49 C.F.R. Appendix A to Part 234—Schedule of Civil Penalties1


Title 49 - Transportation


Title 49: Transportation
PART 234—GRADE CROSSING SIGNAL SYSTEM SAFETY
Subpart D—Maintenance, Inspection, and Testing

Browse Next

Appendix A to Part 234—Schedule of Civil Penalties1
 ------------------------------------------------------------------------                                                               Willful                    Section                      Violation    violation------------------------------------------------------------------------               Subpart B_Reports234.7 Accidents involving grade crossing             $5,000       $7,500 signal failure...............................234.9 Grade crossing signal system failure            2,500        5,000 reports......................................   Subpart C_Response to Reports of Warning              System MalfunctionSec.234.101 Employee notification rules...........        2,500        5,000234.103 Timely response to report of                  2,500        5,000 malfunction..................................    234.105 Activation failure        (a) Failure to notify_train crews.....        5,000        7,500            Other railroads...................        5,000        7,500        (b) Failure to notify law enforcement         2,500        5,000         agency...............................        (c) Failure to comply with_flagging           5,000        5,000         requirements.........................            Speed restrictions................        5,000        7,500        (d) Failure to activate horn or               5,000        7,500         whistle..............................    234.106 Partial activation        (a) Failure to notify_train crews.....        5,000        7,500            Other railroads...................        5,000        7,500        (b) Failure to notify law enforcement         2,500        5,000         agency...............................        (c) Failure to comply with_flagging           5,000        7,500         requirements speed restrictions......        (d) Failure to activate horn or               5,000        7,500         whistle..............................    234.107 False activation        (a) Failure to notify_train crews.....        5,000        7,500            Other railroads...................        5,000        7,500        (b) Failure to notify law enforcement         2,500        5,000         agency...............................        (c) Failure to comply with_flagging           5,000        7,500         requirements.........................            Speed restrictions................        5,000        7,500        (d) Failure to activate horn or               5,000        7,500         whistle..............................    234.109 Recordkeeping.....................        1,000        2,000Subpart D_Maintenance, Inspection, and TestingMaintenance Standards:    234.201 Location of plans.................        1,000        2,000    234.203 Control circuits..................        1,000        2,000    234.205 Operating characteristics of              2,500        5,000     warning system apparatus.................    234.207 Adjustment, repair, or replacement        2,500        5,000     of component.............................    234.209 Interference with normal                  5,000        7,500     functioning of system....................    234.211 Locking of warning system                 1,000        2,000     apparatus................................    234.213 Grounds...........................        1,000        2,000    234.215 Standby power system..............        5,000        7,500    234.217 Flashing light units..............        1,000        2,000    234.219 Gate arm lights and light cable...        1,000        2,000    234.221 Lamp voltage......................        1,000        2,000    234.223 Gate arm..........................        1,000        2,000    234.225 Activation of warning system......        5,000        7,500    234.227 Train detection apparatus.........        2,500        5,000    234.229 Shunting sensitivity..............        2,500        5,000    234.231 Fouling wires.....................        1,000        2,000    234.233 Rail joints.......................        1,000        2,000    234.235 Insulated rail joints.............        1,000        2,000    234.237 Switch equipped with circuit              1,000        2,000     controller...............................    234.239 Tagging of wires and interference         1,000        2,000     of wires or tags with signal apparatus...    234.241 Protection of insulated wire;             1,000        2,000     splice in underground wire...............    234.243 Wire on pole line and aerial cable        1,000        2,000    234.245 Signs.............................        1,000        2,000Inspections and Tests:    234.247 Purpose of inspections and tests;         2,500        5,000     removal from service of relay or device     failing to meet test requirements........    234.249 Ground tests......................        2,500        5,000    234.251 Standby power.....................        5,000        7,500    234.253 Flashing light units and lamp             1,000        2,000     voltage..................................    234.255 Gate arm and gate mechanism.......        1,000        2,000    234.257 Warning system operation..........        2,500        5,000    234.259 Warning time......................        1,000        2,000    234.261 Highway traffic signal pre-emption        1,000        2,000    234.263 Relays............................        1,000        2,000    234.265 Timing relays and timing devices..        1,000        2,000    234.267 Insulation resistance tests, wires        2,500        5,000     in trunking and cables...................    234.269 Cut-out circuits..................        1,000        2,000    234.271 Insulated rail joints, bond wires,        2,500        5,000     and track connections....................    234.273 Results of tests..................        1,000        2,000    234.275 Processor-Based Systems...........       $5,000       $7,500------------------------------------------------------------------------\1\ A penalty may be assessed against an individual only for a willful  violation. The Administrator reserves the right to assess a penalty of  up to $27,000 for any violation where circumstances warrant. See 49  CFR Part 209, Appendix A.

[61 FR 31806, June 20, 1996, as amended at 63 FR 11623, Mar. 10, 1998; 69 FR 30595, May 28, 2004; 70 FR 11094, Mar. 7, 2005]

Browse Next

chanrobles.com