30 C.F.R. PART 250--OIL AND GAS AND SULPHUR OPERATIONS IN THE OUTER CONTINENTAL SHELF
TITLE 30--Mineral Resources
CHAPTER II--MINERALS MANAGEMENT SERVICE, DEPARTMENT OF THE INTERIOR
SUBCHAPTER B--OFFSHORE
PART 250--OIL AND GAS AND SULPHUR OPERATIONS IN THE OUTER CONTINENTAL SHELF
Subpart A--GENERAL
|
Authority and applicability.
|
|
|
Where can I find more information about the requirements in this part?
|
|
|
How may I appeal a decision made under MMS regulations?
|
|
|
What standards will the Director use to regulate lease operations?
|
|
|
What must I do to protect health, safety, property, and the environment?
|
|
|
What requirements must I follow for cranes and other material-handling equipment?
|
|
|
What documents must I prepare and maintain related to welding?
|
|
|
What must I include in my welding plan?
|
|
|
Who oversees operations under my welding plan?
|
|
|
What standards must my welding equipment meet?
|
|
|
What procedures must I follow when welding?
|
|
|
How must I install and operate electrical equipment?
|
|
|
How do I determine well producibility?
|
|
|
How do I determine producibility if my well is in the Gulf of Mexico?
|
|
|
How does a determination of well producibility affect royalty status?
|
|
|
Will MMS approve gas injection?
|
|
|
Will MMS approve subsurface gas storage?
|
|
|
How does injecting, storing, or treating gas affect my royalty payments?
|
|
|
What happens when the reservoir contains both original gas in place and injected gas?
|
|
|
What effect does subsurface storage have on the lease term?
|
|
|
Will MMS allow gas storage on unleased lands?
|
|
|
Will MMS approve gas injection into the cap rock containing a sulphur deposit?
|
|
|
Why does MMS conduct inspections?
|
|
|
Will MMS notify me before conducting an inspection?
|
|
|
What must I do when MMS conducts an inspection?
|
|
|
Will MMS reimburse me for my expenses related to inspections?
|
|
|
What will MMS do if my operating performance is unacceptable?
|
|
|
How will MMS determine if my operating performance is unacceptable?
|
|
|
When will I receive an oral approval?
|
|
|
May I ever use alternate procedures or equipment?
|
|
|
How do I receive approval for departures?
|
|
|
How do I designate an operator?
|
|
|
How do I designate a new operator when a designation of operator terminates?
|
|
|
How do I designate an agent or a local agent?
|
|
|
Who is responsible for fulfilling leasehold obligations?
|
|
|
How do I name facilities and wells in the Gulf of Mexico Region?
|
|
|
How do I name facilities in the Pacific Region?
|
|
|
How do I name facilities in the Alaska Region?
|
|
|
Do I have to rename an existing facility or well?
|
|
|
What identification signs must I display?
|
|
|
When will MMS grant me a right-of-use and easement, and what requirements must I meet?
|
|
|
What else must I submit with my application?
|
|
|
May I continue my right-of-use and easement after the termination of any lease on which it is situated?
|
|
|
If I have a State lease, will MMS grant me a right-of-use and easement?
|
|
|
If I have a State lease, what conditions apply for a right-of-use and easement?
|
|
|
If I have a State lease, what fees do I have to pay for a right-of-use and easement?
|
|
|
If I have a State lease, what surety bond must I have for a right-of-use and easement?
|
|
|
May operations or production be suspended?
|
|
|
What effect does suspension have on my lease?
|
|
|
How long does a suspension last?
|
|
|
How do I request a suspension?
|
|
|
When may the Regional Supervisor grant or direct an SOO or SOP?
|
|
|
When may the Regional Supervisor direct an SOO or SOP?
|
|
|
When may the Regional Supervisor grant or direct an SOP?
|
|
|
When may the Regional Supervisor grant an SOO?
|
|
|
Does a suspension affect my royalty payment?
|
|
|
What additional requirements may the Regional Supervisor order for a suspension?
