§ 250.465   When must I submit an Application for Permit to Modify (APM) or an End of Operations Report to MMS?

Link to an amendment published at 71 FR 40911, July 19, 2006.

(a) You must submit an APM (form MMS–124) or an End of Operations Report (form MMS–125) and other materials to the Regional Supervisor as shown in the following table. You must also submit a public information copy of each form.

 ------------------------------------------------------------------------           When you               Then you must             And------------------------------------------------------------------------(1) Intend to revise your       Submit form MMS-   Receive written or drilling plan, change major     124 or request     oral approval from drilling equipment, or          oral approval.     the District Manager plugback.                                          before you begin the                                                    intended operation.                                                    If you get an                                                    approval, you must                                                    submit form MMS-124                                                    no later than the                                                    end of the 3rd                                                    business day                                                    following the oral                                                    approval. In all                                                    cases, or you must                                                    meet the additional                                                    requirements in                                                    paragraph (b) of                                                    this section.(2) Determine a well's final    Immediately        Submit a plat surface location, water         Submit a form      certified by a depth, and the rotary kelly     MMS-124.           registered land bushing elevation.                                 surveyor that meets                                                    the requirements of                                                    § 250.412.(3) Move a drilling unit from   Submit forms MMS-  Submit appropriate a wellbore before completing    124 and MMS-125    copies of the well a well.                         within 30 days     records.                                 after the                                 suspension of                                 wellbore                                 operations.------------------------------------------------------------------------

(b) If you intend to perform any of the actions specified in paragraph (a)(1) of this section, you must meet the following additional requirements:

(1) Your form MMS–124 must contain a detailed statement of the proposed work that will materially change from the approved APD;

(2) Your form MMS–124 must include the present status of the well, depth of all casing strings set to date, well depth, present production zones and productive capability, and all other information specified; and

(3) Within 30 days after completing this work, you must submit form MMS–124 with detailed information about the work to the District Manager, unless you have already provided sufficient information in a Well Activity Report, form MMS–133 (§250.468(b)).

[68 FR 8423, Feb. 20, 2003]