30 C.F.R. § 57.22304 Approved equipment (II-A mines).
Title 30 - Mineral Resources
(a) Cutting and drilling equipment used at a face or bench shall be approved by MSHA under the applicable requirements of 30 CFR parts 18 through 36. (b) While cutting or drilling is in progress, equipment not approved by MSHA under the applicable requirements of 30 CFR parts 18 through 36 shall remain at least 100 feet from the face or bench being mined. (c) Tests for methane shall be conducted immediately before nonapproved equipment is taken to a face or bench after blasting. (d) Mine power transformers and stationary equipment not approved by MSHA under the applicable requirements of 30 CFR parts 18 through 36 shall be installed in fresh air or downwind from an atmospheric methane monitor sensor.
Title 30: Mineral Resources
PART 57—SAFETY AND HEALTH STANDARDS—UNDERGROUND METAL AND NONMETAL MINES
Subpart T—Safety Standards for Methane in Metal and Nonmetal Mines
Equipment
§ 57.22304 Approved equipment (II-A mines).