|
|
|
What am I required to do to keep my lease term in effect?
|
|
|
When may the Secretary cancel my lease and when am I compensated for cancellation?
|
|
|
When may the Secretary cancel a lease at the exploration stage?
|
|
|
When may MMS or the Secretary extend or cancel a lease at the development and production stage?
|
|
|
What is the amount of compensation for lease cancellation?
|
|
|
When is there no compensation for a lease cancellation?
|
|
|
What reporting information and report forms must I submit?
|
|
|
What are MMS' incident reporting requirements?
|
|
|
What incidents must I report to MMS and when must I report them?
|
|
|
Reporting requirements for incidents requiring immediate notification.
|
|
|
Reporting requirements for incidents requiring written notification.
|
|
|
How does MMS conduct incident investigations?
|
|
|
What evacuation statistics must I submit?
|
|
|
Reports and investigations of apparent violations.
|
|
|
How must I protect archaeological resources?
|
|
|
What notification does MMS require on the production status of wells?
|
|
|
Reimbursements for reproduction and processing costs.
|
|
|
Data and information to be made available to the public or for limited inspection.
|
|
|
Documents incorporated by reference.
|
|
|
Paperwork Reduction Act statements--information collection.
|
|
Subpart B--PLANS AND INFORMATION
|
What plans and information must I submit before I conduct any activities on my lease or unit?
|
|
|
What criteria must the Exploration Plan (EP), Development and Production Plan (DPP), or Development Operations Coordination Document (DOCD) meet?
|
|
|
Where can wells be located under an EP, DPP, or DOCD?
|
|
|
How must I protect the rights of the Federal government?
|
|
|
Are there special requirements if my well affects an adjacent property?
|
|
|
How do I submit the EP, DPP, or DOCD?
|
|
|
What ancillary activities may I conduct?
|
|
|
If I conduct ancillary activities, what notices must I provide?
|
|
|
What is the MMS review process for the notice?
|
|
|
If I conduct ancillary activities, what reporting and data/information retention requirements must I satisfy?
|
|
|
What must the EP include?
|
|
|
What information must accompany the EP?
|
|
|
What general information must accompany the EP?
|
|
|
What geological and geophysical (G&G) information must accompany the EP?
|
|
|
What hydrogen sulfide (H2S) information must accompany the EP?
|
|
|
What biological, physical, and socioeconomic information must accompany the EP?
|
|
|
What solid and liquid wastes and discharges information and cooling water intake information must accompany the EP?
|
|
|
What air emissions information must accompany the EP?
|
|
|
What oil and hazardous substance spills information must accompany the EP?
|
|
|
If I propose activities in the Alaska OCS Region, what planning information must accompany the EP?
|
|
|
What environmental monitoring information must accompany the EP?
|
|
|
What lease stipulations information must accompany the EP?
|
|
|
What mitigation measures information must accompany the EP?
|
|
|
What information on support vessels, offshore vehicles, and aircraft you will use must accompany the EP?
|
|
|
What information on the onshore support facilities you will use must accompany the EP?
|
|
|
What Coastal Zone Management Act (CZMA) information must accompany the EP?
|
|
|
What environmental impact analysis (EIA) information must accompany the EP?
|
|
|
What administrative information must accompany the EP?
|
|
|
After receiving the EP, what will MMS do?
|
|
|
What actions will MMS take after the EP is deemed submitted?
|
|
|
What decisions will MMS make on the EP and within what timeframe?
|
|
|
How do I submit a modified EP or resubmit a disapproved EP, and when will MMS make a decision?
|
|
|
If a State objects to the EP's coastal zone consistency certification, what can I do?
|
|
|
What must the DPP or DOCD include?
|
|
|
What information must accompany the DPP or DOCD?
|
|
|
What general information must accompany the DPP or DOCD?
|
|
|
What geological and geophysical (G&G) information must accompany the DPP or DOCD?
|
|
|
What hydrogen sulfide (H2S) information must accompany the DPP or DOCD?
|
|
|
What mineral resource conservation information must accompany the DPP or DOCD?
