30 C.F.R. § 250.433 What are the diverter actuation and testing requirements?
Title 30 - Mineral Resources
When you install the diverter system, you must actuate the diverter sealing element, diverter valves, and diverter-control systems and control stations. You must also flow-test the vent lines. (a) For drilling operations with a surface wellhead configuration, you must actuate the diverter system at least once every 24-hour period after the initial test. After you have nippled up on conductor casing, you must pressure-test the diverter-sealing element and diverter valves to a minimum of 200 psi. While the diverter is installed, you must conduct subsequent pressure tests within 7 days after the previous test. (b) For floating drilling operations with a subsea BOP stack, you must actuate the diverter system within 7 days after the previous actuation. (c) You must alternate actuations and tests between control stations. [68 FR 8423, Feb. 20, 2003]
Title 30: Mineral Resources
PART 250—OIL AND GAS AND SULPHUR OPERATIONS IN THE OUTER CONTINENTAL SHELF
Subpart D—Oil and Gas Drilling Operations
Diverter System Requirements
§ 250.433 What are the diverter actuation and testing requirements?