ground command in 4 dB steps over a range of 12 dB.

(d) All space stations in the Fixed Satellite Service in the 20/30 GHz band shall employ state-of-the-art full frequency reuse either through the use of orthogonal polarizations within the same beam and/or through the use of spatially independent beams.

(e) [Reserved]

(f) All space stations in the Fixed Satellite Service in the 3600–3700 MHz, 3700–4200 MHz, 5091–5250 MHz, 5825–5925 MHz, 5925–6425 MHz, 6425–6525 MHz, 6525–6700 MHz, 6700–7025 MHz, 10.7–10.95 GHz, 10.95–11.2 GHz, 11.2–11.45 GHz, 11.45–11.7 GHz, 11.7–12.2 GHz, 12.2–12.7 GHz, 12.75–13.15 GHz, 13.15–13.2125 GHz, 13.2125–13.25 GHz, 13.75–14.0 GHz, 14.0–14.5 GHz and 15.43–15.63 GHz bands shall employ state-of-the-art full frequency reuse either through the use of orthogonal polarizations within the same beam and/or the use of spatially independent beams.

(g)–(h) [Reserved]

(i) Space station antennas in the Fixed-Satellite Service must be designed to provide a cross-polarization isolation such that the ratio of the on axis co-polar gain to the cross-polar gain of the antenna in the assigned frequency band shall be at least 30 dB within its primary coverage area.

(j) Space stations operated in the geostationary satellite orbit must be maintained within 0.05° of their assigned orbital longitude in the east/west direction, unless specifically authorized by the Commission to operate with a different longitudinal tolerance, and except as provided in Section 25.283(b) (End-of-life Disposal).

(k) Antenna measurements of both co-polarized and cross-polarized performance must be made on all antennas employed by space stations both within the primary coverage area to facilitate coordination with other Commission space station licensees and outside the primary coverage area to facilitate international frequency coordination with other Administrations. The results of such measurements shall be submitted to the Commission within thirty days after preliminary in-orbit testing is completed.

(l) All operators of space stations shall, on June 30 of each year, file a report with the International Bureau and the Commission's Columbia Operations Center in Columbia, Maryland, containing the following information current as of May 31 of that year:

(1) Status of satellite construction and anticipated launch dates, including any major problems or delays encountered;

(2) A listing of any non-scheduled transponder outages for more than thirty minutes and the cause(s) of such outages;

(3) A detailed description of the utilization made of each transponder on each of the in-orbit satellites. This description should identify the total capacity or the percentage of time each transponder is actually used for transmission, and the amount of unused system capacity in the transponder. This information is not required for those transponders that are sold on a non-common carrier basis. In that case, operators should indicate the number of transponders sold on each in-satellite orbit.

(4) Identification of any transponders not available for service or otherwise not performing to specifications, the cause of these difficulties, and the date any transponder was taken out of service or the malfunction identified.

[58 FR 13420, Mar. 11, 1993, as amended at 61 FR 9952, Mar. 12, 1996; 62 FR 5931, Feb. 10, 1997; 62 FR 61457, Nov. 18, 1997; 68 FR 51508, Aug. 27, 2003; 69 FR 54587, Sept. 9, 2004; 70 FR 32256, June 2, 2005]

§ 25.211   Analog video transmissions in the Fixed-Satellite Services.
top

(a) Downlink analog video transmissions in the band 3700–4200 MHz shall be transmitted only on a center frequency of 3700+20N MHz, where N=1 to 24. The corresponding uplink frequency shall be 2225 MHz higher.

(b) All 4/6 GHz analog video transmissions shall contain an energy dispersal signal at all times with a minimum peak-to-peak bandwidth set at whatever value is necessary to meet the power flux density limits specified in §25.208(a) and successfully coordinated internationally and accepted by adjacent U.S. satellite operators based on the use of state of the art space and earth station facilities. Further, all transmissions operating in frequency bands described in §25.208 (b) and (c) shall also contain an energy dispersal signal at all times with a minimum peak-to-peak bandwidth set at whatever value is necessary to meet the power flux density limits specified in §25.208(b) and (c) and successfully coordinated internationally and accepted by adjacent U.S. satellite operators based on the use of state of the art space and earth station facilities. The transmission of an unmodulated carrier at a power level sufficient to saturate a transponder is prohibited, except by the space station licensee to determine transponder performance characteristics. All 12/14 GHz video transmissions for TV/FM shall identify the particular carrier frequencies for necessary coordination with adjacent U.S. satellite systems and affected satellite systems of other administrations.

(c) All initial analog video transmissions shall be preceded by a video test transmission at an uplink e.i.r.p. at least 10 dB below the normal operating level. The earth station operator shall not increase power until receiving notification from the satellite network control center that the frequency and polarization alignment are satisfactory pursuant to the procedures specified in §25.272. The stationary earth station operator that has successfully transmitted an initial video test signal to a satellite pursuant to this paragraph is not required to make subsequent video test transmissions if subsequent transmissions are conducted using exactly the same parameters as the initial transmission.

(d) An earth station may be routinely licensed for transmission of full transponder video analog services provided:

(1) In the 5925–6425 MHz band, with an antenna equivalent diameter 4.5 meters or greater, the maximum input power into the antenna does not exceed 26.5 dBW; or

(2) In the 14.0–14.5 GHz band, with an antenna equivalent diameter of 1.2 meters or greater, the maximum input power into the antenna does not exceed 27 dBW.

(e) Antennas smaller than those specified in paragraph (d) of this section are subject to the provisions of §25.220, which may include power reduction requirements. These antennas will not be routinely licensed for transmission of full transponder services.

(f) Each applicant for authorization for analog transmissions in the fixed-satellite service proposing to use maximum power into the antenna in excess of those specified in §25.211(d), must comply with the procedures set forth in §25.220.

[58 FR 13421, Mar. 11, 1993, as amended at 61 FR 9952, Mar. 12, 1996; 62 FR 5931, Feb. 10, 1997; 70 FR 32256, June 2, 2005]

§ 25.212   Narrowband analog transmissions, digital transmissions, and video transmissions in the GSO Fixed-Satellite Service.
top

(a) Except as otherwise provided by this part, criteria for unacceptable levels of interference caused by other satellite networks shall be established on the basis of nominal operating conditions and with the objective of minimizing orbital separations between satellites.

(b) Emissions with an occupied bandwidth of less than 2 MHz are not protected from interference from wider bandwidth transmissions if the r.f. carrier frequency of the narrowband signal is within ±1 MHz of one of the frequencies specified in §25.211(a).

(c) In the 14.0–14.5 GHz band, an earth station with an antenna equivalent diameter of 1.2 meters or greater may be routinely licensed for transmission of narrowband analog services with bandwidths up to 200 kHz if the maximum input power spectral density into the antenna does not exceed −8 dBW/4 kHz and the maximum transmitted satellite carrier EIRP density does not exceed 13 dBW/4 kHz. Such earth stations may be routinely licensed for transmission of narrowband and/or wideband digital services, including digital video services, if the maximum input spectral power density into the antenna does not exceed −14 dBW/4 kHz and the maximum transmitted satellite carrier EIRP density does not exceed +6.0 dBW/4 kHz. Antennas with a smaller major or minor axis in the 14 GHz band are subject to the provisions of §25.220, which may include power reduction requirements.

(d)(1) For earth stations licensed before March 10, 2005 in the 5925–6425 MHz band, an earth station with an equivalent diameter of 4.5 meters or greater may be routinely licensed for transmission of SCPC services if the maximum power densities into the antenna do not exceed +0.5 dBW/4 kHz for analog SCPC carriers with bandwidths up to 200 kHz, and do not exceed −2.7 dBW/4 kHz for narrow and/or wideband digital SCPC carriers.

(2) For earth stations licensed after March 10, 2005 in the 5925–6425 MHz band, an earth station with an equivalent diameter of 4.5 meters or greater may be routinely licensed for transmission of SCPC services if the maximum power densities into the antenna do not exceed +0.5 dBW/4 kHz for analog SCPC carriers with bandwidths up to 200 kHz, and do not exceed −2.7 − 10log(N) dBW/4 kHz for narrow and/or wideband digital SCPC carriers. For digital SCPC using frequency division multiple access (FDMA) or time division multiple access (TDMA) technique, N is equal to one. For digital SCPC using code division multiple access (CDMA) technique, N is the maximum number of co-frequency simultaneously transmitting earth stations in the same satellite receiving beam.

(3) Antennas with an equivalent diameter smaller than 4.5 meters in the 5925–6425 MHz band are subject to the provisions of §25.220 of this chapter, which may include power reduction requirements.

(e) Each applicant for authorization for transmissions in the fixed-satellite service proposing to use transmitted satellite carrier EIRP densities, and/or maximum antenna input power densities in excess of those specified in paragraph (c) of this section in the 14.0–14.5 GHz band, or in paragraph (d) of this section in the 5925–6425 MHz band, respectively, must comply with the procedures set forth in §25.220.

[58 FR 13421, Mar. 11, 1993, as amended at 62 FR 5931, Feb. 10, 1997; 62 FR 51378, Oct. 1, 1997; 70 FR 32256, June 2, 2005; 70 FR 33376, June 8, 2005]

§ 25.213   Inter-Service coordination requirements for the 1.6/2.4 GHz mobile-satellite service.
top

(a) Protection of the radio astronomy service in the 1610.6–1613.8 MHz band against interference from 1.6/2.4 GHz Mobile-Satellite Service systems.

(1) Protection zones. All 1.6/2.4 GHz Mobile Satellite Service systems shall be capable of determining the position of the user transceivers accessing the space segment through either internal radiodetermination calculations or external sources such as LORAN-C or the Global Positioning System. During periods of radio astronomy observations, land mobile earth stations shall not operate when located within geographic protection zones defined by the radio observatory coordinates and separation distances as follows:

(i) In the band 1610.6–1613.8 MHz, within a 160 km radius of the following radio astronomy sites:

 ------------------------------------------------------------------------                                                   Latitude    Longitude                   Observatory                       (DMS)       (DMS)------------------------------------------------------------------------Arecibo, PR.....................................    18 20 46    66 45 11Green Bank Telescope, WV........................    38 25 59    79 50 24                                                    38 26 09    79 49 42Very Large Array, NM............................    34 04 43   107 37 04Owens Valley, CA................................    37 13 54   118 17 36Ohio State, OH..................................    40 15 06    83 02 54------------------------------------------------------------------------

(ii) In the band 1610.6–1613.8 MHz, within a 50 km radius of the following sites:

 ------------------------------------------------------------------------                                                   Latitude    Longitude                   Observatory                       (DMS)       (DMS)------------------------------------------------------------------------Pile Town, NM...................................    34 18 04   108 07 07Los Alamos, NM..................................    35 46 30   106 14 42Kitt Peak, AZ...................................    31 57 22   111 36 42Ft. Davis, TX...................................    30 38 06   103 56 39N. Liberty, IA..................................    41 46 17    91 34 26Brewster, WA....................................    48 07 53   119 40 55Owens Valley, CA................................    37 13 54   118 16 34St. Croix, VI...................................    17 45 31    64 35 03Mauna Kea, HI...................................    19 48 16   155 27 29Hancock, NH.....................................    42 56 01    71 59 12------------------------------------------------------------------------

(iii) Out-of-band emissions of a mobile earth station licensed to operate within the 1610.0–1626.5 MHz band shall be attenuated so that the power flux density it produces in the 1610.6–1613.8 MHz band at any radio astronomy site listed in paragraph (a)(1) (i) or (ii) of this section shall not exceed the emissions of a mobile earth station operating within the 1610.6–1613.8 MHz band at the edge of the protection zone applicable for that site. As an alternative, a mobile earth station shall not operate during radio astronomy observations within the 1613.8–1615.8 MHz band within 100 km of the radio astronomy sites listed in paragraph (a)(1)(i) of this section, and within 30 km of the sites listed in paragraph (a)(1)(ii) of this section, there being no restriction on a mobile earth station operating within the 1615.8–1626.5 MHz band.

(iv) For airborne mobile earth stations operating in the 1610.0–1626.5 MHz band, the separation distance shall be the larger of the distances specified in paragraph (a)(1) (i), (ii) or (iii) of this section, as applicable, or the distance, d, as given by the formula:

d (km) = 4.1 square root of (h)

where h is the altitude of the aircraft in meters above ground level.

(v) Smaller geographic protection zones may be used in lieu of the areas specified in paragraphs (a)(1) (i), (ii), (iii), and (iv) of this section if agreed to by the Mobile-Satellite Service licensee and the Electromagnetic Spectrum Management Unit (ESMU), National Science Foundation, Washington, D.C. upon a showing by the Mobile-Satellite Service licensee that the operation of a mobile earth station will not cause harmful interference to a radio astronomy observatory during periods of observation.

(vi) The ESMU shall notify Mobile-Satellite Service space station licensees authorized to operate mobile earth terminals in the 1610.0–1626.5 MHz band of periods of radio astronomy observations. The mobile-satellite systems shall be capable of terminating operations within the frequency bands and protection zones specified in paragraphs (a)(1) (i) through (iv) of this section, as applicable, after the first position fix of the mobile earth terminal either prior to transmission or, based upon its location within the protection zone at the time of initial transmission of the mobile earth terminal. Once the mobile-satellite system determines that a mobile earth terminal is located within an RAS protection zone, the mobile-satellite system shall immediately initiate procedures to relocate the mobile earth terminal operations to a non-RAS frequency.

(vii) A beacon-actuated protection zone may be used in lieu of fixed protection zones in the 1610.6–1613.8 MHz band if a coordination agreement is reached between a mobile-satellite system licensee and the ESMU on the specifics of beacon operations.

(viii) Additional radio astronomy sites, not located within 100 miles of the 100 most populous urbanized areas as defined by the United States Census Bureau at the time, may be afforded similar protection one year after notice to the mobile-satellite system licensees by issuance of a public notice by the Commission.

(2) Mobile-Satellite Service space stations transmitting in the 1613.8–1626.5 MHz band shall take whatever steps necessary to avoid causing harmful interference to the radio astronomy facilities listed in paragraphs (a)(1)(i) and (ii) of this section during periods of observation.

(3) Mobile-Satellite Service space stations operating in the 2483.5–2500 MHz frequency band shall limit spurious emission levels in the 4990–5000 MHz band so as not to exceed −241 dB (W/m2 /Hz) at the surface of the Earth.

(4) The Radioastronomy Service shall avoid scheduling radio astronomy observations during peak MSS/RDSS traffic periods to the greatest extent practicable.

(b) If a Mobile-Satellite Service space station operator in the 2496–2500 MHz band intends to operate at powers levels that exceed the PFD limits in §25.208(v), or if actual operations routinely exceed these PFD limits, we require the Mobile-Satellite Service operator to receive approval from each operational BRS system in the affected geographical region.

[59 FR 53329, Oct. 21, 1994, as amended at 61 FR 9945, Mar. 12, 1996; 67 FR 61816, Oct. 2, 2002; 71 FR 35188, June 19, 2006]

§ 25.214   Technical requirements for space stations in the satellite digital audio radio service.
top

(a) Definitions.

(1) Allocated bandwidth. The term “allocated bandwidth” refers to the entry in the Table of Frequency Allocations of a given frequency band for the purpose of its use by one or more terrestrial or space radiocommunication services under specified conditions. This term shall be applied to the 2310–2360 MHz band for satellite DARS.

