30 C.F.R. § 250.451   What must I do in certain situations involving BOP equipment or systems?


Title 30 - Mineral Resources


Title 30: Mineral Resources
PART 250—OIL AND GAS AND SULPHUR OPERATIONS IN THE OUTER CONTINENTAL SHELF
Subpart D—Oil and Gas Drilling Operations
Blowout Preventer (BOP) System Requirements

Browse Previous

§ 250.451   What must I do in certain situations involving BOP equipment or systems?

The table in this section describes actions that lessees must take when certain situations occur with BOP systems during drilling activities.

 ------------------------------------------------------------------------ If you encounter the following situation:       Then you must . . .------------------------------------------------------------------------(a) BOP equipment does not hold the         Correct the problem and required pressure during a test.            retest the affected                                             equipment.(b) Need to repair or replace a surface or  First place the well in a subsea BOP system.                          safe, controlled condition                                             (e.g., before drilling out                                             a casing shoe or after                                             setting a cement plug,                                             bridge plug, or a packer).(c) Need to postpone a BOP test due to      Record the reason for well-control problems such as lost          postponing the test in the circulation, formation fluid influx, or     driller's report and stuck drill pipe.                           conduct the required BOP                                             test on the first trip out                                             of the hole.(d) BOP control station or pod that does    Suspend further drilling not function properly.                      operations until that                                             station or pod is operable.(e) Want to drill with a tapered drill-     Install two or more sets of string.                                     conventional or variable-                                             bore pipe rams in the BOP                                             stack to provide for the                                             following: two sets of rams                                             must be capable of sealing                                             around the larger-size                                             drill string and one set of                                             pipe rams must be capable                                             of sealing around the                                             smaller-size drill string.(f) Install casing rams in a BOP stack....  Test the ram bonnets before                                             running casing.(g) Want to use an annular BOP with a       Demonstrate that your well rated working pressure less than the        control procedures or the anticipated surface pressure.               anticipated well conditions                                             will not place demands                                             above its rated working                                             pressure and obtain                                             approval from the District                                             Manager.(h) Use a subsea BOP system in an ice-      Install the BOP stack in a scour area.                                 glory hole. The glory hole                                             must be deep enough to                                             ensure that the top of the                                             stack is below the deepest                                             probable ice-scour depth.------------------------------------------------------------------------

[68 FR 8423, Feb. 20, 2003]