30 C.F.R. § 250.905 How do I get approval for the installation, modification, or repair of my platform?
Title 30 - Mineral Resources
Link to an amendment published at 71 FR 40912, July 19, 2006. The Platform Approval Program requires that you submit the environmental and structural information in the following table for your proposed project.
Title 30: Mineral Resources
PART 250—OIL AND GAS AND SULPHUR OPERATIONS IN THE OUTER CONTINENTAL SHELF
Subpart I—Platforms and Structures
Platform Approval Program
§ 250.905 How do I get approval for the installation, modification, or repair of my platform?
------------------------------------------------------------------------ Required documents Required contents Other requirements------------------------------------------------------------------------(a) Application cover letter.... Proposed structure You must submit designation, three copies. If, lease number, your facility is area, name, and subject to the block number, and Platform the type of Verficiation facility your Program (PVP), facility (e.g., you must submit drilling, four copies. production, quarters). The structure designation must be unique for the field (some fields are made up of several blocks); i.e. once a platform ``A'' has been used in the field there should never be another platform ``A'' even if the old platform ``A'' has been removed. Single well free standing caissons should be given the same designation as the well. All other structures are to be designated by letter designations.(b) Location plat............... Latitude and Your plat must be longitude drawn to a scale coordinates, of 1 inch equals Universal 2,000 feet and Mercator grid- include the system coordinates of coordinates, the lease block state plane boundary lines. coordinates in You must submit the Lambert or three Transverse Mercator Projection System, and distances in feet from the nearest block lines. These coordinates must be based on the NAD (North American Datum) 27 datum plane coordinate system.(c) Front, Side, and Plan View Platform Your drawing sizes drawings. dimensions and must not exceed orientation, 11[inch] x elevations 17[inch]. You relative to must submit three M.L.L.W. (Mean copies (four Lower Low Water), copies for PVP and pile sizes applications). and penetration.(d) Complete set of structural The approved for Your drawing sizes drawings. construction must not exceed fabrication 11[inch] x drawings should 17[inch]. You be submitted must submit one including; e.g., copy. cathodic protection systems; jacket design; pile foundations; drilling, production, and pipeline risers and riser tensioning systems; turrets and turret-and- hull interfaces; mooring and tethering systems; foundations and anchoring systems.(e) Summary of environmental A summary of the You must submit data. environmental one copy. data described in the applicable standards referenced under § 250.901(a) of this subpart and in § 250.198 of Subpart A, where the data is used in the design or analysis of the platform. Examples of relevant data include information on waves, wind, current, tides, temperature, snow and ice effects, marine growth, and water depth.(f) Summary of the engineering Loading You must submit design data. information one copy. (e.g., live, dead, environmental), structural information (e.g., design- life; material types; cathodic protection systems; design criteria; fatigue life; jacket design; deck design; production component design; pile foundations; drilling, production, and pipeline risers and riser tensioning systems; turrets and turret-and- hull interfaces; foundations, foundation pilings and templates, and anchoring systems; mooring or tethering systems; fabrication and installation guidelines), and foundation information (e.g., soil stability, design criteria).(g) Project-specific studies All studies You must submit used in the platform design or pertinent to one copy of each installation. platform design study. or installation, e.g., oceanographic and/ or soil reports including the overall site investigative report required in section 250.906.(h) Description of the loads Loads imposed by You must submit imposed on the facility. jacket; decks; one copy. production components; drilling, production, and pipeline risers, and riser tensioning systems; turrets and turret-and- hull interfaces; foundations, foundation pilings and templates, and anchoring systems; and mooring or tethering systems.(i) A copy of the in-service This plan is You must submit inspection plan. described in one copy. § 250.919..(j) Certification statement..... The following An authorized statement: ``The company design of this representative structure has must sign the been certified by statement. You a recognized must submit one classification copy. society, or a registered civil or structural engineer or equivalent, or a naval architect or marine engineer or equivalent, specializing in the design of offshore structures. The certified design and as-built plans and specifications will be on file at (give location)''.------------------------------------------------------------------------