(2) Frequency Assignment. The term “frequency assignment” refers to the authorization given by the Commission for a radio station to use a radio frequency or radio frequency channel under specified conditions. This term shall be applied to the two frequency bands (A) 2320.0–2332.5 MHz and (B) 2332.5–2340.0 MHz for satellite DARS.

(b) Each system authorized under this section will be conditioned upon construction, launch and operation milestones as outlined in §25.144(b). The failure to meet any of the milestones contained in an authorization will result in its cancellation, unless such failure is due to circumstances beyond the licensee's control or unless otherwise determined by the Commission upon proper showing by the licensee in any particular case.

(c) Frequency assignments will be made for each satellite DARS system as follows:

(1) Exclusive satellite DARS licenses are limited to the 2320–2345 MHz band segment of the allocated bandwidth for satellite DARS;

(2) Two, 12.5 MHz frequency assignments are available for satellite DARS: 2320.0–2332.5 MHz and 2332.5–2345.0 MHz;

(3) Satellite DARS licensees may reduce their assigned bandwidth occupancy to provide telemetry beacons in their exclusive frequency assignments;

(4) Each licensee may employ cross polarization within its exclusive frequency assignment and/or may employ cross polarized transmissions in frequency assignments of other satellite DARS licensees under mutual agreement with those licensees. Licensees who come to mutual agreement to use cross-polarized transmissions shall apply to the Commission for approval of the agreement before coordination is initiated with other administrations by the licensee of the exclusive frequency assignment; and

(5) Feeder uplink networks are permitted in the following Fixed-Satellite Service frequency bands: 7025–7075 MHz and 6725–7025 MHz (101° W.L. orbital location only).

[62 FR 11106, Mar. 11, 1997]

§ 25.215   Technical requirements for space stations in the Direct Broadcast Satellite Service.
top

In addition to §25.148(f), space station antennas operating in the Direct Broadcast Satellite Service must be designed to provide a cross-polarization isolation such that the ratio of the on-axis co-polar gain to the cross-polar gain of the antenna in the assigned frequency band shall be at least 30 dB within its primary coverage area.

[67 FR 51114, Aug. 7, 2002]

§ 25.216   Limits on emissions from mobile earth stations for protection of aeronautical radionavigation-satellite service.
top

(a) The e.i.r.p. density of emissions from mobile earth stations placed in service on or before July 21, 2002 with assigned uplink frequencies between 1610 MHz and 1660.5 MHz shall not exceed −70 dBW/MHz, averaged over any 2 millisecond active transmission interval, in the band 1559–1587.42 MHz. The e.i.r.p. of discrete emissions of less than 700 Hz bandwidth generated by such stations shall not exceed −80 dBW, averaged over any 2 millisecond active transmission interval, in that band.

(b) The e.i.r.p. density of emissions from mobile earth stations placed in service on or before July 21, 2002 with assigned uplink frequencies between 1610 MHz and 1626.5 MHz shall not exceed −64 dBW/MHz, averaged over any 2 millisecond active transmission interval, in the band 1587.42–1605 MHz. The e.i.r.p. of discrete emissions of less than 700 Hz bandwidth generated by such stations shall not exceed −74 dBW, averaged over any 2 millisecond active transmission interval, in the 1587.42–1605 MHz band.

(c) The e.i.r.p. density of emissions from mobile earth stations placed in service after July 21, 2002 with assigned uplink frequencies between 1610 MHz and 1660.5 MHz shall not exceed −70 dBW/MHz, averaged over any 2 millisecond active transmission interval, in the band 1559–1605 MHz. The e.i.r.p. of discrete emissions of less than 700 Hz bandwidth from such stations shall not exceed −80 dBW, averaged over any 2 millisecond active transmission interval, in the 1559–1605 MHz band.

(d) As of January 1, 2005, the e.i.r.p. density of emissions from mobile earth stations placed in service on or before July 21, 2002 with assigned uplink frequencies between 1610 MHz and 1660.5 MHz (except Standard A and B Inmarsat terminals used as Global Maritime Distress and Safety System ship earth stations) shall not exceed −70dBW/MHz, averaged over any 2 millisecond active transmission interval, in the 1559–1605 MHz band. The e.i.r.p. of discrete emissions of less than 700 Hz bandwidth from such stations shall not exceed −80 dBW, averaged over any 2 millisecond active transmission interval, in the 1559–1605 MHz band. Standard A Inmarsat terminals used as Global Maritime Distress and Safety System ship earth stations that do not meet the e.i.r.p. density limits specified in this paragraph may continue operation until December 31, 2007. Inmarsat-B terminals manufactured more than six months after Federal Register publication of the rule changes adopted in FCC 03–283 must meet these limits. Inmarsat B terminals manufactured before then are temporarily grandfathered under the condition that no interference is caused by these terminals to aeronautical satellite radio-navigation systems. The full-compliance deadline for grandfathered Inmarsat-B terminals is December 31, 2012.

(e) The e.i.r.p density of emissions from mobile earth stations with assigned uplink frequencies between 1990 MHz and 2025 MHz shall not exceed −70 dBW/MHz, averaged over any 2 millisecond active transmission interval, in frequencies between 1559 MHz and 1610 MHz. The e.i.r.p. of discrete emissions of less than 700 Hz bandwidth from such stations between 1559 MHz and 1605 MHz shall not exceed −80 dBW, averaged over any 2 millisecond active transmission interval. The e.i.r.p. of discrete emissions of less than 700 Hz bandwidth from such stations between 1605 MHz and 1610 MHz manufactured more than six months after Federal Register publication of the rule changes adopted in FCC 03–283 shall not exceed −80 dBW, averaged over any 2 millisecond active transmission interval.

(f) Mobile earth stations placed in service after July 21, 2002 with assigned uplink frequencies in the 1610–1660.5 MHz band shall suppress the power density of emissions in the 1605–1610 MHz band to an extent determined by linear interpolation from −70 dBW/MHz at 1605 MHz to −10 dBW/MHz at 1610 MHz.

(g) Mobile earth stations manufactured more than six months after Federal Register publication of the rule changes adopted in FCC 03–283 with assigned uplink frequencies in the 1610–1626.5 MHz band shall suppress the power density of emissions in the 1605–1610 MHz band-segment to an extent determined by linear interpolation from −70 dBW/MHz at 1605 MHz to −10 dBW/MHz at 1610 MHz averaged over any 2 millisecond active transmission interval. The e.i.r.p of discrete emissions of less than 700 Hz bandwidth from such stations shall not exceed a level determined by linear interpolation from −80 dBW at 1605 MHz to −20 dBW at 1610 MHz, averaged over any 2 millisecond active transmission interval.

(h) Mobile earth stations manufactured more than six months after Federal Register publication of the rule changes adopted in FCC 03–283 with assigned uplink frequencies in the 1626.5–1660.5 MHz band shall suppress the power density of emissions in the 1605–1610 MHz band-segment to an extent determined by linear interpolation from −70 dBW/MHz at 1605 MHz to −46 dBW/MHz at 1610 MHz, averaged over any 2 millisecond active transmission interval. The e.i.r.p of discrete emissions of less than 700 Hz bandwidth from such stations shall not exceed a level determined by linear interpolation from −80 dBW at 1605 MHz to −56 dBW at 1610 MHz, averaged over any 2 millisecond active transmission interval.

(i) The e.i.r.p density of carrier-off state emissions from mobile earth stations manufactured more than six months after Federal Register publication of the rule changes adopted in FCC 03–283 with assigned uplink frequencies between 1 and 3 GHz shall not exceed -80 dBW/MHz in the 1559–1610 MHz band averaged over any two millisecond interval.

(j) A Root-Mean-Square detector shall be used for all power density measurements.

[69 FR 5710, Feb. 6, 2004, as amended at 70 FR 19318, Apr. 13, 2005]

§ 25.217   Default service rules.
top

(a) The technical rules in this section apply only to licenses to operate a satellite system in a frequency band granted after a domestic frequency allocation has been adopted for that frequency band, but before any frequency-band-specific service rules have been adopted for that frequency band.

(b)(1) For all NGSO-like satellite licenses for which the application was filed pursuant to the procedures set forth in §25.157 after August 27, 2003, authorizing operations in a frequency band for which the Commission has not adopted frequency band-specific service rules at the time the license is granted, the licensee will be required to comply with the following technical requirements, notwithstanding the frequency bands specified in these rule provisions: §§25.142(d), 25.143(b)(2)(ii), 25.143(b)(2)(iii), 25.204(g), 25.210(c), 25.210(d), 25.210(f), 25.210(i), 25.210(k), and 25.210(l).

(2) In addition to the requirements set forth in paragraph (b)(1) of this section, the Commission will coordinate with the National Telecommunications and Information Administration (NTIA) regarding the operations of any licensees authorized to operate in a shared government/non-government frequency band, pursuant to the procedure set forth in §25.142(b)(2)(ii).

(3) Earth station licensees authorized to operate with one or more space stations described in paragraph (b)(1) of this section shall comply with the requirements in §25.136. In addition, earth station licensees authorized to operate with one or more space stations described in paragraph (b)(1) of this section in frequency bands shared with terrestrial wireless services shall comply with the requirements in §25.203(c).

(c)(1) For all GSO-like satellite licenses for which the application was filed pursuant to the procedures set forth in §25.158 after August 27, 2003, authorizing operations in a frequency band for which the Commission has not adopted frequency band-specific service rules at the time the license is granted, the licensee will be required to comply with the following technical requirements, notwithstanding the frequency bands specified in these rule provisions: §§25.142(d), 25.143(b)(2)(iv), 25.204(g), 25.210(c), 25.210(d), 25.210(f), 25.210(i), 25.210(j), 25.210(k), and 25.210(l).

(2) In addition to the requirements set forth in paragraph (c)(1) of this section, the Commission will coordinate with the National Telecommunications and Information Administration (NTIA) regarding the operations of any licensees authorized to operate in a shared government/non-government frequency band, pursuant to the procedure set forth in §25.142(b)(2)(ii).

(3) Earth station licensees authorized to operate with one or more space stations described in paragraph (c)(1) of this section shall comply with the earth station antenna performance verification requirements in §25.132, and the antenna gain pattern requirements in §§25.209(a) and (b). In addition, earth station licensees authorized to operate with one or more space stations described in paragraph (c)(1) of this paragraph in frequency bands shared with terrestrial wireless services shall comply with the requirements in §25.203(c).

(4) In addition to the requirements set forth in paragraph (c)(3) of this section, earth station licensees with a gain equivalent or higher than the gain of a 1.2 meter antenna operating in the 14.0–14.5 GHz band, authorized to operate with one or more space stations described in paragraph (c)(1) of this paragraph in frequency bands greater than 14.5 GHz shall be required to comply with the antenna input power density requirements set forth in §25.212(c).

(d) [Reserved]

(e) In the event that the Commission adopts frequency band-specific service rules for a particular frequency band after it has granted one or more space station or earth station licenses for operations in that frequency band, those licensees will be required to come into compliance with the frequency band-specific service rules within 30 days of the effective date of those rules, unless otherwise specified by either Commission or Bureau Order.

[68 FR 51508, Aug. 27, 2003, as amended at 70 FR 59277, Oct. 12, 2005]

§§ 25.218-25.219   [Reserved]
top
§ 25.220   Non-conforming transmit/receive earth station operations.
top

(a)(1) This section applies to earth station applications other than ESV applications in which:

(i) The proposed antenna does not conform to the standards of §§25.209(a) and

(b), and/or

(ii) The proposed power density levels are in excess of those specified in §25.134, §25.211, or §25.212, or those derived by the procedure set forth in paragraph (c)(1) of this section, whichever is applicable.

(2) Paragraphs (b) through (e) and (g) of this section apply to the earth station applications described in paragraph (a)(1) of this section, in which the applicant seeks transmit/receive authority.

(3) Paragraphs (f) and (g) of this section applies to the earth station applications described in paragraph (a)(1) of this section in which the applicant seeks transmit-only or receive-only authority.

(4) The requirements for petitions to deny applications filed pursuant to this section are set forth in §25.154.

(b) If an antenna proposed for use by the applicant does not comply with the antenna performance standards contained in §25.209(a) and (b), the applicant must provide, as an exhibit to its FCC Form 312 application, the antenna gain patterns specified in §25.132(b).

(c) If an antenna proposed for use by the applicant does not comply with the performance standards contained in §25.209(a) and (b), the applicant must meet the requirements of either paragraph (c)(1) or (c)(2) of this section to obtain authority to transmit. The applicant must meet the requirements of paragraph (c)(3) of this section to obtain protection from receiving interference from adjacent satellite operators.

(1) The applicant must provide in its Form 312, Schedule B, the power and power density levels that result by reducing the values stated in §§25.134, 25.211, or 25.212, whichever is applicable, by the number of decibels that the non-compliant antenna fails to meet the antenna performance standard of §25.209(a) and (b), or

(2) The applicant will not be permitted to transmit to any satellite unless the applicant has provided the certifications listed in paragraph (e)(1) of this section from the operator of that satellite(s).

(3) The applicant will not receive protection from adjacent satellite interference from any satellite unless the applicant has provided the certifications listed in paragraph (d)(1) of this section from the operator of that satellite(s) from which it plans to receive.

(d)(1) If an antenna proposed for use by the applicant does not comply with the performance standards contained in §25.209(a) and (b), the applicant must submit the certifications listed in paragraphs (d)(1)(i) through (d)(1)(iv) of this section to qualify for protection from receiving interference from other satellite systems. The applicant will be granted protection from receiving interference only with respect to the satellite systems included in the coordination agreements referred to in the certification required by paragraph (d)(1)(ii) of this section, and only to the extent that protection from receiving interference is afforded by those coordination agreements.

(i) A statement from the satellite operator acknowledging that the proposed operation of the subject non-conforming earth station with its satellite(s) has the potential to receive interference from adjacent satellite networks that may be unacceptable.

(ii) A statement from the satellite operator that it has coordinated the operation of the subject non-conforming earth station accessing its satellite(s), including its required downlink power density based on the information contained in the application, with all adjacent satellite networks within 6° of orbital separation from its satellite(s), and the operations will operate in conformance with existing coordination agreement for its satellite(s) with other satellite systems.

(iii) A statement from the satellite operator that it will include the subject non-conforming earth station operations in all future satellite network coordinations, and

(iv) A statement from the earth station applicant certifying that it will comply with all coordination agreements reached by the satellite operator(s).

(2) A license granted pursuant to paragraph (d)(1) of this section will include, as a condition on that license, that if a good faith agreement cannot be reached between the satellite operator and the operator of a future 2° compliant satellite, the earth station operator shall accept the power density levels that would accommodate the 2° compliant satellite.

(e)(1) An earth station applicant proposing to use transmitted satellite carrier EIRP densities, and/or maximum power into the antenna in excess of the levels in §§25.134, 25.211, 25.212, or the power density levels derived through the procedure set forth in paragraph (c)(1) of this section, whichever is applicable, shall provide the following certifications as an exhibit to its earth station application:

(i) A statement from the specified satellite operator acknowledging that the proposed operation of the subject non-conforming earth station with its satellite(s) has the potential to create interference to adjacent satellite networks that may be unacceptable.

(ii) A statement from the specified satellite operator that it has coordinated the operation of the subject non-conforming Earth Station accessing its satellite(s), and its corresponding downlink power density requirements (based on the information contained in the application) with all adjacent satellite networks within 6° of orbital separation from its satellite(s), and the operations will not violate any existing coordination agreement for its satellite(s) with other satellite systems.