|
|
|
What biological, physical, and socioeconomic information must accompany the DPP or DOCD?
|
|
|
What solid and liquid wastes and discharges information and cooling water intake information must accompany the DPP or DOCD?
|
|
|
What air emissions information must accompany the DPP or DOCD?
|
|
|
What oil and hazardous substance spills information must accompany the DPP or DOCD?
|
|
|
If I propose activities in the Alaska OCS Region, what planning information must accompany the DPP?
|
|
|
What environmental monitoring information must accompany the DPP or DOCD?
|
|
|
What lease stipulations information must accompany the DPP or DOCD?
|
|
|
What mitigation measures information must accompany the DPP or DOCD?
|
|
|
What decommissioning information must accompany the DPP or DOCD?
|
|
|
What related facilities and operations information must accompany the DPP or DOCD?
|
|
|
What information on the support vessels, offshore vehicles, and aircraft you will use must accompany the DPP or DOCD?
|
|
|
What information on the onshore support facilities you will use must accompany the DPP or DOCD?
|
|
|
What sulphur operations information must accompany the DPP or DOCD?
|
|
|
What Coastal Zone Management Act (CZMA) information must accompany the DPP or DOCD?
|
|
|
What environmental impact analysis (EIA) information must accompany the DPP or DOCD?
|
|
|
What administrative information must accompany the DPP or DOCD?
|
|
|
After receiving the DPP or DOCD, what will MMS do?
|
|
|
What actions will MMS take after the DPP or DOCD is deemed submitted?
|
|
|
How does MMS respond to recommendations?
|
|
|
How will MMS evaluate the environmental impacts of the DPP or DOCD?
|
|
|
What decisions will MMS make on the DPP or DOCD and within what timeframe?
|
|
|
For what reasons will MMS disapprove the DPP or DOCD?
|
|
|
If a State objects to the DPP's or DOCD's coastal zone consistency certification, what can I do?
|
|
|
How do I submit a modified DPP or DOCD or resubmit a disapproved DPP or DOCD?
|
|
|
How must I conduct activities under the approved EP, DPP, or DOCD?
|
|
|
What must I do to conduct activities under the approved EP, DPP, or DOCD?
|
|
|
Do I have to conduct post-approval monitoring?
|
|
|
When must I revise or supplement the approved EP, DPP, or DOCD?
|
|
|
How will MMS require revisions to the approved EP, DPP, or DOCD?
|
|
|
How do I submit revised and supplemental EPs, DPPs, and DOCDs?
|
|
|
For what development projects must I submit a DWOP?
|
|
|
When and how must I submit the Conceptual Plan?
|
|
|
What must the Conceptual Plan contain?
|
|
|
What operations require approval of the Conceptual Plan?
|
|
|
When and how must I submit the DWOP?
|
|
|
What must the DWOP contain?
|
|
|
What operations require approval of the DWOP?
|
|
|
May I combine the Conceptual Plan and the DWOP?
|
|
|
When must I revise my DWOP?
|
|
|
When and how must I submit a CID or a revision to a CID?
|
|
|
What information must a CID contain?
|
|
|
How long will MMS take to evaluate and make a decision on the CID?
|
|
|
What operations require approval of the CID?
|
|
Subpart C--POLLUTION PREVENTION AND CONTROL
|
Inspection of facilities.
|
|
|
Definitions concerning air quality.
|
|
|
Facilities described in a new or revised Exploration Plan or Development and Production Plan.
|
|
Subpart D--OIL AND GAS DRILLING OPERATIONS
|
Who is subject to the requirements of this subpart?
|
|
|
What must I do to keep wells under control?
|
|
|
When and how must I secure a well?
|
|
|
What drilling unit movements must I report?
|
|
|
What are the requirements for the crown block?
|
|
|
What are the safety requirements for diesel engines used on a drilling rig?
|
|
|
What additional safety measures must I take when I conduct drilling operations on a platform that has producing wells or has other hydrocarbon flow?
|
|
|
What tests must I conduct to determine reservoir characteristics?
