30 C.F.R. § 250.418 What additional information must I submit with my APD?
Title 30 - Mineral Resources
You must include the following with the APD: (a) Rated capacities of the drilling rig and major drilling equipment, if not already on file with the appropriate District office; (b) A drilling fluids program that includes the minimum quantities of drilling fluids and drilling fluid materials, including weight materials, to be kept at the site; (c) A proposed directional plot if the well is to be directionally drilled; (d) A Hydrogen Sulfide Contingency Plan (see §250.490), if applicable, and not previously submitted; (e) A welding plan (see §§250.109 to 250.113) if not previously submitted; (f) In areas subject to subfreezing conditions, evidence that the drilling equipment, BOP systems and components, diverter systems, and other associated equipment and materials are suitable for operating under such conditions; (g) A request for approval if you plan to wash out or displace some cement to facilitate casing removal upon well abandonment; and (h) Such other information as the District Manager may require. [68 FR 8423, Feb. 20, 2003]
Title 30: Mineral Resources
PART 250—OIL AND GAS AND SULPHUR OPERATIONS IN THE OUTER CONTINENTAL SHELF
Subpart D—Oil and Gas Drilling Operations
Applying for a Permit To Drill
§ 250.418 What additional information must I submit with my APD?

