30 C.F.R. § 250.905   How do I get approval for the installation, modification, or repair of my platform?


Title 30 - Mineral Resources


Title 30: Mineral Resources
PART 250—OIL AND GAS AND SULPHUR OPERATIONS IN THE OUTER CONTINENTAL SHELF
Subpart I—Platforms and Structures
Platform Approval Program

Browse Previous |  Browse Next

§ 250.905   How do I get approval for the installation, modification, or repair of my platform?

Link to an amendment published at 71 FR 40912, July 19, 2006.

The Platform Approval Program requires that you submit the environmental and structural information in the following table for your proposed project.

 ------------------------------------------------------------------------       Required documents          Required contents  Other requirements------------------------------------------------------------------------(a) Application cover letter....  Proposed structure  You must submit                                   designation,        three copies. If,                                   lease number,       your facility is                                   area, name, and     subject to the                                   block number, and   Platform                                   the type of         Verficiation                                   facility your       Program (PVP),                                   facility (e.g.,     you must submit                                   drilling,           four copies.                                   production,                                   quarters). The                                   structure                                   designation must                                   be unique for the                                   field (some                                   fields are made                                   up of several                                   blocks); i.e.                                   once a platform                                   ``A'' has been                                   used in the field                                   there should                                   never be another                                   platform ``A''                                   even if the old                                   platform ``A''                                   has been removed.                                   Single well free                                   standing caissons                                   should be given                                   the same                                   designation as                                   the well. All                                   other structures                                   are to be                                   designated by                                   letter                                   designations.(b) Location plat...............  Latitude and        Your plat must be                                   longitude           drawn to a scale                                   coordinates,        of 1 inch equals                                   Universal           2,000 feet and                                   Mercator grid-      include the                                   system              coordinates of                                   coordinates,        the lease block                                   state plane         boundary lines.                                   coordinates in      You must submit                                   the Lambert or      three                                   Transverse                                   Mercator                                   Projection                                   System, and                                   distances in feet                                   from the nearest                                   block lines.                                   These coordinates                                   must be based on                                   the NAD (North                                   American Datum)                                   27 datum plane                                   coordinate system.(c) Front, Side, and Plan View    Platform            Your drawing sizes drawings.                         dimensions and      must not exceed                                   orientation,        11[inch] x                                   elevations          17[inch]. You                                   relative to         must submit three                                   M.L.L.W. (Mean      copies (four                                   Lower Low Water),   copies for PVP                                   and pile sizes      applications).                                   and penetration.(d) Complete set of structural    The approved for    Your drawing sizes drawings.                         construction        must not exceed                                   fabrication         11[inch] x                                   drawings should     17[inch]. You                                   be submitted        must submit one                                   including; e.g.,    copy.                                   cathodic                                   protection                                   systems; jacket                                   design; pile                                   foundations;                                   drilling,                                   production, and                                   pipeline risers                                   and riser                                   tensioning                                   systems; turrets                                   and turret-and-                                   hull interfaces;                                   mooring and                                   tethering                                   systems;                                   foundations and                                   anchoring systems.(e) Summary of environmental      A summary of the    You must submit data.                             environmental       one copy.                                   data described in                                   the applicable                                   standards                                   referenced under                                   § 250.901(a)                                   of this subpart                                   and in §                                   250.198 of                                   Subpart A, where                                   the data is used                                   in the design or                                   analysis of the                                   platform.                                   Examples of                                   relevant data                                   include                                   information on                                   waves, wind,                                   current, tides,                                   temperature, snow                                   and ice effects,                                   marine growth,                                   and water depth.(f) Summary of the engineering    Loading             You must submit design data.                      information         one copy.                                   (e.g., live,                                   dead,                                   environmental),                                   structural                                   information                                   (e.g., design-                                   life; material                                   types; cathodic                                   protection                                   systems; design                                   criteria; fatigue                                   life; jacket                                   design; deck                                   design;                                   production                                   component design;                                   pile foundations;                                   drilling,                                   production, and                                   pipeline risers                                   and riser                                   tensioning                                   systems; turrets                                   and turret-and-                                   hull interfaces;                                   foundations,                                   foundation                                   pilings and                                   templates, and                                   anchoring                                   systems; mooring                                   or tethering                                   systems;                                   fabrication and                                   installation                                   guidelines), and                                   foundation                                   information                                   (e.g., soil                                   stability, design                                   criteria).(g) Project-specific studies      All studies         You must submit used in the platform design or    pertinent to        one copy of each installation.                     platform design     study.                                   or installation,                                   e.g.,                                   oceanographic and/                                   or soil reports                                   including the                                   overall site                                   investigative                                   report required                                   in section                                   250.906.(h) Description of the loads      Loads imposed by    You must submit imposed on the facility.          jacket; decks;      one copy.                                   production                                   components;                                   drilling,                                   production, and                                   pipeline risers,                                   and riser                                   tensioning                                   systems; turrets                                   and turret-and-                                   hull interfaces;                                   foundations,                                   foundation                                   pilings and                                   templates, and                                   anchoring                                   systems; and                                   mooring or                                   tethering systems.(i) A copy of the in-service      This plan is        You must submit inspection plan.                  described in        one copy.                                   § 250.919..(j) Certification statement.....  The following       An authorized                                   statement: ``The    company                                   design of this      representative                                   structure has       must sign the                                   been certified by   statement. You                                   a recognized        must submit one                                   classification      copy.                                   society, or a                                   registered civil                                   or structural                                   engineer or                                   equivalent, or a                                   naval architect                                   or marine                                   engineer or                                   equivalent,                                   specializing in                                   the design of                                   offshore                                   structures. The                                   certified design                                   and as-built                                   plans and                                   specifications                                   will be on file                                   at (give                                   location)''.------------------------------------------------------------------------