|
|
|
May I use alternative procedures or equipment during drilling operations?
|
|
|
May I obtain departures from these drilling requirements?
|
|
|
How do I obtain approval to drill a well?
|
|
|
What information must I submit with my application?
|
|
|
What requirements must the location plat meet?
|
|
|
What must my description of well drilling design criteria address?
|
|
|
What must my drilling prognosis include?
|
|
|
What must my casing and cementing programs include?
|
|
|
What must I include in the diverter and BOP descriptions?
|
|
|
What must I provide if I plan to use a mobile offshore drilling unit (MODU)?
|
|
|
What additional information must I submit with my APD?
|
|
|
What well casing and cementing requirements must I meet?
|
|
|
What are the casing and cementing requirements by type of casing string?
|
|
|
When may I resume drilling after cementing?
|
|
|
What are the requirements for pressure testing casing?
|
|
|
What are the requirements for prolonged drilling operations?
|
|
|
What are the requirements for pressure testing liners?
|
|
|
What are the recordkeeping requirements for casing and liner pressure tests?
|
|
|
What are the requirements for pressure integrity tests?
|
|
|
What must I do in certain cementing and casing situations?
|
|
|
When must I install a diverter system?
|
|
|
What are the diverter design and installation requirements?
|
|
|
How do I obtain a departure to diverter design and installation requirements?
|
|
|
What are the diverter actuation and testing requirements?
|
|
|
What are the recordkeeping requirements for diverter actuations and tests?
|
|
|
What are the general requirements for BOP systems and system components?
|
|
|
What are the requirements for a surface BOP stack?
|
|
|
What are the requirements for a subsea BOP stack?
|
|
|
What associated systems and related equipment must all BOP systems include?
|
|
|
What are the choke manifold requirements?
|
|
|
What are the requirements for kelly valves, inside BOPs, and drill-string safety valves?
|
|
|
What are the BOP maintenance and inspection requirements?
|
|
|
When must I pressure test the BOP system?
|
|
|
What are the BOP pressure tests requirements?
|
|
|
What additional BOP testing requirements must I meet?
|
|
|
What are the recordkeeping requirements for BOP tests?
|
|
|
What must I do in certain situations involving BOP equipment or systems?
|
|
|
What are the general requirements for a drilling fluid program?
|
|
|
What safe practices must the drilling fluid program follow?
|
|
|
What equipment is required to monitor drilling fluids?
|
|
|
What quantities of drilling fluids are required?
|
|
|
What are the safety requirements for drilling fluid-handling areas?
|
|
|
What are the requirements for conducting a well test?
|
|
|
What are the requirements for directional and inclination surveys?
|
|
|
What are the requirements for well-control drills?
|
|
|
Who establishes field drilling rules?
|
|
|
When must I submit an Application for Permit to Modify (APM) or an End of Operations Report to MMS?
|
|
|
What records must I keep?
|
|
|
How long must I keep records?
|
|
|
What well records am I required to submit?
|
|
|
What other well records could I be required to submit?
|
|
Subpart E--OIL AND GAS WELL-COMPLETION OPERATIONS
|
Emergency shutdown system.
|
|
|
Well-completion structures on fixed platforms.
|
|
|
Diesel engine air intakes.
|
|
|
Traveling-block safety device.
|
|
|
Field well-completion rules.
|
|
|
Approval and reporting of well-completion operations.
|
|
|
Well-control fluids, equipment, and operations.
|
|
|
Blowout prevention equipment.
|
|
|
Blowout preventer system tests, inspections, and maintenance.
|
|
|
Tubing and wellhead equipment.
|
|
Subpart F--OIL AND GAS WELL-WORKOVER OPERATIONS
|
Emergency shutdown system.
|
|
|
Well-workover structures on fixed platforms.
|
|
|
Diesel engine air intakes.
|
|
|
Traveling-block safety device.
|
|
|
Field well-workover rules.
|
|
|
Approval and reporting for well-workover operations.
|
|
|
Well-control fluids, equipment, and operations.
