30 C.F.R. § 250.432   How do I obtain a departure to diverter design and installation requirements?


Title 30 - Mineral Resources


Title 30: Mineral Resources
PART 250—OIL AND GAS AND SULPHUR OPERATIONS IN THE OUTER CONTINENTAL SHELF
Subpart D—Oil and Gas Drilling Operations
Diverter System Requirements

Browse Previous |  Browse Next

§ 250.432   How do I obtain a departure to diverter design and installation requirements?

The table below describes possible departures from the diverter requirements and the conditions required for each departure. To obtain one of these departures, you must have discussed the departure in your APD and received approval from the District Manager.

 ------------------------------------------------------------------------   If you want a departure to:               Then you must...------------------------------------------------------------------------(a) Use flexible hose for         Use flexible hose that has integral diverter lines instead of rigid   end couplings. pipe.(b) Use only one spool outlet     (1) Have branch lines that meet the for your diverter system.         minimum internal diameter                                   requirements; and (2) Provide                                   downwind diversion capability.(c) Use a spool with an outlet    Use a spool that has dual outlets with with an internal diameter of      an internal diameter of at least 8 less than 10 inches on a          inches. surface wellhead.(d) Use a single diverter line    Maintain an appropriate vessel heading for floating drilling             to provide for downwind diversion. operations on a dynamically positioned drillship.------------------------------------------------------------------------

[68 FR 8423, Feb. 20, 2003]

Browse Previous |  Browse Next






















chanrobles.com