(iii) A statement from the specified satellite operator that it will include the subject non-conforming Earth Station power and power densities in all future satellite network coordinations, and

(iv) A statement from the earth station applicant certifying that it will comply with all coordination agreements reached by the satellite operator(s).

(2) A license granted pursuant to paragraph (e)(1) of this section will include, as a condition on that license, that if a good faith agreement cannot be reached between the satellite operator and the operator of a future 2° compliant satellite, the earth station operator shall reduce its power to those levels that would accommodate the 2° compliant satellite.

(f)(1) If an earth station applicant requests transmit-only authority, and its proposed antenna does not conform to the standards of §25.209(a) and (b), it must meet the requirements of paragraphs (b) and (c) of this section.

(2) If an earth station applicant requests transmit-only authority, and its proposed power density levels are in excess of those specified in §§25.134, 25.211, or 25.212, or those derived by the procedure set forth in paragraph (c)(1) of this section, it must meet the requirements of paragraph (e) of this section.

(3) If an earth station applicant requests receive-only authority, and its proposed antenna does not conform to the standards of §25.209(a) and (b), it must meet the requirements of paragraphs (b) and (d) of this section.

(g) Applicants filing applications for earth stations pursuant to this section must provide the following information for the Commission's public notice:

(1) Detailed description of the service to be provided, including frequency bands and satellites to be used. The applicant must identify either the specific satellites with which it plans to operate, or the eastern and western boundaries of the geostationary satellite orbit arc it plans to coordinate.

(2) The diameter or equivalent diameter of the antenna.

(3) Proposed power and power density levels.

(4) Identification of any rule or rules for which a waiver is requested.

[70 FR 32256, June 2, 2005]

§ 25.221   Blanket Licensing provisions for Earth Stations on Vessels (ESVs) receiving in the 3700–4200 MHz (space-to-Earth) frequency band and transmitting in the 5925–6425 MHz (Earth-to-space) frequency band, operating with Geostationary Satellites in the Fixed-Satellite Service.
top

(a) All applications for licenses for ESVs transmitting in the 5925–6425 MHz (Earth-to-space) bands to geostationary-orbit satellites in the fixed-satellite service shall provide sufficient data to demonstrate that the ESV operations meet the following criteria, which are ongoing requirements that govern all ESV licensees and operations in these bands:

(1) The off-axis EIRP spectral density for co-polarized signals, emitted from the ESV, in the plane of the geostationary satellite orbit as it appears at the particular earth station location (i.e., the plane determined by the focal point of the antenna and the line tangent to the arc of the geostationary satellite orbit at the position of the target satellite), shall not exceed the following values:

26.3 − 25log(Θ) − 10log(N) dBW/4kHz for 1.0° ≤ Θ ≤ 7.0°

5.3 − 10log(N)dBW/4kHz for 7.0° < Θ ≤ 9.2°

29.3 − 25log(Θ) − 10log(N) dBW/4kHz for 9.2° < Θ ≤ 48°

−12.7 − 10log(N) dBW/4kHz for 48° < Θ ≤ 180°

where Θ is the angle in degrees from the axis of the main lobe. For an ESV network using frequency division multiple access (FDMA) or time division multiple access (TDMA) technique, N is equal to one. For an ESV network using code division multiple access (CDMA) technique, N is the maximum number of co-frequency simultaneously transmitting earth stations in the same satellite receiving beam.

(2) In all other directions, the off-axis EIRP spectral density for co-polarized signals emitted from the ESV shall not exceed the following values:

29.3 − 25log(Θ) − 10log(N) dBW/4kHz for 1.0° ≤ Θ ≤ 48°

−12.7 − 10log(N) dBW/4kHz for 48° < Θ ≤ 180°

where Θ and N are defined as set forth in paragraph (a)(1) of this section.

(3) For Θ > 7°, the values given in paragraphs (a)(1) of this Section may be exceeded by no more than 10% of the earth station antenna sidelobes, provided no individual sidelobe exceeds the criteria given by more than 3 dB.

(4) In all directions, the off-axis EIRP spectral density for cross-polarized signals emitted from the ESV shall not exceed the following values:

16.3 − 25log(Θ) − 10log(N) dBW/4kHz for 1.8° ≤ Θ ≤ 7.0°

−4.7 − 10log(N) dBW/4kHz for 7.0° < Θ ≤ 9.2°

where Θ and N are defined as set forth in paragraph (a)(1) of this section.

(5) For non-circular ESV antennas, the major axis of the antenna will be aligned with the tangent to the geostationary satellite orbital arc at the target satellite point, to the extent required to meet specified off-axis e.i.r.p. criteria.

(6) A pointing error of less than 0.2°, between the orbital location of the target satellite and the axis of the main lobe of the ESV antenna.

(7) All emissions from the ESV shall automatically cease within 100 milliseconds if the angle between the orbital location of the target satellite and the axis of the main lobe of the ESV antenna exceeds 0.5°, and transmission will not resume until such angle is less than 0.2°.

(8) There shall be a point of contact in the United States, with phone number and address included with the application, available 24 hours a day, seven days a week, with authority and ability to cease all emissions from the ESVs, either directly or through the facilities of a U.S. Hub or a Hub located in another country with which the U.S. has a bilateral agreement that enables such cessation of emissions.

(9) ESVs that exceed the radiation guidelines of Section 1.1310 Radiofrequency radiation exposure limits must provide, with their environmental assessment, a plan for mitigation of radiation exposure to the extent required to meet those guidelines.

(10) ESV operators transmitting in the 5925–6425 MHz (Earth-to-space) frequency bands to geostationary satellites in the fixed-satellite service (FSS) shall not seek to coordinate, in any geographic location, more than 36 MHz of uplink bandwidth on each of no more than two GSO FSS satellites.

(11) There shall be an exhibit included with the application describing the geographic area(s) in which the ESVs will operate.

(12) ESVs shall not operate in the 5925–6425 MHz (Earth-to-space) and 3700–4200 MHz (space-to-Earth) frequency bands on vessels smaller than 300 gross tons.

(b) Applications for ESV operation in the 5925–6425 MHz band to geostationary satellites in the fixed-satellite service must include, in addition to the particulars of operation identified on Form 312, and associated Schedule B, the following data, for each earth station antenna type:

(1) A series of e.i.r.p. density charts or tables, calculated for a production earth station antenna, based on measurements taken on a calibrated antenna range at 6.0 GHz, with the off-axis e.i.r.p. envelope set forth in paragraphs (a)(1) through (a)(4) of this section superimposed, as follows:

(i) Showing off-axis co-polarized e.i.r.p. spectral density in the azimuth plane, for off-axis angles from minus 10° to plus 10° and from minus 180° to plus 180°.

(ii) Showing off-axis co-polarized e.i.r.p. spectral density in the elevation plane, at off-axis angles from 0° to plus 30°.

(iii) Showing off-axis cross-polarized e.i.r.p. spectral density in the azimuth plane, at off-axis angles from minus 10° to plus 10°.

(iv) Showing off-axis cross-polarized e.i.r.p. spectral density in the elevation plane, at off-axis angles from minus 10° to plus 10°; or

(2) A series of gain charts or tables, for a production earth station antenna, measured on a calibrated antenna range at 6.0 GHz, with the Earth station antenna gain envelope set forth in §25.209(a) and (b) superimposed, for the same planes and ranges enumerated in paragraphs (b)(1)(i) through (b)(1)(iv) of this section, that, combined with input power density entered in Schedule B, demonstrates that the off-axis e.i.r.p. spectral density envelope set forth in paragraphs (a)(1) through (a)(4) of this section will be met; or

(3) A certification that the antenna conforms to the gain pattern criteria of §25.209(a) and (b), that, combined with input power density entered in Schedule B, demonstrates that the off-axis e.i.r.p. spectral density envelope set forth in paragraphs (a)(1) through (a)(4) of this section will be met.

(c) ESVs receiving and transmitting in the 3700–4200 MHz (space-to-Earth) and 5925–6425 MHz (Earth-to-space) frequency bands shall operate with the following provisions:

(1) For each ESV transmitter, a record of the ship location (i.e., latitude/longitude), transmit frequency, channel bandwidth and satellite used shall be time annotated and maintained for a period of not less than 1 year. Records will be recorded at time intervals no greater than every 20 minutes while the ESV is transmitting. The ESV operator will make this data available upon request to a coordinator, fixed system operator, fixed-satellite system operator, or the Commission within 24 hours of the request.

(2) ESV operators communicating with vessels of foreign registry must maintain detailed information on each vessel's country of registry and a point of contact for the relevant administration responsible for licensing ESVs.

(3) ESV operators shall control all ESVs by a Hub earth station located in the United States, except that an ESV on U.S.-registered vessels may operate under control of a Hub earth station location outside the United States provided the ESV operator maintains a point of contact within the United States that will have the capability and authority to cause an ESV on a U.S.-registered vessel to cease transmitting if necessary.

(4) ESVs, operating while docked, that complete coordination with terrestrial stations in the 3700–4200 MHz band in accordance with §25.251, shall receive protection from such terrestrial stations in accordance with the coordination agreements, for 180 days, renewable for 180 days.

(d) ESVs in motion shall not claim protection from harmful interference from any authorized terrestrial stations or lawfully operating satellites to which frequencies are either already assigned, or may be assigned in the future in the 3700–4200 MHz (space-to-Earth) frequency band.

(e) ESVs operating in the 5925–6425 MHz (Earth-to-space) band, within 200 km from the baseline of the United States, or within 200 km from a fixed service offshore installation, shall complete coordination prior to operation. The coordination method and the interference criteria objective shall be determined by the frequency coordinator. The details of the coordination shall be maintained and available at the frequency coordinator, and shall be filed with the Commission to be placed on Public Notice. Operation of each individual ESV may commence immediately after the Public Notice is released that identifies the notification sent to the Commission. Continuance of operation of that ESV for the duration of the coordination term shall be dependent upon successful completion of the normal public notice process. If any objections are received to the coordination prior to the end of the 30-day comment period of the Public Notice, the licensee shall immediately cease operation of that particular station until the coordination dispute is resolved and the ESV licensee informs the Commission of the resolution.

(f) ESV operators must automatically cease transmission if the ESV operates in violation of the terms of its coordination, including, but not limited to, conditions related to speed of the vessel or if the ESV travels outside the coordinated area, if within 200 km from the baseline of the United States, or within 200 km from a fixed service offshore installation. Transmissions may be controlled by the ESV network. The frequency coordinator may decide whether ESV operators should automatically cease transmissions if the vessel falls below a prescribed speed within a prescribed geographic area.

[70 FR 4784, Jan. 31, 2005, as amended at 70 FR 33377, June 8, 2005]

§ 25.222   Blanket Licensing provisions for Earth Stations on Vessels (ESVs) receiving in the 10.95–11.2 GHz (space-to-Earth), 11.45–11.7 GHz (space-to-Earth), 11.7–12.2 GHz (space-to-Earth) frequency bands and transmitting in the 14.0–14.5 GHz (Earth-to-space) frequency band, operating with Geostationary Satellites in the Fixed-Satellite Service.
top

(a) All applications for licenses for ESVs receiving in the 10.95–11.2 GHz (space-to-Earth), 11.45–11.7 GHz (space-to-Earth), 11.7–12.2 GHz (space-to-Earth) frequency bands, and transmitting in the 14.0–14.5 GHz (Earth-to-space) frequency band, to Geostationary Satellites in the fixed-satellite service shall provide sufficient data to demonstrate that the ESV operations meet the following criteria, which are ongoing requirements that govern all ESV licensees and operations in these bands:

(1) The off-axis EIRP spectral density for co-polarized signals, emitted from the ESV in the plane of the geostationary satellite orbit as it appears at the particular earth station location (i.e., the plane determined by the focal point of the antenna and the line tangent to the arc of the geostationary satellite orbit at the position of the target satellite), shall not exceed the following values:

15 − 25log(Θ) − 10log(N) dBW/4kHz for 1.25° ≤ Θ ≤ 7.0°

−6 − 10 log(N) dBW/4kHz for 7.0° < Θ ≤ 9.2°

18 − 25log(Θ) − 10log(N) dBW/4kHz for 9.2° < Θ ≤ 48°

−24 − 10log(N) dBW/4kHz for 48° < Θ ≤ 180°

where Θ is the angle in degrees from the axis of the main lobe. For an ESV network using frequency division multiple access (FDMA) or time division multiple access (TDMA) technique, N is equal to one. For an ESV network using code division multiple access (CDMA) technique, N is the maximum number of co-frequency simultaneously transmitting earth stations in the same satellite receiving beam.

(2) In all other directions, the off-axis EIRP spectral density for co-polarized signals emitted from the ESV shall not exceed the following values:

18 − 25log(Θ) − 10log(N) dBW/4kHz for 1.25° ≤ Θ ≤ 48°

−24 − 10log(N) dBW/4kHz for 48° < Θ ≤ 180°

where Θ and N are defined as set forth in paragraph (a)(1) of this section.

(3) For Θ>7°, the values given in paragraphs (a)(1) of this section may be exceeded by no more than 10% of the sidelobes, provided no individual sidelobe exceeds the criteria given by more than 3 dB.

(4) In all directions, the off-axis EIRP spectral density for cross-polarized signals emitted from the ESV shall not exceed the following values:

5 − 25log(Θ) − 10log(N) dBW/4kHz for 1.8° ≤ Θ ≤ 7°

−16 − 10log(N) dBW/4kHz for 7° ≤ Θ ≤ 9.2°

where Θ and N are defined as set forth in paragraph (a)(1) of this section.

(5) For non-circular ESV antennas, the major axis of the antenna will be aligned with the tangent to the geostationary satellite orbital arc at the target satellite point, to the extent required to meet specified off-axis e.i.r.p. criteria.

(6) A pointing error of less than 0.2°, between the orbital location of the target satellite and the axis of the main lobe of the ESV antenna.

(7) All emissions from the ESV shall automatically cease within 100 milliseconds if the angle between the orbital location of the target satellite and the axis of the main lobe of the ESV antenna exceeds 0.5°, and transmission will not resume until such angle is less than 0.2°.

(8) There shall be a point of contact in the United States, with phone number and address included with the application, available 24 hours a day, seven days a week, with authority and ability to cease all emissions from the ESVs, either directly or through the facilities of a U.S. Hub or a Hub located in another country with which the U.S. has a bilateral agreement that enables such cessation of emissions.

(9) ESVs that exceed the radiation guidelines of §1.1310 of this chapter, Radiofrequency radiation exposure limits, must provide, with their environmental assessment, a plan for mitigation of radiation exposure to the extent required to meet those guidelines.

(10) There shall be an exhibit included with the application describing the geographic area(s) in which the ESVs will operate.

(b) Applications for ESV operation in the 14.0–14.5 GHz (Earth-to-space) to geostationary satellites in the fixed-satellite service must include, in addition to the particulars of operation identified on Form 312 and associated Schedule B, the following data for each earth station antenna type:

(1) A series of e.i.r.p. density charts or tables, calculated for a production earth station antenna, based on measurements taken on a calibrated antenna range at 14.25 GHz, with the off-axis e.i.r.p. envelope set forth in paragraphs (a)(1) through (a)(4) of this section superimposed, as follows:

(i) Showing off-axis co-polarized e.i.r.p. spectral density in the azimuth plane, for off-axis angles from minus 10° to plus 10° and from minus 180° to plus 180°.

