30 C.F.R. § 817.122 Subsidence control: Public notice.
Title 30 - Mineral Resources
At least 6 months prior to mining, or within that period if approved by the regulatory authority, the underground mine operator shall mail a notification to all owners and occupants of surface property and structures above the underground workings. The notification shall include, at a minimum, identification of specific areas in which mining will take place, dates that specific areas will be undermined, and the location or locations where the operator's subsidence control plan may be examined. [48 FR 24652, June 1, 1983]
Title 30: Mineral Resources
PART 817—PERMANENT PROGRAM PERFORMANCE STANDARDS—UNDERGROUND MINING ACTIVITIES
§ 817.122 Subsidence control: Public notice.