30 C.F.R. § 57.12042 Track bonding.
Title 30 - Mineral Resources
Both rails shall be bonded or welded at every joint and rails shall be crossbonded at least every 200 feet if the track serves as the return trolley circuit. When rails are moved, replaced, or broken bonds are discovered, they shall be rebonded within three working shifts.
Title 30: Mineral Resources
PART 57—SAFETY AND HEALTH STANDARDS—UNDERGROUND METAL AND NONMETAL MINES
Subpart K—Electricity
Surface and Underground
§ 57.12042 Track bonding.