(ii) Showing off-axis co-polarized e.i.r.p. spectral density in the elevation plane, at off-axis angles from 0° to plus 30°.

(iii) Showing off-axis cross-polarized e.i.r.p. spectral density in the azimuth plane, at off-axis angles from minus 10° to plus 10°.

(iv) Showing off-axis cross-polarized e.i.r.p. spectral density in the elevation plane, at off-axis angles from minus 10° to plus 10°; or

(2) A series of gain charts or tables, for a production earth station antenna, measured on a calibrated antenna range at 14.25 GHz, with the Earth station antenna gain envelope set forth in §25.209(a) and (b) superimposed, for the same planes and ranges enumerated in paragraphs (b)(1)(i) through (b)(1)(iv) of this section, that, combined with input power density entered in Schedule B, demonstrates that off-axis e.i.r.p. spectral density envelope set forth in paragraphs (a)(1) through (a)(4) of this section will be met; or

(3) A certification that the ESV antenna conforms to the gain pattern criteria of §25.209(a) and (b), that, combined with input power density entered in Schedule B, demonstrates that the off-axis e.i.r.p. spectral density envelope set forth in paragraphs (a)(1) through (a)(4) of this section will be met.

(c) ESVs receiving in the 10.95–11.2 GHz (space-to-Earth), 11.45–11.7 GHz (space-to-Earth), 11.7–12.2 GHz (space-to-Earth) frequency bands, and transmitting in the 14.0–14.5 GHz (Earth-to-space) frequency band shall operate with the following provisions:

(1) For each ESV transmitter a record of the ship location (i.e., latitude/longitude), transmit frequency, channel bandwidth and satellite used shall be time annotated and maintained for a period of not less than 1 year. Records will be recorded at time intervals no greater than every 20 minutes while the ESV is transmitting. The ESV operator will make this data available upon request to a coordinator, fixed system operator, fixed-satellite system operator, NTIA, or the Commission within 24 hours of the request.

(2) ESV operators communicating with vessels of foreign registry must maintain detailed information on each vessel's country of registry and a point of contact for the relevant administration responsible for licensing ESVs.

(3) ESV operators shall control all ESVs by a Hub earth station located in the United States, except that an ESV on U.S.-registered vessels may operate under control of a Hub earth station location outside the United States provided the ESV operator maintains a point of contact within the United States that will have the capability and authority to cause an ESV on a U.S.-registered vessel to cease transmitting if necessary.

(d) Operations of ESVs in the 14.0–14.2 GHz (Earth-to-space) frequency band within 125 km of the NASA TDRSS facilities on Guam (located at latitude: 13° 36' 55" N, longitude 144° 51' 22" E) or White Sands, New Mexico (latitude: 32° 20' 59" N, longitude 106° 36' 31" W and latitude: 32° 32' 40" N, longitude 106° 36' 48" W) are subject to coordination through the National Telecommunications and Information Administration (NTIA) Interdepartment Radio Advisory Committee (IRAC). When NTIA seeks to provide similar protection to future TDRSS sites that have been coordinated through the IRAC Frequency Assignment Subcommittee process, NTIA will notify the Commission that the site is nearing operational status. Upon public notice from the Commission, all Ku-band ESV operators must cease operations in the 14.0–14.2 GHz band within 125 km of the new TDRSS site until after NTIA/IRAC coordination for the new TDRSS facility is complete. ESV operations will then again be permitted to operate in the 14.0–14.2 GHz band within 125 km of the new TDRSS site, subject to any operational constraints developed in the coordination process.

(e) Operations of ESVs in the 14.47–14.5 GHz (Earth-to-space) frequency band within a) 45 km of the radio observatory on St. Croix, Virgin Islands (latitude 17° 46' N, longitude 64° 35' W); b) 125 km of the radio observatory on Mauna Kea, Hawaii (at latitude 19° 48' N, longitude 155° 28' W); and c) 90 km of the Arecibo Observatory on Puerto Rico (latitude 18° 20' 46" W, longitude 66° 45' 11" N) are subject to coordination through the National Telecommunications and Information Administration (NTIA) Interdepartment Radio Advisory Committee (IRAC).

(f) In the 10.95–11.2 GHz (space-to-Earth) and 11.45–11.7 GHz (space-to-Earth) frequency bands ESVs shall not claim protection from interference from any authorized terrestrial stations to which frequencies are either already assigned, or may be assigned in the future.

[70 FR 4786, Jan. 31, 2005, as amended at 70 FR 33377, June 8, 2005]

§§ 25.223-25.249   [Reserved]
top
§ 25.250   Sharing between NGSO MSS Feeder links Earth Stations in the 19.3–19.7 GHz and 29.1–29.5 GHz Bands.
top

(a) NGSO MSS applicants shall be licensed to operate in the 29.1–29.5 GHz band for Earth-to-space transmissions and 19.3–19.7 GHz for space-to-Earth transmissions from feeder link earth station complexes. A “feeder link earth station complex” may include up to three (3) earth station groups, with each earth station group having up to four (4) antennas, located within a radius of 75 km of a given set of geographic coordinates provided by NGSO-MSS licensees or applicants.

(b) Licensees of NGSO MSS feeder link earth stations separated by 800 km or less are required to coordinate their operations, see §25.203. The results of the coordination shall be reported to the Commission.

[61 FR 44181, Aug. 28, 1996]

§ 25.251   Special requirements for coordination.
top

(a) The administrative aspects of the coordination process are set forth in §101.103 of this chapter in the case of coordination of terrestrial stations with earth stations, and in §25.203 in the case of coordination of earth stations with terrestrial stations.

(b) The technical aspects of coordination are based on Appendix S7 of the International Telecommunication Union Radio Regulations and certain recommendations of the ITU Radiocommunication Sector (available at the FCC's Reference Information Center, Room CY-A257, 445 12th Street, SW., Washington, DC 20554).

[66 FR 10630, Feb. 16, 2001]

§ 25.252   Special requirements for ancillary terrestrial components operating in the 2000–2020 MHz/2180–2200 MHz bands.
top

(a) Applicants for an ancillary terrestrial component in these bands must demonstrate that ATC base stations shall not:

(1) Exceed an EIRP of −100.6 dBW/4 kHz for out-of-channel emissions at the edge of the MSS licensee's selected assignment.

(2) Exceed a peak EIRP of 27 dBW in 1.23 MHz.

(3) Exceed an EIRP toward the physical horizon (not to include man-made structures) of 25.5 dBW in 1.23 MHz.

(4) Be located less than 190 meters from all airport runways and aircraft stand areas, including takeoff and landing paths.

(5) Exceed an aggregate power flux density of −51.8 dBW/m2 in a 1.23 MHz bandwidth at all airport runways and aircraft stand areas, including takeoff and landing paths and all ATC base station antennas shall have an overhead gain suppression according to the following.

(6) Be located less than 820 meters from a U.S. Earth Station facility operating in the 2200–2290 MHz band. In its MSS ATC application, the MSS licensee should request a list of operational stations in the 2200–2290 MHz band.

(7) Generate EIRP density, averaged over any two millisecond active transmission interval, greater than -70 dBW/MHz in the 1559–1610 MHz band. The EIRP, measured over any two millisecond active transmission interval, of discrete out-of-band emissions of less than 700 Hz bandwidth from such base stations, shall not exceed -80 dBW in the 1559–1610 MHz band. A root-mean-square detector function with a resolution bandwidth of one megahertz or equivalent and no less video bandwidth shall be used to measure wideband EIRP density for purposes of this rule, and narrowband EIRP shall be measured with a root-mean-square detector function with a resolution bandwidth of one kilohertz or equivalent.

(8) Use ATC base station antennas that have a gain greater than 17 dBi and must have an overhead gain suppression according to the following:

 ------------------------------------------------------------------------ Angle from direction of maximum gain,    in vertical plane, above antenna      Antenna discrimination pattern               (degrees)                               (dB)------------------------------------------------------------------------0......................................  Gmax2......................................  Not to Exceed Gmax -148 to 180...............................  Not to Exceed Gmax -25------------------------------------------------------------------------Where: Gmax is the maximum gain of the base station antenna in dBi.

(b) Applicants for an ancillary terrestrial component in these bands must demonstrate that ATC mobile terminals shall:

(1) Observe a peak EIRP limit of 1.0 dBW in 1.23 MHz.

(2) Limit out-of-channel emissions at the edge of a MSS licensee's selected assignment to an EIRP density of −67 dBW/4 kHz.

(3) Not generate EIRP density, averaged over any two-millisecond active transmission interval, greater than -70 dBW/MHz in the 1559–1610 MHz band. The EIRP, measured over any two-millisecond active transmission interval, of discrete out-of-band emissions of less than 700 Hz bandwidth from such mobile terminals shall not exceed -80 dBW in the 1559–1610 MHz band. The EIRP density of carrier-off-state emissions from such mobile terminals shall not exceed -80 dBW/MHz in the 1559–1610 MHz band, averaged over a two-millisecond interval. A root-mean-square detector function with a resolution bandwidth of one megahertz or equivalent and no less video bandwidth shall be used to measure wideband EIRP density for purposes of this rule, and narrowband EIRP shall be measured with a root-mean-square detector function with a resolution bandwidth of one kilohertz or equivalent.

(c) For ATC operations in the 2000–2020 MHz band, the power of any emission outside the licensee's frequency band(s) of operation shall be attenuated below the transmitter power (P) within the licensed band(s) of operation, measured in watts, in accordance with the following:

(1) On any frequency within the 2000 to 2020 MHz band outside the licensee's frequency band(s) of operations, emissions shall be attenuated by at least 43 + 10 log (P) dB.

(2) Emissions on frequencies lower than 1995 MHz and higher than 2025 MHz shall be attenuated by at least 70 + 10 log P. Emissions in the bands 1995–2000 MHz and 2020–2025 MHz shall be attenuated by at least a value as determined by linear interpolation from 70 + 10 log P at 1995 MHz or 2025 MHz, to 43 + 10 log P dB at the nearest MSS band edge at 2000 MHz or 2020 MHz respectively.

(3) When an emission outside of the authorized bandwidth causes harmful interference, the Commission may, in its discretion, require greater attenuation than specified in paragraphs (c)(1) and (2) of this section.

(4) Compliance with these provisions is based on the use of measurement instrumentation employing a resolution bandwidth of 1 megahertz or greater.

Note to §25.252: The preceding rules of §25.252 are based on cdma2000 system architecture. To the extent that a 2 GHz MSS licensee is able to demonstrate that the use of a different system architecture would produce no greater potential interference than that produced as a result of implementing the rules of this section, an MSS licensee is permitted to apply for ATC authorization based on another system architecture.

[68 FR 33651, June 5, 2003, as amended at 70 FR 19318, Apr. 13, 2005]

§ 25.253   Special requirements for ancillary terrestrial components operating in the 1626.5–1660.5 MHz/1525–1559 MHz bands.
top

(a) An ancillary terrestrial component in these bands shall:

(1) In any band segment coordinated for the exclusive use of an MSS applicant within the land area of the U.S., where there is no other L-Band MSS satellite making use of that band segment within the visible portion of the geostationary arc as seen from the ATC coverage area, the ATC system will be limited by the in-band and out-of-band emission limitations contained in this section and the requirement to maintain a substantial MSS service.

(2) In any band segment that is coordinated for the shared use of the applicant's MSS system and another MSS operator, where the coordination agreement existed prior to February 10, 2005 and permits a level of interference to the other MSS system of less than 6% ΔT/T, the applicant's combined ATC and MSS operations shall increase the system noise level of the other MSS to no more then 6% ΔT/T. Any future coordination agreement between the parties governing ATC operation will supersede this paragraph.

(3) In any band segment that is coordinated for the shared use of the applicant's MSS system and another MSS operator, where a coordination agreement existed prior to February 10, 2005 and permits a level of interference to the other MSS system of 6% ΔT/T or greater, the applicant's ATC operations may increase the system noise level of the other MSS system by no more than an additional 1% ΔT/T. Any future coordination agreement between the parties governing ATC operations will supersede this paragraph.

(4) In a band segment in which the applicant has no rights under a coordination agreement, the applicant may not implement ATC in that band.

(b) ATC base stations shall not exceed an out-of-channel emissions measurement of -57.9 dBW/MHz at the edge of a MSS licensee's authorized and internationally coordinated MSS frequency assignment.

(c) An applicant for an ancillary terrestrial component in these bands shall:

(1) Demonstrate, at the time of application, how its ATC network will comply with the requirements of footnotes US308 and US315 to the table of frequency allocations contained in §2.106 of this chapter regarding priority and preemptive access to the L-band MSS spectrum by the aeronautical mobile-satellite en-route service (AMS(R)S) and the global maritime distress and safety system (GMDSS).

(2) Coordinate with the terrestrial CMRS operators prior to initiating ATC transmissions when co-locating ATC base stations with terrestrial commercial mobile radio service (CMRS) base stations that make use of Global Positioning System (GPS) time-based receivers.

(3) Provide, at the time of application, calculations that demonstrate the ATC system conforms to the ΔT/T requirements in paragraphs (a)(2) and (a)(3) of this section, if a coordination agreement that incorporates the ATC operations does not exist with other MSS operators.

(d) Applicants for an ancillary terrestrial component in these bands must demonstrate that ATC base stations shall not:

(1) Exceed a peak EIRP of 31.9–10*log (number of carriers) dBW/200kHz, per sector, for each carrier in the 1525–1541.5 MHz and 1547.5–1559 MHz frequency bands;

(2) Exceed an EIRP in any direction toward the physical horizon (not to include man-made structures) of 26.9–10*log (number of carriers) dBW/200 kHz, per sector, for each carrier in the 1525–1541.5 MHz and 1547.5–1559 MHz frequency bands;

(3) Exceed a peak EIRP of 23.9 −10*log(number of carriers) dBW/200 kHz, per sector, for each carrier in the 1541.5–1547.5 MHz frequency band;

(4) Exceed an EIRP toward the physical horizon (not to include man-made structures) of 18.9–10*log(number of carriers) dBW/200 kHz, per sector, for each carrier in the 1541.5–1547.5 MHz frequency band;

(5) Exceed a total power flux density level of −56.8 dBW/m2 /200 kHz at the edge of all airport runways and aircraft stand areas, including takeoff and landing paths from all carriers operating in the 1525–1559 MHz frequency bands. The total power flux density here is the sum of all power flux density values associated with all carriers in a sector in the 1525–1559 MHz frequency band, expressed in dB(Watts/m2 /200 kHz). Free-space loss must be assumed if this requirement is demonstrated via calculation;

(6) Exceed a total power flux density level of −56.6 dBW/ m2 /200 kHz at the water's edge of any navigable waterway from all carriers operating in the 1525–1541.5 MHz and 1547.5–1559 MHz frequency bands. The total power flux density here is the sum of all power flux density values associated with all carriers in a sector in the 1525–1541.5 MHz and 1547.5–1559 MHz frequency bands, expressed in dB(Watts/m2 /200 kHz). Free-space loss must be assumed if this requirement is demonstrated via calculation;

(7) Exceed a total power flux density level of −64.6 dBW/ m2 /200 kHz at the water's edge of any navigable waterway from all carriers operating in the 1541.5–1547.5 MHz frequency band. The total power flux density here is the sum of all power flux density values associated with all carriers in a sector in the 1541.5–1547.5 MHz frequency band, expressed in dB(Watts/m2 /200 kHz). Free-space loss must be assumed if this requirement is demonstrated via calculation;

(8) Exceed a peak antenna gain of 16 dBi;

(9) Generate EIRP density, averaged over any two-millisecond active transmission interval, greater than −70 dBW/MHz in the 1559–1605 MHz band or greater than a level determined by linear interpolation in the 1605–1610 MHz band, from −70 dBW/MHz at 1605 MHz to −46 dBW/MHz at 1610 MHz. The EIRP, averaged over any two-millisecond active transmission interval, of discrete out-of-band emissions of less than 700 Hz bandwidth from such base stations shall not exceed −80 dBW in the 1559–1605 MHz band or exceed a level determined by linear interpolation in the 1605–1610 MHz band, from −80 dBW at 1605 MHz to −56 dBW at 1610 MHz. A root-mean-square detector function with a resolution bandwidth of one megahertz or equivalent and no less video bandwidth shall be used to measure wideband EIRP density for purposes of this rule, and narrowband EIRP shall be measured with a root-mean-square detector function with a resolution bandwidth of one kilohertz or equivalent.

