30 C.F.R. § 250.428   What must I do in certain cementing and casing situations?


Title 30 - Mineral Resources


Title 30: Mineral Resources
PART 250—OIL AND GAS AND SULPHUR OPERATIONS IN THE OUTER CONTINENTAL SHELF
Subpart D—Oil and Gas Drilling Operations
Casing and Cementing Requirements

Browse Previous

§ 250.428   What must I do in certain cementing and casing situations?

The table in this section describes actions that lessees must take when certain situations occur during casing and cementing activities.

 ------------------------------------------------------------------------ If you encounter the following           situation:                       Then you must . . .------------------------------------------------------------------------(a) Have unexpected formation     Submit a revised casing program to the pressures or conditions that      District Manager for approval. warrant revising your casing design.(b) Need to increase casing       Submit those changes to the District setting depths more than 100      Manager for approval. feet true vertical depth (TVD) from the approved APD due to conditions encountered during drilling operations.(c) Have indication of            (1) Pressure test the casing shoe; (2) inadequate cement job (such as    Run a temperature survey; (3) Run a lost returns, cement              cement bond log; or (4) Use a channeling, or failure of         combination of these techniques. equipment).(d) Inadequate cement job.......  Re-cement or take other remedial                                   actions as approved by the District                                   Manager.(e) Primary cement job that did   Isolate those intervals from normal not isolate abnormal pressure     pressures by squeeze cementing before intervals.                        you complete; suspend operations; or                                   abandon the well, whichever occurs                                   first.(f) Decide to produce a well      Have at least two cemented casing that was not originally           strings (does not include liners) in contemplated for production.      the well. Note: All producing wells                                   must have at least two cemented                                   casing strings.(g) Want to drill a well without  Submit geologic data and information setting conductor casing.         to the District Manager that                                   demonstrates the absence of shallow                                   hydrocarbons or hazards. This                                   information must include logging and                                   drilling fluid-monitoring from wells                                   previously drilled within 500 feet of                                   the proposed well path down to the                                   next casing point.(h) Need to use less than         Submit information to the District required cement for the surface   Manager that demonstrates the use of casing during floating drilling   less cement is necessary. operations to provide protection from burst and collapse pressures.(i) Cement across a permafrost    Use cement that sets before it freezes zone.                             and has a low heat of hydration.(j) Leave the annulus opposite a  Fill the annulus with a liquid that permafrost zone uncemented.       has a freezing point below the                                   minimum permafrost temperature and                                   minimizes opposite a corrosion.------------------------------------------------------------------------

[68 FR 8423, Feb. 20, 2003]

Browse Previous






















chanrobles.com