10 C.F.R. § 52.21 Hearings.
Title 10 - Energy
An early site permit is a partial construction permit and is therefore subject to all procedural requirements in 10 CFR part 2 which are applicable to construction permits, including the requirements for docketing in §2.101(a)(1)-(4), and the requirements for issuance of a notice of hearing in §§2.104(a), (b)(1)(iv) and (v), (b)(2) to the extent it runs parallel to (b)(1)(iv) and (v), and (b)(3), provided that the designated sections may not be construed to require that the environmental report or draft or final environmental impact statement include an assessment of the benefits of the proposed action. In the hearing, the presiding officer shall also determine whether, taking into consideration the site criteria contained in 10 CFR part 100, a reactor, or reactors, having characteristics that fall within the parameters for the site can be constructed and operated without undue risk to the health and safety of the public. All hearings conducted on applications for early site permits filed under this part are governed by the procedures contained in subparts C, G and L of part 2 of this chapter. [69 FR 2277, Jan. 14, 2004]
Title 10: Energy
PART 52—EARLY SITE PERMITS; STANDARD DESIGN CERTIFICATIONS; AND COMBINED LICENSES FOR NUCLEAR POWER PLANTS
Subpart A—Early Site Permits
§ 52.21 Hearings.