(e) Applicants for an ancillary terrestrial component in these bands must demonstrate, at the time of the application, that ATC base stations shall use left-hand-circular polarization antennas with a maximum gain of 16 dBi and overhead gain suppression according to the following:

 ------------------------------------------------------------------------ Angle from direction of maximum  gain, in vertical plane, above    Antenna discrimination pattern (dB)        antenna (degrees)------------------------------------------------------------------------0................................  Gmax5................................  Not to Exceed Gmax -510...............................  Not to Exceed Gmax -1915 to 55.........................  Not to Exceed Gmax -2755 to 145........................  Not to Exceed Gmax -30145 to 180.......................  Not to Exceed Gmax -26------------------------------------------------------------------------

Where: Gmax is the maximum gain of the base station antenna in dBi.

(f) Prior to operation, ancillary terrestrial component licensees shall:

(1) Provide the Commission with sufficient information to complete coordination of ATC base stations with Search-and-Rescue Satellite-Aided Tracking (SARSAT) earth stations operating in the 1544–1545 MHz band for any ATC base station located either within 27 km of a SARSAT station, or within radio horizon of the SARSAT station, whichever is less.

(2) Take all practicable steps to avoid locating ATC base stations within radio line of sight of Mobile Aeronautical Telemetry (MAT) receive sites in order to protect U.S. MAT systems consistent with ITU–R Recommendation ITU–R M.1459. MSS ATC base stations located within radio line of sight of a MAT receiver must be coordinated with the Aerospace and Flight Test Radio Coordinating Council (AFTRCC) for non-Government MAT receivers on a case-by-case basis prior to operation. For government MAT receivers, the MSS licensee shall supply sufficient information to the Commission to allow coordination to take place. A listing of current and planned MAT receiver sites can be obtained from AFTRCC for non-Government sites and through the FCC's IRAC Liaison for Government MAT receiver sites.

(g) ATC mobile terminals shall:

(1) Be limited to a peak EIRP level of 0 dBW and an out-of-channel emissions of −67 dBW/4 kHz at the edge of an MSS licensee's authorized and internationally coordinated MSS frequency assignment.

(2) Be operated in a fashion that takes all practicable steps to avoid causing interference to U.S. radio astronomy service (RAS) observations in the 1660–1660.5 MHz band.

(3) Not generate EIRP density, averaged over any two-millisecond active transmission interval, greater than −70 dBW/MHz in the 1559–1605 MHz band or greater than a level determined by linear interpolation in the 1605–1610 MHz band, from −70 dBW/MHz at 1605 MHz to −46 dBW/MHz at 1610 MHz. The EIRP, averaged over any two-millisecond active transmission interval, of discrete out-of-band emissions of less than 700 Hz bandwidth from such mobile terminals shall not exceed −80 dBW in the 1559–1605 MHz band or exceed a level determined by linear interpolation in the 1605–1610 MHz band, from −80 dBW at 1605 MHz to −56 dBW at 1610 MHz. The EIRP density of carrier-off-state emissions from such mobile terminals shall not exceed −80 dBW/MHz in the 1559–1610 MHz band, averaged over a two-millisecond interval. A root-mean-square detector function with a resolution bandwidth of one megahertz or equivalent and no less video bandwidth shall be used to measure wideband EIRP density for purposes of this rule, and narrowband EIRP shall be measured with a root-mean-square detector function with a resolution bandwidth of one kilohertz or equivalent.

(h) When implementing multiple base stations and/or base stations using multiple carriers, where any third-order intermodulation product of these base stations falls on an L-band MSS band coordinated for use by another MSS operator with rights to the coordinated band, the MSS ATC licensee must notify the MSS operator. The MSS operator may request coordination to modify the base station carrier frequencies, or to reduce the maximum base station EIRP on the frequencies contributing to the third-order intermodulation products. The threshold for this notification and coordination is when the sum of the calculated signal levels received by an MSS receiver exceeds −70 dBm. The MSS receiver used in these calculations can be assumed to have an antenna with 0 dBi gain. Free-space propagation between the base station antennas and the MSS terminals can be assumed and actual signal polarizations for the ATC signals and the MSS system may be used.

[70 FR 19319, Apr. 13, 2005]

§ 25.254   Special requirements for ancillary terrestrial components operating in the 1610–1626.5 MHz/2483.5–2500 MHz bands.
top

(a) An applicant for an ancillary terrestrial component in these bands must demonstrate that ATC base stations shall:

(1) Not exceed a peak EIRP of 32 dBW in 1.25 MHz;

(2) Not cause unacceptable interference to systems identified in paragraph (c) of this section and, in any case, shall not exceed out-of-channel emissions of −44.1 dBW/30 kHz at the edge of the MSS licensee's authorized frequency assignment;

(3) At the time of application, that it has taken, or will take steps necessary to avoid causing interference to other services sharing the use of the 2450–2500 MHz band through frequency coordination; and

(4) Base stations operating in frequencies above 2483.5 MHz shall not generate EIRP density, averaged over any two-millisecond active transmission interval, greater than −70 dBW/MHz in the 1559–1610 MHz band. The EIRP, averaged over any two-millisecond active transmission interval, of discrete out-of-band emissions of less than 700 Hz bandwidth from such base stations shall not exceed −80 dBW in the 1559–1610 MHz band. A root-mean-square detector function with a resolution bandwidth of one megahertz or equivalent and no less video bandwidth shall be used to measure wideband EIRP density for purposes of this rule, and narrowband EIRP shall be measured with a root-mean-square detector function with a resolution bandwidth of one kilohertz or equivalent.

(b) An applicant for an ancillary terrestrial component in these bands must demonstrate that mobile terminals shall:

(1) Meet the requirements contained in §25.213 to protect radio astronomy service (RAS) observations in the 1610.6–1613.8 MHz band from unacceptable interference;

(2) Observe a peak EIRP limit of 1.0 dBW in 1.25 MHz;

(3) Observe an out-of-channel EIRP limit of −57.1 dBW/30 kHz at the edge of the licensed MSS frequency assignment.

(4) ATC mobile terminals operating in assigned frequencies in the 1610–1626.5 MHz band shall not generate EIRP density, averaged over any two-millisecond active transmission interval, greater than -70 dBW/MHz in the 1559–1605 MHz band or greater than a level determined by linear interpolation in the 1605–1610 MHz band, from −70 dBW/MHz at 1605 MHz to −10 dBW/MHz at 1610 MHz. The EIRP, averaged over any two-millisecond active transmission interval, of discrete out-of-band emissions of less than 700 Hz bandwidth from such mobile terminals shall not exceed −80 dBW in the 1559–1605 MHz band or exceed a level determined by linear interpolation in the 1605–1610 MHz band, from −80 dBW at 1605 MHz to −20 dBW at 1610 MHz. The EIRP density of carrier-off-state emissions from such mobile terminals shall not exceed −80 dBW/MHz in the 1559–1610 MHz band, averaged over a two-millisecond interval. A root-mean-square detector function with a resolution bandwidth of one megahertz or equivalent and no less video bandwidth shall be used to measure wideband EIRP density for purposes of this rule, and narrowband EIRP shall be measured with a root-mean-square detector function with a resolution bandwidth of one kilohertz or equivalent.

(c) Applicants for an ancillary terrestrial component to be used in conjunction with a mobile-satellite service system using CDMA technology shall coordinate the use of the Big LEO MSS spectrum designated for CDMA systems using the framework established by the ITU in Recommendation ITU-R M.1186 “Technical Considerations for the Coordination Between Mobile Satellite Service (MSS) Networks Utilizing Code Division Multiple Access (CDMA) and Other Spread Spectrum Techniques in the 1–3 GHz Band” (1995). Recommendation ITU-R M.1186 is incorporated by reference. The Director of the Federal Register approves this incorporation by reference in accordance with 5 U.S.C. 552(a) and 1 CFR part 51. Copies of this standard can be inspected at the Federal Communications Commission, 445 12th Street, SW., Washington, DC (Reference Information Center) or at the National Archives and Records Administration (NARA). For information on the availability of this material at NARA, call 202–741–6030, or go to: http://www.archives.gov/federal_register/code_of_federal_regulations/ibr_locations.html. The ITU-R Recommendations can also be purchased from the International Telecommunication Union (ITU), Place des Nations, CH–1211 Geneva 20, Switzerland.

Note to §25.254: The preceding rules of §25.254 are based on cdma2000 and IS–95 system architecture. To the extent that a Big LEO MSS licensee is able to demonstrate that the use of different system architectures would produce no greater potential interference than that produced as a result of implementing the rules of this section, an MSS licensee is permitted to apply for ATC authorization based on another system architecture.

[68 FR 33653, June 5, 2003, as amended at 69 FR 18803, Apr. 9, 2004; 70 FR 19320, Apr. 13, 2005]

§ 25.255   Procedures for resolving harmful interference related to operation of ancillary terrestrial components operating in the 1.5./1.6 GHz, 1.6/2.4 GHz and 2 GHz bands.
top

If harmful interference is caused to other services by ancillary MSS ATC operations, either from ATC base stations or mobile terminals, the MSS ATC operator must resolve any such interference. If the MSS ATC operator claims to have resolved the interference and other operators claim that interference has not been resolved, then the parties to the dispute may petition the Commission for a resolution of their claims.

[68 FR 33653, June 5, 2003]

§ 25.256   Special Requirements for operations in the 3.65–3.7 GHz band.
top

Upon request from a terrestrial licensee authorized under Subpart Z, Part 90 that seeks to place base and fixed stations in operation within 150 km of a primary earth station, licensees of earth stations operating on a primary basis in the fixed satellite service in the 3.65–3.7 GHz band must negotiate in good faith with that terrestrial licensee to arrive at mutually agreeable operating parameters to prevent unacceptable interference.

[70 FR 24725, May 11, 2005]

§ 25.257   Special requirements for operations in the band 29.1–29.25 GHz between NGSO MSS and LMDS.
top

(a) Non-geostationary mobile satellite service (NGSO MSS) operators shall be licensed to use the 29.1–29.25 GHz band for Earth-to-space transmissions from feeder link earth station complexes. A “feeder link earth station complex” may include up to three (3) earth station groups, with each earth station group having up to four (4) antennas, located within a radius of 75 km of a given set of geographic coordinates provided by a NGSO MSS licensees or applicants pursuant to §101.147.

(b) A maximum of seven (7) feeder link earth station complexes in the contiguous United States, Alaska and Hawaii may be placed into operation, in the largest 100 MSAs, in the band 29.1–29.25 GHz in accordance with §25.203 and §101.147 of this chapter.

(c) One of the NGSO MSS operators licensed to use the 29.1–29.25 GHz band may specify geographic coordinates for a maximum of eight feeder link earth station complexes that transmit in the 29.1–29.25 GHz band. The other NGSO MSS operator licensed to use the 29.1–29.25 GHz band may specify geographic coordinates for a maximum of two feeder link earth station complexes that transmit in the 29.1–29.25 GHz band.

(d) Additional NGSO MSS operators may be licensed in this band if the additional NGSO MSS operator shows that its system can share with the existing NGSO MSS systems.

(e) All NGSO MSS operators shall cooperate fully and make reasonable efforts to identify mutually acceptable locations for feeder link earth station complexes. In this connection, any single NGSO MSS operator shall only identify one feeder link earth station complex protection zone in each category identified in §101.147(c)(2) of this chapter until the other NGSO MSS operator has been given an opportunity to select a location from the same category.

[61 FR 44181, Aug. 28, 1996]

§ 25.258   Sharing between NGSO MSS Feeder links Stations and GSO FSS services in the 29.25–29.5 GHz Bands.
top

(a) Operators of NGSO MSS feeder link earth stations and GSO FSS earth stations in the band 29.25 to 29.5 GHz where both services have a co-primary allocation shall cooperate fully in order to coordinate their systems. During the coordination process both service operators shall exchange the necessary technical parameters required for coordination.

(b) Licensed GSO FSS systems shall, to the maximum extent possible, operate with frequency/polarization selections, in the vicinity of operational or planned NGSO MSS feeder link earth station complexes, that will minimize instances of unacceptable interference to the GSO FSS space stations. Earth station licensees operating with GSO FSS systems shall be capable of providing earth station locations to support coordination of NGSO MSS feeder link stations under paragraphs (a) and (c) of this section. Operation of ubiquitously deployed GSO FSS earth stations in the 29.25–29.5 GHz frequency band shall conform to the rules contained in §25.138.

(c) Applicants for authority to use the 29.25–29.5 GHz band for NGSO MSS feeder uplinks will have to demonstrate that their systems can share with GSO FSS and NGSO MSS systems that have been authorized for operation in that band.

[67 FR 37336, May 29, 2002, as amended at 68 FR 16967, Apr. 8, 2003]

§ 25.259   Time sharing between NOAA meteorological satellite systems and non-voice, non-geostationary satellite systems in the 137–138 MHz band.
top

(a) A non-voice, non-geostationary mobile-satellite service system licensee (“NVNG licensee”) time-sharing spectrum in the 137–138 MHz frequency band shall not transmit signals into the “protection areas” of National Oceanic and Atmospheric Administration (“NOAA”) satellite systems. When calculating the protection areas for a NOAA satellite in the 137.333–137.367 MHz, 137.485–137.515 MHz, 137.605–137.635 MHz and 137.753–137.787 MHz bands, a NVNG licensee shall use an earth station elevation angle of five degrees towards the NOAA satellite and will cease its transmissions prior to the NVNG licensee's service area, based on an elevation angle of zero degrees towards the NVNG licensee's satellite, overlapping the NOAA protection area. When calculating the protection areas for a NOAA satellite in the 137.025–137.175 MHz and 137.825–138 MHz bands, a NVNG licensee shall use an earth station elevation angle of zero degrees, or less if reasonably necessary, towards the NOAA satellite and will cease its transmissions prior to the NVNG licensee's service area, based on an elevation angle of zero degrees towards the NVNG licensee's satellite, overlapping the NOAA protection area. A NVNG licensee is responsible for obtaining the necessary ephemeris data. This information shall be updated system-wide on at least a weekly basis. A NVNG licensee shall use an orbital propagator algorithm with an accuracy equal to or greater than the NORAD propagator used by NOAA.