|
|
|
Blowout prevention equipment.
|
|
|
Blowout preventer system testing, records, and drills.
|
|
|
Tubing and wellhead equipment.
|
|
Subpart G--[RESERVED]
Subpart H--OIL AND GAS PRODUCTION SAFETY SYSTEMS
|
Subsurface safety devices.
|
|
|
Design, installation, and operation of surface production-safety systems.
|
|
|
Additional production system requirements.
|
|
|
Production safety-system testing and records.
|
|
|
Safety and pollution prevention equipment quality assurance requirements.
|
|
Subpart I--PLATFORMS AND STRUCTURES
|
What general requirements apply to all platforms?
|
|
|
What industry standards must your platform meet?
|
|
|
What are the requirements for platform removal and location clearance?
|
|
|
What records must I keep?
|
|
|
What is the Platform Approval Program?
|
|
|
How do I get approval for the installation, modification, or repair of my platform?
|
|
|
What must I do to obtain approval for the proposed site of my platform?
|
|
|
Where must I locate foundation boreholes?
|
|
|
What are the minimum structural fatigue design requirements?
|
|
|
What is the Platform Verification Program?
|
|
|
Which of my facilities are subject to the Platform Verification Program?
|
|
|
If my platform is subject to the Platform Verification Program, what must I do?
|
|
|
What plans must I submit under the Platform Verification Program?
|
|
|
When must I resubmit Platform Verification Program plans?
|
|
|
What are the CVA's primary responsibilities?
|
|
|
What are the CVA's primary duties during the design phase?
|
|
|
What are the CVA's primary duties during the fabrication phase?
|
|
|
What are the CVA's primary duties during the installation phase?
|
|
|
What in-service inspection requirements must I meet?
|
|
|
What are the MMS requirements for assessment of platforms?
|
|
|
How do I analyze my platform for cumulative fatigue?
|
|
Subpart J--PIPELINES AND PIPELINE RIGHTS-OF-WAY
|
Design requirements for DOI pipelines.
|
|
|
Installation, testing, and repair requirements for DOI pipelines.
|
|
|
Safety equipment requirements for DOI pipelines.
|
|
|
Inspection requirements for DOI pipelines.
|
|
|
How must I decommission and take out of service a DOI pipeline?
|
|
|
What to include in applications.
|
|
|
Requirements to obtain pipeline right-of-way grants.
|
|
|
General requirements for pipeline right-of-way holders.
|
|
|
Bond requirements for pipeline right-of-way holders.
|
|
|
Required payments for pipeline right-of-way holders.
|
|
|
Grounds for forfeiture of pipeline right-of-way grants.
|
|
|
When pipeline right-of-way grants expire.
|
|
|
Applications for pipeline right-of-way grants.
|
|
|
Granting pipeline rights-of-way.
|
|
|
Requirements for construction under pipeline right-of-way grants.
|
|
|
Assignment of pipeline right-of-way grants.
|
|
|
Relinquishment of pipeline right-of-way grants.
|
|
Subpart K--OIL AND GAS PRODUCTION RATES
|
Definitions for production rates.
|
|
|
General requirements and classification of reservoirs.
|
|
|
Oil and gas production rates.
|
|
|
Bottomhole pressure survey.
|
|
|
Flaring or venting gas and burning liquid hydrocarbons.
|
|
|
Enhanced oil and gas recovery operations.
|
|
Subpart L--OIL AND GAS PRODUCTION MEASUREMENT, SURFACE COMMINGLING, AND SECURITY
|
Liquid hydrocarbon measurement.
|
|
Subpart M--UNITIZATION
|
What is the purpose of this subpart?
|
|
|
What are the requirements for unitization?
|
|
|
What if I have a competitive reservoir on a lease?
|
|
|
How do I apply for voluntary unitization?
|
|
|
How will MMS require unitization?
|
|
Subpart N--OUTER CONTINENTAL SHELF (OCS) CIVIL PENALTIES
|
How does MMS begin the civil penalty process?
