30 C.F.R. § 250.200   Definitions.


Title 30 - Mineral Resources


Title 30: Mineral Resources
PART 250—OIL AND GAS AND SULPHUR OPERATIONS IN THE OUTER CONTINENTAL SHELF
Subpart B—Plans and Information
General Information

Browse Next

§ 250.200   Definitions.

Acronyms and terms used in this subpart have the following meanings:

(a) Acronyms used frequently in this subpart are listed alphabetically below:

CID means Conservation Information Document

CZMA means Coastal Zone Management Act

DOCD means Development Operations Coordination Document

DPP means Development and Production Plan

DWOP means Deepwater Operations Plan

EIA means Environmental Impact Analysis

EP means Exploration Plan

MMS means Minerals Management Service

NPDES means National Pollutant Discharge Elimination System

NTL means Notice to Lessees and Operators

OCS means Outer Continental Shelf

(b) Terms used in this subpart are listed alphabetically below:

Amendment means a change you make to an EP, DPP, or DOCD that is pending before MMS for a decision (see §§250.232(d) and 250.267(d)).

Modification means a change required by the Regional Supervisor to an EP, DPP, or DOCD (see §250.233(b)(2) and §250.270(b)(2)) that is pending before MMS for a decision because the OCS plan is inconsistent with applicable requirements.

New or unusual technology means equipment or procedures that:

(1) Have not been used previously or extensively in an MMS OCS Region;

(2) Have not been used previously under the anticipated operating conditions; or

(3) Have operating characteristics that are outside the performance parameters established by this part.

Non-conventional production or completion technology includes, but is not limited to, floating production systems, tension leg platforms, spars, floating production, storage, and offloading systems, guyed towers, compliant towers, subsea manifolds, and other subsea production components that rely on a remote site or host facility for utility and well control services.

Offshore vehicle means a vehicle that is capable of being driven on ice.

Resubmitted OCS plan means an EP, DPP, or DOCD that contains changes you make to an OCS plan that MMS has disapproved (see §§250.234(b), 250.272(a), and 250.273(b)).

Revised OCS plan means an EP, DPP, or DOCD that proposes changes to an approved OCS plan, such as those in the location of a well or platform, type of drilling unit, or location of the onshore support base (see §250.283(a)).

Supplemental OCS plan means an EP, DPP, or DOCD that proposes the addition to an approved OCS plan of an activity that requires approval of an application or permit (see §250.283(b)).

Browse Next






















chanrobles.com


ChanRobles Legal Resources:

ChanRobles On-Line Bar Review

ChanRobles Internet Bar Review : www.chanroblesbar.com

ChanRobles MCLE On-line

ChanRobles Lawnet Inc. - ChanRobles MCLE On-line : www.chanroblesmcleonline.com