(b) A NVNG licensee time sharing spectrum in the 137–138 MHz band shall establish a 24-hour per day contact person and telephone number so that claims of harmful interference into NOAA earth station users and other operational issues can be reported and resolved expeditiously. This contact information shall be made available to NOAA or its designee. If the National Telecommunications and Information Administration (“NTIA”) notifies the Commission that NOAA is receiving unacceptable interference from a NVNG licensee, the Commission will require such NVNG licensee to terminate its interfering operations immediately unless it demonstrates to the Commission's reasonable satisfaction, and that of NTIA, that it is not responsible for causing harmful interference into the worldwide NOAA system. A NVNG licensee assumes the risk of any liability or damage that it and its directors, officers, employees, affiliates, agents and subcontractors may incur or suffer in connection with an interruption of its non-voice, non-geostationary mobile-satellite service, in whole or in part, arising from or relating to its compliance or noncompliance with the requirements of this paragraph (b). The Commission will not hesitate to impose sanctions on a NVNG licensee time-sharing spectrum in the 137–138 MHz band with NOAA, including monetary forfeitures and license revocations, when appropriate.

(c) Each satellite in a NVNG licensee's system time-sharing spectrum with NOAA in the 137–138 MHz band shall automatically turn off and cease satellite transmissions if, after 72 consecutive hours, no reset signal is received from the NVNG licensee's gateway earth station and verified by the satellite. All satellites in such NVNG licensee's system shall be capable of instantaneous shutdown on any sub-band upon command from such NVNG licensee's gateway earth station.

[62 FR 59296, Nov. 3, 1997]

§ 25.260   Time sharing between DoD meteorological satellite systems and non-voice, non-geostationary satellite systems in the 400.15–401 MHz band.
top

(a) A non-voice, non-geostationary mobile-satellite service system licensee (“NVNG licensee”) time-sharing spectrum in the 400.15–401.0 MHz band shall not transmit signals into the “protection areas” of Department of Defense (“DoD”). When calculating the protection areas for a DoD satellite in the 400.15–401 MHz band, a NVNG licensee shall use an earth station elevation angle of five degrees towards the DoD satellite and will shut off its transmissions prior to the NVNG licensee's service area, based on an elevation angle of zero degrees towards the NVNG licensee's satellite, overlapping the DoD protection area. A NVNG licensee is responsible for obtaining the necessary ephemeris data. This information shall be updated system-wide at least once per week. A NVNG licensee shall use an orbital propagator algorithm with an accuracy equal to or greater than the NORAD propagator used by DoD.

(b) A NVNG licensee time sharing spectrum in the 400.15–401 MHz band shall establish a 24-hour per day contact person and telephone number so that claims of harmful interference into DoD earth station users and other operational issues can be reported and resolved expeditiously. This contact information shall be made available to DoD or its designee. If the National Telecommunications and Information Administration (“NTIA”) notifies the Commission that DoD is receiving unacceptable interference from a NVNG licensee, the Commission will require such NVNG licensee to terminate its interfering operations immediately unless it demonstrates to the Commission's reasonable satisfaction, and that of NTIA, that it is not responsible for causing harmful interference into the worldwide DoD system. A NVNG licensee assumes the risk of any liability or damage that it and its directors, officers, employees, affiliates, agents and subcontractors may incur or suffer in connection with an interruption of its non-voice, non-geostationary mobile-satellite service, in whole or in part, arising from or relating to its compliance or noncompliance with the requirements of this paragraph (b). The Commission will not hesitate to impose sanctions on a NVNG licensee time-sharing spectrum in the 400.15–401 MHz band with DoD, including monetary forfeitures and license revocations, when appropriate.

(c) Each satellite in a NVNG licensee's system time-sharing spectrum with DoD in the 400.15–401 MHz band shall automatically turn off and cease satellite transmissions if, after 72 consecutive hours, no reset signal is received from the NVNG licensee's gateway earth station and verified by the satellite. All satellites in such NVNG licensee's system shall be capable of instantaneous shutdown on any sub-band upon command from such NVNG licensee's gateway earth station.

(d) Initially, a NVNG licensee time-sharing spectrum with DoD in the 400.15–401 MHz band shall be able to change the frequency on which its system satellites are operating within 125 minutes of receiving notification from a DoD required frequency change in the 400.15–401 MHz band. Thereafter, when a NVNG licensee constructs additional gateway earth stations located outside of North and South America, it shall use its best efforts to decrease to 90 minutes the time required to implement a DoD required frequency change. A NVNG licensee promptly shall notify the Commission and NTIA of any decrease in the time it requires to implement a DoD required frequency change.

(e) Once a NVNG licensee time-sharing spectrum with DoD in the 400.15–401 MHz band demonstrates to DoD that it is capable of implementing a DoD required frequency change within the time required under paragraph (d) of this section, thereafter, such NVNG licensee shall demonstrate its capability to implement a DoD required frequency change only once per year at the instruction of DoD. Such demonstrations shall occur during off-peak hours, as determined by the NVNG licensee, unless otherwise agreed by the NVNG licensee and DoD. Such NVNG licensee will coordinate with DoD in establishing a plan for such a demonstration. In the event that a NVNG licensee fails to demonstrate to DoD that it is capable of implementing a DoD required frequency change in accordance with a demonstration plan established by DoD and the NVNG licensee, upon the Commission's receipt of a written notification from NTIA describing such failure, the Commission shall impose additional conditions or requirements on the NVNG licensee's authorization as may be necessary to protect DoD operations in the 400.15–401 MHz downlink band until the Commission is notified by NTIA that the NVNG licensee has successfully demonstrated its ability to implement a DoD required frequency change. Such additional conditions or requirements may include, but are not limited to, requiring such NVNG licensee immediately to terminate its operations interfering with the DoD system.

[62 FR 59296, Nov. 3, 1997]

§ 25.261   Procedures for avoidance of in-line interference events for Non Geostationary Satellite Orbit (NGSO) Satellite Network Operations in the Fixed Satellite Service (FSS) Bands.
top

(a) Applicable NGSO FSS Bands. The coordination procedures in this section apply to non-Federal-Government NGSO FSS satellite networks operating in the following assigned frequency bands: The 28.6–29.1 GHz or 18.8–19.3 GHz frequency bands.

(b) Definition of “In-line interference events.” For purposes of this section, an “in-line interference event” is defined as the interference associated with an occurrence of any physical alignment of space stations of two or more satellite networks with an operating Earth station of one of these networks in such a way that the angular separation between operational links of the two networks is less than 10° as measured at the Earth station.

(c) Default procedure. If no agreed coordination exists between two or more satellite networks, then the bands will be divided among the affected satellite networks involved in an in-line interference event in accordance with the following procedure:

(1) Each of n (number of) satellite networks involved in a particular in-line interference event shall select 1/n of the assigned spectrum available in each frequency band for its home base spectrum. The selection order for each satellite network shall be determined by and be in accordance with the date that the first space station in each satellite network is launched and operating;

(2) The affected space station(s) of the respective satellite networks shall only operate in the selected (1/n) spectrum associated with its satellite network, its home base spectrum, for the duration of the in-line interference event;

(3) All affected space station(s) may resume operations throughout the assigned frequency bands once the angular separation between the affected space stations in the in-line interference event is again greater than 10°.

(d) Coordination procedure. Any coordination procedure agreed among the affected operating satellite networks, which allows operations of the satellite networks when each network's respective space stations are within the 10 degree avoidance angle associated with an in-line interference event, shall supersede the default procedure of paragraph (c) of this section. Coordination may be effected using information relating to the space stations and the parameters of one or more typical earth stations. All parties are required to coordinate in good faith.

[68 FR 59129, Oct. 14, 2003]

Subpart D—Technical Operations
top

Source:  58 FR 13421, Mar. 11, 1993, unless otherwise noted.

§ 25.271   Control of transmitting stations.
top

(a) The licensee of a facility licensed under this part is responsible for the proper operation and maintenance of the station.

(b) The licensee of a transmitting earth station, other than an ESV, licensed under this part shall ensure that a trained operator is present on the earth station site, or at a designated remote control point for the earth station, at all times that transmissions are being conducted. No operator's license is required for a person to operate or perform maintenance on facilities authorized under this part.

(c) Authority will be granted to operate a transmitting earth station, other than an ESV, by remote control only on the conditions that:

(1) The parameters of the transmissions of the remote station monitored at the control point, and the operational functions of the remote earth stations that can be controlled by the operator at the control point, are sufficient to insure that the operations of the remote station(s) are at times in full compliance with the remote station authorization(s);

(2) The earth station facilities are protected by appropriate security measures to prevent unauthorized entry or operations;

(3) Upon detection by the license, or upon notification from the Commission of a deviation or upon notification by another licensee of harmful interference, the operation of the remote station shall be immediately suspended by the operator at the control point until the deviation or interference is corrected, except that transmissions concerning the immediate safety of life or property may be conducted for the duration of the emergency; and

(4) The licensee shall have available at all times the technical personnel necessary to perform expeditiously the technical servicing and maintenance of the remote stations.

(5) International VSAT system operators are required to maintain a control point within the United States, or to maintain a point of contact within the United States available 24 hours a day, 7 days a week, with the ability to shut off any earth station within the VSAT network immediately upon notification of harmful interference.

(d) The licensee shall insure that the licensed facilities are properly secured against unauthorized access or use whenever an operator is not present at the transmitter.

(e) The licensee of an NGSO FSS system operating in the 10.7–14.5 GHz bands shall maintain an electronic web site bulletin board to list the satellite ephemeris data, for each satellite in the constellation, using the North American Aerospace Defense Command (NORAD) two-line orbital element format. The orbital elements shall be updated at least once every three days.

(f) Rules for control of transmitting ESVs are provided in §§25.221 and 25.222.

[58 FR 13421, Mar. 11, 1993, as amended at 66 FR 10631, Feb. 16, 2001; 70 FR 4787, Jan. 31, 2005; 70 FR 32257, June 2, 2005]

§ 25.272   General inter-system coordination procedures.
top

(a) Each space station licensee in the Fixed-Satellite Service shall establish a satellite network control center which will have the responsibility to monitor space-to-Earth transmissions in its system. This would indirectly monitor uplink earth station transmissions in its system and to coordinate transmissions in its satellite system with those of other systems to prevent harmful interference incidents or, in the event of a harmful interference incident, to identify the source of the interference and correct the problem promptly.

(b) Each space station licensee shall maintain on file with the Commission and with its Columbia Operations Center in Columbia, Maryland, a current listing of the names, titles, addresses and telephone numbers of the points of contact for resolution of interference problems. Contact personnel should include those responsible for resolution of short term, immediate interference problems at the system control center, and those responsible for long term engineering and technical design issues.

(c) The transmitting earth station licensee shall provide the operator(s) of the satellites, on which the licensee is authorized to transmit, contact telephone numbers for the control center of the earth station and emergency telephone numbers for key personnel; a current file of these contacts shall be maintained at each satellite system control center.

(d) An earth station licensee shall ensure that each of its authorized earth stations complies with the following:

(1) The earth station licensee shall ensure that there is continuously available means of communications between the satellite network control center and the earth station operator or its remote control point as designated by the licensee.

(2) The earth station operator shall notify the satellite network control center and receive permission from the control center before transmitting to the satellite or changing the basic characteristics of a transmission.

(3) The earth station operator shall keep the space station licensee informed of all actual and planned usage.

(4) Upon approval of the satellite network control center, the earth station operator may radiate an RF carrier into the designated transponder. Should improper illumination of the transponder or undue adjacent transponder interference be observed by the satellite network control center, the earth station operator shall immediately take whatever measures are needed to eliminate the problem.

(5) The space station licensee may delegate the responsibility and duties of the satellite network control center to a technically qualified user or group of users, but the space station licensee shall remain ultimately responsible for the performance of those duties.

[58 FR 13421, Mar. 11, 1993, as amended at 62 FR 5931, Feb. 10, 1997]

§ 25.273   Duties regarding space communications transmissions.
top

(a) No person shall:

(1) Transmit to a satellite unless the specific transmission is first authorized by the satellite network control center;

(2) Conduct transmissions over a transponder unless the operator is authorized by the satellite licensee or the satellite licensee's successor in interest to transmit at that time; or

(3) Transmit in any manner that causes unacceptable interference to the authorized transmission of another licensee.

(b) Satellite operators shall provide upon request by the Commission and by earth station licensees authorized to transmit on their satellites relevant information needed to avoid unacceptable interference to other users, including the polarization angles for proper illumination of a given transponder.

(c) Space station licensees are responsible for maintaining complete and accurate technical details of current and planned transmissions over their satellites, and shall require that authorized users of transponders on their satellites, whether by tariff or contract, provide any necessary technical information in this regard including that required by §25.272. Based on this information, space station licensees shall exchange among themselves general technical information concerning current and planned transmission parameters as needed to identify and promptly resolve any potential cases of unacceptable interference between their satellite systems.

(d) Space stations authorized after May 10, 1993 which do not satisfy the requirements of §25.210 may be required to accept greater constraints in resolving interference problems than complying ones. The extent of these constraints shall be determined on a case-by-case basis.

§ 25.274   Procedures to be followed in the event of harmful interference.
top

(a) The earth station operator whose transmission is suffering harmful interference shall first check the earth station equipment to ensure that the equipment is functioning properly.

(b) The earth station operator shall then check all other earth stations in the licensee's network that could be causing the harmful interference to ensure that none of the licensee's earth stations are the source of the interference and to verify that the source of interference is not from a local terrestrial source.

(c) After the earth station operator has determined that the source of the interference is not another earth station operating in the same network or from a terrestrial source, the earth station operator shall contact the satellite system control center and advise the satellite operator of the problem. The control center operator shall observe the interference incident and make reasonable efforts to determine the source of the problem. A record shall be maintained by the control center operator and the earth station operator of all harmful interference incidents and their resolution. These records shall be made available to an FCC representative on request.

(d) Where the suspected source of the interference incident is the operation of an earth station licensed to operate on one or more of the satellites in the satellite operator's system, the control center operator shall advise the offending earth station of the harmful interference incident and assist in the resolution of the problem where reasonably possible.

(e) The earth station licensee whose operations are suspected of causing harmful interference to the operations of another earth station shall take reasonable measures to determine whether its operations are the source of the harmful interference problem. Where the operations of the suspect earth station are the source of the interference, the licensee of that earth station shall take all measures necessary to resolve the interference.

(f) Where the earth station suspected of causing harmful interference to the operations of another earth station cannot be identified or is identified as an earth station operating on a satellite system other than the one on which the earth station suffering harmful interference is operating, it is the responsibility of a representative of the earth station suffering harmful interference to contact the control center of other satellite systems. The operator of the earth station suffering harmful interference is free to choose any representative to make this contact, including but not limited to the operator of the satellite system on which the earth station is operating. The operator of the earth station suffering harmful interference is also free to contact the control center of the other satellite systems directly.

(g) At any point, the system control center operator may contact the Commission's Columbia Operations Center in Columbia, Maryland, to assist in resolving the matter. This office specializes in the resolution of satellite interference problems. All licensees are required to cooperate fully with the Commission in any investigation of interference problems.

[58 FR 13421, Mar. 11, 1993, as amended at 62 FR 5931, Feb. 10, 1997; 70 FR 32257, June 2, 2005]

§ 25.275   Particulars of operation.
top

(a) Radio station authorizations issued under this part will normally specify only the frequency bands authorized for transmission and/or reception of the station.