|
|
|
What is the maximum civil penalty?
|
|
|
Which violations will MMS review for potential civil penalties?
|
|
|
When is a case file developed?
|
|
|
When will MMS notify me and provide penalty information?
|
|
|
How do I respond to the letter of notification?
|
|
|
When will I be notified of the Reviewing Officer's decision?
|
|
|
What are my appeal rights?
|
|
Subpart O--WELL CONTROL AND PRODUCTION SAFETY TRAINING
|
What is the goal of my training program?
|
|
|
Is there a transition period for complying with the regulations in this subpart?
|
|
|
What are my general responsibilities for training?
|
|
|
May I use alternative training methods?
|
|
|
Where may I get training for my employees?
|
|
|
How often must I train my employees?
|
|
|
How will MMS measure training results?
|
|
|
What must I do when MMS administers written or oral tests?
|
|
|
What must I do when MMS administers or requires hands-on, simulator, or other types of testing?
|
|
|
What will MMS do if my training program does not comply with this subpart?
|
|
Subpart P--SULPHUR OPERATIONS
|
Determination of sulphur deposit.
|
|
|
Well casing and cementing.
|
|
|
Pressure testing of casing.
|
|
|
Blowout preventer systems and system components.
|
|
|
Blowout preventer systems tests, actuations, inspections, and maintenance.
|
|
|
Supervision, surveillance, and training.
|
|
|
Application for permit to drill.
|
|
|
Sundry notices and reports on wells.
|
|
|
Well-completion and well-workover requirements.
|
|
|
Approvals and reporting of well-completion and well-workover operations.
|
|
|
Well-control fluids, equipment, and operations.
|
|
|
Blowout prevention equipment.
|
|
|
Blowout preventer system testing, records, and drills.
|
|
|
Tubing and wellhead equipment.
|
|
|
Design, installation, and operation of production systems.
|
|
|
Additional production and fuel gas system requirements.
|
|
|
Safety-system testing and records.
|
|
Subpart Q--DECOMMISSIONING ACTIVITIES
|
What do the terms ''decommissioning'', ''obstructions'', and ''facility'' mean?
|
|
|
Who must meet the decommissioning obligations in this subpart?
|
|
|
When do I accrue decommissioning obligations?
|
|
|
What are the general requirements for decommissioning?
|
|
|
When must I submit decommissioning applications and reports?
|
|
|
When must I permanently plug all wells on a lease?
|
|
|
When will MMS order me to permanently plug a well?
|
|
|
What information must I submit before I permanently plug a well or zone?
|
|
|
Must I notify MMS before I begin well plugging operations?
|
|
|
What must I accomplish with well plugs?
|
|
|
How must I permanently plug a well?
|
|
|
To what depth must I remove wellheads and casings?
|
|
|
After I permanently plug a well, what information must I submit?
|
|
|
If I temporarily abandon a well that I plan to re-enter, what must I do?
|
|
|
If I install a subsea protective device, what requirements must I meet?
|
|
|
What must I do when it is no longer necessary to maintain a well in temporary abandoned status?
|
|
|
When do I have to remove platforms and other facilities?
|
|
|
When must I submit an initial platform removal application and what must it include?
|
|
|
What information must I include in my final application to remove a platform or other facility?
|
|
|
To what depth must I remove a platform or other facility?
|
|
|
After I remove a platform or other facility, what information must I submit?
|
|
|
When might MMS approve partial structure removal or toppling in place?
|
|
|
How must I verify that the site of a permanently plugged well, removed platform, or other removed facility is clear of obstructions?
|
|
|
If I drag a trawl across a site, what requirements must I meet?
|
|
|
What other methods can I use to verify that a site is clear?
|
|
|
How do I certify that a site is clear of obstructions?
|
|
|
When may I decommission a pipeline in place?
|
|
|
How do I decommission a pipeline in place?
|
|
|
How do I remove a pipeline?
|
|
|
After I decommission a pipeline, what information must I submit?
|
|
|
When must I remove a pipeline decommissioned in place?
|
|