49 C.F.R. § 236.18 Software management control plan.
Title 49 - Transportation
(a) Within 6 months of June 6, 2005, each railroad shall develop and adopt a software management control plan for its signal and train control systems. A railroad commencing operations after June 6, 2005, shall adopt a software management control plan for its signal and train control systems prior to commencing operations. (b) Within 30 months of the completion of the software management control plan, each railroad shall have fully implemented such plan. (c) For purposes of this section, “software management control plan” means a plan designed to ensure that the proper and intended software version for each specific site and location is documented (mapped) and maintained through the life-cycle of the system. The plan must further describe how the proper software configuration is to be identified and confirmed in the event of replacement, modification, or disarrangement of any part of the system. [70 FR 11095, Mar. 7, 2005]
Title 49: Transportation
PART 236—RULES, STANDARDS, AND INSTRUCTIONS GOVERNING THE INSTALLATION, INSPECTION, MAINTENANCE, AND REPAIR OF SIGNAL AND TRAIN CONTROL SYSTEMS, DEVICES, AND APPLIANCES
Subpart A—Rules and Instructions: All Systems
General
§ 236.18 Software management control plan.