(b) When authorized frequency bands are specified in the station authorization, the licensee is authorized to transmit any number of r.f. carriers on any discrete frequencies within an authorized frequency band in accordance with the other terms and conditions of the authorization and the requirements of this part. Specific r.f. carrier frequencies within the authorized frequency band shall be selected by the licensee to avoid unacceptable levels of interference being caused to other earth, space or terrestrial stations. Any coordination agreements, both domestic and international, concerning specific frequency usage constraints, including non-use of any particular frequencies within the frequency bands listed in the station authorization, are considered to be conditions of the station authorization.

(c) A license for a transmitting earth station will normally specify only the r.f. carriers having the highest e.i.r.p. density, the narrowest bandwidth, and the largest bandwidth authorized for transmission from that station. Unless otherwise specified in the station authorization, the licensee is authorized to transmit any other type of carrier not specifically listed which does not exceed the highest e.i.r.p., e.i.r.p. density and bandwidth prescribed for any listed emission.

(d) Only the most sensitive emission(s) for which protection is being afforded from interference in the authorized receive frequency band(s) will be specified in the station authorization.

§ 25.276   Points of communication.
top

(a) Unless otherwise specified in the station authorization, an earth station is authorized to transmit to any space station in the same radio service provided that permission has been received from the space station operator to access that space station.

(b) Space stations licensed under this part are authorized to provide service to earth stations located within the specified service area. Coastal waters within the outer continental shelf shall be considered to be included within the service area specified by the named land mass.

(c) Transmission to or from foreign points over space stations in the Fixed-Satellite Service, other than those operated by the International Telecommunications Satellite Organization and Inmarsat, are subject to the policies set forth in the Report and Order, adopted January 19, 1996 in IB Docket No. 95–41.

[58 FR 13421, Mar. 11, 1993, as amended at 61 FR 9953, Mar. 12, 1996]

§ 25.277   Temporary fixed earth station operations.
top

(a) When an earth station in the Fixed-Satellite Service is to remain at a single location for fewer than 6 months, the location may be considered to be temporary fixed. Services provided at a single location which are initially known to be of longer than six months' duration shall not be provided under a temporary fixed authorization.

(b) When a station, other than an ESV, authorized as a temporary fixed earth station, is to remain at a single location for more than six months, application for a regular station authorization at that location shall be filed at least 30 days prior to the expiration of the six-month period.

(c) The licensee of an earth station, other than an ESV, which is authorized to conduct temporary fixed operations in bands shared co-equally with terrestrial fixed stations shall provide the following information to the Director of the Columbia Operations Center at 9200 Farmhouse Lane, Columbia, Maryland 21046, and to the licensees of all terrestrial facilities lying within the coordination contour of the proposed temporary fixed earth station site before beginning transmissions:

(1) The name of the person operating the station and the telephone number at which the operator can be reached directly;

(2) The exact frequency or frequencies used and the type of emissions and power levels to be transmitted; and

(3) The commencement and anticipated termination dates of operation from each location.

(d) Except as set forth in §25.151(e), transmissions may not be commenced until all affected terrestrial licensees have been notified and the earth station operator has confirmed that unacceptable interference will not be caused to such terrestrial stations.

(e) Operations of temporary fixed earth stations shall cease immediately upon notice of harmful interference from the Commission or the affected licensee.

(f) Filing requirements concerning applications for new temporary fixed earth station facilities operating in frequency bands shared co-equally with terrestrial fixed stations.

(1) When the initial location of the temporary fixed earth station's operation is known, the applicant shall provide, as part of the Form 312 application, a frequency coordination report in accordance with §25.203 for the initial station location.

(2) When the initial location of the temporary fixed earth station's operation is not known at the time the application is filed, the applicant shall provide, as part of the Form 312 application, a statement by the applicant acknowledging its coordination responsibilities under §25.277.

[58 FR 13421, Mar. 11, 1993, as amended at 62 FR 5931, Feb. 10, 1997; 70 FR 4787, Jan. 31, 2005; 70 FR 32257, June 2, 2005]

§ 25.278   Additional coordination obligation for non-geostationary and geostationary satellite systems in frequencies allocated to the fixed-satellite service.
top

Licensees of non-geostationary satellite systems that use frequency bands allocated to the fixed-satellite service for their feeder link operations shall coordinate their operations with licensees of geostationary fixed-satellite service systems licensed by the Commission for operation in the same frequency bands. Licensees of geostationary fixed-satellite service systems in the frequency bands that are licensed to non-geostationary satellite systems for feeder link operations shall coordinate their operations with the licensees of such non-geostationary satellite systems.

[59 FR 53330, Oct. 21, 1994]

§ 25.279   Inter-satellite service.
top

(a) Any satellite communicating with other space stations may use frequencies in the inter-satellite service as indicated in §2.106 of this chapter. This does not preclude the use of other frequencies for such purposes as provided for in several service definitions, e.g., FSS. The technical details of the proposed inter-satellite link shall be provided in accordance with §25.114(c).

(b) Operating conditions. In order to ensure compatible operations with authorized users in the frequency bands to be utilized for operations in the inter-satellite service, these inter-satellite service systems must operate in accordance with the conditions specified in this section.

(1) Coordination requirements with federal government users. (i) In frequency bands allocated for use by the inter-satellite service that are also authorized for use by agencies of the federal government, the federal use of frequencies in the inter-satellite service frequency bands is under the regulatory jurisdiction of the National Telecommunications and Information Administration (NTIA).

(ii) The Commission will use its existing procedures to reach agreement with NTIA to achieve compatible operations between federal government users under the jurisdiction of NTIA and inter-satellite service systems through frequency assignment and coordination practice established by NTIA and the Interdepartment Radio Advisory Committee (IRAC). In order to facilitate such frequency assignment and coordination, applicants shall provide the Commission with sufficient information to evaluate electromagnetic compatibility with the federal government users of the spectrum, and any additional information requested by the Commission. As part of the coordination process, applicants shall show that they will not cause interference to authorized federal government users, based upon existing system information provided by the government. The frequency assignment and coordination of the satellite system shall be completed prior to grant of construction authorization.

(2) Coordination among inter-satellite service systems. Applicants for authority to establish inter-satellite service are encouraged to coordinate their proposed frequency usage with existing permittees and licensees in the inter-satellite service whose facilities could be affected by the new proposal in terms of frequency interference or restricted system capacity. All affected applicants, permittees, and licensees, shall at the direction of the Commission, cooperate fully and make every reasonable effort to resolve technical problems and conflicts that may inhibit effective and efficient use of the radio spectrum; however, the permittee or licensee being coordinated with is not obligated to suggest changes or re-engineer an applicant's proposal in cases involving conflicts.

[59 FR 53331, Oct. 21, 1994, as amended at 65 FR 59144, Oct. 4, 2000]

§ 25.280   Inclined orbit operations.
top

(a) Satellite operators may commence operation in inclined orbit mode without obtaining prior Commission authorization provided that the Commission is notified by letter within 30 days after the last north-south station keeping maneuver. The notification shall include:

(1) The operator's name;

(2) The date of commencement of inclined orbit operation;

(3) The initial inclination;

(4) The rate of change in inclination per year; and

(5) The expected end-of-life of the satellite accounting for inclined orbit operation, and the maneuvers specified under §25.283 of the Commission's rules.

(b) Licensees operating in inclined-orbit are required to:

(1) Periodically correct the satellite attitude to achieve a stationary spacecraft antenna pattern on the surface of the Earth and centered on the satellite's designated service area;

(2) Control all electrical interference to adjacent satellites, as a result of operating in an inclined orbit, to levels not to exceed that which would be caused by the satellite operating without an inclined orbit;

(3) Not claim protection in excess of the protection that would be received by the satellite network operating without an inclined orbit; and

(4) Continue to maintain the space station at the authorized longitude orbital location in the geostationary satellite arc with the appropriate east-west station-keeping tolerance.

[69 FR 54587, Sept. 9, 2004]

§ 25.281   Automatic Transmitter Identification System (ATIS).
top

All satellite uplink transmissions carrying broadband video information shall be identified through the use of an automatic transmitter identification system as specified below.

(a) Effective March 1, 1991, all satellite video uplink facilities shall be equipped with an ATIS encoder meeting the specifications set forth in paragraph (d) of this section.

(b) All video uplink facilities utilizing a transmitter manufactured on or after March 1, 1991 shall be equipped with an ATIS encoder meeting the performance specifications set forth in paragraph (d) of this section and the encoder shall be integrated into the uplink transmitter chain in a method that cannot easily be defeated.

(c) The ATIS signal shall be a separate subcarrier which is automatically activated whenever any RF emissions occur. The ATIS information shall continuously repeat.

(d) The ATIS signal shall consist of the following:

(1) A subcarrier signal generated at a frequency of 7.1 MHz ±25 KHz and injected at a level no less than −26 dB (referenced to the unmodulated carrier). The subcarrier deviation shall not exceed 25 kHz peak deviation.

(2) The protocol shall be International Morse Code keyed by a 1200 Hz ±800 Hz tone representing a mark and a message rate of 15 to 25 words per minute. The tone shall frequency modulate the subcarrier signal.

(3) The ATIS signal as a minimum shall consist of the following:

(i) The FCC assigned earth station call sign;

(ii) A telephone number providing immediate access to personnel capable of resolving ongoing interference or coordination problems with the station;

(iii) A unique ten digit serial number of random number code programmed into the ATIS device in a permanent manner such that it cannot be readily changed by the operator on duty;

(iv) Additional information may be included within the ATIS data stream provided the total message length, including ATIS, does not exceed 30 seconds.

[55 FR 21551, May 25, 1990. Redesignated at 62 FR 5932, Feb. 10, 1997]

§ 25.282   Orbit raising maneuvers.
top

A space station authorized to operate in the geostationary satellite orbit under this part is also authorized to transmit in connection with short-term, transitory maneuvers directly related to post-launch, orbit-raising maneuvers, provided that the following conditions are met:

(a) Authority is limited to those tracking, telemetry, and control frequencies in which the space station is authorized to operate once it reaches its assigned geostationary orbital location;

(b) In the event that any unacceptable interference does occur, the space station licensee shall cease operations until the issue is rectified;

(c) The space station licensee is required to accept interference from any lawfully operating satellite network or radio communication system.

[69 FR 54587, Sept. 9, 2004]

§ 25.283   End-of-life disposal.
top

(a) Geostationary orbit space stations. Unless otherwise explicitly specified in an authorization, a space station authorized to operate in the geostationary satellite orbit under this part shall be relocated, at the end of its useful life, barring catastrophic failure of satellite components, to an orbit with a perigee with an altitude of no less than:

36,021 km + (1000·CA/m)

where CR is the solar pressure radiation coefficient of the spacecraft, and A/m is the Area to mass ratio, in square meters per kilogram, of the spacecraft.

(b) A space station authorized to operate in the geostationary satellite orbit under this part may operate using its authorized tracking, telemetry and control frequencies, and outside of its assigned orbital location, for the purpose of removing the satellite from the geostationary satellite orbit at the end of its useful life, provided that the conditions of paragraph (a) of this section are met, and on the condition that the space station's tracking, telemetry and control transmissions are planned so as to avoid electrical interference to other space stations, and coordinated with any potentially affected satellite networks.

(c) All space stations. Upon completion of any relocation authorized by paragraph (b) of this section, or any relocation at end-of-life specified in an authorization, or upon a spacecraft otherwise completing its authorized mission, a space station licensee shall ensure, unless prevented by technical failures beyond its control, that all stored energy sources on board the satellite are discharged, by venting excess propellant, discharging batteries, relieving pressure vessels, and other appropriate measures.

(d) The minimum perigee requirement of paragraph (a) of this section shall not apply to space stations launched prior to March 18, 2002.

[69 FR 54588, Sept. 9, 2004]

§ 25.284   Emergency Call Center Service.
top

(a) Providers of mobile satellite service to end-user customers (part 25, subparts A–D) must provide Emergency Call Center service to the extent that they offer real-time, two way switched voice service that is interconnected with the public switched network and utilize an in-network switching facility which enables the provider to reuse frequencies and/or accomplish seamless hand-offs of subscriber calls. Emergency Call Center personnel must determine the emergency caller's phone number and location and then transfer or otherwise redirect the call to an appropriate public safety answering point. Providers of mobile satellite services that utilize earth terminals that are not capable of use while in motion are exempt from providing Emergency Call Center service for such terminals.

(b) Beginning February 11, 2005, each mobile satellite service carrier that is subject to the provisions of paragraph (a) of this section must maintain records of all 911 calls received at its emergency call center. Beginning October 15, 2005, and on each following October 15, mobile satellite service carriers providing service in the 1.6/2.4 GHz and 2 GHz bands must submit a report to the Commission regarding their call center data, current as of September 30 of that year. Beginning June 30, 2006, and on each following June 30, mobile satellite service carriers providing service in bands other than 1.6/2.4 GHz and 2 GHz must submit a report to the Commission regarding their call center data, current as of May 31 of that year. These reports must include, at a minimum, the following:

(1) The name and address of the carrier, the address of the carrier's emergency call center, and emergency call center contact information;

(2) The aggregate number of calls received by the call center each month during the relevant reporting period;

(3) An indication of how many calls received by the call center each month during the relevant reporting period required forwarding to a public safety answering point and how many did not require forwarding to a public safety answering point.

[69 FR 6582, Feb. 11, 2004, as amended at 69 FR 54042, Sept. 7, 2004]

Subpart E [Reserved]
top
Subpart F—Competitive Bidding Procedures for DARS
top

Source:  62 FR 11106, Mar. 11, 1997, unless otherwise noted.

§ 25.401   Satellite DARS applications subject to competitive bidding.
top

Mutually exclusive initial applications for DARS service licenses are subject to competitive bidding. The general competitive bidding procedures set forth in part 1, subpart Q of this chapter will apply unless otherwise provided in this part.

[67 FR 45373, July 9, 2002]

§ 25.402   [Reserved]
top
§ 25.403   Bidding application and certification procedures.
top

Submission of Supplemental Application Information. In order to be eligible to bid, each pending applicant must timely submit certain supplemental information. All supplemental information shall be filed by the applicant five days after publication of these rules in the Federal Register. The supplemental information must be certified and include the following:

(a) Applicant's name;

(b) Mailing Address (no Post Office boxes);

(c) City;

(d) State;

(e) ZIP Code;

(f) Auction Number 15;

(g) FCC Account Number;

(h) Person(s) authorized to make or withdraw a bid (list up to three individuals);

(i) Certifications and name and title of person certifying the information provided;

(j) Applicant's contact person and such person's telephone number, E-mail address and FAX number; and

(k) Signature and date.

§ 25.404   Submission of down payment and filing of long-form applications.
top

A high bidder that meets its down payment obligations in a timely manner must, within thirty (30) business days after being notified that it is a high bidder, submit an amendment to its pending application to provide the information required by §25.144.

[67 FR 45373, July 9, 2002]

§§ 25.405-25.406   [Reserved]
top
Subparts G–H [Reserved]
top
Subpart I—Equal Employment Opportunities
top
§ 25.601   Equal employment opportunity requirement.
top

Notwithstanding other EEO provisions within these rules, an entity that uses an owned or leased fixed-satellite service or direct broadcast satellite service facility (operating under this part) to provide video programming directly to the public on a subscription basis must comply with the equal employment opportunity requirements set forth in part 76, subpart E, of this chapter, if such entity exercises control (as defined in part 76, subpart E, of this chapter) over the video programming it distributes. Notwithstanding other EEO provisions within these rules, a licensee or permittee of a direct broadcast satellite station operating as a broadcaster must comply with the equal employment opportunity requirements set forth in part 73.

[67 FR 51114, Aug. 7, 2002]

Subpart J—Public Interest Obligations
top
§ 25.701   Public interest obligations.
top

(a) DBS providers are subject to the public interest obligations set forth in paragraphs (b), (c), (d), (e) and (f) of this section. As used in this section, DBS providers are any of the following:

(1) Entities licensed to operate satellites in the 12.2 to 12.7 GHz DBS frequency bands; or

(2) Entities licensed to operate satellites in the Ku band fixed satellite service and that sell or lease capacity to a video programming distributor that offers service directly to consumers providing a sufficient number of channels so that four percent of the total applicable programming channels yields a set aside of at least one channel of non commercial programming pursuant to paragraph (e) of this section, or

(3) Non U.S. licensed satellite operators in the Ku band that offer video programming directly to consumers in the United States pursuant to an earth station license issued under part 25 of this title and that offer a sufficient number of channels to consumers so that four percent of the total applicable programming channels yields a set aside of one channel of non commercial programming pursuant to paragraph (e) of this section.

(b) Political broadcasting requirements—

(1) Legally qualified candidates for public office for purposes of this section are as defined in §73.1940 of this chapter.

(2) DBS origination programming is defined as programming (exclusive of broadcast signals) carried on a DBS facility over one or more channels and subject to the exclusive control of the DBS provider.

(3) Reasonable access. (i) DBS providers must comply with section 312(a)(7) of the Communications Act of 1934, as amended, by allowing reasonable access to, or permitting purchase of reasonable amounts of time for, the use of their facilities by a legally qualified candidate for federal elective office on behalf of his or her candidacy.

(ii) Weekend access. For purposes of providing reasonable access, DBS providers shall make facilities available for use by federal candidates on the weekend before the election if the DBS provider has provided similar access to commercial advertisers during the year preceding the relevant election period. DBS providers shall not discriminate between candidates with regard to weekend access.

(4) Use of facilities; equal opportunities. DBS providers must comply with section 315 of the Communications Act of 1934, as amended, by providing equal opportunities to legally qualified candidates for DBS origination programming.

(i) General requirements. Except as otherwise indicated in §25.701(b)(3), no DBS provider is required to permit the use of its facilities by any legally qualified candidate for public office, but if a DBS provider shall permit any such candidate to use its facilities, it shall afford equal opportunities to all other candidates for that office to use such facilities. Such DBS provider shall have no power of censorship over the material broadcast by any such candidate. Appearance by a legally qualified candidate on any:

(A) Bona fide newscast;

(B) Bona fide news interview;

(C) Bona fide news documentary (if the appearance of the candidate is incidental to the presentation of the subject or subjects covered by the news documentary); or

(D) On the spot coverage of bona fide news events (including, but not limited to political conventions and activities incidental thereto) shall not be deemed to be use of a DBS provider's facility. (Section 315(a) of the Communications Act.)

(ii) Uses. As used in this section and §25.701(c), the term “use” means a candidate appearance (including by voice or picture) that is not exempt under paragraphs (b)(3)(i)(A) through (b)(3)(i)(D) of this section.

(iii) Timing of request. A request for equal opportunities must be submitted to the DBS provider within 1 week of the day on which the first prior use giving rise to the right of equal opportunities occurred: Provided, however, That where the person was not a candidate at the time of such first prior use, he or she shall submit his or her request within 1 week of the first subsequent use after he or she has become a legally qualified candidate for the office in question.

(iv) Burden of proof. A candidate requesting equal opportunities of the DBS provider or complaining of noncompliance to the Commission shall have the burden of proving that he or she and his or her opponent are legally qualified candidates for the same public office.

(v) Discrimination between candidates. In making time available to candidates for public office, no DBS provider shall make any discrimination between candidates in practices, regulations, facilities, or services for or in connection with the service rendered pursuant to this part, or make or give any preference to any candidate for public office or subject any such candidate to any prejudice or disadvantage; nor shall any DBS provider make any contract or other agreement that shall have the effect of permitting any legally qualified candidate for any public office to use DBS origination programming to the exclusion of other legally qualified candidates for the same public office.

(c) Candidate rates—(1) Charges for use of DBS facilities. The charges, if any, made for the use of any DBS facility by any person who is a legally qualified candidate for any public office in connection with his or her campaign for nomination for election, or election, to such office shall not exceed:

(i) During the 45 days preceding the date of a primary or primary runoff election and during the 60 days preceding the date of a general or special election in which such person is a candidate, the lowest unit charge of the DBS provider for the same class and amount of time for the same period.

(A) A candidate shall be charged no more per unit than the DBS provider charges its most favored commercial advertisers for the same classes and amounts of time for the same periods. Any facility practices offered to commercial advertisers that enhance the value of advertising spots must be disclosed and made available to candidates upon equal terms. Such practices include but are not limited to any discount privileges that affect the value of advertising, such as bonus spots, time sensitive make goods, preemption priorities, or any other factors that enhance the value of the announcement.

(B) The Commission recognizes non preemptible, preemptible with notice, immediately preemptible and run of schedule as distinct classes of time.

(C) DBS providers may establish and define their own reasonable classes of immediately preemptible time so long as the differences between such classes are based on one or more demonstrable benefits associated with each class and are not based solely upon price or identity of the advertiser. Such demonstrable benefits include, but are not limited to, varying levels of preemption protection, scheduling flexibility, or associated privileges, such as guaranteed time sensitive make goods. DBS providers may not use class distinctions to defeat the purpose of the lowest unit charge requirement. All classes must be fully disclosed and made available to candidates.

(D) DBS providers may establish reasonable classes of preemptible with notice time so long as they clearly define all such classes, fully disclose them and make them available to candidates.

(E) DBS providers may treat non preemptible and fixed position as distinct classes of time provided that they articulate clearly the differences between such classes, fully disclose them, and make them available to candidates.

(F) DBS providers shall not establish a separate, premium priced class of time sold only to candidates. DBS providers may sell higher priced non preemptible or fixed time to candidates if such a class of time is made available on a bona fide basis to both candidates and commercial advertisers, and provided such class is not functionally equivalent to any lower priced class of time sold to commercial advertisers.

(G) [Reserved]

(H) Lowest unit charge may be calculated on a weekly basis with respect to time that is sold on a weekly basis, such as rotations through particular programs or dayparts. DBS providers electing to calculate the lowest unit charge by such a method must include in that calculation all rates for all announcements scheduled in the rotation, including announcements aired under long term advertising contracts. DBS providers may implement rate increases during election periods only to the extent that such increases constitute “ordinary business practices,” such as seasonal program changes or changes in audience ratings.

(I) DBS providers shall review their advertising records periodically throughout the election period to determine whether compliance with this section requires that candidates receive rebates or credits. Where necessary, DBS providers shall issue such rebates or credits promptly.

(J) Unit rates charged as part of any package, whether individually negotiated or generally available to all advertisers, must be included in the lowest unit charge calculation for the same class and length of time in the same time period. A candidate cannot be required to purchase advertising in every program or daypart in a package as a condition for obtaining package unit rates.

(K) DBS providers are not required to include non cash promotional merchandising incentives in lowest unit charge calculations; provided, however, that all such incentives must be offered to candidates as part of any purchases permitted by the system. Bonus spots, however, must be included in the calculation of the lowest unit charge calculation.

(L) Make goods, defined as the rescheduling of preempted advertising, shall be provided to candidates prior to election day if a DBS provider has provided a time sensitive make good during the year preceding the pre election periods, respectively set forth in paragraph (c)(1)(i) of this section, to any commercial advertiser who purchased time in the same class.

(M) DBS providers must disclose and make available to candidates any make good policies provided to commercial advertisers. If a DBS provider places a make good for any commercial advertiser or other candidate in a more valuable program or daypart, the value of such make good must be included in the calculation of the lowest unit charge for that program or daypart.

(ii) At any time other than the respective periods set forth in paragraph (c)(1)(i) of this section, DBS providers may charge legally qualified candidates for public office no more than the charges made for comparable use of the facility by commercial advertisers. The rates, if any, charged all such candidates for the same office shall be uniform and shall not be rebated by any means, direct or indirect. A candidate shall be charged no more than the rate the DBS provider would charge for comparable commercial advertising. All discount privileges otherwise offered by a DBS provider to commercial advertisers must be disclosed and made available upon equal terms to all candidates for public office.

(2) If a DBS provider permits a candidate to use its facilities, it shall make all discount privileges offered to commercial advertisers, including the lowest unit charges for each class and length of time in the same time period and all corresponding discount privileges, available on equal terms to all candidates. This duty includes an affirmative duty to disclose to candidates information about rates, terms, conditions and all value enhancing discount privileges offered to commercial advertisers, as provided herein. DBS providers may use reasonable discretion in making the disclosure; provided, however, that the disclosure includes, at a minimum, the following information:

(i) A description and definition of each class of time available to commercial advertisers sufficiently complete enough to allow candidates to identify and understand what specific attributes differentiate each class;

(ii) A description of the lowest unit charge and related privileges (such as priorities against preemption and make goods prior to specific deadlines) for each class of time offered to commercial advertisers;

(iii) A description of the DBS provider's method of selling preemptible time based upon advertiser demand, commonly known as the “current selling level,” with the stipulation that candidates will be able to purchase at these demand generated rates in the same manner as commercial advertisers;

(iv) An approximation of the likelihood of preemption for each kind of preemptible time; and

(v) An explanation of the DBS provider's sales practices, if any, that are based on audience delivery, with the stipulation that candidates will be able to purchase this kind of time, if available to commercial advertisers.

(3) Once disclosure is made, DBS providers shall negotiate in good faith to actually sell time to candidates in accordance with the disclosure.

(d) Political file. Each DBS provider shall keep and permit public inspection of a complete and orderly political file and shall prominently disclose the physical location of the file, and the telephonic and electronic means to access the file.

(1) The political file shall contain, at a minimum:

(i) A record of all requests for DBS origination time, the disposition of those requests, and the charges made, if any, if the request is granted. The “disposition” includes the schedule of time purchased, when spots actually aired, the rates charged, and the classes of time purchased; and

(ii) A record of the free time provided if free time is provided for use by or on behalf of candidates.

(2) DBS providers shall place all records required by this section in a file available to the public as soon as possible and shall be retained for a period of four years until December 31, 2006, and thereafter for a period of two years.

(3) DBS providers shall make available, by fax, e-mail, or by mail upon telephone request, photocopies of documents in their political files and shall assist callers by answering questions about the contents of their political files. Provided, however, that if a requester prefers access by mail, the DBS provider shall pay for postage but may require individuals requesting documents to pay for photocopying. To the extent that a DBS provider places its political file on its Web site, it may refer the public to the Web site in lieu of mailing photocopies. Any material required by this section to be maintained in the political file must be made available to the public by either mailing or Web site access or both.

(e) Commercial limits in children's programs. (1) No DBS provider shall air more than 10.5 minutes of commercial matter per hour during children's programming on weekends, or more that 12 minutes of commercial matter per hour on week days.

(2) This rule shall not apply to programs aired on a broadcast television channel which the DBS provider passively carries, or to channels over which the DBS provider may not exercise editorial control, pursuant to 47 U.S.C. 335(b)(3).

(3) DBS providers airing children's programming must maintain records sufficient to verify compliance with this rule and make such records available to the public. Such records must be maintained for a period sufficient to cover the limitations period specified in 47 U.S.C. 503(b)(6)(B).

Note 1 to paragraph (e): Commercial matter means airtime sold for purposes of selling a product or service.

Note 2 to paragraph (e): For purposes of this section, children's programming refers to programs originally produced and broadcast primarily for an audience of children 12 years old and younger.

(f) Carriage obligation for noncommercial programming—

(1) Reservation requirement. DBS providers shall reserve four percent of their channel capacity exclusively for use by qualified programmers for noncommercial programming of an educational or informational nature. Channel capacity shall be determined annually by calculating, based on measurements taken on a quarterly basis, the average number of channels available for video programming on all satellites licensed to the provider during the previous year. DBS providers may use this reserved capacity for any purpose until such time as it is used for noncommercial educational or informational programming.

(2) Qualified programmer. For purposes of these rules, a qualified programmer is:

(i) A noncommercial educational broadcast station as defined in section 397(6) of the Communications Act of 1934, as amended,

(ii) A public telecommunications entity as defined in section 397(12) of the Communications Act of 1934, as amended,

(iii) An accredited nonprofit educational institution or a governmental organization engaged in the formal education of enrolled students (A publicly supported educational institution must be accredited by the appropriate state department of education; a privately controlled educational institution must be accredited by the appropriate state department of education or the recognized regional and national accrediting organizations), or

(iv) A nonprofit organization whose purposes are educational and include providing educational and instructional television material to such accredited institutions and governmental organizations.

(v) Other noncommercial entities with an educational mission.

(3) Editorial control. (i) A DBS operator will be required to make capacity available only to qualified programmers and may select among such programmers when demand exceeds the capacity of their reserved channels.

(ii) A DBS operator may not require the programmers it selects to include particular programming on its channels.

(iii) A DBS operator may not alter or censor the content of the programming provided by the qualified programmer using the channels reserved pursuant to this section.

(4) Non-commercial channel limitation. A DBS operator cannot initially select a qualified programmer to fill more than one of its reserved channels except that, after all qualified entities that have sought access have been offered access on at least one channel, a provider may allocate additional channels to qualified programmers without having to make additional efforts to secure other qualified programmers.

(5) Rates, terms and conditions. (i) In making the required reserved capacity available, DBS providers cannot charge rates that exceed costs that are directly related to making the capacity available to qualified programmers. Direct costs include only the cost of transmitting the signal to the uplink facility and uplinking the signal to the satellite.

(ii) Rates for capacity reserved under paragraph (a) of this section shall not exceed 50 percent of the direct costs as defined in this section.

(iii) Nothing in this section shall be construed to prohibit DBS providers from negotiating rates with qualified programmers that are less than 50 percent of direct costs or from paying qualified programmers for the use of their programming.

(iv) DBS providers shall reserve discrete channels and offer these to qualifying programmers at consistent times to fulfill the reservation requirement described in these rules.

(6) Public file. (i) In addition to the political file requirements in §25.701(d), each DBS provider shall keep and permit public inspection of a complete and orderly record of:

(A) Quarterly measurements of channel capacity and yearly average calculations on which it bases its four percent reservation, as well as its response to any capacity changes;

(B) A record of entities to whom noncommercial capacity is being provided, the amount of capacity being provided to each entity, the conditions under which it is being provided and the rates, if any, being paid by the entity;

(C) A record of entities that have requested capacity, disposition of those requests and reasons for the disposition.

(ii) All records required by this paragraph shall be placed in a file available to the public as soon as possible and shall be retained for a period of two years.

(7) Effective date. DBS providers are required to make channel capacity available pursuant to this section upon the effective date. Programming provided pursuant to this rule must be available to the public no later than six months after the effective date.

[69 FR 23157, Apr. 28, 2004]

Browse Previous |  Browse Next

chanrobles.com